// A North Virginia Office Building
MEMORIAL VISTA
Advisor // Craig Dubler
William J. Gamble // Construction Option
I. Project Background
I. Overview
II. Existing Conditions
II. Analysis 1 // SIPS
III. Analysis 2 // Prefab & PV Windows
IV.Analysis 3 // Automated Parking Garage
V. Conclusions & Recommendations
VI.Acknowledgements
// Presentation Outline Memorial Vista
William J. Gamble // Construction Option
Location //
Northern Virginia, USA
Main East Coast Office
Building Parameters //
322,725 GSF Above Grade
247,530 Below Grade
5 Stories (North Wing), 6 Stories (South Wing)
2 Levels Below Grade (Parking)
Project Parameters //
Contract Value = $78.5 Million
Dates of Construction = April 2011 – January 2014
Delivery Method = CM at Risk w/ GMP
LEED Certification = 60 Points, LEED Gold
// O
verv
iew
Image Courtesy of Google Images
Ima
ge
Cou
rte
sy o
f G
oo
gle
Im
ag
es
Ima
ge
s C
ou
rte
sy o
f G
oo
gle
Im
ag
es
I. Project Background
I. Overview
II. Existing Conditions
II. Analysis 1 // SIPS
III. Analysis 2 // Prefab & PV Windows
IV.Analysis 3 // Automated Parking Garage
V. Conclusions & Recommendations
VI.Acknowledgements
// Presentation Outline Memorial Vista
William J. Gamble // Construction Option
// E
xis
tin
g C
on
dit
ion
s
1 Story Industrial Warehouse
2 Story Industrial Warehouse
2 Story Industrial Warehouse
1 Story Industrial Building
2 Story Industrial
Warehouse
2 Story Industrial
Warehouse
2 Story Motel
Existing Road to be
removed
{
Key
Actual Durations
Projected Durations 68 Work Days
Description
Issue Site Utilities
Permit9/30/2011 10/11/2011
Clearing, Grading,
& Demo9/21/2011 11/27/2011 10/6/2011 2/3/2012
Excavation,
Sheeting, &
Shoring
12/20/2011 2/16/2012 11/29/2011 3/16/2012
Footing to Grade 2/17/2012 5/10/2012 2/21/2012 7/26/2012
Building 12/7/2011 5/24/2012 1/17/2012 8/2/2012
Mobilization of Site 11/17/2011 12/2/2011 11/21/2011 1/20/2012
Utility Relocations 11/28/2011 2/1/2012 1/16/2012 7/27/2012
Demolition/
Hardscaping12/5/2011 2/19/2011 2/8/2012 6/14/2012
Excavation 3/5/2012 7/13/2012 5/1/2012 9/4/2012
Concrete
Substructure6/13/2012 10/16/2012 8/30/2012 12/11/2012
Concrete
Superstructure10/24/2012 2/25/2013 12/6/2012 5/1/2013
Façade & Roof 1/11/2013 5/13/2013 3/25/2013 6/14/2013
Core MEP /
Finishes5/13/2013 8/29/2013 5/2/2013 10/1/2013
Elevators 4/22/2013 9/25/2013 5/8/2013 10/15/2013
Concrete
Substructure6/28/2012 11/14/2012 9/6/2012 1/29/2013
Concrete
Superstructure11/15/2012 3/7/2013 1/18/2013 5/3/2013
Façade & Roof 2/8/2013 5/17/2013 3/13/2013 6/10/2013
Core MEP /
Finishes5/29/2013 9/11/2013 4/12/2013 10/2/2013
Elevators 3/8/2013 8/15/2013 5/10/2013 10/16/2013
Core MEP /
Finishes4/2/2013 8/5/2013 6/17/2013 10/2/2013
Sitework 3/14/2013 6/19/2013 4/19/2013 8/29/2013
Substantial
