    EDP Project

    SEPT - 2011

  • 8/12/2019 Cost of Quality_Final - 24.01.2012

    2/22

    2

    Define Cost of Quality and Develop Report for Cost of Quality

    Project Objective: To Study and Define Cost of Quality and Developing Report for

    measuring and analysing Cost of Quality

    Project Deliverables:

    1. To Define Cost of Quality (before sales and after sale)

    2. To determine the elements of Cost to be considered for determining the Cost of Quality.

    3. To standardize a format for capturing the Cost of Quality

    4. Assess the status where TML stands in comparison to other Auto industry

    Project Guide: Uttam Biswas, Head (Finance)

    Name Location

    Riat Rashpalsingh Pune PCBU

    Verma Manish Jamshedpur Works

    Kumar Dhanu Jamshedpur Works

    Taiyab Md. Jamshedpur Works

    Kothari Manoj Pantnagar Works

    TEAM MEMBERS

  • 8/12/2019 Cost of Quality_Final - 24.01.2012

    3/22

    3

    Cost of Quality

    The COQ is the cost (both Tangible and Intangible)

    relating to the Quality characteristics of a product orService.

    Definition

  • 8/12/2019 Cost of Quality_Final - 24.01.2012

    4/22

    4

    1. Cos ts of conformance

    (Cost of control):It has twocomponents:

    Prevention costs

    Appraisal costs

    2. Cos ts of non conformance(Cost of failure of control):It

    has two components:

    Internal failure costs

    External failure costs

    Elements of costs to determine Cost of Quality

  • 8/12/2019 Cost of Quality_Final - 24.01.2012

    5/22

    5

    1. Quality management has a major impact on the financial results.

    2. Many areas do not realize the actual cost of quality leading to high quality cost

    3. To achieve the most effective improvement effort, it is evident that quality and

    costs are complementary and not conflicting objectives.

    GENESIS OF THE PROJECT

    The goals of this project are to measure as

    accurately as possible the Costs of Quality, to identify

    what could be improved in order to optimize costsand processes, and to set up a framework

    for the collection and analysis of quality costs.

  • 8/12/2019 Cost of Quality_Final - 24.01.2012

    6/22

    6

    Quality Cost

  • 8/12/2019 Cost of Quality_Final - 24.01.2012

    7/227

    Scraps

    Customer returns

    Inspection costs

    Testing costs

    Reprocess

    Loss of market share

    Loss of costumers

    Lack of motivation

    Development cost of

    failed product

    Unused capacity

    Loss of productivity

    Inefficient processes

    Longer product life

    cycle

    Iceberg Model - Intangible costs,

  • 8/12/2019 Cost of Quality_Final - 24.01.2012

    8/228

    WORK DONE FOR DEVELOPING FORMAT FOR CAPTURING COST OF QUALITY

    Benchmark data for cost of quality is not available from other Automotive

    Industries

    Cost of Quality for all the four plants (Jsr, Lkw, Pune & Pantnagar) were

    gathered and studied.

    Comparison was done in between the reporting of Cost of Quality for all theplants.

    All elements of cost involvement were studied inside the plant and

    recommendations given for capturing the same

    Cost elements were categorized according to the type of costs

  • 8/12/2019 Cost of Quality_Final - 24.01.2012

    9/229

    Scraps

    Customer returns

    Inspection costs

    Testing costs

    Reprocess

    Loss of market share

    Loss of costumers

    Lack of motivation

    Development cost of

    failed product

    Unused capacity

    Loss of productivity

    Inefficient processes

    Longer product life

    cycle

    Iceberg Model - Intangible costs,

  • 8/12/2019 Cost of Quality_Final - 24.01.2012

    10/2210

    JAMSHEDPUR FORMAT FOR CAPTURING COST OF QUALITY

    S. No. Particulars Source of Data

    1.0 Prevention Costs

    1 Products/Service/Design Development 80% of Beta Proto Shop (1216280) Revenue and ERC PTS to other location + 46 %

    Share of Common Services

    1 Purchasing Prevention Costs Total expense of ADD (BC 1216936) and Sourcing World Truck (1216272) has been

    considered for purchasing prevention cost + 26 % Share of C.S .

