5
GWADAR MASTER PLAN NEWSLETTER ISSUE 17 | SEP-OCT 2019 Page 01 CONTENTS Gwadar will be the second planned city of Pakistan, after Islamabad. China Communications Construction Company Limited, which specializes in Infrastructure Development and Planning, is one of the 10 biggest construction companies in the world. It started work on Gwadar Master Plan in 2017. Input from developers and political officials was incorporated. Initially, 3 proposals were presented and they finally decided to proceed with one. DG GDA has released the master plan officially and its available on GDA’s website. (http://www.gda.gov.pk/masterplan/). “Master Plan” of “Gwadar Smart City” has been approved Thanks to Almighty Allah, Central Location of our project has become even more central and important in the new master plan. We have increased the pace of development at Site and pace of works in Gwadar (by Government) has also picked up. I am positive that the time investors have been waiting for is just around the corner. (Plz see rest of the Newsletter for that) - CHIEF EXECUTIVE Gwadar will emerge as the most secure and well planned city of international standards in the next decade if the plan is followed properly. Great Importance has been given to the environmental factors, and the interests of native inhabitants of Gwadar have been secured to avoid implementation bottlenecks. The pace of work by private developers and Government bodies will improve substantially after the approval of master plan. New By-Laws are expected to be finalized and released in the current month. GWADAR CENTRAL DEVELOPMENTS SITE OFFICE COMPLETION DEVELOPMENTS IN GWADAR INTERNATIONAL AIRPORT UPDATES ON CPEC CPEC-FIRST PRIORITY CUSTOMER ADVISORY CONTACT US 02 04 06 07 08 www.gwadarcentral.com

CONTENTS GWADAR MASTER PLAN - Gwadar CentralA long standing bitter issue for the residents of Gwadar has been resolved lately. A pipeline has been laid from Sod dam to Gwadar. ShadiKaur

  • Upload
    others

  • View
    4

  • Download
    0

Embed Size (px)

Citation preview

Page 1: CONTENTS GWADAR MASTER PLAN - Gwadar CentralA long standing bitter issue for the residents of Gwadar has been resolved lately. A pipeline has been laid from Sod dam to Gwadar. ShadiKaur

GWADAR MASTER PLAN

NEWSLETTERISSUE 17 | SEP-OCT 2019

Page 01

CONTENTS

Gwadar will be the second planned city of Pakistan, after Islamabad. China Communications Construction Company Limited, which specializes in Infrastructure Development and Planning, is one of the 10 biggest construction companies in the world. It started work on Gwadar Master Plan in 2017. Input from developers and political officials was incorporated.

Initially, 3 proposals were presented and they finally decided to proceed with one. DG GDA has released the master plan officially and its available on GDA’s website.(http://www.gda.gov.pk/masterplan/).

“Master Plan” of “Gwadar Smart City” has been approved

Thanks to Almighty Allah, Central Location of our project has become even more central and important in the new master plan. We have increased the pace of development at Site and pace of works in Gwadar (by Government) has

also picked up. I am positive that the time investors have been waiting for is just around the corner. (Plz see rest of the Newsletter for that)

- CHIEF EXECUTIVE

Gwadar will emerge as the most secure and well planned city of international standards in the next decade if the plan is followed properly. Great Importance has been given to the environmental factors, and the interests of native inhabitants of Gwadar have been secured to avoid implementation bottlenecks.

The pace of work by private developers and Government bodies will improve substantially after the approval of master plan.New By-Laws are expected to be finalized and released in the current month.

GWADAR CENTRAL DEVELOPMENTSSITE OFFICE COMPLETION

DEVELOPMENTS IN GWADARINTERNATIONAL AIRPORT

UPDATES ON CPECCPEC-FIRST PRIORITY

CUSTOMER ADVISORY

CONTACT US

02

04

06

07

08

www.gwadarcentral.com

Page 2: CONTENTS GWADAR MASTER PLAN - Gwadar CentralA long standing bitter issue for the residents of Gwadar has been resolved lately. A pipeline has been laid from Sod dam to Gwadar. ShadiKaur

Page 02 Page 03

Developments in Gwadar Central Developments in Gwadar Central

The Gwadar Central’s office has been completed on the site. It is adjacent to labor quarters, machinery compound and car park. A walled-area of 20 Kanals has been developed for the this purpose. Blocks Manufacturing, Pavers

Maunfacturing and Pipe Manufacturing etc. will be done outside the enclosed area.

INFRASTRUCTURE DEVELOPMENT

Road Embankments are being built with mechanised Earth Moving equipment. Right now, the work is being carried out on the 80’ central boulevard and the 40’ back road running parallel to the Sarawan Avenue.

MANUFACTURING ON SITE

Gwadar Central has started the production of basic construction materials like Blocks, Tough Pavers and Kerb stones. The need for the same was felt owing to the poor standards of locally available materials.

The structure of main gate is going to be 50’ high and 120’ wide in total. Gate Building has been built to accommodate the security issues and beautification. Gate Building will also house the network operating centre of

security cameras.

GATE UNDER CONSTRUCTION The grey structure of the gate will be completed by the year end while the finishing will be over in another two months.

