12
0 10 20 30 40 50 60 70 80 90 100 0 20 40 60 80 100 120 140 160 180 200 3 CONSOLIDATION PROPERTIES SHEAR 100 Normal Pressure (kPa) Shear Stress (kPa) (mm/min) (mm) (kPa) CONSOLIDATED DRAINED SHEAR BOX TEST Horizontal Displacement at Peak Shear Stress Peak Shear Stress Effective Angle of Friction ( ') 34.5 (deg) Trial Pit : TP1 Sample Ref: 1-4 Sample Type: B Depth (m): 0.50 Width x Length (mm): 60 x 60 Sample Height (mm): 20.0 Sample Condition: Recompacted Description: Brown slightly sandy gravelly CLAY Particle Density (Assumed): 2.65 18.878 Peak strength 19.352 19.328 18.470 18.229 50 19.356 25 0.0078 2.8 26 0.0070 2.9 41 0.0079 6.7 77 22 1.95 1.60 0.6574 22 1.94 1.60 0.6599 22 1.93 1.59 0.6698 Initial Moisture Content Initial Bulk Density Initial Dry Density Initial Voids Ratio (%) (Mg/m 3 ) (Mg/m 3 ) (kPa) (mm) (mm) Normal Pressure Initial Height Consolidated Height In accordance with clause 4.5 of BS1377:Part 7:1990 SPECIMEN NUMBER Effective Cohesion (C') 8 (kPa) 1 2 PEAK STRENGTH Rate of Horizontal Displacement 0.0070 2.9 41 0.0079 6.7 77 0.0078 2.8 26 (mm/min) (mm) (kPa) Horizontal Displacement at Peak Shear Stress STRUCTURAL_SOILS_GINT_LIBRARY.GLB!L - SBOX - AUTO - TEST RESULTS | 723466_DORRINGTON_QUARRY.GPJ - v8_02 | 24/08/09 - 05:50. Compiled By Date Checked By Date Job No Contract Dorrington Quarry 24/08/09 723466 Approved Signatories: D. TROWBRIDGE A. FROST F. HAMILTON STRUCTURAL SOILS 1a Princess Street Bedminster Bristol BS3 4AG

CONSOLIDATED DRAINED SHEAR BOX TEST

  • Upload
    others

  • View
    11

  • Download
    0

Embed Size (px)

Citation preview

Page 1: CONSOLIDATED DRAINED SHEAR BOX TEST

0

10

20

30

40

50

60

70

80

90

100

0 20 40 60 80 100 120 140 160 180 200

3

CONSOLIDATION

PROPERTIES

SHEAR

100

Normal Pressure (kPa)

Shea

r St

ress

(kPa

)

(mm/min)

(mm)

(kPa)

CONSOLIDATED DRAINED SHEAR BOX TEST

Horizontal Displacement at Peak Shear Stress

Peak Shear Stress

Effective Angle of Friction ( ') 34.5 (deg)

Trial Pit : TP1 Sample Ref: 1-4 Sample Type: B Depth (m): 0.50Width x Length (mm): 60 x 60 Sample Height (mm): 20.0

Sample Condition: RecompactedDescription: Brown slightly sandy gravelly CLAY

Particle Density (Assumed): 2.65

18.878

Peak strength

19.352 19.328

18.470 18.229

50

19.356

25

0.0078

2.8

26

0.0070

2.9

41

0.0079

6.7

77

22

1.95

1.60

0.6574

22

1.94

1.60

0.6599

22

1.93

1.59

0.6698

Initial Moisture Content

Initial Bulk Density

Initial Dry Density

Initial Voids Ratio

(%)

(Mg/m3)

(Mg/m3)

(kPa)

(mm)

(mm)

Normal Pressure

Initial Height

Consolidated Height

In accordance with clause 4.5 of BS1377:Part 7:1990

SPECIMEN NUMBER

Effective Cohesion (C') 8 (kPa)

1 2

PEAK STRENGTH

Rate of Horizontal Displacement 0.0070

2.9

41

0.0079

6.7

77

0.0078

2.8

26

(mm/min)

(mm)

(kPa)

Horizontal Displacement at Peak Shear Stress

STR

UC

TUR

AL_

SO

ILS

_GIN

T_LI

BR

AR

Y.G

LB!L

- S

BO

X -

AU

TO -

TES

T R

ES

ULT

S |

7234

66_D

OR

RIN

GTO

N_Q

UA

RR

Y.G

PJ

- v8_

02 |

24/0

8/09

- 05

:50.