Completion6/4/2013 8/27/2013 7/19/2013 10/30/2013
Punchlist 8/28/2013 10/2/2013 10/31/2013 1/6/2014
Base Building
Final Completion10/2/2013 1/6/2014
SITEWORK / INSPECTIONS
LOBBY
DurationsActualProjected
CONSTRUCTION
SOUTH
NORTH
PERMITS
Image Courtesy of Google Maps and Davis
// Presentation Outline
William J. Gamble // Construction Option Memorial Vista
// A
nal
ysis
1
I. Project Background
II. Analysis 1 // SIPS
I. Façade Study
II. Building Zones
III. Impact
III. Analysis 2 // Prefab & PV Windows
IV.Analysis 3 // Automated Parking Garage
V. Conclusions & Recommendations
VI.Acknowledgements
I. Project Background
II. Analysis 1 // SIPS
I. Façade Study
II. Building Zones
III. Impact
III. Analysis 2 // Prefab & PV Windows
IV.Analysis 3 // Automated Parking Garage
V. Conclusions & Recommendations
VI.Acknowledgements
// Presentation Outline Memorial Vista
William J. Gamble // Construction Option
// F
açad
e S
tud
y
// C
ran
e O
rie
nta
tio
n
N. Wing
S. Wing
W2
Precast Conc.
Panel Composite
Metal Panel
W1B W1 W5A
W6A
CW1A W5B
W6B
CW1B
CW1D
Composite
Metal Panel
CW1E
5WE
5WD 5WC G3
W6C
W6D CW1A
W1 W1A Precast
Conc. Panel
W3
CW4B
Precast
Conc. Panel
Precast
Conc. Panel
Composite
Metal Panel
Composite
Metal Panel
CW2A CW1C
W4 G3
CW2B
CW4B
CW1B
W3C
W3B
W3A
CW2A
CW1B
W2C
W2B
W2A
CW3 CW4C
CW2A
CW1C
Composite
Metal Panel
Crane Layout
Courtesy of: // F
açad
e B
reak
do
wn
Ele
va
tio
ns C
ou
rte
sy o
f G
en
sle
r
I. Project Background
II. Analysis 1 // SIPS
I. Façade Study
II. Building Zones
III. Impact
III. Analysis 2 // Prefab & PV Windows
IV.Analysis 3 // Automated Parking Garage
V. Conclusions & Recommendations
VI.Acknowledgements
// Presentation Outline Memorial Vista
William J. Gamble // Construction Option
// C
ran
e O
rie
nta
tio
n
N. Wing
S. Wing
// F
açad
e B
reak
do
wn
W2
Precast Conc.
Panel Composite
Metal Panel
W1B W1 W5A
W6A
CW1A W5B
W6B
CW1B
CW1D
Composite
Metal Panel
CW1E
5WE
5WD 5WC G3
W6C
W6D CW1A
W1 W1A Precast
Conc. Panel
W3
CW4B
Precast
Conc. Panel
Precast
Conc. Panel
Composite
Metal Panel
Composite
Metal Panel
CW2A CW1C
W4 G3
CW2B
CW4B
CW1B
W3C
W3B
W3A
CW2A
CW1B
W2C
W2B
W2A
CW3 CW4C
CW2A
CW1C
Composite
Metal Panel //
Faç
ade
Stu
dy
Ele
va
tio
ns C
ou
rte
sy o
f G
en
sle
r
Crane Layout
Courtesy of:
// Presentation Outline Memorial Vista
William J. Gamble // Construction Option
// B
uil
din
g Z
on
es
ZONE 1 ZONE 3 ZONE 5 ZONE 7
ZONE 2 ZONE 4 ZONE 6
// B
uil
din
g Z
on
es
NORTH WING
SOUTH WING
I. Project Background
II. Analysis 1 // SIPS
I. Façade Study
II. Building Zones
III. Impact
III. Analysis 2 // Prefab & PV Windows
IV.Analysis 3 // Automated Parking Garage
V. Conclusions & Recommendations
VI.Acknowledgements
150’ – 11”
19
5’ –
1/4
”
28
8’ –
10
7/8
”
150’ – 11”
Total L.F. of Glass Façade = 759.27 L.F. Average Ceiling Height = 11.5 ft.