    1 Operations Prevention Costs Cost of maintenence work + 26 % Share of C.S .

    1 Quality Administration Total expense of Inspection + 26 % Share of Common Services

    1 Other Prevention Costs

    2.0 Appraisal Costs

    2 Purchasing Appraisal Costs Not Tracked

    2 Operations Appraisal Costs Total cost of Inspection + 26% Share of Common Service2 External Appraisal Costs PDI provision

    2 Review of Test and Inspection Data 20% of Beta Proto Shop (1216280) Revenue and ERC PTS to other location + 46 %

    Share of C.S.

    2 Misc. Quality evaluations

    3.0 Internal Failure Costs

    3 Product/Service Design Failure Costs Not Tracked

    3 Purchasing Failure Costs Not Tracked

    3 Operations Failure Costs Not Tracked

    3 Scrap Net Values of amount booked as scrap in GL 400001 & 891001& Recovery in 4001013 Rework

    3 Rectification Cost of Rectification work Centres

    3 Other Internal failure costs

    4.0 External Failure Costs

    4 Warranty Cost Warranty Provision

    TOTAL QUALITY COSTS

    PRODUCTION: (Eq. Nos.) Total Eq Veh

  • 8/12/2019 Cost of Quality_Final - 24.01.2012

    11/2211

    S. No. Particulars Source of Data

    1.0 Prevention Costs

    1 Products/Service/Design Development 80% of ERC Revenue and Support Projects cost

    1 Purchasing Prevention Costs Total expense of ADD (BC 1316240) has been considered for purchasing preventioncost.(Manpower Cost)

    1 Operations Prevention Costs Manpower Cost for workers employed for maintenence work (data manually by area

    owner) and machinery spares expense (SAP)

    1 Quality Administration Total expense of QA (BC 1316500)+ C/s share

    1 Other Prevention Costs

    2.0 Appraisal Costs

    2 Purchasing Appraisal Costs 80% of ERC Revenue and Support Projects cost

    2 Operations Appraisal Costs Total expense of ADD (BC 1316240) has been considered for purchasing prevention

    cost.(Manpower Cost)

    2 External Appraisal Costs Manpower Cost for workers employed for maintenence work (data manually by area

    owner) and machinery spares expense (SAP)

    2 Review of Test and Ispection Data Total expense of QA (BC 1316500)+ C/s share

    2 Misc. Quality evaluations

    3.0 Internal Failure Costs

    3 Product/Service Design Failure Costs Not Tracked

    3 Purchasing Failure Costs Not Tracked

    3 Operations Failure Costs Not Tracked

    3 Scrap Values booked as scrap in GL 400001 & 891001

    3 Rework 3 Rectification Manpower employed for Rectification work in R2 area and other direct cost centres

    (Captured Mannualy)

    3 Other Internal failure costs

    4.0 External Failure Costs

    4 Warranty Cost Warranty Provision

    Retro Cost Values booked in GL 445915 Campgn/RetroFit Exps

    TOTAL QUALITY COSTS

    PRODUCTION: (Eq. Nos.) Total Eq Veh

    LUCKNOW FORMAT FOR CAPTURING COST OF QUALITY

  • 8/12/2019 Cost of Quality_Final - 24.01.2012

    12/2212

    PUNE FORMAT FOR CAPTURING COST OF QUALITY

    PREVENTIVE COSTS

    Quality Planning & Process Control Planning

    Quality Planning Salary -10 % of QA BCs + C/s shareProcess Control Planning Salary 22 % of QA BCs + C/s share

    Quality Planning by functions other than Quality Control M/s Purchase + Projects + APL - 10 % of Salary