Compiled By Date Checked By Date

Job NoContract

Dorrington Quarry

24/08/09

723466

Approved Signatories: D. TROWBRIDGE A. FROST F. HAMILTON

STRUCTURAL SOILS1a Princess Street

BedminsterBristol

BS3 4AG

Page 2: CONSOLIDATED DRAINED SHEAR BOX TEST

0.0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

0.9

1.0

1.10 5 10 15 20 25 30 35 40

In accordance with clause 4.5 of BS1377:Part 7:1990

Root Time

Settl

emen

t (m

m)

CONSOLIDATED DRAINED SHEAR BOX - CONSOLIDATION GRAPH

KEY :

Solid Line = Specimen 1 (25 kPa), Dashed Line = Specimen 2 (50 kPa), Dotted Line = Specimen 3 (100 kPa).

Trial Pit : TP1 Sample Ref: 1-4 Sample Type: B Depth (m): 0.50

STR

UC

TUR

AL_

SO

ILS

_GIN

T_LI

BR

AR

Y.G

LB!L

- S

BO

X -

AU

TO -

CO

NS

OL

| 723

466_

DO

RR

ING

TON

_QU

AR

RY

.GP

J - v

8_02

| 24

/08/

09 -

05:5

2.

Compiled By Date Checked By Date

Job NoContract

Dorrington Quarry

24/08/09

723466

Approved Signatories: D. TROWBRIDGE A. FROST F. HAMILTON

STRUCTURAL SOILS1a Princess Street

BedminsterBristol

BS3 4AG

Page 3: CONSOLIDATED DRAINED SHEAR BOX TEST

-0.08

-0.06

-0.04

-0.02

0.00

0.02

0.04

0.06

0.08

0.10

0.12

0.14

0.160 1 2 3 4 5 6 7 8 9

Hei

ght C

hang

e (m

m)

Horizontal Displacement(mm)

KEY :

Solid Line = Specimen 1 (25 kPa), Dashed Line = Specimen 2 (50 kPa), Dotted Line = Specimen 3 (100 kPa).

Trial Pit : TP1 Sample Ref: 1-4 Sample Type: B Depth (m): 0.50

In accordance with clause 4.5 of BS1377:Part 7:1990

CONSOLIDATED DRAINED SHEAR BOXHEIGHT CHANGE vs HORIZONTAL DISPLACEMENT

STR

UC

TUR

AL_

SO

ILS

_GIN

T_LI

BR

AR

Y.G

LB!L

- S

BO

X -

AU

TO -

HE

IGH

T C

HA

NG

E V

STR

AIN

| 72

3466

_DO

RR

ING

TON

_QU

AR

RY

.GP

J - v

8_02

| 24

/08/

09 -

05:5

3.

Compiled By Date Checked By Date

Job NoContract

Dorrington Quarry

24/08/09

723466

Approved Signatories: D. TROWBRIDGE A. FROST F. HAMILTON

STRUCTURAL SOILS1a Princess Street

BedminsterBristol

BS3 4AG

Page 4: CONSOLIDATED DRAINED SHEAR BOX TEST

0

10

20

30

40

50

60

70

80

0 1 2 3 4 5 6 7 8 9

Shea

r St

ress

(kPa

)

Horizontal Displacement(mm)

KEY :

Solid Line = Specimen 1 (25 kPa), Dashed Line = Specimen 2 (50 kPa), Dotted Line = Specimen 3 (100 kPa).

Trial Pit : TP1 Sample Ref: 1-4 Sample Type: B Depth (m): 0.50

In accordance with clause 4.5 of BS1377:Part 7:1990

CONSOLIDATED DRAINED SHEAR BOXSHEAR STRESS vs HORIZONTAL DISPLACEMENT

STR

UC

TUR

AL_

SO

ILS

_GIN

T_LI

BR

AR

Y.G

LB!L

- S

BO

X -

AU

TO -

SH

EA

R S

TRE

SS

VS

STR

AIN

| 72

3466

_DO

RR

ING

TON

_QU

AR

RY

.GP

J - v

8_02

| 24

/08/

09 -

05:5

5.

