CONSTRUCTION MEASUREMENT III: SBQ 3314
AIR CONDITIONING INSTALLATIONS : PACKAGE/CENTRALSYSTEM
DR. SARAJUL FIKRI MOHAMEDDEPARTMENT OF QUANTITY SURVEYING
UNIVERSITI TEKNOLOGI MALAYSIA
8/2/2019 Construction Measurement III Air Conditioning Central System
2/131
Pre-cast and Pre-stressed ConcreteCIVIL WORKS
Electrical Installations
Fire Fighting Installations
Air Conditioning Installations
Window/Split Package/Central
Landscape Works
Single Phase Three Phase
Gas Installations
ELECTRICAL WORKS
MECHANICAL WORKS
LANDSCAPE WORKS
Hard Landscape Soft Landscape
MAIN COURSE COMPONENTS
8/2/2019 Construction Measurement III Air Conditioning Central System
3/131
1. Air conditioning installations: main components of package & central system
2. SMM2 measurement rules for air conditioning installations
3. Taking off list for air conditioning installations
4. Heading and description.
5. Case study: WATER COOLED CHILLER SYSTEM
6. Studio work: AIR CONDITIONING SYSTEM: CENTRAL SYSTEM FORCADANGAN MEMBINA DAN MENYIAPKAN KOMPLEKS PERNIAGAANLARKIN MALL.
TABLE OF CONTENTS
8/2/2019 Construction Measurement III Air Conditioning Central System
4/131
Main components
8/2/2019 Construction Measurement III Air Conditioning Central System
5/131
PREAMBLES
EQUIPMENT: CONDENSING UNIT & FAN COIL UNIT ETC
DUCTING: SUPPLY DUCT & RETURN DUCT
DUCTING FITTING
INSULATION TO DUCTWORK/PIPE
DUCT WORK SUPPORT
PIPEWORK
EQUIPMENT/DIFFUSER/GRILLE/DAMPER
BUILDERS WORK
ELECTRICAL SYSTEM
TESTING
AIR CONDITIONING SYSTEM
8/2/2019 Construction Measurement III Air Conditioning Central System
6/131
AIR CONDITIONING SYSTEM
UNIT SYSTEM PACKAGE SYSTEM CENTRAL SYSTEM
WINDOW UNITSPLIT UNIT
UNIT KEMAS SIAPPENYEJUKAN
UDARA
UNIT KEMAS SIAPKESELURUHAN
UNIT KEMAS SIAPKESELURUHAN
UNIT KEMAS SIAPPENYEJUKAN
UDARA
SISTEM AIRDISEJUKKAN
SISTEM LOGIPUSAT
AIR CONDITIONING SYSTEM
8/2/2019 Construction Measurement III Air Conditioning Central System
7/131
7
PACKAGE SYSTEM
8/2/2019 Construction Measurement III Air Conditioning Central System
8/131
8
COOLING TOWER Menara penyejuk
CENTRAL SYSTEM
8/2/2019 Construction Measurement III Air Conditioning Central System
9/131
9
Sistem ini digunakan untuk sistem pendinginan bangunan yangmelibatkan beban penyejukan 15 TR atau keupayaan kendalian udarasebanyak 6000 CFM ke atas. Memerlukan ruang-ruang khas di dalambangunan untuk menempatkan peralatannya
Dibahagikan kepada 2 jenis iaitu:
a) Sistem Logi Pengendalian Pusat
b) Sistem Logi Pengendalian Air Sejuk/Water Chilled System
SISTEM LOGI
CENTRAL SYSTEM
8/2/2019 Construction Measurement III Air Conditioning Central System
10/131
DUCTING SYSTEM
AIR HANDLING UNIT
8/2/2019 Construction Measurement III Air Conditioning Central System
11/131
A/C CHILLED WATER EXPANSION TANK
CHILLED WATER PUMP
AIR COOLED CHILLERS
8/2/2019 Construction Measurement III Air Conditioning Central System
12/131
12
Komponen-komponen asas diletak dalam satu ruang logi mekanikalpenyaman udara yang mengendalikan sebahagian besar Saikel Refrigerationdan penyejukan udara.
Selain itu ia memerlukan satu Unit Pengental penyejukan udara dan Menara
Penyejuk di mana ia boleh mendapat pengudaraan yang baik. Kedua-dua unitini disambung melalui paip ulang-alik refrigerant atau air ikut sistem yangdigunakan.
Udara bekal didatangkan dari Logi Pusat dan diagihkan melalui saluran danbaur ke ruang-ruang yang didinginkan. Udara boleh diagihkan secara
mendatar melalui salur dalam ruang siling gantung/ bawah lantai ditinggikan.
Agihan mendatar boleh dibuat melalui liang-liang pugak kemudahan.
