8
Address T - 1 Client Name/Company DRAWING LIST Project Summary Address T: Company MECHANICAL OWNER/CLIENT ARCHITECT ELECTRICAL/ PLUMBING FIRE PROTECTION Address T: Company Address T: Company Coolidge Middle School Boilers 89 Birch Meadow Drive, Reading, MA 02/25/20 Project Status Coolidge Middle School Boilers H-1 Legend, Abbreviation And Details H-2 Boiler Room Demolition Plan H-3 Boiler Room Hot Water Piping System New Work Plan H-4 Bpoiler Room Gas Piping New Work Plan H-5 Boiler Room Boiler Combustion Air And Vent Systems New Work Plan H-6 Boiler Room New Hot Water Piping Heating Schematic H-7 Boiler Venting And Combustion Air Intake elevation And Section This Project is to replace two heat exchangers with boilers.

Coolidge Middle School Boilersportal.gienapparchitects.com/storage/Erz3tMdaZ6M2/...Project Status Coolidge Middle School Boilers H-1 Legend, Abbreviation And Details H-2 Boiler Room

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Coolidge Middle School Boilersportal.gienapparchitects.com/storage/Erz3tMdaZ6M2/...Project Status Coolidge Middle School Boilers H-1 Legend, Abbreviation And Details H-2 Boiler Room

Address

T-1

Client Name/Company

DRAWING LIST

Project Summary

AddressT:

Company

MECHANICALOWNER/CLIENT ARCHITECT ELECTRICAL/ PLUMBING

FIRE PROTECTION

AddressT:

Company

AddressT:

Company

Coolidge Middle School Boilers

89 Birch Meadow Drive,Reading, MA

02/25/20

Pro

ject

Sta

tus

Coo

lid

ge M

idd

le S

cho

ol

Boil

ers

H-1 Legend, Abbreviation And Details

H-2 Boiler Room Demolition Plan

H-3 Boiler Room Hot Water Piping System New Work Plan

H-4 Bpoiler Room Gas Piping New Work Plan

H-5 Boiler Room Boiler Combustion Air And Vent Systems New Work Plan

H-6 Boiler Room New Hot Water Piping Heating Schematic

H-7 Boiler Venting And Combustion Air Intake elevation And Section

This Project is to replace two heat exchangers with boilers.

Page 2: Coolidge Middle School Boilersportal.gienapparchitects.com/storage/Erz3tMdaZ6M2/...Project Status Coolidge Middle School Boilers H-1 Legend, Abbreviation And Details H-2 Boiler Room

LTC

LTC

LTCDrawn

Designed

Scale

Date

Draw

ing Num

ber

ISSUED FOR BID

No Scale

Checked

Sheet Title Project

Northeast Engineering & CommissioningT: (978) 430-0565

LEGEND, ABBREVIATIONS ANDDETAILS

REPLACEMENT OF STEAM TOHOT WATER HEAT EXCHANGER PROJECT

COOLIDGE MIDDLE SCHOOL89 BIRCH MEADOW DRIVE

READING MASSACHUSETTS

Of 7

Sheet 1

FEBRUARY 13, 2020

Page 3: Coolidge Middle School Boilersportal.gienapparchitects.com/storage/Erz3tMdaZ6M2/...Project Status Coolidge Middle School Boilers H-1 Legend, Abbreviation And Details H-2 Boiler Room

LTC

LTC

LTCDrawn

Designed

Scale

Date

Draw

ing Num

ber 1/4"=1'-0"

Checked

Sheet Title Project

Northeast Engineering & CommissioningT: (978) 430-0565

BOILER ROOMDEMOLITION PLAN

REPLACEMENT OF STEAM TOHOT WATER HEAT EXCHANGER PROJECT

COOLIDGE MIDDLE SCHOOL89 BIRCH MEADOW DRIVE

READING MASSACHUSETTS

Of 7

Sheet 2

ISSUED FOR BID

FEBRUARY 13, 2020

Page 4: Coolidge Middle School Boilersportal.gienapparchitects.com/storage/Erz3tMdaZ6M2/...Project Status Coolidge Middle School Boilers H-1 Legend, Abbreviation And Details H-2 Boiler Room

