Crenshaw/LAX Transit ProjectConstruction Update Community Meeting
July 12th, 2018
1
2
Walsh Shea Corridor Constructors (WSCC)Main Line & Stations Contractor
Hensel Phelps Herzog (HPH)Southwestern Maintenance Yard Contractor
• 8.5-mile light-rail line
• 8 new stations:▪ 3 underground
▪ 4 at-grade
▪ One aerial
• Project budget: $2.058 billion
• Scheduled Opening: Fall 2019
2
Project Overview
PLA & CCP
Project Labor Agreement (PLA) &
Construction Careers Policy (CCP) Update
Crenshaw/LAX Transit Corridor Project
Report Data Through June 2018 Reporting Period
Targeted Worker AttainmentReport Data Through June 2018
Executive Order 11246 Demographic SummaryPercentage Project Complete Based on Worker Hours: 83.05% (rounded)
No. of Work Hours* Targeted Economically Disadvantaged Worker Utilization (%)
Goal: 40%
Apprentice Utilization (%)
Goal: 20%
Disadvantaged Worker Utilization (%)
Goal: 10%
5,096,935.23 59.99% 23.26%
Based on Total ApprenticeableWork Hours
12.03%
No. of Work Hours*
African American Utilization
Asian/Pacific Islander Utilization
Caucasian Utilization
Hispanic Utilization
Native American Utilization
Other/Declined to state
Minority Utilization
Goal: 28.3%
(rounded)
Female
Utilization
Goal: 6.9%
5,096,935.23 12.12% 1.21% 21.59% 61.76% 1.12% 2.19% 76.21% 3.69%
Cumulative Hours Through End of Noted Reporting Period – as Reported by Prime Contractor. Data subject to change to reflect updates or audits.
Targeted Worker AttainmentReport Data Through June 2018
Cumulative Hours Through End of Noted Reporting Period – as Reported by Prime Contractor. Data subject to change to reflect updates or audits.
Four New Stations • Three At-Grade• One Aerial
Five Aerial Structures
One Underground Structure
6
Crenshaw/LAX Transit ProjectSouthern Segment Update
Fairview Heights StationNew station steel canopy placement
7
May 2018: Installation elevator frames.
Activity Near Fairview Heights StationTrack and Ballast Retainer Walls
8
May 2018: Inspecting trackwork.
Installation of glass canopy
Downtown Inglewood Station
9
June 2018: Installation of glass canopy.
Bridge ConstructionLa Brea Av
10
• Rail on bridge over La Brea Avfacing eastbound
Activity Near Downtown Inglewood Station
11
Westbound view of track, OCS and catenary lines.
Northbound perspective from Eucalyptus Av
Electrical Trench Work Eucalyptus Av/Florence Av
12
AC compaction and placement for electrical trench line.
Bridge ConstructionUnder I-405 Bridge facing westbound
13
Patching rock pockets under the 405 bridge
14
Westchester/Veterans StationInstallation of glass canopy fittings
Installation of glass canopy fittings.
15
Westchester/Veterans StationInstallation of glass canopy
Installation of glass canopy
Bridge ConstructionManchester Bridge: Manchester Bl/Aviation Bl Facing Southbound
16
TPSS Site # 3 Laying base for a ramp adjacent to Traction Power Substation site.
Aviation/Century Station
17
April 2018: Stair No. 2 staircase formwork
Aviation/Century Station
18
June 2018: Completion of the activity.
Installation of Elevator Frames
19
June 2018: Installation elevator frames.
Aviation/Century Station
Installation of the Glass Canopy
20
June 2018: Glass canopy installation.
Aviation/Century Station
Century/Aviation StationConceptual Rendering
21
Underground Segment 1(UG1)
22
June 2018: Barrier rebar installation on the west U-wall
23
Underground Segment 1 (UG1) A newly installed lighting fixture
June 2018: A newly installed lighting fixtures.