SISTEM LOGI PENGENDALIAN PUSAT
8/2/2019 Construction Measurement III Air Conditioning Central System
13/131
13
8/2/2019 Construction Measurement III Air Conditioning Central System
14/131
14
8/2/2019 Construction Measurement III Air Conditioning Central System
15/131
15
COOLING TOWER AND CONCRETE PLINTH
RETURN AND SUPPLY REFRGERATION PIPE
8/2/2019 Construction Measurement III Air Conditioning Central System
16/131
16
WATER CHILLER UNIT
SUPPLY & RETURN CHILLED WATER PIPE
8/2/2019 Construction Measurement III Air Conditioning Central System
17/131
17
AIR HANDLING UNIT AND DIFFUSER
REGISTER AND DIFFUSER
8/2/2019 Construction Measurement III Air Conditioning Central System
18/131
18
COOLING TOWER
8/2/2019 Construction Measurement III Air Conditioning Central System
19/131
19
CAPACITY
COOLING TOWER
8/2/2019 Construction Measurement III Air Conditioning Central System
20/131
20
Ciri utama sistem ini adalah penggunaan air yang disejukkan dari SaikelRefrigerant untuk menyejukkan udara dalam Saikel Udara.
Sistem ini mengadakan media air sejuk di satu Logi Pendinginan dengan tujuanuntuk diagihkan kebeberapa Unit Pengendalian Udara ( A.H.U ).
Sistem ini mempunyai 4 pusingan berasingan untuk mengalih haba dari dalamruang didinginkan ke udara luar bangunan.
Pertama- Saikel Udara mengalih haba dari ruang didinginkan ke A.H.U melalui mediaudara.Kedua- Pusingan Air mengalih haba dari alat A.H.U ke Lingkaran Pengental di LogiPendinginan melalui media air.Ketiga- Saikel Refrigerant mengalih haba dari Lingkaran Pengental ke LingkaranPengental dalam alat Chiller di Logi Pendinginan.Keempat- Pusingan Air mengalih haba dari Lingkaran Pengental ke Menara Penyejukmelalui media air
SISTEM LOGI AIR SEJUK
8/2/2019 Construction Measurement III Air Conditioning Central System
21/131
21
AIR HANDLING UNIT
8/2/2019 Construction Measurement III Air Conditioning Central System
22/131
22
AIR CHILLED SYSTEM
AIR HANDLING UNIT
8/2/2019 Construction Measurement III Air Conditioning Central System
23/131
23
DUCTWORK, DUCT FITTING ANDCOMPONENTS
SISTEM PERALATAN PENGAGIHAN UDARA
8/2/2019 Construction Measurement III Air Conditioning Central System
24/131
24
DUCTWORK COMPONENTS
8/2/2019 Construction Measurement III Air Conditioning Central System
25/131
25
8/2/2019 Construction Measurement III Air Conditioning Central System
26/131
26
ALL ROUND METAL DUCT WITH ROUND METAL BRANCH DUCTS
DUCTWORK TYPES
8/2/2019 Construction Measurement III Air Conditioning Central System
27/131
27
METAL TRUNK LINES WITH ROUND FIBERGLASS BRANCH DUCT
DUCTWORK TYPES
8/2/2019 Construction Measurement III Air Conditioning Central System
28/131
28
DUCTING INSTALLATIONS
8/2/2019 Construction Measurement III Air Conditioning Central System
29/131
29
8/2/2019 Construction Measurement III Air Conditioning Central System
30/131
30
Pre-insulated aluminium sandwich panels with an extra aluminium foil covering
and internal closed-cell insulation
DUCTING INSULATION
8/2/2019 Construction Measurement III Air Conditioning Central System
31/131
31
8/2/2019 Construction Measurement III Air Conditioning Central System
32/131
32
MAIN DUCT
8/2/2019 Construction Measurement III Air Conditioning Central System
33/131
33
BRANCH DUCT
8/2/2019 Construction Measurement III Air Conditioning Central System
34/131
34
DUCT COMPONENT: ELBOW
8/2/2019 Construction Measurement III Air Conditioning Central System
35/131
35
INSPECTION HOLE
8/2/2019 Construction Measurement III Air Conditioning Central System
36/131
36
DIFFUSER
8/2/2019 Construction Measurement III Air Conditioning Central System
37/131
37
REGISTER
8/2/2019 Construction Measurement III Air Conditioning Central System
38/131
8/2/2019 Construction Measurement III Air Conditioning Central System
39/131
39
FABRICATION METHOD
8/2/2019 Construction Measurement III Air Conditioning Central System
40/131
40
DUCTWORK SUPPORT
8/2/2019 Construction Measurement III Air Conditioning Central System
41/131
SMM2 measurement
rules
8/2/2019 Construction Measurement III Air Conditioning Central System
42/131
42
AIR CONDITIONING ANDVENTILATION SYSTEM
MEASUREMENT RULES
SECTION QPLUMBING AND MECHANICALENGINEERING INSTALLATIONS
8/2/2019 Construction Measurement III Air Conditioning Central System
43/131
43
DUCTWORKQ.14 DUCTING AND FITTING
1. Ducting (measured over all pipe fittings, short running lengths andbranches) shall be given in metres stating the type and the normalsize. Joints in the running length shall be given in the descriptionstating the method of jointing.
2. Lining ducting internally meter separately stating the typeand the thickness of the lining material and internal size ofducting.
3. Flexible ducting and extensible ducting (measured as fullyextended)- described and enumerated.
MEASUREMENT RULES
8/2/2019 Construction Measurement III Air Conditioning Central System
44/131
44
DUCTWORKQ.14 DUCTING AND FITTING
4. Curved ducting - described and enumerated-stating mean radius.Curved rectangular ducting stated whether shaped to curved onthe wider or narrow side.
