MOL.19960716.02I9
Mon-Q Design Analysis Cover Sheet @ I QA: N/A
Complete only applicable items. Page: 1 Of: 5
3. DOCUMENT IDENTIFIER (Including Rev. No.)
- CRWMS/M&O
4. REV. NO. 5. TOTAL PAGES
1
BABBAD000-01717-0200-00140 REV 01 Io1 15 6. TOTAL ATTACHMENTS 7. ATTACHMENT NUMBERS - NO. OF PAGES IN EACH 18. SYSTEM ELEMENT
11-4 1 MGDS
9. Originator
~
IO. Checker
1 1. Lead Design Engineer
12. Department Manager
Print Name - R. Blackstone
D. F. Vanica
-
R. E. Flye
G. M. Kiiiiura
Signature
J 4. f l . jLn4d
Date
NAP-MG-013 (Effective 09/08/95) 0842 IRev. 08/16/95)
CRWMS/M&O Design Analysis Revision Record
Complete only applicable items.
2. DESIGN ANALYSIS TITLE
NORTH PORTAL - WATER HEATER CALCULATION - SHOP BUILDING #5006 3. DOCUMENT IDENTIFIER (Including Rev. No.)
BABBAD000-0 1717
4. Revision No.
30 31
)200-00140 REV 01
5. Description of Revision
Initial Issue Reformatted to conform to NAP-MG-013, Rev. 0 Revised Title Removed TBV-122 Changed QA Classification from TBV-122 to QA: NIA Editorial Changes
DI: BABBAD000-0 17 17-0200-00 140 REV 0 1 Title: North Portal -Wa.ter Heater Calculation - Shop Building #5006 Page: 3 of 5
1. PURPOSE
The purpose of this design analysis and calculation is to determine the demand for hot and the selection of a water heater of appropriate size, in accordance with the Uniform Plumbing Code (Section 4.4.1) and U.S. Department of Energy Order 6430.1A-1540 (Section 4.4.2).
2. QUALITY ASSURANCE
This analysis is non-Q because it is for a temporary item. The Determination of Importance Evaluation (Reference 5.1) of the shop building has determined that no quality assurance (QA) controls are applicable within the context of this analysis.
3. METFIOD
The method used for the calculation is based on Reference 5.2 that provides estimates for the hot water demand per fixture for various types of buildings. The hot water demand is then totalled and multiplied by two factors from Reference 5.2 representing demand and storage capacity. A water heater with a storage capacity to the calculated value is then selected from manufacturer's equipment catalogs (Reference 5 -4)
4.1 DESIGN PARAMETERS
Hot Water Demand (Reference 5.2)
A. Lavatory - 12 gallons per hour (gph) B. Service Sink .- 20 gph C. Mop Sink - 210 gph D. Kitchen Sink - 20 gph
Demand Factor = 0.40 (Reference 5.2)
Storage Capacity Factor = 1.00 (Reference 5.2)
4.2 CRITERIA
The Plumbing Design for the shop building will be designed in accordance with DOE Order 6430.1A (Section 4.4.2) and appropriate state and local codes (ESFDR Sections 3.2.1Q, 3.2. lR, and 3.2.1 Si, Reference 5.3).
in&o\analysesbnd 140.d 1
I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I
DI: BABBADOOO-0 17 17-0200-00140 REV 01 I Title: North Portal -Water Heater Calculation - Shop Building #5006 Page: 4 o f 5 I
4.3
4.4
5.1
5.2
5.3
5.4
5.5
ASSUMPTIONS
Not used.
CODES AND STANDARDS
4.4.1 International Association of Plumbing and Mechanical Officials:
UPC 1991
U.S. Department of Energy (DOE):
DOE Order 6430.1A - 89
Uniform Plumbing Code (UPC)
General Design Criteria
4.4.2
5. REFERENCES
BABBA0000-01717-2200-00007 Rev 00 Determination of Importance Evaluation for ESF Change House Facility and Shop Building.
199 1 American Society of Heating, Refiigeration, and Air Conditioning Engineers Handbook, W A C Application I-P Edition.
Yucca Mountain Site Characterization Project Exploratory Studies Facility Design Requirements, YMP/CM-00 19, REV. 1, ICN 3
A.O. Smith Water Products Bulletin A202, August 1988.