Ongoing Bridge Construction
24
Location/Activity
• Century Station (Glass Canopy) July 2018*
• Century Station(Ticket Pavilion Foundation Slab)
August 2018*
• Century Station (Elevator Install)
* Schedule is subject to change
October 2018*
Tentative Date:
25
Southern Segment Ongoing At-Grade Station Construction
• Downtown Inglewood Station: Install Device/Lighting Canopy
• Westchester Veterans Station: Install Glass Canopy
• Westchester Veterans Station: HVAC and Train Control & Communications Room
• Fairview Heights Station: Erect Structural Steel Canopy
* Schedule is subject to change
July 2018*
July 2018*
August 2018*
August 2018*
Tentative Date:Location/Activity
Inglewood/Westchester Upcoming Lane Restrictions and Closures
26
• Florence Av/Hindry Av (Full Depth Paving)
• Florence Av/Centinela(Full Depth Paving)
* Schedule is subject to change
TBD 2018*
TBD 2018*
Tentative Date:Location/Activity
27
Southern Segment Southwestern Maintenance Yard Construction
• Installation of Hand Rails(Stairs #3)
• Office Area (Restroom Finishes-Level 1)
• Communication Room (Contract Milestone)
* Schedule is subject to change
July 2018*
July 2018*
July 2018*
Anticipated Completion*Activity
Southwestern Maintenance Yard Project
May 2018
Southwestern Maintenance Yard ProjectPlacement of Precast Concrete Walls
May 2018: Southwestern Yard
Southwestern Maintenance Yard ProjectConceptual Rendering
AMC-Airport Metro Connector Project Rough grading
31
Rough grading for the trans pad at the future 96th St Station
AMC-Airport Metro Connector Projectlocated on Aviation Bl and Arbor Vitae St
32
The proposed project includes a new multi-modal transportation center to connect LAX to the regional bus and rail transit system.
AMC-Station Naming
• Preliminary outreach in form of briefings and presentation are being hosted with key stakeholder to inform and educate about the station naming process and timeline.
• Outreach began in May 2018 and is scheduled through the end of Summer 2018.
• Email your name suggestions to: [email protected]
33
Northern Segment - Expo/Crenshaw Bl to 67th St
Four new stations• Three underground• One at-grade
Underground structures• Dual parallel bored tunnels• “Cut and Cover” tunnel
One mile at-grade segment
34
Crenshaw/LAX Transit ProjectNorthern Segment Update
35
Underground stations construction:• Expo/Crenshaw Station• MLK Jr. Station• Leimert Park Station
Ongoing construction activities: • Concrete pours of station floors
and walls• Concourse level installation• Installation of station facilities
*Anticipated completion in 2019
Underground Station ConstructionNorthern Segment Update
MLK STATION – Removal of formwork from concourse level interior wall
36
Crenshaw Bl Restoration ClosuresNorthern Segment Update
Schedule full closures performed in three progressive phases:
• Restoration Phase 1: Leimert Park Station Area June 15 to July 27 (43 days)
• Restoration Phase 2: MLK Jr./Crenshaw Station AreaLate July to – Late August
• Restoration Phase 3: Expo/Crenshaw Station AreaLate August to Early October
Crenshaw Bl Restoration ClosuresNorthern Segment Update
UG4 – Removal of deck beams and panels during the Phase One 43-day closure
Leimert Park Station – Slurry backfill at the 24” storm drain tie-in line
38
Crenshaw Bl restoration ClosuresUnderground Station Area Construction Phase
Typical Station Area Location
39
Crenshaw Bl Restoration ClosuresStreet Restoration Construction Phase
Typical Station Area Location
40
Crenshaw Bl Restoration ClosuresStreet Restoration Construction Phase One
Crenshaw Bl between Vernon Av and 43rd St/Homeland Dr.
41
Crenshaw Bl Restoration ClosuresStreet Restoration Construction Phase One (cont.)
Crenshaw Bl near Vernon Av
42
Crenshaw Bl Restoration ClosuresUG4 - Street Restoration
UG4 – Cut soldier piles above the cut-and-cover section.