5. Duct fitting in numbers extra over the duct in which they occur.Cutting and forming openings and jointing ducting to fitting shallbe deemed to be included. Fitting involving a change of directionof ducting- shall be described.
MEASUREMENT RULES
8/2/2019 Construction Measurement III Air Conditioning Central System
45/131
45
Elbow, Reducer And Branch
Shall be described and enumerated as extra over in which theyoccur. (Q.14.5)
6. Providing materials, heat, bolts, nuts, washers and everything elsenecessary for making joints in ducting shall be deemed to beincluded with the items. (Q.14.6)
MEASUREMENT RULES
8/2/2019 Construction Measurement III Air Conditioning Central System
46/131
46
DUCTWORKQ.15 SPECIAL CONNECTION, ETC
1. Special connection and special joints in ducting shall beenumerated separately (except where given in the description ofother enumerated item) stating size and kind of ducting concernedand method of jointing.
2. Classification :a. Connection between ducting of differing materials.b. Connection between ducting and equipment stating the nature
of the equipment.c. Isolated joints which differ from those given in the description of
the ducting.d. Flexible connection between ducting and plant.
MEASUREMENT RULES
8/2/2019 Construction Measurement III Air Conditioning Central System
47/131
47
DUCTWORKQ.15 SPECIAL CONNECTION, ETC
3. Ducting turn and splittershall be enumeratedseparately statingthe type and internal size of ducting.
4. Nozzle outlets, test holes and covers and access door shall beenumeratedseparately stating the size and method of jointing andmaterial and thickness or gauge of the ducting and lining.
5. Cowls, terminals, intake louvres and like shall beenumeratedseparately stating the size and type, the size of ducting.
MEASUREMENT RULES
8/2/2019 Construction Measurement III Air Conditioning Central System
48/131
48
Q.16 DUCTWORK SUPPORTS1. Components for supporting ductworks shall beenumerated- size
and type of the components and size of ducting.
Stating the:- Size,type of the components
Size of the ducting
Classification shall be as follows:- Components for supporting single runs of ducting
Ditto multiple runs of ducting
Combined components for supporting ducting and pipework.
MEASUREMENT RULES
8/2/2019 Construction Measurement III Air Conditioning Central System
49/131
49Hanger
HANGER
8/2/2019 Construction Measurement III Air Conditioning Central System
50/131
50
Q.17 ALTERNATIVE METHOD OF MEASUREMENT
1. ClauseQ. 18provide alternative method of measurement.
MEASUREMENT RULES
8/2/2019 Construction Measurement III Air Conditioning Central System
51/131
51
Q.18 DUCTING AND DUCTING FITTING
1. Measured in metres (over all ducting fittings,short lengths andbranches) stating the type and size.(Q.18.1)
2. Joints and method of the jointing shall be given in the description.
3. Flexible / extensible ducting shall be described andenumerated.(Q.18.3)
4. Curved ducting shall be so described and enumerated stating themean radius.(Q.18.4)
MEASUREMENT RULES
8/2/2019 Construction Measurement III Air Conditioning Central System
52/131
52
EQUIPMENT AND ANCILLARIES
Q.19 GENERALLY
1. Unless otherwise stated, equipment such as boiler, generators,cylinder, pumps, cooling, air handling unit, fans, refrigeratorequipment etcin numbers ( Q.19.1)
Condenser Unit And Fan Coil, etc.
Measured in nos (Q.19.1)
2. Packaged item shall be described in conjunction with a
manufacturers detailed specification (Q.19.2)
MEASUREMENT RULES
8/2/2019 Construction Measurement III Air Conditioning Central System
53/131
53
EQUIPMENT AND ANCILLARIES
Q.19 GENERALLY
3. Any limiting dimensions on the size shall be given. (Q.19.3)
4. Electrical connection shall be given in accordance withsection R . (Q.19.4) Section R.
5. Platework, fuel hoppers dan supporting steelwork -accordance Section P.
MEASUREMENT RULES
8/2/2019 Construction Measurement III Air Conditioning Central System
54/131
54
EQUIPMENT
FIRE DAMPER
Measured in nos. (Q.19.1)
The related specification shall be described
MEASUREMENT RULES
8/2/2019 Construction Measurement III Air Conditioning Central System
55/131
55
EQUIPMENT
AIR DIFFUSER & AIR GRILLE
Measured in nos.
Stating the type, size and method of fixing.
Described accordance with the details drawing and specificationgiven.
MEASUREMENT RULES
8/2/2019 Construction Measurement III Air Conditioning Central System
56/131
56
AIR DIFFUSER
8/2/2019 Construction Measurement III Air Conditioning Central System
57/131
57
8/2/2019 Construction Measurement III Air Conditioning Central System
58/131
58
Measurement rules
8/2/2019 Construction Measurement III Air Conditioning Central System
59/131
Measurement rules
AIR CONDITIONING INSTALLATIONS
8/2/2019 Construction Measurement III Air Conditioning Central System
60/131
60
GENERALLYQ.1 INFORMATION
AIR CONDITIONING SYSTEM AND INSTALLATION
Generally
Q.1. Information1 Particulars of the following shall be given :
a) Regulation, etc.b) Kind and quality of material.c) Gauge, thickness or substance of material.d) Any tests, etc.
