Country EstatesFinal Report
PARAGON
Project Team Mike Reeves – Project Manager
Cole Marr – Project Engineer
Bryce Beckstrom – Project Engineer
Amanda Sheehe – Project Editor
Project DescriptionDesign RequirementsProject ApproachWork Completed Projected Work
Project Description
Project Description 66 Acres 22 Estate Size Homes 1-2 Acre Lots ± 33 Acre Community
Space High Efficiency Low Environmental
Impact
Existing Site
Proposed Development
Design Requirements
Objectives Develop 3 Wastewater Treatment Options Develop Stormwater Management Plan Incorporate Greywater Treatment and Reuse Wetland Habitat Area Community Recycling Program Design Trail Around Site
Preliminary Feasibility Study Location Zoning Utilities Transportation Site Characteristics
Environmental Site Assessment Site Reconnaissance
Current and Past Use Tax Information Other Concerns
Interviews Josh Reed – Property Owner Hancock County Assessor’s Office
Codes & Regulations
Regulation Entities Hancock County Conservation Subdivision IDNR LEED 10 State Standards AASHTO
LID Design Options
Preliminary Site Plan Designed According
to Hancock County
Will Meet R-1 Zoning
1-2 Acre Lots for
Adequate Septic
In Contact with Mike Dale - Planning Dept
Use Natural Lay of
Land to Reduce Cut and Fill in Roadway
Roundabout Designed to Standards (TFHDC)
Preliminary Site Plan
Geotechnical Analysis
Wildcat Dynamic Cone Penatrometer
Tube Samples (6” &3’)
Laboratory Analysis of Samples Unconfined Compression Test (ASTM D2166)
Atterberg Limits (ASTM D4318)
Particle Size Analysis (ASTM D422)
Assessment of Wastewater Options 3 Options Considered
Conventional Septic System
Presby Treatment System
Wetlands Treatment
Assessment of Wastewater Options Decision Matrix Criteria
Decision Matrix Results
Alternative Percentage Weighting
Environmental Impact 30%
Cost 30%
Feasibility 20%
Creativity 20%
AlternativeEnvironmental
ImpactCost Feasibility Creativity Total
Conventional Septic 0.9 0.6 0.3 0.45 2.25
Presby System 0.3 0.3 0.15 0.3 1.05
Wetlands Treatment 0.6 0.6 0.45 0.3 1.95
Hydraulics and Hydrology
Design for 100-yr flood Route stormwater
through wetlands Size pipes to control
flooding Design water quality
trenches Promote natural
overland flow
Existing vs Proposed 100-year Storm Routing
Wetlands Treat 170 acres Design wet pond to
allow for sediment settling/quality volume
Research vegetation for the wetlands
Design outlet structure that controls 100-year flood
Erosion Control Plan
Minimize sediment runoff into Miller Ditch
Minimize cut and fill on-site: 680cy cut
Reduce soil that leave site via truck tires
LID/Conservation Highlights 50% Community
Space 20 Lots front
community space Enviro-Septic
Wastewater Treatment
Density meets maximum requirement
Highlights
22 Lots, 1-2 Acres Each Site Layout/Roadway Design Sustainable LID Designs for:
Wastewater
Greywater
Stormwater
$440,000 Cost Estimates for Design/Construction/Lifecycle