43
Crenshaw Bl Restoration ClosuresTraffic Management Plan
• Traffic detours
• Traffic control officers at designated locations
• Traffic signage/notification
• Local access provided
• Pedestrian access maintained
• Bus routes and stops relocation
44
Crenshaw Bl Restoration ClosuresPhase 1: Leimert Park Station Area Traffic Detours Crenshaw Bl from 48th St to 43rd St./Homeland Dr – June 15 to July 27
45
Crenshaw Bl Restoration ClosuresPhase 1: Leimert Park Station Area Closure and Staging Area
N
Ve
rno
n A
v.
Leimert Bl
Street Closure, Local Access
48
thSt
Street Closure, Local Access
Street Closure
Street Closure
46
thSt
Street Closure
Work Zone Staging Area
Approximate Depiction of Work Area
46
Crenshaw Bl Restoration ClosuresPhase 1: Leimert Park Station Area Closure and Staging Area
NDegnan Bl
Street Closure
Street Closures
Street Closure, Local Access
Alley Partial Closure, No Alley Parking
Work Zone Staging Area
Approximate Depiction of Work Area
47
Leimert Park StationConceptual Rendering
48
Crenshaw Bl Restoration ClosurePhase 2: MLK/Crenshaw Station Area Traffic Detour Crenshaw Bl from Stocker St to MLK Jr Bl - Late July – Mid August 2018
49
Crenshaw/MLK Jr StationConceptual Rendering
50
Expo/Crenshaw Bl StationPhase 3: MLK/Crenshaw Station Area Traffic DetoursCrenshaw Bl from Coliseum Av to Exposition Bl - Late August – Early October 2018
51
Expo/Crenshaw Bl Station Conceptual Rendering
52
Additional Restoration Work
• Station areas to remain under traffic reconfiguration until early 2019
• Ongoing street level or station plaza construction until early 2019
• Sidewalk reconstruction
• Streetscape and landscaping
• Final roadway re-surfacing
53
Haul Routes
• Large vehicle traffic and transport of construction materials and equipment only on main streets
• No hauling and vehicle traffic in residential neighborhoods
• Hauling on designated route:▪ Crenshaw Bl to the 10 Freeway▪ Crenshaw Bl to Slauson Av
Sidewalk work in the UG4 area
54
Tunnel Section
Installation of the radiating cable brackets in the NB tunnel between Expo and MLK stations.
Scope of Work:
• New sidewalks and driveways
• Updated/new street lights and traffic signals
• New roadway surface/rehabilitation
• New Hyde Park Station
• New landscaped center medians
• Rail safety enhancements
• Crenshaw Bl Streetscape Plan elements:
▪ New sidewalk trees
▪ New lighting
▪ New crosswalks
At Grade Segment - Park Mesa Heights North and Central Segments: 48th St to 59th St
56
At Grade Segment - Park Mesa Heights North and Central Segments: 48th St to 59th St (cont.)