MEASUREMENT RULES
8/2/2019 Construction Measurement III Air Conditioning Central System
61/131
61
Q.1.2 Assembling and jointing together the component parts of compositeunits and providing any necessary connecting flanges and jointingmaterials shall be deemed to be included with the items concerned.Where composite units are supplied by the Employer, particulars shallbe given of the assembly work involved.
Q.1.3 Patterns, moulds, templets and the like shall be deemed to be includedwith the items.
MEASUREMENT RULES
8/2/2019 Construction Measurement III Air Conditioning Central System
62/131
62
WATER COOLED CHILLER UNIT
Install and complete the water cooled chiller unit (minimumcapacity 186 tonne) c/w microprocessor system, concrete plinth (ifnecessary), vibration isolators and other assecories. (No)
CHILLED WATER PUMPSET
Horizontal split casing chilled water pumpset (minimumrequirement 608 igpm, 120 ft) c/w motor, concrete plinth (ifnecessary), vibration isolators and other assecories. (No)
BILL OF QUANTITIES: EQUIPMENT
8/2/2019 Construction Measurement III Air Conditioning Central System
63/131
63
BILL OF QUANTITIES: EQUIPMENT
WATER EXPANSION TANK
200 gallons chilled water expansion tank c/w concrete plinth (ifnecessary) and other assecories. (No)
AIR HANDLING UNITInstall and complete the 366 000 min btu/hr air handling unit c/wthermostat, evaporator blower unit, fan, motor, filters, concreteplinth (if necessary), vibration isolators and other assecories. (No)
8/2/2019 Construction Measurement III Air Conditioning Central System
64/131
64
Q.1.4 Priming and painting off-site and proprietary finishes or surfacetreatment applied as part of the production process shall bedescribed stating whether applied before or after fabrication orassembly.
Q.1.5 Except where otherwise stated the method of fixing and the provisionof nails, bolts, nuts, holes, screws, plugs, shot-fired pins and the likeshall be given in the description of the work.
MEASUREMENT RULES
8/2/2019 Construction Measurement III Air Conditioning Central System
65/131
65
Q.1.6 The nature of the background to which work is to be fixed shall begiven in the description. Any necessary drilling of the backgroundsshall be deemed to be included. Backgrounds shall be classified asfollows :
a) Building-board which shall be deemed to includehardboard, compressed cement sheet, plasterboard, fibreboard andsimilar materials which do not grip woodscrews.
b) Etc
MEASUREMENT RULES
S S
8/2/2019 Construction Measurement III Air Conditioning Central System
66/131
66
Q.1.6 The nature of the background.
b) Timber which shall be deemed to include softwood,hardwood, blockboard, plywood and similar materials which will gripwood-screws when a lead-hole has been drilled.
c) Brickwork, concrete or stone work
d) Plain metal
e) Glass
MEASUREMENT RULES
MEASUREMENT RULES
8/2/2019 Construction Measurement III Air Conditioning Central System
67/131
67
Q.1.7. Temporary work shall be so described. Removing temporarywork and making good after shall be deemed to be includedwith the item.
1.8. Connecting to existing services shall be described
MEASUREMENT RULES
MEASUREMENT RULES
8/2/2019 Construction Measurement III Air Conditioning Central System
68/131
68
GENERALLY
Q.2. CLASSIFICATION OF WORKQ.2.1 Work together with its metalwork, supports and the like
(unless associated with more than one installation) shall be
classified as follows and given under an appropriateheading :
t) Air handling installation, identifying whether ventilationsupply, ventilation extract, ventilation with heating (airheated centrally), ventilation with heating (air heated
locally),air conditioning (air heated centrally), airconditioning (air heated locally), or foul air extract.
MEASUREMENT RULES
MEASUREMENT RULES
8/2/2019 Construction Measurement III Air Conditioning Central System
69/131
69
Q.3. LOCATION OF WORK
Location of works :
a. Internally
b. Externallyc. In plant rooms
MEASUREMENT RULES
MEASUREMENT RULES
8/2/2019 Construction Measurement III Air Conditioning Central System
70/131
70
PIPE WORKSQ.7 GENERALLY1. Purpose-made pipes and purpose-made pipe fittings shall be
described.
2. Pipes and pipe fittings which are wrapped, coated or lined bythe manufacturer shall be so described stating the type oftreatment.
3. Pipework required to be temporarily fixed in position,dismantled for chromium-plating or other special finishing andsubsequently refixed shall be so described.
MEASUREMENT RULES
MEASUREMENT RULES
8/2/2019 Construction Measurement III Air Conditioning Central System
71/131
71
PIPEWORKS
a)Shall be supplied and installed:
- all necessary interconnecting pipeworks between item of
equipment- all vents and exhausts
- all necessary pipe, valves, fittings, anchors, supports, brackets,insulation etc
MEASUREMENT RULES
MEASUREMENT RULES
8/2/2019 Construction Measurement III Air Conditioning Central System
72/131
72
Q.8 PIPE AND FITTING
1. Pipes (measured over all pipe fittings, short running lengthsand branches) shall be given in metres stating the type andthe normal size. (Q.8.1)
Purpose-made pipe shall be so described and givenseparately. Curved pipes shall be so described stating themean radius.