    10 % Design of ERC & PE Bc

    30 % Testing Charges of ERC

    Quality Training Training cost - 50 %

    Other Preventive Costs QA Balance Expenses

    APPRAISAL COSTS

    Test & Inspection of purchased Material QA Cost involved in Inward Inspection - 9510 & 9711Self Checking 1 % Salary of Auto for self checking

    Inspection & Testing QA Cost involved in Inward Inspection - Balance salaries + C/s Allocation

    Test & Inspection Material Estimated Rs.25 lakhs per Qtr

    Outside Endorsements / Approvals a/c 439350 - Testing charges

    Maintenance & Calibration of Inspection & Test Equipments QA Metrology Expenses - Partial salary + depreciation Cost

    INTERNAL FAILURES

    Rejections Rejection value of auto provided by QA - Value of Controllable Fault (CF)

    Trouble Shooting 5 % of salary of M1 to M5 in Auto + Foundry

    EXTERNAL FAILURES

    Domestic Warranty provision for Current Year

    Export Warranty provision for Current Year

    Additional Provision for previous years (Domestic)

    Additional Provision for previous years (Export)

    Retro fitment Cost

  • 8/12/2019 Cost of Quality_Final - 24.01.2012

    13/2213

    S NO P A R T I C U L A R S Source of Data

    I

    1 Quality Planning & Process Control Planning

    a Quality Planning

    b Process Control Planning

    2 Quality Planning by functions other than Quality Control

    3 Quality Training

    4 Other Preventive Costs

    II

    1 Test & Inspection of purchased Material

    2 Self Checking3 Inspection & Testing

    4 Test & Inspection Material

    5 Outside Endorsements / Approvals

    6 Maintenance & Calibration of Inspection & Test Equipments

    III

    1 Rejections

    2 Trouble Shooting

    IV1 Warranty provision for domestic vehicles sold during

    the period

    2 Additional Provis ion for previous years

    V

    1 Interest on Investments

    APPRAISAL COSTS

    PREVENTIVE COSTS

    OTHERS

    % of Turnover

    GRAND TOTAL ( I TO V )

    EXTERNAL FAILURES

    INTERNAL FAILURES

    PANTNAGAR FORMAT FOR CAPTURING COST OF QUALITY

  • 8/12/2019 Cost of Quality_Final - 24.01.2012

    14/2214

    Particulars Source Of data Particulars Source Of data

    Marketing/Customer/User Not Tracked Quality Planning & Process

    Control Planning

    Products/Service/Design

    Development

    80% of ERC Revenue and Support

    Projects costQuality Planning

    Salary -10 % of QA BCs + C/s

    share

    Purchasing Prevention

    Costs

    Total expense of ADD (BC 1316240)

    has been considered for purchasing

    prevention cost.(Manpower Cost) Process Control PlanningSalary 22 % of QA BCs + C/s

    share

    Operations Prevention

    Costs

    Manpower Cost for workers

    employed for maintenence work

    (data manually by area owner) and

    machinery spares expense (SAP)

    M/s Purchase + Projects +

    APL - 10 % of Salary

    Quality Administration Total expense of QA (BC 1316500)+

    C/s share 10 % Design of ERC & PE BC

    Other Prevention Costs 30 % Testing Charges of ERC

    Quality Training Training cost - 50 %

    Other Preventive Costs QA Balance Expenses

    Lko & Jsr (Format and Reporting Same) Pune & Pantnagar (Format and Reporting Same)

    Quality Planning by functions

    other than Quality Control

    RemarksCOQ

    Elements

    1. Cell indicated with

    red colour are totally

    different for cost

    tracking

    2. Cell indicated with

    same colour (other than

    red) are showing data

    capturing from samesource but criteria is

    different

    Preventive

    Cost

    COMPARISION OF REPORTING FOR ALL LOCATIONS

  • 8/12/2019 Cost of Quality_Final - 24.01.2012

    15/2215

    COMPARISION OF REPORTING FOR ALL LOCATIONS

    Particulars Source Of data Particulars Source Of data

    Purchasing Appraisal Costs Not TrackedTest & Inspection of purchased

    Material

    QA Cost involved in Inward

    Inspection - 9510 & 9711

    Operations Appraisal Costs

    Total cost of VQA (BC 1316550) +

    Manpower employed for Inspection

    work in R2 area and other direct

    cost centres(Manually)