Compiled By Date Checked By Date

Job NoContract

Dorrington Quarry

24/08/09

723466

Approved Signatories: D. TROWBRIDGE A. FROST F. HAMILTON

STRUCTURAL SOILS1a Princess Street

BedminsterBristol

BS3 4AG

Page 5: CONSOLIDATED DRAINED SHEAR BOX TEST

0

10

20

30

40

50

60

70

80

90

100

0 20 40 60 80 100 120 140 160 180 200

3

CONSOLIDATION

PROPERTIES

SHEAR

100

Normal Pressure (kPa)

Shea

r St

ress

(kPa

)

(mm/min)

(mm)

(kPa)

CONSOLIDATED DRAINED SHEAR BOX TEST

Horizontal Displacement at Peak Shear Stress

Peak Shear Stress

Effective Angle of Friction ( ') 32 (deg)

Trial Pit : TP2 Sample Ref: 1-4 Sample Type: B Depth (m): 1.00Width x Length (mm): 60 x 60 Sample Height (mm): 20.0

Sample Condition: RecompactedDescription: Brown slightly sandy gravelly CLAY

Particle Density (Assumed): 2.65

18.551

Peak strength

19.096 19.088

18.159 17.809

50

19.116

25

0.0053

2.8

24

0.0056

2.8

40

0.0077

3.3

71

22

1.98

1.62

0.6351

22

1.99

1.63

0.6297

22

1.98

1.62

0.6370

Initial Moisture Content

Initial Bulk Density

Initial Dry Density

Initial Voids Ratio

(%)

(Mg/m3)

(Mg/m3)

(kPa)

(mm)

(mm)

Normal Pressure

Initial Height

Consolidated Height

In accordance with clause 4.5 of BS1377:Part 7:1990

SPECIMEN NUMBER

Effective Cohesion (C') 8 (kPa)

1 2

PEAK STRENGTH

Rate of Horizontal Displacement 0.0056

2.8

40

0.0077

3.3

71

0.0053

2.8

24

(mm/min)

(mm)

(kPa)

Horizontal Displacement at Peak Shear Stress

STR

UC

TUR

AL_

SO

ILS

_GIN

T_LI

BR

AR

Y.G

LB!L

- S

BO

X -

AU

TO -

TES

T R

ES

ULT

S |

7234

66_D

OR

RIN

GTO

N_Q

UA

RR

Y.G

PJ

- v8_

02 |

24/0

8/09

- 06

:22.

Compiled By Date Checked By Date

Job NoContract

Dorrington Quarry

24/08/09

723466

Approved Signatories: D. TROWBRIDGE A. FROST F. HAMILTON

STRUCTURAL SOILS1a Princess Street

BedminsterBristol

BS3 4AG

Page 6: CONSOLIDATED DRAINED SHEAR BOX TEST

0.0

0.2

0.4

0.6

0.8

1.0

1.2

1.40 5 10 15 20 25 30 35

In accordance with clause 4.5 of BS1377:Part 7:1990

Root Time

Settl

emen

t (m

m)

CONSOLIDATED DRAINED SHEAR BOX - CONSOLIDATION GRAPH

KEY :

Solid Line = Specimen 1 (25 kPa), Dashed Line = Specimen 2 (50 kPa), Dotted Line = Specimen 3 (100 kPa).

Trial Pit : TP2 Sample Ref: 1-4 Sample Type: B Depth (m): 1.00

STR

UC

TUR

AL_

SO

ILS

_GIN

T_LI

BR

AR

Y.G

LB!L

- S

BO

X -

AU

TO -

CO

NS

OL

| 723

466_

DO

RR

ING

TON

_QU

AR

RY

.GP

J - v

8_02

| 24

/08/

09 -

06:2

3.

Compiled By Date Checked By Date

Job NoContract

Dorrington Quarry

24/08/09

723466

Approved Signatories: D. TROWBRIDGE A. FROST F. HAMILTON

STRUCTURAL SOILS1a Princess Street

BedminsterBristol

BS3 4AG

Page 7: CONSOLIDATED DRAINED SHEAR BOX TEST

-0.04

-0.02

0.00

0.02

0.04

0.06

0.08

0.10

0.12

0.14

0.16

0.18

0.200 1 2 3 4 5 6 7 8 9

Hei

ght C

hang

e (m

m)

Horizontal Displacement(mm)

KEY :

Solid Line = Specimen 1 (25 kPa), Dashed Line = Specimen 2 (50 kPa), Dotted Line = Specimen 3 (100 kPa).

