© Copyright Genpact All Rights Reserved

Best Practice Sharing

Preparing an Organization for

Planning/Forecasting Processes

© Copyright Genpact All Rights Reserved

Presentation Title Goes Here

Date: 17-Aug-2012

© Copyright Genpact All Rights Reserved

Planning/Forecasting Processes

Using Oracle R12

Introduction to Knape and Vogt

1. Founded in 1898

2. Acquired by Wind Point Partners in

2006

3. High level of Growth through Acquisition

4. Facilities in Grand Rapids MI

(Headquarters), Petaluma CA

(Workrite), and Taipei Taiwan (GSlide)

© Copyright Genpact All Rights Reserved

(Workrite), and Taipei Taiwan (GSlide)

as well as a sales office in Canada

Introduction to Knape and Vogt

Product Categories

Market Served

© Copyright Genpact All Rights Reserved

A mid-sized manufacturing org on a growth path

Introduction to Genpact

Manufacturing� Discrete � Process

BFS& I� Banking

� Insurance

Business Services� Telecom, Media� Hospitality

SIZE• Over 3,000 Oracle professionals

• One of the largest Oracle

capabilities globally

• Over 3.1 million days of Oracle

experience

EXPERIENCE• 160+ go-lives in 40+ countries

• Support experience of 46,000

plus users

• 60% resources > 5 years of

industry experience

© Copyright Genpact All Rights Reserved

Oracle EBS Suite | Oracle Database | Siebel | Hyperion + OBIEE

ERPSTRATEGY

DESIGN BUILDRUN &

UPGRADE

• > 80% resources trained in Lean,

Six Sigma, CMMi

EXPERTISE / SKILLS• Centers of Excellence (CoE)

dedicated for Industry Vertical

Solutions

• Full life-cycle capabilities for

deployment and upgrade

solutions

• 24x7 maintenance &

enhancement capabilities

• Strong DNA of managing

Program Management Offices

(PMO)

Approach And Solution

Identify the improvement areas

Assess the benefits

Evaluate product alternatives

© Copyright Genpact All Rights Reserved

Define the planning/forecasting organization

Design the info flow

As-Is Process – Improvement Areas

Spread sheet based manual process

Calculate future usage based on past consumption

Limited S&OP inputs

Inability to track ‘forecast’ accuracy easily

© Copyright Genpact All Rights Reserved

Inability to track ‘forecast’ accuracy easily

No functionality to factor trend/seasonality over long term

Difficulty in assessing the resource requirements and their scheduling

Key Benefits of To-Be Process

Best of breed forecasting and planning engine

Ability to review/tune/improve forecast accuracy

Automation of work order entry

© Copyright Genpact All Rights Reserved

Better management labor scheduling

Improve inventory turns in long run

Evaluate Product Alternatives

KV – Known Key Requirements Product 1 Product 2 Product 3

Robust Forecasting tool (with multiple

forecasting methodologies)��� � �

Business Intelligence – Dashboards & Reporting � � �

Inventory Classification & Segmentation X X �

Scope and flexibility for customization based on

business needs � � �

Scalability �� � �

© Copyright Genpact All Rights Reserved

�� � �

Version upgrade flexibility �� � �

Minimal additional hardware requirements � � �

Provision for market intelligence inputs � �� ��

Enhanced exception handling ability � � �

In built alerts for prompt action � � �

Selection Criteria – A Snapshot

Final Score

Cost

License

Maintenance

Ongoing Support

Tech support

Duration

Sales

Visibility level?

© Copyright Genpact All Rights Reserved

Functionalities

Inputs?

Marketing

Planning

SKU or Prod Family?

Exceptions?

FinanceIntegrate to Essbase?

ITIntegration to

legacy?

MiscCustom reports?

Define Organization – Roles and Responsibilities

Before After

Demand Planning

System Administrator

Demand Planners

Marketing/Sales

© Copyright Genpact All Rights Reserved

Planners

Planning LeadPlanning Team

Shop Floor

Re-organization To Drive Synergy

Shop Floor

Key Lessons Learned

Process Management

• Perform a LEAN workout to derive process benefits

• Follow Oracle standard flows

• Start with basics and then build on it (ASCP unconst.

Change Management

• Functional lead should be tech savvy

• Robust end user training

• Review forecast info again and again

Technical Solution

• Test the links with feeder systems and analyze the fallouts

• Conduct multiple iterations with master data

• Utilize Oracle APS

© Copyright Genpact All Rights Reserved

it (ASCP unconst. to EDD)

again

• Buy-in from executive level for the investment and re-org

• Utilize Oracle APS standard hooks and codes

Take-away> Leverage Process + Oracle R12 to Derive Benefits

Thank You

Sanjay Sil

Sr Principal Consultant

Genpact

[email protected]

Salli Churchill

IT Manager

Knape and Vogt

[email protected]

Gene Olsen

Sr VMI Analyst

© Copyright Genpact All Rights Reserved

Presentation Title Goes Here

© Copyright Genpact All Rights Reserved

www.genpact.com www.knapeandvogt.com

Sr VMI Analyst

Knape and Vogt

[email protected]

Our Values

© Copyright Genpact All Rights Reserved