Task 2.2: TRTL Facility Construction, Installation, Commissioning Daniel LaBrier Oregon State University School of Nuclear Science and Engineering 2017 INTEGRATED RESEARCH PROJECT BI-ANNUAL MEETING

Construction, Installation, Commissioningresearch.engr.oregonstate.edu/treat-irp/sites/research...some ground since November 2016 Logistical Updates • Lab Re-Allocation of Space

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Construction, Installation, Commissioningresearch.engr.oregonstate.edu/treat-irp/sites/research...some ground since November 2016 Logistical Updates • Lab Re-Allocation of Space

Task 2.2: TRTL FacilityConstruction, Installation, Commissioning

Daniel LaBrier

Oregon State University

School of Nuclear Science and Engineering

2017 INTEGRATED RESEARCH PROJECT BI-ANNUAL MEETING

Page 2: Construction, Installation, Commissioningresearch.engr.oregonstate.edu/treat-irp/sites/research...some ground since November 2016 Logistical Updates • Lab Re-Allocation of Space

Background

• Project Lead: Dr. Wade Marcum• Experimental Lead: Dr. Dan LaBrier• New Assistant Professor (SR): Dr. Guillaume Mignot (0.1 FTE)• Faculty Research Assistant: Mr. Aaron Weiss (0.1 FTE)• Graduate Students: Mr. Emory Brown, Mr. Yikuan Yan• Undergraduate Student: Mr. Musa Moussaoui

May 29, 2017

1

Page 3: Construction, Installation, Commissioningresearch.engr.oregonstate.edu/treat-irp/sites/research...some ground since November 2016 Logistical Updates • Lab Re-Allocation of Space

Catching up since November…

In our last meeting…

• Updates to laboratory space

• Fabrication process in early stages

• Design still being revised

May 29, 2017

2

Page 4: Construction, Installation, Commissioningresearch.engr.oregonstate.edu/treat-irp/sites/research...some ground since November 2016 Logistical Updates • Lab Re-Allocation of Space

Timeline, milestones and deliverables

May 29, 2017

3

Qtr 1 Qtr 2 Qtr 3 Qtr 4 Qtr 1 Qtr 2 Qtr 3 Qtr 4 Qtr 1 Qtr 2 Qtr 3 Qtr 422.2

2.2.1                 Identify and review industry needs for water loop 100% 100%2.2.2                 Develop loop technical and functional requirements 100% 100%2.2.3                 Loop design + 100% 100%2.2.4                 Loop fabrication 100% 95%2.2.5                 Loop shakedown 100% 20%2.2.6                 Define flow loop ‘operations tests’ and ‘benchmark tests’ + 100% 40%2.2.7                 Operations test conduct 50% 0%2.2.8                 Synthesis of operations tests data 30% 0%2.2.9                 Benchmark test conduct 0% 0%2.2.10                 Synthesis of benchmark test data 0% 0%2.2.11                 Modeling of benchmark test with U.S. NRC code TRACE 50% 10%2.2.12                 Modeling of benchmark test with RELAP5‐3D 50% 10%2.2.13                 Comparison of experimental data & model results for problem 0% 0%2.2.14                 Benchmark level evaluation of problem 0% 0%2.2.15                 Evaluation of uncertainties in selected problem 0% 0%2.2.16                 Submission of benchmark for peer review = 0% 0%

Actual Percent Complete

Loop Thermal‐HydraulicsWater Loop

Task ID [#]Task NameYear 1 Year 2 Year 3

Proposal Percent Complete

Operations tasks still behind, but have gained some ground since November 2016

Page 5: Construction, Installation, Commissioningresearch.engr.oregonstate.edu/treat-irp/sites/research...some ground since November 2016 Logistical Updates • Lab Re-Allocation of Space

Logistical Updates

• Lab Re-Allocation of Space – mid-March 2017• Electrical Installation - late March 2017• Control Room Installed - mid-April 2017