LTC

LTC

LTCDrawn

Designed

Scale

Date

Draw

ing Num

ber 1/4"=1'-0"

Checked

Sheet Title Project

Northeast Engineering & CommissioningT: (978) 430-0565

BOILER ROOM HOT WATER PIPING SYSTEM

NEW WORK PLAN

REPLACEMENT OF STEAM TOHOT WATER HEAT EXCHANGER PROJECT

COOLIDGE MIDDLE SCHOOL89 BIRCH MEADOW DRIVE

READING MASSACHUSETTS

Of 7

Sheet 3

ISSUED FOR BID

FEBRUARY 13, 2020

Page 5: Coolidge Middle School Boilersportal.gienapparchitects.com/storage/Erz3tMdaZ6M2/...Project Status Coolidge Middle School Boilers H-1 Legend, Abbreviation And Details H-2 Boiler Room

LTC

LTC

LTCDrawn

Designed

Scale

Date

Draw

ing Num

ber 1/4"=1'-0"

Checked

Sheet Title Project

Northeast Engineering & CommissioningT: (978) 430-0565

BOILER ROOM GAS PIPING NEW WORK PLAN

REPLACEMENT OF STEAM TOHOT WATER HEAT EXCHANGER PROJECT

COOLIDGE MIDDLE SCHOOL89 BIRCH MEADOW DRIVE

READING MASSACHUSETTS

Of 7

Sheet 4

ISSUED FOR BID

FEBRUARY 13, 2020

Page 6: Coolidge Middle School Boilersportal.gienapparchitects.com/storage/Erz3tMdaZ6M2/...Project Status Coolidge Middle School Boilers H-1 Legend, Abbreviation And Details H-2 Boiler Room

LTC

LTC

LTCDrawn

Designed

Scale

Date

Draw

ing Num

ber 1/4"=1'-0"

Checked

Sheet Title Project

Northeast Engineering & CommissioningT: (978) 430-0565

BOILER ROOMBOILER COMBUSTION AIR AND

VENT SYSTEMS NEW WORKPLAN

REPLACEMENT OF STEAM TOHOT WATER HEAT EXCHANGER PROJECT

COOLIDGE MIDDLE SCHOOL89 BIRCH MEADOW DRIVE

READING MASSACHUSETTS

Of 7

Sheet 5

ISSUED FOR BID

FEBRUARY 13, 2020

Page 7: Coolidge Middle School Boilersportal.gienapparchitects.com/storage/Erz3tMdaZ6M2/...Project Status Coolidge Middle School Boilers H-1 Legend, Abbreviation And Details H-2 Boiler Room

LTC

LTC

LTCDrawn

Designed

Scale

Date

Draw

ing Num

ber No Scale

Checked

Sheet Title Project

Northeast Engineering & CommissioningT: (978) 430-0565

BOILER ROOM NEWHOT WATER PIPING HEATING

SCHEMATIC

REPLACEMENT OF STEAM TOHOT WATER HEAT EXCHANGER PROJECT

COOLIDGE MIDDLE SCHOOL89 BIRCH MEADOW DRIVE

READING MASSACHUSETTS

Of 7

Sheet 6

ISSUED FOR BID

FEBRUARY 13, 2020

Page 8: Coolidge Middle School Boilersportal.gienapparchitects.com/storage/Erz3tMdaZ6M2/...Project Status Coolidge Middle School Boilers H-1 Legend, Abbreviation And Details H-2 Boiler Room

LTC

LTC

LTCDrawn

Designed

Scale

Date

Draw

ing Num

ber No Scale

Checked

Sheet Title Project

Northeast Engineering & CommissioningT: (978) 430-0565

BOILER VENTING ANDCOMBUSTION AIR INTAKEELEVATION AND SECTION

REPLACEMENT OF STEAM TOHOT WATER HEAT EXCHANGER PROJECT

COOLIDGE MIDDLE SCHOOL89 BIRCH MEADOW DRIVE

READING MASSACHUSETTS

Of 7

Sheet 7

ISSUED FOR BID

FEBRUARY 13, 2020