Trial Pit : TP2 Sample Ref: 1-4 Sample Type: B Depth (m): 1.00

In accordance with clause 4.5 of BS1377:Part 7:1990

CONSOLIDATED DRAINED SHEAR BOXHEIGHT CHANGE vs HORIZONTAL DISPLACEMENT

STR

UC

TUR

AL_

SO

ILS

_GIN

T_LI

BR

AR

Y.G

LB!L

- S

BO

X -

AU

TO -

HE

IGH

T C

HA

NG

E V

STR

AIN

| 72

3466

_DO

RR

ING

TON

_QU

AR

RY

.GP

J - v

8_02

| 24

/08/

09 -

06:2

5.

Compiled By Date Checked By Date

Job NoContract

Dorrington Quarry

24/08/09

723466

Approved Signatories: D. TROWBRIDGE A. FROST F. HAMILTON

STRUCTURAL SOILS1a Princess Street

BedminsterBristol

BS3 4AG

Page 8: CONSOLIDATED DRAINED SHEAR BOX TEST

0

10

20

30

40

50

60

70

80

0 1 2 3 4 5 6 7 8 9

Shea

r St

ress

(kPa

)

Horizontal Displacement(mm)

KEY :

Solid Line = Specimen 1 (25 kPa), Dashed Line = Specimen 2 (50 kPa), Dotted Line = Specimen 3 (100 kPa).

Trial Pit : TP2 Sample Ref: 1-4 Sample Type: B Depth (m): 1.00

In accordance with clause 4.5 of BS1377:Part 7:1990

CONSOLIDATED DRAINED SHEAR BOXSHEAR STRESS vs HORIZONTAL DISPLACEMENT

STR

UC

TUR

AL_

SO

ILS

_GIN

T_LI

BR

AR

Y.G

LB!L

- S

BO

X -

AU

TO -

SH

EA

R S

TRE

SS

VS

STR

AIN

| 72

3466

_DO

RR

ING

TON

_QU

AR

RY

.GP

J - v

8_02

| 24

/08/

09 -

06:2

6.

Compiled By Date Checked By Date

Job NoContract

Dorrington Quarry

24/08/09

723466

Approved Signatories: D. TROWBRIDGE A. FROST F. HAMILTON

STRUCTURAL SOILS1a Princess Street

BedminsterBristol

BS3 4AG

Page 9: CONSOLIDATED DRAINED SHEAR BOX TEST

0

10

20

30

40

50

60

70

80

90

100

0 20 40 60 80 100 120 140 160 180 200

3

CONSOLIDATION

PROPERTIES

SHEAR

100

Normal Pressure (kPa)

Shea

r St

ress

(kPa

)

(mm/min)

(mm)

(kPa)

CONSOLIDATED DRAINED SHEAR BOX TEST

Horizontal Displacement at Peak Shear Stress

Peak Shear Stress

Effective Angle of Friction ( ') 32 (deg)

Width x Length (mm): 60 x 60 Sample Height (mm): 20.0

Sample Condition: RecompactedDescription: Brown slightly sandy gravelly CLAY

Particle Density (Assumed): 2.65

18.810

Peak strength

19.232 19.202

18.433 18.206

50

19.300

25

0.0051

2.0

24

0.0063

2.8

41

0.0060

3.0

71

22

1.99

1.64

0.6194

22

1.99

1.64

0.6166

22

2.00

1.64

0.6110

Initial Moisture Content

Initial Bulk Density

Initial Dry Density

Initial Voids Ratio

(%)

(Mg/m3)

(Mg/m3)

(kPa)

(mm)

(mm)

Normal Pressure

Initial Height

Consolidated Height

In accordance with clause 4.5 of BS1377:Part 7:1990

SPECIMEN NUMBER

Effective Cohesion (C') 9 (kPa)

1 2

PEAK STRENGTH

Rate of Horizontal Displacement 0.0063

2.8

41

0.0060

3.0

71

0.0051

2.0

24

(mm/min)

(mm)

(kPa)

Horizontal Displacement at Peak Shear Stress

STR

UC

TUR

AL_

SO

ILS

_GIN

T_LI

BR

AR

Y.G

LB!L

- S

BO

X -

AU

TO -

TES

T R

ES

ULT

S |

7234

66_D

OR

RIN

GTO

N_Q

UA

RR

Y.G

PJ

- v8_

02 |

24/0

8/09

- 06

:47.