Joints in the running length shall be given in the description
stating the method of jointing.
MEASUREMENT RULES
MEASUREMENT RULES
8/2/2019 Construction Measurement III Air Conditioning Central System
73/131
73
Q.8 PIPE AND FITTING
2. Flexible pipes and extensible pipes (measured as fully extended)shall each be so described. (Q.8.3)
3. Pipes laid or fixed in ducts, trenches and chases or embedded inin-situ concrete or screeds shall each be so described. (Q.8.4)
MEASUREMENT RULES
MEASUREMENT RULES
8/2/2019 Construction Measurement III Air Conditioning Central System
74/131
74
Q.9. SPECIAL CONNECTIONS, ETC.
1. Special connections and special joints in pipes shall each beenumerated separately (except where given in the description ofanother enumerated item) stating the nominal size and kind of pipeconcerned and the method of jointing. Classification shall be asfollows :
a) Connections between pipes of differing materials anddiffering grades of the same material.
b) Connections between pipes and appliances or
equipment.c) Connections to existing pipes.
MEASUREMENT RULES
MEASUREMENT RULES
8/2/2019 Construction Measurement III Air Conditioning Central System
75/131
75
Q.10. LABOURS
Labours on pipes (e.g. made bends, made springs, made offsets,beaded ends, ornamental ends, etc.) shall be deemed to beincluded with the pipes on which they occur.
MEASUREMENT RULES
MEASUREMENT RULES
8/2/2019 Construction Measurement III Air Conditioning Central System
76/131
76
Q.11 SUNDRIES6. Pipe-sleeves through walls, floors ceilings shall be
enumerated stating the type, lengths, the nominal size andkind of pipe passing through and the type of packing required,and if to be supplied for fixing by other trades, this shall be so
described.
7. Wall, floor or ceiling plates shall be grouped together as platesand enumerated stating the type and size.
MEASUREMENT RULES
MEASUREMENT RULES
8/2/2019 Construction Measurement III Air Conditioning Central System
77/131
77
Q.12 PIPEWORK SUPPORTS
1. Components or assemblies of components (e.g. clips,saddles, pipe-hooks, holderbats, brackets, rollers, chairs andhangers or black-plates and girder-lugs) used to fix supportsfor more than one pipe shall be enumerated separatelystating the type and size of components.
Spring compensated components shall be so describedstating the loading and movement to be accommodated.
MEASUREMENT RULES
Measurement rules
8/2/2019 Construction Measurement III Air Conditioning Central System
78/131
AIR CONDITIONING INSTALLATIONS
MEASUREMENT RULES
8/2/2019 Construction Measurement III Air Conditioning Central System
79/131
79
DUCTWORKQ.14 DUCTING AND FITTING
1. Ducting (measured over all pipe fittings, short running lengthsand branches) shall be given in metres stating the type and thenormal size. Joints in the running length shall be given in the
description stating the method of jointing.
2. Lining ducting internally meter separatelystating the typeand the thickness of the lining material and internal size ofducting.
3. Flexible ducting and extensible ducting (measured as fullyextended)- described and enumerated.
MEASUREMENT RULES
MEASUREMENT RULES
8/2/2019 Construction Measurement III Air Conditioning Central System
80/131
80
DUCTWORKQ.14 DUCTING AND FITTING
4. Curved ducting - described and enumerated-stating meanradius. Curved rectangular ducting stated whether shaped tocurved on the wider or narrow side.
5. Duct fitting in numbers extra over the duct in which theyoccur. Cutting and forming openings and jointing ducting tofitting shall be deemed to be included. Fitting involving achange of direction of ducting- shall be described.
MEASUREMENT RULES
MEASUREMENT RULES
8/2/2019 Construction Measurement III Air Conditioning Central System
81/131
81
ELBOW, REDUCER AND BRANCH
Shall be described and enumerated as extra over in which theyoccur. (Q.14.5)
6. Providing materials, heat, bolts, nuts, washers and everything elsenecessary for making joints in ducting shall be deemed to beincluded with the items. (Q.14.6)
MEASUREMENT RULES
MEASUREMENT RULES
8/2/2019 Construction Measurement III Air Conditioning Central System
82/131
82
DUCTWORKQ.15 SPECIAL CONNECTION, ETC
1. Special connection and special joints in ducting shall beenumerated separately (except where given in the description ofother enumerated item) stating size and kind of ducting concerned
and method of jointing.
2. Classification :a. Connection between ducting of differing materials.b. Connection between ducting and equipment stating the nature
of the equipment.c. Isolated joints which differ from those given in the description
of the ducting.d. Flexible connection between ducting and plant.
MEASUREMENT RULES
MEASUREMENT RULES
8/2/2019 Construction Measurement III Air Conditioning Central System
83/131
83
DUCTWORKQ.15 SPECIAL CONNECTION, ETC
3. Ducting turn and splittershall be enumeratedseparatelystating the type and internal size of ducting.
4. Nozzle outlets, test holes and covers and access door shallbeenumeratedseparately stating the size and method of
jointing and material and thickness or gauge of the ductingand lining.