Total L.F. of Glazing – 3rd Floor = (759.27)*(11.5) = 8,731.605 S.F. Total L.F. of Precast Façade = 384 L.F. Average Height = 5.75 ft.
Total L.F. of Precast – 3rd Floor = (384)*(5.75) = 2,208 S.F.
100’
22
0’
64’
S. Wing = 101 Work Days / 6 Stories
= 16.833 Work Days / Floor
N. Wing = 66 Work Days / 5 Stories
= 13.2 Work Days / Floor
RED = Glazing
= 9.095 Days/ floor wing
GREEN = Precast Concrete Panels
= 1.15 Days / floor wing
= 10.245 days ~ 11 Days (<16.833)
Floor Plan Courtesy of Gensler
Table Courtesy of Davis
// Presentation Outline Memorial Vista
William J. Gamble // Construction Option
// B
uil
din
g Z
on
es
ZONE 3
// B
uil
din
g Z
on
es
150’ – 11”
19
5’ –
1/4
”
28
8’ –
10
7/8
”
150’ – 11”
Total L.F. of Glass Façade = 759.27 L.F. Average Ceiling Height = 11.5 ft.
Total L.F. of Glazing – 3rd Floor = (759.27)*(11.5) = 8,731.605 S.F. Total L.F. of Precast Façade = 384 L.F. Average Height = 5.75 ft.
Total L.F. of Precast – 3rd Floor = (384)*(5.75) = 2,208 S.F.
100’
22
0’
64’
RED = Glazing
= 9.095 Days/ floor wing
GREEN = Precast Concrete Panels
= 1.15 Days / floor wing
= 10.245 days ~ 11 Days (<16.833)
I. Project Background
II. Analysis 1 // SIPS
I. Façade Study
II. Building Zones
III. Impact
III. Analysis 2 // Prefab & PV Windows
IV.Analysis 3 // Automated Parking Garage
V. Conclusions & Recommendations
VI.Acknowledgements
NORTH WING
SOUTH WING S. Wing = 101 Work Days / 6 Stories
= 16.833 Work Days / Floor
N. Wing = 66 Work Days / 5 Stories
= 13.2 Work Days / Floor
Floor Plan Courtesy of Gensler
Table Courtesy of Davis
// Presentation Outline Memorial Vista
William J. Gamble // Construction Option
// B
uil
din
g Z
on
es
Zone 3 = Level 3
South Wing 152 Panels
28 Min [Precast]
35.86 min [Glazing]
I. Project Background
II. Analysis 1 // SIPS
I. Façade Study
II. Building Zones
III. Impact
III. Analysis 2 // Prefab & PV Windows
IV.Analysis 3 // Automated Parking Garage
V. Conclusions & Recommendations
VI.Acknowledgements
Vision Glass
Precast Concrete
Spandrel Glass
Typical Precast
Panel
Typical Glazing
Panel
// 4
-D S
ynch
ro M
od
el
Interpolate for Zones in N. Wing
𝑆. 𝑊𝑖𝑛𝑔
𝑁. 𝑊𝑖𝑛𝑔=
16.833daysfloor
(𝑜𝑟𝑖𝑔𝑖𝑛𝑎𝑙 𝑑𝑢𝑟𝑎𝑡𝑎𝑡𝑖𝑜𝑛)
13.2daysfloor
(𝑜𝑟𝑖𝑔𝑖𝑛𝑎𝑙 𝑑𝑢𝑟𝑎𝑡𝑖𝑜𝑛)=
11.573𝑑𝑎𝑦𝑠𝑓𝑙𝑜𝑜𝑟
(𝑐𝑎𝑙𝑐𝑢𝑙𝑎𝑡𝑒𝑑 𝑠𝑐ℎ𝑒𝑑𝑢𝑙𝑒 𝑑𝑢𝑟𝑎𝑡𝑖𝑜𝑛)
𝑋 (𝑠𝑐ℎ𝑒𝑑𝑢𝑙𝑒 𝑑𝑢𝑟𝑎𝑡𝑖𝑜𝑛 𝑓𝑜𝑟 𝑁𝑜𝑟𝑡ℎ 𝑊𝑖𝑛𝑔)
Where 𝑋 = 𝟗. 𝟎𝟕𝟓 𝒅𝒂𝒚𝒔/𝒇𝒍𝒐𝒐𝒓
South Wing