Drawings:
5.5.1
5.5.1
5.5.3
BABBAI>OOO-Ol717-2 100-27400 Rev. 00 Shop-Building 5006 Plumbing and Piping First Floor Plan
BABBAI>000-0 17 17-2100-27401 Rev. 00 Shop-Building 5006 Plumbing and Piping Second Floor Plan
BAE3BAI>000-01717-2100-27400 Rev. 00 Shop-Building 5006 Plumbing Isometrics and Details
6. USE OF COMPUTER SOFTWARE
Not used.
m&o\analyses\bndI4O.r0 1
DI: B ABBAD000-0 17 17-0200-00 140 REV 0 1 I Title: North Portal -Water Heater Calculation - Shop Building #5006 Page: 5 of5 I
7. DESIGN ANALYSIS
The possible maximum hot water demand shown in Attachment I is 180 gph based on the number of plumbing fixtures as required by the UPC (Section 4.4.1) for the type of occupancy and the hot water demand &om Section 4.1. The probable demand equals the product ofthe possible maximum demand multiplied by the demand factor which equals 72 gph The storage capacity is the probable demand (72 gph) multiplied by the storage capacity factor (1 .O) which equals 72 gallons.
8. CONCLUSIONS
For the Shop Building, an A.O. Smith Model DSE was selected. This water heater has a storage capacity of 80 gallons with a recovery rate of 70 gph.
9. ATTACHMENTS
ATTACHMENT
I
TITLE
A.O. Smith Data Sheets
I
. .
m&o\analyses\badl40.r0 1
f
-_
f ATTACHMENT I
Page: 1-1 of 4 DI: BABBAD000-01717-0200-00140 REV 01
Title: North Portal - Water Heater Calculation - Shop Building #5006
Wd. .--_.
Dura-Power Y SUPREME COMMERCtAL ELECTRK
OS€-5 lhru 120 WATER HEATERS .
:, . . -.
Designed for uid I S a recovery heater havinq ill own stofapa bnk 01 boater for iupalyinq ranilizing r in is wa{er for dishwashing.
+ ASME TANK CONSTRUCTIOH - I 2 5 mi workinq pres. sure (65 t:iru 120 gallonsl. 150 pi wmking preisure (5 thru 50 gallons).
R.16 F W INSULATEO. TO meet rigorous s t a t e codes. _ - . .
c GI ASSLINE0 TANK . Ten tank s i z n available: 5 to !2O p a x capacity: c n k inti!rior is coated with glass Specifi- a l l y developed for watc!r heater use. Tank cabinet h a bonderired undercpat yiqh baked, enamel finish.
F INCOCOY IMMERSION HEATERS - Heavyduly medium wat'l density elernena hhree/imrnersion heater) have incoloy sheathing and prewired leads: provide excellent protection against oxidation and scaling. Input rancp from 6KW to 54KW available lux accompanying chart).
' STANDARC) VOLTAGES - 208.240 and 4 8 0 dolt single and three phare. Single phase 208 and 240 vo l t are con- venible to three phase, 1208 and 240 volt a t 24KW and &low are phase convertible (three to single and vice versa). 277 volt single phae also available.
MEETS OR EXCEEOS THE REQUIREMENTS OF ASHRAE 3GA.1980 STANDARO FOR ENERGY EFFICIENCIES
ASME @
OTHER STANOARO FEATURES
e Simplified circuitry. color coded tor ease of semi- '
9 Anode rod for corrosion votection Manual reset hi@ limtc Orass drain v a l v e Hinged control companment door ASME T & P relief valve.
TERMINAL BLOCK . To accept ccgper or aluminum conduir
IMMERSION THERMOSTAT - Close differential immer. sion rype thermortat provider the accurate terncerature control required lor commercial applications (adjusrable through a range 0 1 95' to 180°F).
120 VOLT CONTROL CIRCUIT - 120 volt control circuit powered by hsed rransfornier.
MAGNETIC CONTACTORS - Heavyducy U L rated for ' 1 D0,cOo cycles.
POWER' CIRCUIT FUSIN'S 1120 amp current draw and above1 - Meets National Elccrric Cock and UC require- meno that ASME tank rnust have internal luring when current draw e x a e d r 1M amps.
1 1 ' LIMITED WARRANTY OUTLINE
If the tank should leak any time during the f i rs t rhrcc years. under the terms of the warranty. A 0. Smith will repair or replace the heater: inrtallatico. labor, handling and loca l delivev extrz. THIS OUTLINE IS A WARRANTY. For complete inlormation. consult the written warranty or A 0. Smith Water Products Company.
I
I I I
i I I I
ATTACHMENTI I . DI: BABBAD000-01717-0200-00140 REV 01 I
Page: 1-2 of4 I Title: North Portal - Water Heater Calculation - Shop Building #5006
.