Remaining Construction Work
• Some outstanding sidewalk work
• Hyde Park Station and guideway construction on-going
• At-grade crossings at all intersections
• Street resurfacing/full depth construction
• Landscaping
Impacts
• Long term traffic reconfiguration
• Frequent lane closures
• Pedestrian access occasionally restricted and rerouted
• Temporary bus stop/route relocations
Hyde Park Station – Trench for the under-drain along the southbound track
Park Mesa HeightsCrenshaw Bl and Slauson at Grade Crossing
Hyde Park StationCanopy Progress
59
Hyde Park StationConceptual Rendering
*
Current Construction:
• Ongoing tunnel construction, concrete pours, and staging in the center of Crenshaw Bl
• Frequent lane closures
• Restoration/backfilling work
• Some extended street closures
• Scheduled completion: 2019
60
Hyde Park (59th to 67th St.)Tunnel/Cut and Cover Construction
Metro Small Business Pilot Programs
61
Metro Business Solution Center (BSC) Metro Business Interruption Fund (BIF)
Help small “mom and pop” businesses continue to thrive throughout construction and post construction
Business Solution CenterCrenshaw/LAX Transit Project
62
BSC Program Statistics – June 30, 2018:
• Number of business Contacts: 450
• Number of business Intakes/Assessments: 341
• Number of business referrals: 1106
BSC Business Resources:
• Hands-on business development
• Expert business advice and coaching
• Technical assistance
• Referrals to expert professionals
BSC Areas of Focus:
• Long term business planning
• Increasing business access to technology
• Website development
• Assessment of IT infrastructure and IT systems
• Workshops and Events
• Build Your Business Plan, Yelp 101, Get Your Business Online (sponsored by Google),
• Accounting Management
• Financial readiness
• Access to financial capital
Learn More: www.metrobsc.net
Business Interruption FundCrenshaw/LAX Transit Project
63
• Financial assistance to small “mom & pop” businesses with 25 or fewer employeesdirectly impacted by Metro Rail construction along three project areas
• Businesses must be located immediately adjacent to the rail corridor and meet other eligibility requirements
• Grant amount determined by loss of business revenue related to period of construction disruption
Learn More: www.metro.net/BIF
64
BIF Program Statistics – July 6, 2018:
• BIF applications submitted: 927
• BIF applications approved/awarded: 703
• BIF applications pending financials: 136
• BIF applications deemed not eligible: 86
• BIF applications denied: 2
• BIF Application Approval Rate: 83.79%
• BIF Grant Payments: $15,731,990.66
Crenshaw/LAX – BIF Statistics:
• 396 grants awarded to C/LAX
• Total amount: $8,436,720.09
• 169 small businesses received a grant
BIF Project Updates and Areas of Focus:
• Continued outreach along Crenshaw Corridor areas of:
• Park Mesa Heights
• Hyde Park
• Baldwin Hills Crenshaw Mall
• Inglewood/Southern Section
• Ongoing education of program requirements and application process through: application sessions and one-on-one meetings
Learn More: www.metro.net/BIF
Business Interruption FundCrenshaw/LAX Transit Project
65
100%96%
87%
92%
86%
Businesses referred tosupport services
Applications processedwithin 9 business days
Clients satisfactionrating
Businesses remainingopen after 6 months of
grant award
Businesses remainingopen after 1 year of
grant award
BIF Measures of Effectiveness(as of CY 2018 Q1)
$8,436,720.09
$4,204,865.92
$341,282.12
$1,798,958.50 $950,164.03
Crenshaw/LAX TransitProject
Purple Line Extension,Section 1
Purple Line Extension,Section 2
Regional Connector,Little Tokyo Area
Regional Connector,2nd/Broadway
Segment
Value of BIF Grants Awarded(as of 07/6/18)
Business Interruption FundTransit Project Corridors
66
June 16 - Crenshaw Corridor Cleanup • The CLC Community Engagement Workgroup hosted a Community Cleanup in the Crenshaw Bl/Florence Ave community
• Partners: Park Mesa Park Mesa Heights Community Council & Council District 8
• 30+ neighbors participated
July 14 - Financial Awareness Investing in Total Health (FAITH) Expo • The CLC Community Engagement Workgroup and Metro will host booth on Saturday, July 14 from 11am-3pm at West Angeles
Church (hangar)
• Information about the Crenshaw/LAX Transit Project will be provided, as well as Metro TAP Cards and details on other Metro programs including Eat Shop Play
August 30 – Metro Art Tour • The CLC Special Projects Workgroup will host at artist-led tour on the Expo Line going toward Union Station on Thursday,
August 30 from 10am-12pm.
• Union Station also has a new farmers market which starts this Thursday through the end of the summer, so participants will have the option of going back to the Crenshaw/LAX Project Office or explore the farmers market at Union Station for lunch at their leisure.
Community Leadership Council Events
Community Leadership Council Events
67
Upcoming Events
• RAMS/Charger Stadium Update – CLC Economic Development Workgroup
• Crenshaw/LAX Corridor Construction Tour – CLC Quality of Life Workgroup
For more information on CLC activities or to RSVP, please email:
Kinya Claiborne at
Contact Us