• TRTL Delivered to OSU! - April 24 2017

• Control Systems Package (Software) • Design – March/April 2017• Troubleshooting – April 2017 – Present• Projected Final Walkthrough in late June 2017

May 29, 2017

4

Page 6: Construction, Installation, Commissioningresearch.engr.oregonstate.edu/treat-irp/sites/research...some ground since November 2016 Logistical Updates • Lab Re-Allocation of Space

Installation of Control Room

May 29, 2017

5

Page 7: Construction, Installation, Commissioningresearch.engr.oregonstate.edu/treat-irp/sites/research...some ground since November 2016 Logistical Updates • Lab Re-Allocation of Space

Installation of Control Room

May 29, 2017

6

• Mezzanine for storage (separate supports)

Page 8: Construction, Installation, Commissioningresearch.engr.oregonstate.edu/treat-irp/sites/research...some ground since November 2016 Logistical Updates • Lab Re-Allocation of Space

• 120V (w/UPS backup) & network connections installed

• Quad monitor system in place

Control Room

May 29, 2017

7

Page 9: Construction, Installation, Commissioningresearch.engr.oregonstate.edu/treat-irp/sites/research...some ground since November 2016 Logistical Updates • Lab Re-Allocation of Space

TRTL Facility – Concept to Actual

May 29, 2017

8

Page 10: Construction, Installation, Commissioningresearch.engr.oregonstate.edu/treat-irp/sites/research...some ground since November 2016 Logistical Updates • Lab Re-Allocation of Space

TRTL in Actuality

May 29, 2017

9

Page 11: Construction, Installation, Commissioningresearch.engr.oregonstate.edu/treat-irp/sites/research...some ground since November 2016 Logistical Updates • Lab Re-Allocation of Space

Loop Design (2.2.3) to Fabrication/Installation (2.2.4)

May 29, 2017

10

Suction side

Flexible high-pressure hose

Turbine flow meter

Band (pre-conditioning) heaters

Venturi flow meter

Inline heat exchanger

Instrument ‘neck’ & gas plenum

Heater and Instrument Pass-thru

Discharge side

Parker Circulating

Pump

Test section

Page 12: Construction, Installation, Commissioningresearch.engr.oregonstate.edu/treat-irp/sites/research...some ground since November 2016 Logistical Updates • Lab Re-Allocation of Space

• Pre-conditioning heaters installed today

• Pulse heater installed in the next 2 weeks

• Utilities including electrical (480/240/120V), water, and air being tied-in within 2 weeks

Current Status of Hardware

May 29, 2017

11

Page 13: Construction, Installation, Commissioningresearch.engr.oregonstate.edu/treat-irp/sites/research...some ground since November 2016 Logistical Updates • Lab Re-Allocation of Space

Shakedown (2.2.5) Activities

• Preliminary Wire Tracing for DAS and PLC complete

• Preliminary P&ID Walkthrough (Mechanical Systems/Components) complete

• Controls System in progress (40% complete)

May 29, 2017

12

Page 14: Construction, Installation, Commissioningresearch.engr.oregonstate.edu/treat-irp/sites/research...some ground since November 2016 Logistical Updates • Lab Re-Allocation of Space

Operations and Benchmarking Tests (2.2.6)

• Role of TRTL is to provide as much useful information (qualitative and quantitative) for development and implementation of water loop test section in TREAT

• Scientific questions steer the focus of engineering; experimentation provides the feedback

• Consider the ‘life cycle’ of a water loop test in TREAT

May 29, 2017

13

Page 15: Construction, Installation, Commissioningresearch.engr.oregonstate.edu/treat-irp/sites/research...some ground since November 2016 Logistical Updates • Lab Re-Allocation of Space

Conceptualizing a Water Loop Test in TREAT

• Determine the form factor

• Loading fuel and instrumentation in HFEF

• Preparing the loop for testing• Water fill• Pre-emptive pressurization• Gas Fill/Purge

May 29, 2017

14

Page 16: Construction, Installation, Commissioningresearch.engr.oregonstate.edu/treat-irp/sites/research...some ground since November 2016 Logistical Updates • Lab Re-Allocation of Space

Conceptualizing a Water Loop Test in TREAT

May 29, 2017

15

Page 17: Construction, Installation, Commissioningresearch.engr.oregonstate.edu/treat-irp/sites/research...some ground since November 2016 Logistical Updates • Lab Re-Allocation of Space

Operations and Benchmarking Tests

• TRTL can emphasize: • Optimization of test prep procedures• Instrumentation and equipment

loading/unloading/performance• Various cladding types (SS, Zirc-4, etc.)