A.O. SMITH DATA SHEETS (Continued)
28.8 1 4 3 3
57.7 72.1
I8.m 86.5
15.m 2 144.2 36 18.ooO 173.1
21 6 3 54 1 a . w ' H I A
1
1
1 2 . m 2 11 5.4
3 4 5 1s.m . 3
' x 8 V modrlc !le ana addiuiod imrnenioa hldtrr.
*'Each imrnenian heater eonfrinc lhrce rlrctrlc ciamenu.
piping diagrams
25.0 37.5 54 .a 62.5
l W 0 125.0 1 w.0
225.0
75.0
187.5
-
21 2 12.5 4 3 3 %2 65.0 86.6 Io83 130 .a 1623 1949 -
- 480v
6 3 11.5
-
1 aa zsa
wn
1 1 3 17.5
62.5 , 7 5 0 93.8
11 2.5 -
- mav - 0-1
16.7 25.0 133 4 l A 50.0 €4.8 833 999
1249 1499
. -
m&ohialyses\bad 140.d 1
ATTACHMENT I
Page: 1-3 of4 DI: BABBAD000-01717-0200-00140 REV 01
Title: North Portal - Witer Heater Calculation - Shop Building #5006
A.O. SMITH DATA SHEETS (Continued)
L L
A L L OIMENSIONS IN INCHES
'clch irnmanion heater canlainr three d*ctric damgnu.
. .
RECOVERY RkTE IN GALLONS PER HOUR. -TtmpcraNrs Rim OF
F i q u d .I I ICW (3411 8tul - 4.1 Gallonr a t l W 0 F IcmperitucII r w . \ '
To &termin. r c c o n ~ nu per minut*. divicb rxcortrf n l r f x r hour by 60. NSF rrtinqr may- abuinecl by mulliqlyinp r b a w figures b y 0.98.
I I I
m&o\analyses\badl40.rO 1
ATTACHMENT I I I
Page: 1-4 of 4 I DI: BABBAD000-0 17 17-0200-00 140 REV 0 1
Title: North Portal - Wiiter Heater Calculation - Shop Building #5006
A.O. SMITH DATA SHEETS (Continued)
OPTIONAL EQUIPMENT C; CONSTRUCTION:
SILICON 8 R O N Z E TANK - Available for ipecial app l iu - <ions or very corrosive water conditions.
STAINLESS STEEL TANK -Available for special applica- tions or unique water conditions.
1M OR 160 P S I WORKING PRESSURE -Available when required. Must b specified a t lime o f order.
SEQUENCER - Two or three step time delay requenar provide for rteQPing of elemenu in g roup or individually (maximum of 1 r t e p per contactor).
MOOULATING STEP - Solid rtafe electronic ccntrol device that modulates input to mafch load through progrer. l i v e sequencing o f s t e p (up to 3 s t e r n with maximum of 1 per contactorl. Contact factory for availability.
HANOHOLE CLEANOUT - 4" X 6" Size. TIME C L M K - Seven day clcxck may be programmed for . up to 14 onloff operations peer week. Skip a day feature 5 .
'COMBINATION TEMPER.ATURE/qRESSURE GAUGE - allo* - lor . . shutdown* . Dial v p e combination gauge lshipwd lome 1
. . p IMMERSION RESET HIGH LIMITS - Adjustable auto. matic or manual m e t type. Provides additional proteaion against high temperature conditions. ocerating fanv.
SAFETY OOOR INTERLOCK - Prevents owning o f con- t ro l panel door when heater power supply is energized. NOTE: Once door is open. the heater may be energized i f necmary for remice diagnosis.
. . Specify type and , CONTROL OPTIONS:
LOW WATER CUTOFF -. P r a k type electric low water curof f prevencs energizing of elemenu in fie event o f low water condition.
OVERRIDE SWITCHES -. A simple form of load control ,
up to one override switch $xr cflntacror is dvaiiable. P R E S S U R E LIMIT SWITCHES - 80th high and low pressure limit switches available.
INDICATING/PlLO'T LIGHTS - ;:or indiu<ir?g dlerr!sni operation and/or switch clswre. Up !O onc indinr inq l i gh t POWER CIRCUIT FUSING --Sub-divide3 internal circuitry available for e x h switch and/or confaaor i s available. w i th m c d r u n Of 60 amp fuses. Supplied as standard
when required by NEC and UL. THERMOSTAT STEP - The iirnplest form of modulation. AlI~,-.-j clemcno to he stepped on in groupr or individually ALARM HORN - Horns may be furnished to warn of any by Swif -y ing addiriondl thermosno (up to I per con. condition in the heater for which seniors have been r@. t a a o r l . tied.
. -
a l l o w al l or parr of unit input to be controlled manually. ... .
SUGGESTED SPECIFICATION -