    Self Checking1 % Salary of Auto for self

    checking

    External Appraisal Costs PDI provision Inspection & Testing

    QA Cost involved in Inward

    Inspection - Balance salaries

    + C/s Allocation

    Review of Test and

    Inspection Data

    20% of ERC Revenue and Support

    Projects costTest & Inspection Material Estimated Rs.25 lakhs per Qtr

    Misc. Quality evaluations Outside Endorsements /Approvals a/c 439350 - Testing charges

    Maintenance & Calibration of

    Inspection & Test Equipments

    QA Metrology Expenses -

    Partial salary + dpe

    Lko & Jsr (Format and Reporting Same) Pune & Pantnagar (Format and Reporting Same)

    Appraisal

    Cost

    RemarksCOQ

    Elements

    1. Cell indicated with

    red colour are totally

    different for cost

    tracking

    2. Cell indicated with

    same colour (other than

    red) are showing data

    capturing from same

    source but criteria is

    different

  • 8/12/2019 Cost of Quality_Final - 24.01.2012

    16/22

    16

    COMPARISION OF REPORTING FOR ALL LOCATIONS

    Particulars Source Of data Particulars Source Of data

    Product/Service Design

    Failure CostsNot Tracked Rejections

    Rejection value of auto provided by

    QA - Value of CF

    Purchasing Failure Costs Not Tracked Trouble Shooting5 % of salary of M1 to M5 in Auto +

    Foundry

    Operations Failure Costs Not Tracked

    ScrapValues booked as scrap in GL

    400001 & 891001

    Rework

    Rectification

    Manpower employed for

    Rectification work in R2 area and

    other direct cost centres

    (Captured Mannualy)

    Other Internal failure

    costs

    Lko & Jsr (Format and Reporting Same) Pune & Pantnagar (Format and Reporting Same)

    Internal

    Failure

    RemarksCOQ

    Elements

    1. Cell indicated with

    same colour (other than

    red) are showing data

    capturing from same

    source but criteria is

    different

  • 8/12/2019 Cost of Quality_Final - 24.01.2012

    17/22

    17

    COMPARISION OF REPORTING FOR ALL LOCATIONS

    Particulars Source Of data Particulars Source Of data

    Warranty Cost Warraty ProvisionDomestic Warranty provision for

    Current Year

    Retro CostValues booked in GL 445915

    Campgn/RetroFit Exps

    Export Warranty provision for Current

    Year

    Additional Provision for previous

    years (Domestic)

    Additional Provision for previous

    years (Export)

    Retro fitment Cost

    Interest on Investments Interest on QA Net Block

    Inventory Carrying CostInterest on Inventory - 5 % held

    for QA

    Lko & Jsr (Format and Reporting Same) Pune & Pantnagar (Format and Reporting Same)

    External

    Failure

    1. Cell indicated with

    same colour (other than

    red) are showing data

    capturing from same

    source but criteria is

    different

    1. Cell indicated with

    red colour are totally

    different for costtracking

    RemarksCOQ

    Elements

    Others

  • 8/12/2019 Cost of Quality_Final - 24.01.2012

    18/22

    18

    Prevention Cost PARTICULARS RECOMMENDATION JSR LKW Pune Pantnagar

    All cost towards failed project to be

    considered

    All costs related to design development tobe considered

    Expenses of ADDAll Expenses of ADD team for developing

    new vendors to take care of quality issues

    Expenses of SQIG

    Total Expenses of SQIG team as they are

    involved in process correction for getting

    quality components

    Expenses of QA & Materials team for

    conducting PPAP & Training at vendors endAll Expenses of this team to be taken

    Expenses of CFT team for Quality Improvement

    at vendors end All Expenses of this team to be taken

    Expenses for Dies/ Jigs/ Fixtures / ToolsAll expenses for correcting old or providing