IMMEDIATE MILESTONES

• Plantation and Landscaping on Sarawan Ave.• Monument design for the intersection point of

coastal highway and Sarawan Ave.• Street Light Poles on the main roads.• Installation of Pavers on one side of Sarawan

Avenue.• Kerbstones on the side of Sarawan Avenue.• Grey structure of the project Entrance Gate

• Installation of Pavers/Kerbstones on 80’ main road.

• 1-2 ft Road embankment of all the Project roads.

www.gwadarcentral.comwww.gwadarcentral.com

Page 3: CONTENTS GWADAR MASTER PLAN - Gwadar CentralA long standing bitter issue for the residents of Gwadar has been resolved lately. A pipeline has been laid from Sod dam to Gwadar. ShadiKaur

Page 04 Page 05

Construction work of Gwadar International Airport has started. It will be built at a cost of US $220 Million and is being funded by China. It will be completed in a period of 3 years. Chinese Government wants to finish this project by the

mid of 2021.

EAST BAY EXPRESSWAY

Work on East Bay Expressway started in November 2017 and it is scheduled to be completed by October 2020 at a cost of US $168 Million. Ministry of Maritime Affairs is working on the project and the progress has been satisfactory.

GWADAR CANTT

A functional cantonement board is instrumental for the ongoing security of the area. This will be the biggest cantonement in the country, just next to the Gwadar International Airport. Access road has been built and construction of some small buildings is underway.

A long standing bitter issue for the residents of Gwadar has been resolved lately. A pipeline has been laid from Sod dam to Gwadar. ShadiKaur Dam will be linked to this pipeline as well. This development will significantly ease the

cost of construction and living in Gwadar.

COASTAL TRADE

Gwadar port is targeting the large untapped market of coastal trade between national seaports, Afghan Transit Trade (ATT), regional transshipments and exports and imports.

“First container line service is launched between Pakistan’s three ports and Gulfs’ ports. The container line service is going to connect Gwadar port with global trading centres in the Gulf. The container line service is an

essential element of CPEC which will link up Afghanistan, the Central Asian states and Western China.”

Source: http://www.cpecinfo.com/news/cosco-commences-pakistan-first-karachi-gwadar-gulf-container-line-service/NzY3NQ==

Developments in Gwadar Developments in Gwadar

www.gwadarcentral.comwww.gwadarcentral.com

Page 4: CONTENTS GWADAR MASTER PLAN - Gwadar CentralA long standing bitter issue for the residents of Gwadar has been resolved lately. A pipeline has been laid from Sod dam to Gwadar. ShadiKaur

Updates on CPECUpdates on CPEC

Formation of CPEC Authority is underway to speed up the process of CPEC implementation, so that a sustainedpositive impact on economy can be harvested at the earliest .CPEC has once again emerged as the No. 1 priority of

Pakistan government due to economic and strategic considerations (especially after standoff with India).

Page 06 Page 07

CUSTOMER ADVISORY

I am a proud owner of 10 Marla Residential plot and highly satisfied with my decisionof investing in Gwadar Central. It’s the only housing project, which is delivering as

promised. Although I haven’t completed the payment of cost of land against my plotin Block D, they have already commenced development in that area. I am sure they will

deliver on their promises.

- Aarish Shahzad

MAKE A SMALL ROOM LOOK BIG, IN 9 STEPS:

• Use ultra light colors or dark colors to give depth to a room.• Hang floor-to-ceiling curtains.• Use a few larger decorative accents instead of many small decorative

items.• Display large-scale art.• Use lamps to spread light evenly around the room instead of relying

completely on one overhead light.• Buy a visually interesting ceiling light fixture.• Place mirrors on dark walls that don’t get much natural light.• Use rugs to define the spaces.• Buy furniture with exposed legs to make the living space feel more open.

Pakistan and China embarked on the new phase of the China-Pakistan Economic Corridor by signing memorandum of understanding (MoUs) on the first Special Economic Zone (SEZ) and socio-economic development and a new

agreement on free trade.

PAK- CHINA MOU’S

“There will be 27 new projects in the second phase of the China-Pakistan Economic Corridor (CPEC),” said Consul General of China Wang Yu. He further stated that agriculture, education, vocational training, industry and increase in water supply etc., are all part of our plans.

RAILWAY MAIN LINE -1

No country can make industrial progress without an effective Railway Network. ML1 Project will link Gwadar with the rest of Pakistan. The Cabinet Committee on CPEC has decided to commence financing discussion over ML-1 Project with China.

www.gwadarcentral.comwww.gwadarcentral.com

Page 5: CONTENTS GWADAR MASTER PLAN - Gwadar CentralA long standing bitter issue for the residents of Gwadar has been resolved lately. A pipeline has been laid from Sod dam to Gwadar. ShadiKaur

Corporate Office Location

Page 08

Corporate Office BTN Marketing Consultants

75 D-1 Gulberg III Liberty Roundabout, Lahore

www.gwadarcentral.com

[email protected]

facebook.com/gwadarcentral

12 , Guberg II (off main blvd), Lahore.

UAN: 042-111-286-111

btnconsultants.com.pk/

[email protected]

www.facebook.com/BtnConsultants/

Contact Us

+92 321 1942131 | +92 322 4588240