Floors being taken into account: 2, 3, 4, & 5 (4 floors total)
Actual duration to do these floors = (16.833 days/floor)*(4 floors) = 67.332 days
SIPS duration = (11.573 days/floor)*(4 floors) = 46.292 days
Difference of 21.04 days ~~ 21 days
North Wing
Floors being taken into account: 2, 3, 4, & 5 (3 floors total)
Actual duration to do these floors = (13.2 days/floor)*(3 floors) = 39.6 days
SIPS duration = (9.075 days/floor)*(3 floors) = 27.225 days
Difference of 12.375 days ~~ 12 days
// Presentation Outline Memorial Vista
William J. Gamble // Construction Option
// Im
pac
t
// In
terp
ola
tio
n
I. Project Background
II. Analysis 1 // SIPS
I. Façade Study
II. Building Zones
III. Impact
III. Analysis 2 // Prefab & PV Windows
IV.Analysis 3 // Automated Parking Garage
V. Conclusions & Recommendations
VI.Acknowledgements
Total Installation Time for Zone 1, 3, 5, & 7
ZONE 1 ZONE 3 ZONE 5 ZONE 7
ZONE 2 ZONE 4 ZONE 6
Total Installation Time for Zone 2, 4, & 6
33 Days Saved Total
// Presentation Outline
William J. Gamble // Construction Option Memorial Vista
// A
nal
ysis
2
I. Project Background
II. Analysis 1 // SIPS
III. Analysis 2 // Prefab & PV Windows
I. Solar Study (Breadth)
II. Prefabrication Process
III. Impact
IV.Analysis 3 // Automated Parking Garage
V. Conclusions & Recommendations
VI.Acknowledgements
I. Project Background
II. Analysis 1 // SIPS
III. Analysis 2 // Prefab & PV Windows
I. Solar Study (Breadth)
II. Prefabrication Process
III. Impact
IV.Analysis 3 // Automated Parking Garage
V. Conclusions & Recommendations
VI.Acknowledgements
// Presentation Outline Memorial Vista
William J. Gamble // Construction Option
// S
ola
r S
tud
y
Summer Solstice
Winter Solstice
Vernal & Autumnal Equinox
12 13
14
15
16
17
18
11
10
9
8
7
6
N
345°
330°
315°
300°
15°
30°
45°
60°
Image Courtesy of Autodesk Ecotect 2011
Image Courtesy of Gensler Im
ag
e C
ou
rte
sy o
f G
oo
gle
Im
ag
es
// P
V G
lass
Lo
cati
on
I. Project Background
II. Analysis 1 // SIPS
III. Analysis 2 // Prefab & PV Windows
I. Solar Study (Breadth)
II. Prefabrication Process
III. Impact
IV.Analysis 3 // Automated Parking Garage
V. Conclusions & Recommendations
VI.Acknowledgements
// Presentation Outline Memorial Vista
William J. Gamble // Construction Option
// P
refa
bri
cati
on
Pro
cess
// F
açad
e P
refa
bri
cati
on
`
Each color Stands for a single
load of panels.