    new things to be taken

    Maintenance of machines which are not giving

    desired quality output

    All expenses for correction of machines to

    be taken

    Online updation of Hourly Production Control

    Chart to be started

    Time lost due to Defect/ Repair & Waiting

    for matl for Quality issues to be taken

    Manpower related cost of Central Quality to

    be considered

    Manpower related cost of Divisional QA

    persons to be considered

    Manpower related cost of SQA persons to

    be considered

    Cost of Training to be considered

    Cost of released Manpower to be

    considered

    PDI COST (Internal )All cost related to conducting internal PDI to

    be consirered

    Project CostProducts / Service / Design

    Development

    Other Prevention Costs

    Training Related cost to be considered

    Purchasing Prevention

    Costs

    Operations Prevention

    Costs

    Quality Administration Administ rative Costs

    Not Being Monitored Being Monitored but not taken in COQ Being Monitored & also taken in COQ

    RECOMMENDATIONS

  • 8/12/2019 Cost of Quality_Final - 24.01.2012

    19/22

    19

    Not Being Monitored Being Monitored but not taken in COQ Being Monitored & also taken in COQ

    RECOMMENDATIONS

    Appraisal Cost PARTICULARS RECOMMENDATION JSR LKW Pune Pantnagar

    Cost related to testing of components

    Cost related to destructive testing ofmaterials

    Self Audit Cost

    Pre Delivery Inspection Cost External PDI Cost to be included

    Camps setup for Quality Check of the

    VehiclesCost for setting up camps + Manpower cost

    CFT Team formed for study/ analysis of

    quality issues of vehicles in the field CFT Cost to be included

    Testing Cost of products Cost of testing of vehicles on the field

    Test from other agencies Cost of testing from other agencies

    Cost for calibrationTotal cost of calibration of jigs, Fixtures,

    Tools & Guages

    Misc. Quality evaluations Cost of checking of incoming material

    (Dimensional + Paint)

    Persons cost for checking of incoming

    components

    Operations Appraisal Costs

    External Appraisal Costs

    Review of Test and

    Inspection Data

    Testing Cost

  • 8/12/2019 Cost of Quality_Final - 24.01.2012

    20/22

    20

    Not Being Monitored Being Monitored but not taken in COQ Being Monitored & also taken in COQ

    RECOMMENDATIONS

    Internal Failure Cost PARTICULARS RECOMMENDATION JSR LKW Pune Pantnagar

    Cost of rejection

    Cost of Transportation

    Cost of Manpower in Document Preparation

    Manpower cost involved in rectification

    Tool Room cost for rectification of jobs

    Manufacturing cost for job rectification

    Cost involved in delayed supply of Vehicles

    Total interest paid on QA Blocked stock

    Interest paid on Hold Vehicles/ Aggregates

    Interest on excess inventory held for line

    feeding in case of rejections

    Cost of returning defective material to the

    supplier

    Cost of manpower in despatching the materials

    Misc CostMisc. Cost

    Rejection Rejection Cost

    Rectification Rectification Cost

    Interest on Investments Interest on QA Hold Stock

  • 8/12/2019 Cost of Quality_Final - 24.01.2012

    21/22

    21

    Not Being Monitored Being Monitored but not taken in COQ Being Monitored & also taken in COQ

    RECOMMENDATIONS

    External Failure Cost PARTICULARS RECOMMENDATION JSR LKW Pune Pantnagar

    Domestic warranty cost

    Export Warranty cost

    Market share loss

    Payout for the material of Retro fitment

    Manpower cost for doing retrofitment

    Expenses incured for training to the drivers

    Expenses incurred for training to Vehicle

    Owners

    Training to the Drivers and

    Vehicle OwnersCost of Training

    Warranty Cost for the vehicle Payout of warranty cost

    Retro fitment Cost Payout of Retro Fitment

  • 8/12/2019 Cost of Quality_Final - 24.01.2012

    22/22

    22

    Thank You