33
1 Conveying Water Rights Division of Water Rights By Randy Tarantino Title Program Specialist Telephone: (801) 538-7387 [email protected] March 2012 Utah Water Users Workshop

Conveying Water Rights

Embed Size (px)

DESCRIPTION

Conveying Water Rights. Division of Water Rights By Randy Tarantino Title Program Specialist Telephone: (801) 538-7387 [email protected] - PowerPoint PPT Presentation

Citation preview

Page 1: Conveying   Water Rights

1

Conveying Water Rights

Division of Water RightsBy Randy Tarantino

Title Program SpecialistTelephone: (801) [email protected]

March 2012

Utah Water Users Workshop

Page 2: Conveying   Water Rights

2

Topics of Discussion

Water Resources, Water Right Terms, and Basics

Water Addendums Common Problems Encountered, and Potential Solutions

Questions

Page 3: Conveying   Water Rights

3

Water Right Resources

Utah Code:o Title 73, Chapter 1, Sections 10-12

http://le.utah.gov/~code/TITLE73/htm/73_01_001000.htm

o Title 57, Chapter 3, Sections 109http://le.utah.gov/~code/TITLE57/htm/57_03_010900.htm

Utah Administrative Code:o Rule R655-3

http://www.rules.utah.gov/publicat/code/r655/r655-003.htm

Training Manual for Preparing a Report of Water Right Conveyance

http://www.waterrights.utah.gov/titleInfo/trainman.pdf

Page 4: Conveying   Water Rights

4

Water Right TermsBeneficial Use: All water rights are

based upon and limited by the beneficial use(s) of the water right.

Diversion Limits: The Division authorizes specific maximum quantities of water that can be diverted to achieve the beneficial use.

Place of Use: The land where the water is authorized by the Division to be used. The location of the place of use is critical in determining the appurtenance of water rights to land when evaluating ownership documents.

Page 5: Conveying   Water Rights

5

More TermsUnperfected: A water right that has

been approved but not perfected

Perfected: A water right that has been legally established or perfected for use upon a particular parcel of lando Decreed Rights - are described in and

confirmed by an official court decree

o Diligence Rights – are water rights that have been legally established prior to 1903 for surface sources (Diligence Claims) and 1935 for underground water sources (Underground Water Claims).

o Appropriated Rights - are established by filing an application, proof, and obtaining a certificate from the State Engineer

Page 6: Conveying   Water Rights

6

Water Right BasicsProposals to appropriate surface water after 1903 (diligence claims) and underground water after 1935 (underground water claims) from any available un-appropriated water supply must be initiated through the filing of an Application to Appropriate Water with the state engineer. Applications to appropriate that are approved are subject to specific periods in which to develop the proposed projects and place the water to beneficial use. During the period that an application is being developed, the rights may be conveyed by assignment or by deed. Upon proof of development of the approved used, certificates are issued, and the rights are “perfected” and must be conveyed by deed.

Page 7: Conveying   Water Rights

7

Water Addendum’sLand DeedWater Deed

These Forms are Available on the Divisions Website

Page 8: Conveying   Water Rights

8

Water Addendum’s When deed is recorded in the county recorders

office and a water addendum is attached, Utah Code Section 57-3-109 requires the recorder to forward a copy of the deed and addendum to the State Engineer.

The Division will notify the grantee, of an identified water right, whether or not ownership has been updated on the State Engineer’s Records.

The title section will review the addendum as if it were a ROC submittal and update the records if additional clarification is not required.

The letter, deed, and addendum will be posted to the water right file the addendum references.

The County Recorders office can mail, fax, or e-mail the addendums to the Division of Water Rights ([email protected])

Page 9: Conveying   Water Rights

9

Conveyance Problems Not understanding the Water Right being

conveyed.o Is the water right Appurtenant to the land it’s used

on?o Is the water right a member of a Supplemental

Group?o Is the water right based on shares in a Private Water

Company? Not understanding what the documents mean

within the water right file.o What is a No Claim Filed (NCF)/Pending

Adjudication Claim?o What is an Unpublished Water User’s Claim (WUC)?o Decreed Rights not in the State Engineer’s records

Problems with the rules or policieso Internal Title Boardo Water Right Title Committee

Discrepancies on the Divisions Records

Page 10: Conveying   Water Rights

10

Understanding the Water Right

Hydrographic Map

Page 11: Conveying   Water Rights

11

Scanned DocumentsApplication to Appropriate POU: S½SW¼, Sec 10, T10N, R1E,

SLBM13 January 1976Approved Application

(A45919) 24 May 1976

Election Filed 27 July 1978

Water User’s Claim No POU listed 5

January 1979

The water became

appurtenant to the land on this

date

Approved Change a35830 POU: SW ¼ SW ¼,

Sec 10, T10N, R1E, SLBM 28 January 2010

Page 12: Conveying   Water Rights

12

Is the Water Right Appurtenant?