833 Panels Total
31 Prefab Trucks Required
Northern, VA
Northern, VA
// P
refa
b D
eli
very
Images Courtesy of Google Images
Maps C
ourt
esy
of
MapQ
uest
Cost for Memoiral Vista to Run in January = $3,022.85 ∗ 31 days = $𝟗𝟑, 𝟕𝟎𝟖. 𝟐𝟗
Cost for Memorial Vista to Run per Year = $𝟏, 𝟏𝟎𝟑, 𝟑𝟒𝟎. 𝟐𝟓
I. Project Background
II. Analysis 1 // SIPS
III. Analysis 2 // Prefab & PV Windows
I. Solar Study (Breadth)
II. Prefabrication Process
III. Impact
IV.Analysis 3 // Automated Parking Garage
V. Conclusions & Recommendations
VI.Acknowledgements
// Presentation Outline Memorial Vista
William J. Gamble // Construction Option
// Im
pac
t
// S
avin
gs
Total SF of Glazing = 96599.94
Total kW = 96.60
Cost Savings
per Year = 6,649.84
Saves 5.9 Minutes/ Panel
833 Panels
= 10.239 days
10 Days Saved Total
Image Courtesy of Gensler
Image Courtesy of PSU’s OPP
// Presentation Outline
William J. Gamble // Construction Option Memorial Vista
// A
nal
ysis
3
I. Project Background
II. Analysis 1 // SIPS
III. Analysis 2 // Prefab & PV Windows
IV.Analysis 3 // Automated Parking Garage
I. Soil Mitigation
II. Redesign (Breath)
III. Impact
V. Conclusions & Recommendations
VI.Acknowledgements
I. Project Background
II. Analysis 1 // SIPS
III. Analysis 2 // Prefab & PV Windows
IV.Analysis 3 // Automated Parking Garage
I. Soil Mitigation
II. Redesign (Breath)
III. Impact
V. Conclusions & Recommendations
VI.Acknowledgements
// Presentation Outline Memorial Vista
William J. Gamble // Construction Option
// S
oil
Mit
igat
ion
// T
est
Bo
re S
amp
les
2,124 Wells Total
US EPA estimates $32 to $73 per cubic yard
Memorial Vista = 4.7 Acres at 29.17 foot
minimum excavation
= 47,061 CY
US EPA Estimates Contaminant Mediation to
be between $1,505,952 and $3,435,453
// I
n-S
itu
Ele
ctri
cal T
he
rmal
Tre
atm
en
t
115 Days to Excavate (Originally)
Originally 115 Days for excavation / Soil contaminant mitigation
Process would start on November 8th (of 2013) and take 45 days to drill and mitigate the contamination
Leaving 70 days to excavate to be on schedule
Images Courtesy of Davis Construction
Image Courtesy of
Google Maps
Image Courtesy of Google Images
I. Project Background
II. Analysis 1 // SIPS
III. Analysis 2 // Prefab & PV Windows
IV.Analysis 3 // Automated Parking Garage
I. Soil Mitigation
II. Redesign (Breath)
III. Impact
V. Conclusions & Recommendations
VI.Acknowledgements
// Presentation Outline Memorial Vista
William J. Gamble // Construction Option
// R
ed
esi
gn
// O
rig
inal
De
sig
n
Estimated Automated
Garage Area
Original Garage
Area
Actual Design Tailored to
Memorial Vista
Automated Garage Estimated to be 60% of
the area and 50% of the Depth
Designed Automated
Garage Area
Original Garage
Area
Level P1
Level P2
KEY Entering the Traditional Garage Exiting the Traditional Garage
556 Total Parking Spaces
247,530 SF
430 SF per Space
Images Courtesy of Gensler
I. Project Background
II. Analysis 1 // SIPS
III. Analysis 2 // Prefab & PV Windows
IV.Analysis 3 // Automated Parking Garage
I. Soil Mitigation
II. Redesign (Breath)
III. Impact
V. Conclusions & Recommendations
VI.Acknowledgements
// Presentation Outline Memorial Vista
William J. Gamble // Construction Option
// A
uto
mat
ed
Gar
age
Lay
ou
t
// R
ed
esi