• Benchmarking tests are a natural extension/continuation from operations tests

May 29, 2017

16

Page 18: Construction, Installation, Commissioningresearch.engr.oregonstate.edu/treat-irp/sites/research...some ground since November 2016 Logistical Updates • Lab Re-Allocation of Space

Benchmarking Tests

• Three types of benchmark tests:• Steady-state, no external heat added• Steady-state, additional heat source• Unsteady, heated

• Call on parameter space defined in previous TREAT/RIA tests for boundaries on energy deposition

• Gradual ramp tests for the pulse heater

May 29, 2017

17

Page 19: Construction, Installation, Commissioningresearch.engr.oregonstate.edu/treat-irp/sites/research...some ground since November 2016 Logistical Updates • Lab Re-Allocation of Space

Benchmarking Tests• TREAT capabilities are still being

determined, but historically produced pulses for sodium loop tests

• Bridging the gap between TREAT and LWR RIA (pulse) conditions

• Based on guidance from INL and lit review for pulse and energy deposition ranges, our target ramp duration is 25-50 ms for high energy pulses (> 100 kW)

• Investigate longer ramp durations at lower energies

May 29, 2017

180 50 100 150 200 250 300 350 400 450 500

Time [ms]

0

10

20

30

40

50

60

70

80

90

100TRTL Power Ramp Rates

100.00 [kW]50.00 [kW]25.00 [kW]10.00 [kW]5.00 [kW]

Peak Power

0 5 10 15 20 25 30 35 40 45 50

Time [ms]

0

50

100

150

200

250

300

350

400

450

500TRTL Power Ramp Rates

500.00 [kW]250.00 [kW]166.67 [kW]125.00 [kW]100.00 [kW]

Peak Power

Page 20: Construction, Installation, Commissioningresearch.engr.oregonstate.edu/treat-irp/sites/research...some ground since November 2016 Logistical Updates • Lab Re-Allocation of Space

Next Steps

• 30-60 days• As-built drawings (2.2.11 & 2.2.12)• Pre-Conditioning Pulse Heater installation• Controls System commissioning• Complete Operations Testing• Procure Cladding Sleeves for Benchmarking

• 90 days• Analysis and Evaluation of Operations Testing• Begin Benchmarking Testing• Progress on TRACE and R5-3D Models

• 180 days• Completion ‘in sight’ for Benchmarking Testing,

TRACE and R5-3D Models• Analysis of Completed (to date) Benchmarking

May 29, 2017

19

Page 21: Construction, Installation, Commissioningresearch.engr.oregonstate.edu/treat-irp/sites/research...some ground since November 2016 Logistical Updates • Lab Re-Allocation of Space

Topics for Discussion

• What parameters/techniques should TRTL operations tests emphasize?

• How well can TRTL align with previous transient modes?• Temperature limited• Shaped transients• Extended power transients

• Limiting scope of benchmarking tests to take advantage of previous TREAT campaigns (e.g. limited access to TREXR)

May 29, 2017

20

Page 22: Construction, Installation, Commissioningresearch.engr.oregonstate.edu/treat-irp/sites/research...some ground since November 2016 Logistical Updates • Lab Re-Allocation of Space

Thank you!

May 29, 2017

21

Page 23: Construction, Installation, Commissioningresearch.engr.oregonstate.edu/treat-irp/sites/research...some ground since November 2016 Logistical Updates • Lab Re-Allocation of Space

Backup Photos of Loop

May 29, 2017

22