Upload
others
View
1
Download
0
Embed Size (px)
Citation preview
Creating Community in the University District: SOUTH UNIVERSITY AVE. CORRIDOR STUDY
PROJECT TEAM:
Dr. Hunter Bacot
Sarah Bennings
Brandon Bibby
Tim Brockway
Heather Davis
Dr. Christopher Diaz
Chris East
Mason Ellis
Lawrence Finn
Kyle Marsh
James Meyer
Carolina Cruz-Neira
Dirk Reiners
Joe Stanley
Caleb Tyson
Jay Williams
Glen Woodruff
Chad Young
1. Create pedestrian friendly crossing
& slow traffic along University Ave.
2. Establish a "campus neighborhood"
along the corridor and West side of
University
3. Create symbolic gateways and
enhance the neighborhood
surrounding UALR.
4. Enhance the economic viability of
the business areas through
improved access.
GOALS
SOUTH UNIVERSITY AVENUE
CORRIDOR STUDY for UALR
UALR
CAMPUS
UALR
CAMPUS
UNIVERSITY AVE.
32
ND S
T.
28
TH S
T.
HIG
HW
AY
5
6
7
BEFORE: 32ND STREET &
UNIVERSTIY AVENUE
INTERSECTION
AFTER: 32ND STREET &
UNIVERSTIY AVENUE
INTERSECTION
UALR
CAMPUS
• Gateways at the End of Intersections
-Paving and Focal Points
• Pedestrian Crossing Emphasized
• Widened Medians with Landscaping
• Sidewalks & Landscaping at edge
• Reduce 6 Lanes to 4 Lanes
• Redesign Accomplished in Existing
Curbs
• Use of UALR Right-of-Way
UNIVERSITY AVE.
32
ND S
T.
UALR
CAMPUS
UALR
CAMPUS
UALR
CAMPUS
UNIVERSITY AVE.
32
ND S
T.
28
TH S
T.
HIG
HW
AY
5
UALR
CAMPUS
UNIVERSITY AVE. 3
2N
D S
T.
28
TH S
T.
HIG
HW
AY
5
UALR
CAMPUS
Local Residence 1
Streetscape
Upgrades
2
Raised
Intersections
3
Sidewalks &
Crosswalks
4
Pedestrian Refuge
Island
5
2
3
5
1
4
32
ND S
T.
UALR
CAMPUS
28
TH S
T.
UNIVERSITY AVE.
HIG
HW
AY
5
v
UALR
CAMPUS
UNIVERSITY AVE. 32
ND S
T.
DICKSON ST.
DICKSON ST.
ELIZABETH ST. MALL
Local Businesses 1
Streetscape
Upgrades
2
Raised
Intersections
3
Sidewalks &
Crosswalks
4
Pedestrian Refuge
Island
5
2
3
5
1
1
4
4
32
ND S
T.
UALR
CAMPUS
28
TH S
T.
UNIVERSITY AVE.
HIG
HW
AY
5
Local Businesses 1
Streetscape
Upgrades
2
Raised
Intersections
3
Sidewalks &
Crosswalks
4
Pedestrian Refuge
Island
5
Signature Building 6
1
6
1 2 3
5 4
32
ND S
T.
UALR
CAMPUS
28
TH S
T.
UNIVERSITY AVE.
HIG
HW
AY
5
Local Businesses 1
Streetscape
Upgrades
2
Raised
Intersections
3
Sidewalks &
Crosswalks
4
Pedestrian Refuge
Island
5
2
3
5
6
4
Gateway Signage 6
1
• Access Across University
Avenue:
-Land Bridge
• Residential and Mixed Use
Development
• Campus Front Facing
University Avenue.
• Campus Facilities on West
Side of University Ave.
UN
IVE
RS
ITY
DR
IVE
La
nd
Brid
ge
W. 3
2nd S
t.
Ca
mp
us D
r.
CROSSING
15’
ELEVATION CHANGE
28
th S
tree
t
As
her
/ H
wy 5
32
ND S
T.
UALR
CAMPUS
28
TH S
T.
UNIVERSITY AVE.
HIG
HW
AY
5
UALR
UNIVERSITY
DISTRICT
University Ave.
UALR
UNIVERSITY
DISTRICT Local Businesses 1
Streetscape
Upgrades
2
Raised Walk to
Campus
3
Sidewalks 4
Public Transit
Station
5
2 3
5
Pedestrian Bridge 6
1
4
6
5
PEDESTRIAN BRIDGE THAT ALSO ACTS AS A PARK WITH
STREET LEVEL SHOPS & UNDERGROUND PARKING
GREEN BRIDGE AT MILE END PARK
– LONDON
HIGH LINE – NEW YORK
HIGH LINE – NEW YORK
BROADMOOR LAKE
BROADMOOR SHOPPING
•
•
•
•
•
UALR
CAMPUS
32
ND S
T.
28
TH S
T.
UNIVERSITY AVE.
HIG
HW
AY
5