gn 2 Level Garage (Level P1 & P2)
Level P1 = 7’2” Floor to Floor Height
(Class A, B, & C Cars)
Level P2 = 6’10” Floor to Floor Height
(Class A & B Cars)
560 Parking Spaces
Key
Entering Vehicle Storing Vehicle Retrieving Vehicle Exiting Vehicle
Isometric
View
Ramp
Level
1st Level of
Parking
2nd Level of
Parking
Key
Pedestrian Traffic
Images Courtesy of Unitronics
I. Project Background
II. Analysis 1 // SIPS
III. Analysis 2 // Prefab & PV Windows
IV.Analysis 3 // Automated Parking Garage
I. Soil Mitigation
II. Redesign (Breath)
III. Impact
V. Conclusions & Recommendations
VI.Acknowledgements
// Presentation Outline Memorial Vista
William J. Gamble // Construction Option
// C
ost
& T
ime
Co
mp
aris
on
TypeUnit Cost
($/SF)X
Efficiency
(SF/ Stall)=
Cost Per
Stall+
Automated Machinery
Cost($/Stall)=
Total Cost
($/StallX
Number
of Stalls=
Total Garage
Cost
Ramp Garage $105 X 430 = $45,150 + $0 = $45,150 X 556 = $25,103,400
Automated Garage $85 X 225 = $19,125 + $12,000 = $31,125 X 560 = $17,430,000
// Im
pac
t
Designed Automated
Garage Area
Original Garage
Area
Actual Cost of Garage for Memorial Vista = $24.8 Million
Automated Garage = 36% Cost Decrease
Original Excavation Area = 132,650 CY
115 Days to Excavate Originally
Yielding 1,153 CY/ Day
New Automated Garage Area = 59,426 CY
70 Days Remaining for Excavation
Constant 1,153 CY/ Day
Yielding a total of 52 days to excavate the site
Automated Garage & In-Situ Soil Contaminant Mitigation saves 18 days
18 Days Saved Total Image Courtesy of Unitronics
Graphs Courtesy of Unitronics
I. Project Background
I. Analysis 1 // SIPS
II. Analysis 2 // Prefab & PV Windows
III. Analysis 3 // Automated Parking Garage
IV.Conclusions & Recommendations
V. Acknowledgements
// Presentation Outline Memorial Vista
William J. Gamble // Construction Option
// C
on
clu
sio
ns
& R
eco
mm
en
dat
ion
s
Analysis 1 // SIPS on the Façade
Analysis 2 // Photovoltaic Glazing Units
Prefabrication
Analysis 3 //
Soil Contaminant Mitigation
Automated Parking Structure 18 Days Saved
10 Days Saved
33 Days Saved
(24 yr. Payback Period)
{
Key
Actual Durations
Projected Durations 68 Work Days
+
61 Days Saved Total 68 – 61 = 7 Work Days off Original Schedule
I. Project Background
I. Analysis 1 // SIPS
II. Analysis 2 // Prefab & PV Windows
III. Analysis 3 // Automated Parking Garage
IV.Conclusions & Recommendations
V. Acknowledgements
// Presentation Outline Memorial Vista
William J. Gamble // Construction Option
// A
ckn
ow
led
ge
me
nts
Acknowledgements //
Penn State Architectural Engineering Faculty
James G. Davis Construction Corporation
Special Tanks To //
Dr. Craig R. Dubler – Senior Thesis Advisor
Chris Voros – Davis Project Manager
Todd Povell – Davis Virtual Construction Manager
Bill Moyer – Davis Executive Vice President
Fred Gorove – Unitronics Parking Development Assistant
Patrick Hartford – Harmon Inc. Estimator
Family & Friends
Image Courtesy of Gensler
Ima
ge
s C
ou
rte
sy o
f G
oo
gle
// Presentation Outline
William J. Gamble // Construction Option Memorial Vista
// T
han
k Y
ou
I. Project Background
II. Analysis 1 // SIPS
III. Analysis 2 // Prefab & PV Windows
IV.Analysis 3 // Automated Parking Garage
V. Conclusions & Recommendations
VI.Acknowledgements
// Questions?