5. Cowls, terminals, intake louvres and like shall beenumeratedseparately stating the size and type, the size of ducting.
MEASUREMENT RULES
BILL OF QUANTITIES DUCTWORKS
8/2/2019 Construction Measurement III Air Conditioning Central System
84/131
84
BILL OF QUANTITIES: DUCTWORKS
Heading:Galvanised iron duct as described with snaplock beam, pocketlock, grooved lock seam, pittsburgh lock and cross bracking forstiffening and including jointing and fixing for supply air
Description:
150mm x 150mm supply duct (M)
350mm x 300mm return duct (M)
BILL OF QUANTITIES DUCTWORKS
8/2/2019 Construction Measurement III Air Conditioning Central System
85/131
85
BILL OF QUANTITIES: DUCTWORKSFITTING
ELBOW
EXTRA over for 900mm x 350mm to 900mm x 350mm galvanisediron round elbow duct including cutting and forming opening and
jointing ducting to fitting (NO)
REDUCER
EXTRA over for 450mm x 350mm to 350mm x 350mm galvanisediron round reducer including cutting and forming opening and
jointing ducting to fitting (NO)
BRANCH
EXTRA over for 200mm x 250mm to 400mm x 450mm to 300mm x500mm galvanised iron branch including cutting and formingopening and jointing ducting to fitting (NO)
MEASUREMENT RULES
8/2/2019 Construction Measurement III Air Conditioning Central System
86/131
86
Q.16 DUCTWORK SUPPORTS
1. Components for supporting ductworks shall beenumerated- sizeand type of the components and size of ducting.
Stating the:- Size,type of the components
Size of the ducting
Classification shall be as follows:- Components for supporting single runs of ducting
Ditto multiple runs of ducting
Combined components for supporting ducting and pipework.
MEASUREMENT RULES
HANGER
8/2/2019 Construction Measurement III Air Conditioning Central System
87/131
87
HANGER
Hanger
MEASUREMENT RULES
8/2/2019 Construction Measurement III Air Conditioning Central System
88/131
88
Q.17 ALTERNATIVE METHOD OF MEASUREMENT
1. Clause Q. 18 provide alternative method of measurement.
MEASUREMENT RULES
MEASUREMENT RULES
8/2/2019 Construction Measurement III Air Conditioning Central System
89/131
89
Q.18 DUCTING AND DUCTING FITTING1. Measured in metres (over all ducting fittings,short lengths and
branches) stating the type and size.(Q.18.1)
2. Joints and method of the jointing shall be given in the description.
3. Flexible / extensible ducting shall be described andenumerated.(Q.18.3)
4. Curved ducting shall be so described and enumerated stating the
mean radius.(Q.18.4)
MEASUREMENT RULES
MEASUREMENT RULES
8/2/2019 Construction Measurement III Air Conditioning Central System
90/131
90
EQUIPMENT AND ANCILLARIES
Q.19 GENERALLY
1. Unless otherwise stated, equipment such as boiler, generators,cylinder, pumps, cooling, air handling unit, fans, refrigeratorequipment etc in numbers ( Q.19.1)
Condenser Unit And Fan Coil, etc.
Measured in nos (Q.19.1)
2. Packaged item shall be described in conjunction with a
manufacturers detailed specification (Q.19.2)
MEASUREMENT RULES
MEASUREMENT RULES
8/2/2019 Construction Measurement III Air Conditioning Central System
91/131
91
EQUIPMENT AND ANCILLARIES
Q.19 GENERALLY
3. Any limiting dimensions on the size shall be given. (Q.19.3)
4. Electrical connection shall be given in accordance with sectionR . (Q.19.4) Section R.
5. Platework, fuel hoppers dan supporting steelwork -accordanceSection P.
MEASUREMENT RULES
BILL OF QUANTITIES: ELECTRICAL
8/2/2019 Construction Measurement III Air Conditioning Central System
92/131
92
ELECTRICAL WORKS
Power cabling using 4 x 50mm sq. XLPE/PVC/CU c/w 150A TPNmetalclad isolator and 150A TPN MCCB for 2 nos Air CooledChiller from ACP switchboard (at chiller plant room) (ITEM)
ELECTRICAL WORKS
Power cabling using 4 x 35mm sq. XLPE/PVC/CU c/w 100A TPNmetalclad isolator and 100A TPN MCCB for 3 nos chiller waterpump from ACP switchboard (at chiller plant room) (ITEM)
BILL OF QUANTITIES: ELECTRICALWIRING
MEASUREMENT RULES
8/2/2019 Construction Measurement III Air Conditioning Central System
93/131
93
EQUIPMENTFIRE DAMPER
Measured in nos. (Q.19.1)
The related specification shall be described
MEASUREMENT RULES
MEASUREMENT RULES
8/2/2019 Construction Measurement III Air Conditioning Central System
94/131
94
EQUIPMENT
AIR DIFFUSER & AIR GRILLE
Measured in nos.
Stating the type, size and method of fixing.
Described accordance with the details drawing and specificationgiven.