May 4, 1998o Prior to this date only perfected

water rights can be conveyed by appurtenance.

o Land conveyances executed on or after this date may convey the associated perfected or unperfected water right by appurtenance.

Page 13: Conveying   Water Rights

13

Appurtenance?

Problem (refer to deed handout)o Appurtenance cannot be established

for the land conveyed in the SE ¼ SW ¼, Section 10 T10N, R5E, SLBM.

o Application to appropriate and the hydrographic survey map lists place of use in the S½SW¼, Sec. 10, T10N, R5E, SLBM.

o There is a discrepancy on the Division’s records

Page 14: Conveying   Water Rights

14

Is the Water Right part of a Supplemental Group?

If you find any errors in the database in supplemental water use groups, contact the Regional Office, and they can help.

Be prepared to submit a written description of the problem with supporting documentation.

Page 15: Conveying   Water Rights

15

Hydrographic Survey Maps

Page 16: Conveying   Water Rights

16

Private Water Companies?

Water Shares issued by a private water companyo The private water company owns the water right.

Therefore, the water is not appurtenant to the land. Water shares are conveyed as securities under the Uniform Commercial Code (UCC 70A-8). The Division cannot update ownership based solely on shares.

Change Applications based on shareso The water company is the owner of the water right.

The shareholder is a party to the change application. o A change based on shares is valid only if the shares

are maintained in good standing with the water company. A copy of the stock certificate in the name of the new owner should be provided with the ROC.

o The change application can be conveyed as an appurtenance.

Page 17: Conveying   Water Rights

17

Understanding Water Right Documents

No Claim Filed (NCF)/Pending Adjudication Claim

Unpublished Water User’s Claims (WUC)

Decreed Rights not in the State Engineer’s records

Page 18: Conveying   Water Rights

18

No Claim Filed (NCF) or Pending Adjudication

ClaimsClaim collected during a general

adjudication on which no proposed determination has been published

Currently has no supporting legal basis

The claim itself has no legal standing other than as evidence of the manner of use at the time taken

Page 19: Conveying   Water Rights

19

Page 20: Conveying   Water Rights

20

Pending Adjudication Claim

Page 21: Conveying   Water Rights

21

Page 22: Conveying   Water Rights

22

What does a No Claim Filed (NCF) or Pending Adjudication Claims

Mean for Conveyance?Title can be updated from the owner shown on

the claim, but the claim still as yet has no supporting legal basis.

A diligence claim must be submitted before any action can be taken on applications for changes on these rights.

NCF or Pending Adjudication Claim Resources:

Hydrographic map (shows location of claim)Documents in the water right file

Page 23: Conveying   Water Rights

23

Unpublished Water User’s Claims (WUC)

The underlying water right’s legal basis is actually another document such as a decree, application to appropriate, diligence claim, etc… and may not match the WUC in all respects.

The database often reflects the WUC, not the actual basis of the water right.

The claim itself has no legal standing other than as evidence of the manner of use at the time it the claim was collected.

Title work must extend back to the document the WUC is based upon.

Page 24: Conveying   Water Rights

24

Unpublished Claims

Page 25: Conveying   Water Rights

25

Water User’s Claim

Page 26: Conveying   Water Rights

26

Provo River Decree

Page 27: Conveying   Water Rights

27

Decreed Rights not in the State Engineer’s RecordsNot all rights have a water right

number assigned to them.Title must be updated from the owner

listed in the decree.Decrees are available online, or at the

courthouse. The courthouse is the best location to research for decrees.

A water right number can be assigned to decreed water rights upon request, but the State Engineer’s office may decide to assign numbers to all rights in the decree at the same time, which may take considerable time.

Page 28: Conveying   Water Rights

28

Page 29: Conveying   Water Rights

29

Water Right Decrees

Page 30: Conveying   Water Rights

30

Decrees by County

Page 31: Conveying   Water Rights

31

General Adjudications

Page 32: Conveying   Water Rights

32

Discrepancies on the Divisions Records

If it is believed that the Division has made an error associated with the water right on the division records and appurtenance cannot be established, the Regional Office can be contacted to determine the action required to correct the State Engineer’s records. The correction will need to occur prior to filing the ROC.

Page 33: Conveying   Water Rights

33

Questions?