// Presentation Outline
William J. Gamble // Construction Option Memorial Vista
I. Project Background
II. Analysis 1 // SIPS
III. Analysis 2 // Prefab & PV Windows
IV.Analysis 3 // Automated Parking Garage
V. Conclusions & Recommendations
VI.Acknowledgements
// Presentation Outline
William J. Gamble // Construction Option Memorial Vista
// A
nal
ysis
1
I. Project Background
II. Analysis 1 // SIPS
III. Analysis 2 // Prefab & PV Windows
IV.Analysis 3 // Automated Parking Garage
V. Conclusions & Recommendations
VI.Acknowledgements
// Appendix Duration per Panel Installed
11 days to construct a floor (Where there are 8 work hours/day) = 88 work
hours per floor wing
(88 hours) / (152 Panels) = 34.73 minutes per panel – Installation
This value takes into account crane operation or hoisting material to
the proper bay.
Therefore:
It takes 34.73 minutes on average to complete one panel around the perimeter
of the building.
There are 130 panels of glazing.
There are 22 precast pieces.
It is assumed that 28 minutes is assigned for the precast panels. This allows
the left over 6.73 minutes of each of the concrete panels (or 148.06 minutes
total)
Each of the 130 glazing panels of the third floor facade then gain 1.13 minutes
of additional installation time, yielding a total installation time to be 35.86
minutes.
// Presentation Outline
William J. Gamble // Construction Option Memorial Vista
// A
nal
ysis
2
I. Project Background
II. Analysis 1 // SIPS
III. Analysis 2 // Prefab & PV Windows
IV.Analysis 3 // Automated Parking Garage
V. Conclusions & Recommendations
VI.Acknowledgements
// Appendix Watts/Panel
Width
(ft.)
Height
(ft.)SF/Panel Watts/SF
Total SF of
GlazingTotal Watts
Total
kWDays/Yr
Hrs/Day of Sunlight in
VA (kWh/day)Hrs/Yr
Total
kWh/Yr
Cost/kWh
in VA
Cost
Savings/Yr
252.8 5.00 5.00 25.00 10.11 9553.00 96599.94 96.60 365 2.3 839.5 81,096 $0.08 $6,649.84
Map found at Solar Direct 2014 to get Kilowatt hours of sunlight per
day in Northern Virginia
Spec for PV window from Pythagoras Solar
2 Switchboards at 4,000 A = 3,2072 kW
Energy
Day= 3,072 kW ∗ Time that Building is in Use
**7 A.M. to 7 P.M. would be the typical time frame Energy
Day= 3,072 kW ∗ 12 hrs. = 36,864 kW - h
8.2 Cents/ kWh in Northern VA
Cost
Day= 36,864 kWh ∗ 8.20
Cents
kWh= 302,284.8 cents ∗
1dollar
100cents= $3,022.85
Cost
Month= $3,022.85 ∗ #of days in January = $3,022.85 ∗ 31 days = $𝟗𝟑, 𝟕𝟎𝟖. 𝟐𝟗
Cost
Year= $3,022.85 ∗ #of days in a year = $3,022.85 ∗ 365 days = $𝟏, 𝟏𝟎𝟑, 𝟑𝟒𝟎. 𝟐𝟓
// Presentation Outline
William J. Gamble // Construction Option Memorial Vista
// A
nal
ysis
2
I. Project Background
II. Analysis 1 // SIPS
III. Analysis 2 // Prefab & PV Windows
IV.Analysis 3 // Automated Parking Garage
V. Conclusions & Recommendations
VI.Acknowledgements
// Appendix 1
4 3
2
5
Entering the Garage Exiting the Garage
All images courtesy of
Unitronics