Compiled By Date Checked By Date

Job NoContract

Dorrington Quarry

24/08/09

723466

Approved Signatories: D. TROWBRIDGE A. FROST F. HAMILTON

STRUCTURAL SOILS1a Princess Street

BedminsterBristol

BS3 4AG

Trial Pit : TP1-4 Sample Ref: 5 Sample Type: AMAL Depth (m): 0.50+1.00

Page 10: CONSOLIDATED DRAINED SHEAR BOX TEST

0.0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

0.9

1.00 5 10 15 20 25 30 35

In accordance with clause 4.5 of BS1377:Part 7:1990

Root Time

Settl

emen

t (m

m)

CONSOLIDATED DRAINED SHEAR BOX - CONSOLIDATION GRAPH

KEY :

Solid Line = Specimen 1 (25 kPa), Dashed Line = Specimen 2 (50 kPa), Dotted Line = Specimen 3 (100 kPa).

STR

UC

TUR

AL_

SO

ILS

_GIN

T_LI

BR

AR

Y.G

LB!L

- S

BO

X -

AU

TO -

CO

NS

OL

| 723

466_

DO

RR

ING

TON

_QU

AR

RY

.GP

J - v

8_02

| 24

/08/

09 -

06:5

1.

Compiled By Date Checked By Date

Job NoContract

Dorrington Quarry

24/08/09

723466

Approved Signatories: D. TROWBRIDGE A. FROST F. HAMILTON

STRUCTURAL SOILS1a Princess Street

BedminsterBristol

BS3 4AG

Trial Pit : TP1-4 Sample Ref: 5 Sample Type: AMAL Depth (m): 0.50+1.00

Page 11: CONSOLIDATED DRAINED SHEAR BOX TEST

-0.10

-0.08

-0.06

-0.04

-0.02

0.00

0.02

0.04

0.06

0.08

0.10

0.120 1 2 3 4 5 6 7

Hei

ght C

hang

e (m

m)

Horizontal Displacement(mm)

KEY :

Solid Line = Specimen 1 (25 kPa), Dashed Line = Specimen 2 (50 kPa), Dotted Line = Specimen 3 (100 kPa).

In accordance with clause 4.5 of BS1377:Part 7:1990

CONSOLIDATED DRAINED SHEAR BOXHEIGHT CHANGE vs HORIZONTAL DISPLACEMENT

STR

UC

TUR

AL_

SO

ILS

_GIN

T_LI

BR

AR

Y.G

LB!L

- S

BO

X -

AU

TO -

HE

IGH

T C

HA

NG

E V

STR

AIN

| 72

3466

_DO

RR

ING

TON

_QU

AR

RY

.GP

J - v

8_02

| 24

/08/

09 -

06:5

3.

Compiled By Date Checked By Date

Job NoContract

Dorrington Quarry

24/08/09

723466

Approved Signatories: D. TROWBRIDGE A. FROST F. HAMILTON

STRUCTURAL SOILS1a Princess Street

BedminsterBristol

BS3 4AG

Trial Pit : TP1-4 Sample Ref: 5 Sample Type: AMAL Depth (m): 0.50+1.00

Page 12: CONSOLIDATED DRAINED SHEAR BOX TEST

0

10

20

30

40

50

60

70

80

0 1 2 3 4 5 6 7

Shea

r St

ress

(kPa

)

Horizontal Displacement(mm)

KEY :

Solid Line = Specimen 1 (25 kPa), Dashed Line = Specimen 2 (50 kPa), Dotted Line = Specimen 3 (100 kPa).

In accordance with clause 4.5 of BS1377:Part 7:1990

CONSOLIDATED DRAINED SHEAR BOXSHEAR STRESS vs HORIZONTAL DISPLACEMENT

STR

UC

TUR

AL_

SO

ILS

_GIN

T_LI

BR

AR

Y.G

LB!L

- S

BO

X -

AU

TO -

SH

EA

R S

TRE

SS

VS

STR

AIN

| 72

3466

_DO

RR

ING

TON

_QU

AR

RY

.GP

J - v

8_02

| 24

/08/

09 -

06:5

8.

Compiled By Date Checked By Date

Job NoContract

Dorrington Quarry

24/08/09

723466

Approved Signatories: D. TROWBRIDGE A. FROST F. HAMILTON

STRUCTURAL SOILS1a Princess Street

BedminsterBristol

BS3 4AG

Trial Pit : TP1-4 Sample Ref: 5 Sample Type: AMAL Depth (m): 0.50+1.00