MEASUREMENT RULES
DIFFUSER
8/2/2019 Construction Measurement III Air Conditioning Central System
95/131
95
TYPES OF DIFFUSER
8/2/2019 Construction Measurement III Air Conditioning Central System
96/131
96
8/2/2019 Construction Measurement III Air Conditioning Central System
97/131
97
DIFFUSER/COLLAR CONNECTION
8/2/2019 Construction Measurement III Air Conditioning Central System
98/131
98
REGISTER/COLLAR CONNECTION
BILL OF QUANTITIES EQUIPMENTS
8/2/2019 Construction Measurement III Air Conditioning Central System
99/131
99
BILL OF QUANTITIES: EQUIPMENTS
DIFFUSER
600mm x 600mm anodized extruded aluminium supply air diffusercomplete with blade damper.
200mm x 400mm 4 way square type air diffuser , fixed tosuspended ceiling complete with all approved gasket
BILL OF QUANTITIES EQUIPMENTS
8/2/2019 Construction Measurement III Air Conditioning Central System
100/131
100
BILL OF QUANTITIES: EQUIPMENTS
RETURN AIR GRILLES
600mm x600mm extruded aluminium return air grilles
DAMPER
Volume control damper complete with access opening.
Fusible link type fire damper (2 hour fire rated and approved byJabatan Bomba) complete with access opening.
HANGER
Hanger, constructed of 2 nos 12mm mild steel rod, 60mm longcentres, 25mm x 25mm x 5mm mild steel angels 80 long forsupply duct / return duct (no)
MEASUREMENT RULES
8/2/2019 Construction Measurement III Air Conditioning Central System
101/131
101
EQUIPMENT AND ANCILLLARIES
Q.20 Anti-vibration and sound insulation
Anti-vibration mountings for plant shall be enumerated stating thetype and the size. Anti-vibration material and sound-insulatingmaterial in plant bases shall be given in square metres stating thenature of the material and the thickness.
SU U S
MEASUREMENT RULES
8/2/2019 Construction Measurement III Air Conditioning Central System
102/131
102
EQUIPMENT AND ANCILLLARIES
Q.21 Equipment supports
1. Equipment supports shall be enumerated and described.
2. Particulars of the method of fixing shall be given in thedescription in accordance with clauses Q.1.5-6.
HANGER TO DUCTWORKS
8/2/2019 Construction Measurement III Air Conditioning Central System
103/131
103
c
8/2/2019 Construction Measurement III Air Conditioning Central System
104/131
104
c
DUCTWORK SUPPORT
8/2/2019 Construction Measurement III Air Conditioning Central System
105/131
105
DUCTWORK SUPPORT
ELBOW
8/2/2019 Construction Measurement III Air Conditioning Central System
106/131
106
ELBOW
MEASUREMENT RULES
8/2/2019 Construction Measurement III Air Conditioning Central System
107/131
107
Q.22 JOINTING (PENYAMBUNGAN)1. Particulars of the method of jointing shall be given
in the description of the equipment.
MEASUREMENT RULES
8/2/2019 Construction Measurement III Air Conditioning Central System
108/131
108
EQUIPMENT AND ANCILLARIES
Q.24 IDENTIFICATION PLATES
Plates,discs and labels for identification plants shall be deemed to
be included with the item concerned. (Q.24)
Charts giving the keys shall be enumerated
Measurement rules
8/2/2019 Construction Measurement III Air Conditioning Central System
109/131
AIR CONDITIONING INSTALLATIONS
Measurement rules
8/2/2019 Construction Measurement III Air Conditioning Central System
110/131
INSULATIONQ.25 GENERALLY
1. Particulars of the following shall be given: (Q.25.1)
Kind and quality of material Thickness of material Finish of material Method of fixing
2. Includes smoothing the material and working aroundsupports.(Q.25.2)
AIR CONDITIONING INSTALLATIONS
Measurement rules
8/2/2019 Construction Measurement III Air Conditioning Central System
111/131
Q.26 INSULATION TO PIPEWORK
1. Insulation to pipeworkmeter stating types and size ofthe pipe.
2. Working insulation around ancillaries shall be enumeratedseparately in numbers extra over
3. Working insulation over flanges and pipe fitting shall bedeemed.
4. Insulation boxes shall be enumeratedseparately in
numbers stating types of material and infill.
AIR CONDITIONING INSTALLATIONS
Insulation to ductwork
8/2/2019 Construction Measurement III Air Conditioning Central System
112/131
Q.27 INSULATION TO DUCTWORK
1. Insulation to ductwork meter stating types and size of theducting.
2. Working insulation around ducting fittings, special fittings and
ancillariesin numbers extra over
AIR CONDITIONING INSTALLATIONS
Insulation to equipment
8/2/2019 Construction Measurement III Air Conditioning Central System
113/131
Q.28 INSULATION TO EQUIPMENT
1. Insulation to equipment enumerated stating overall sizeof the unit. Particular shall be given of any protection to the
insulation.
2. Providing detachable mattressesand working insulationaround special fittingsand ancillaries shall be deemed.
AIR CONDITIONING INSTALLATIONS
Sundry insulation
8/2/2019 Construction Measurement III Air Conditioning Central System
114/131
Q.29 SUNDRY INSULATION
1. Loose insulation in trench, ducts, tank casings and like - shallbe given separately in cubic metres stating nature ofmaterials.
2. Cellular concrete insulation in trench and ducts (groupedtogether) - shall be given in cubic metres stating mix of theconcrete.
3. 3. Special protection or finish at opening through wall, valvechambers and the like shall each be describedenumerated.
AIR CONDITIONING INSTALLATIONS
BILL OF QUANTITIES: INSULATION TO
8/2/2019 Construction Measurement III Air Conditioning Central System
115/131
115
DUCTWORKS
Insulation to duct works
50 mm Thick fibreglass insulation to 200 mm X 100 mm galvanisediron ducting, with clips at 450 mm centres and covered with single
side aluminium foil for supply air duct.
Insulation to pipe works
50mm Thick Aeroflax or other approved flexible expanded rubber
compound insulation to 40mm diameter copper tubing.
Measurement rules
8/2/2019 Construction Measurement III Air Conditioning Central System
116/131
AIR CONDITIONING INSTALLATIONS
Measurement rules
8/2/2019 Construction Measurement III Air Conditioning Central System
117/131
Q.30 SUNDRIES
1. Testing each installation shall be given as an ITEM.
stating any required qualifications, no of stage tests in
addition to the final, purpose, instruments and appliancesrequired, special insurances etc.
AIR CONDITIONING INSTALLATIONS
BILL OF QUANTITIES: TESTING
8/2/2019 Construction Measurement III Air Conditioning Central System
118/131
118
BILL OF QUANTITIES: TESTING
TESTING
Upon completion allowed for testing the foregoing Air CooledChiller System air conditioning, make good any defects and leave
the whole of the installation in perfect working order to thesatisfaction of engineer.
Measurement rules
8/2/2019 Construction Measurement III Air Conditioning Central System
119/131
AIR CONDITIONING INSTALLATIONS
Measurement rules
8/2/2019 Construction Measurement III Air Conditioning Central System
120/131
BUILDERS WORK
Q.31 GENERALLY
1. Unless otherwise stated, all items of builders shall be givenin accordance with theappropriate section.
2. Builders works in connection with plumbing and mechanicalengineering installations shall be grouped together under an
appropriate heading.
AIR CONDITIONING INSTALLATIONS
Measurement rules
8/2/2019 Construction Measurement III Air Conditioning Central System
121/131
BUILDERS WORK
Q.32 PARTICULARLY
1. Excavation works.2. Inspection chamber-V.6.3. Bedding and pointing equipments or unit of equipment.4. Cutting away for and making goods after the plumbing and
mechanical installations.
5. Etc
AIR CONDITIONING INSTALLATIONS
BILL OF QUANTITIES: TESTING
8/2/2019 Construction Measurement III Air Conditioning Central System
122/131
122
BUILDERS WORK
50 mm thick concrete grade 15 as base of 300 mm wide (m3)
8/2/2019 Construction Measurement III Air Conditioning Central System
123/131
Taking off list
TAKING OFF LIST
8/2/2019 Construction Measurement III Air Conditioning Central System
124/131
124
1. Preamble2. Equipment Chiller unit, water pump, water tank, AHU.3. Ducting - supply duct, return duct
4. Ducting Fitting5. Ductwork Support6. Pipe work7. Insulation to ductwork/pipe8. Equipment - Diffuser, Grille, Damper9. Builders Work10. Electrical system11. Testing
AIR CONDITIONING SYSTEM
TAKING OFF LIST
8/2/2019 Construction Measurement III Air Conditioning Central System
125/131
125
1) Air cond Equipment (NO)- Air cooled chiller
- Chilled water tank- Chilled water pump- Air handling unit
2) Ducting (M)
3) Ducting Fitting (NO)-Elbow
-Tee
-Branch
4) Ducting Support (NO)
-Hanger
5) Pipe Work (M)
-Refrigerant pipe
-Suction pipe-Drain Pipe
6) Insulation (M)-To ductwork
- To pipe work
7) Equipment (NO)
-Diffuser
-Grill
-Damper
8) Sundries
9) Builders work
8/2/2019 Construction Measurement III Air Conditioning Central System
126/131
Case study
Fakulti Alam Bina
8/2/2019 Construction Measurement III Air Conditioning Central System
127/131
CASE STUDY
PROJECT TITLE
AIR CONDITIONING INSTALLATIONS: WATER
COOLED CHILLER SYSTEMS
8/2/2019 Construction Measurement III Air Conditioning Central System
128/131
Studio work
Fakulti Alam Bina
8/2/2019 Construction Measurement III Air Conditioning Central System
129/131
AIR CONDITIONING
INSTALLATIONS CENTRAL
SYSTEM
PROJECT TITLE
CADANGAN MEMBINA DAN MENYIAPKAN
KOMPLEKS PERNIAGAAN LARKIN MALL
8/2/2019 Construction Measurement III Air Conditioning Central System
130/131
DUCTING SYSTEM
AIR HANDLING UNIT
AIR COOLED CHILLERS
8/2/2019 Construction Measurement III Air Conditioning Central System
131/131
A/C CHILLED WATER EXPANSION TANK
CHILLED WATER PUMP
AIR COOLED CHILLERS