23
logo area Cryomodule Integration Plans Niklas Templeton - STFC - UK Collaboration On Behalf of the Cryomodule Design Team 26th LARP Hi Lumi Collaboration Meeting, 19 th May 2016

Cryomodule Integration Plans · logo area 26th LARP Hi Lumi Collaboration Meeting - Cryomodule Integration Plans 3 SPS Test Prototype Cryomodule 3mm Thick MuMetal Magnetic Shield

  • Upload
    others

  • View
    10

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Cryomodule Integration Plans · logo area 26th LARP Hi Lumi Collaboration Meeting - Cryomodule Integration Plans 3 SPS Test Prototype Cryomodule 3mm Thick MuMetal Magnetic Shield

logo

area

logo

area

Cryomodule Integration Plans

Niklas Templeton - STFC - UK Collaboration

On Behalf of the Cryomodule Design Team

26th LARP Hi Lumi Collaboration Meeting, 19th May 2016

Page 2: Cryomodule Integration Plans · logo area 26th LARP Hi Lumi Collaboration Meeting - Cryomodule Integration Plans 3 SPS Test Prototype Cryomodule 3mm Thick MuMetal Magnetic Shield

logo

area

Content

Overview & Schedule

Cavity String Assembly

Top Plate Assembly

Support & Alignment

Thermal Shield Assembly

Warm Magnetic Shield

Vacuum Vessel Integration

Cryomodule in SPS

26th LARP Hi Lumi Collaboration Meeting - Cryomodule Integration Plans 2

Page 3: Cryomodule Integration Plans · logo area 26th LARP Hi Lumi Collaboration Meeting - Cryomodule Integration Plans 3 SPS Test Prototype Cryomodule 3mm Thick MuMetal Magnetic Shield

logo

area 26th LARP Hi Lumi Collaboration Meeting - Cryomodule Integration Plans 3

SPS Test Prototype Cryomodule

3mm Thick MuMetal

Magnetic Shield OFHC Copper Thermal

Shield (50-70K)

Fundamental

Power Coupler

Vacuum Vessel

2.8 x 0.92 x 1.1 m

Cryogenic

Service Module

Dressed Cavity

in 2K

Helium Tank

Frequency Tuner

Mechanism

Page 4: Cryomodule Integration Plans · logo area 26th LARP Hi Lumi Collaboration Meeting - Cryomodule Integration Plans 3 SPS Test Prototype Cryomodule 3mm Thick MuMetal Magnetic Shield

logo

area

Build, Test & Installation

26th LARP Hi Lumi Collaboration Meeting - Cryomodule Integration Plans 4

Page 5: Cryomodule Integration Plans · logo area 26th LARP Hi Lumi Collaboration Meeting - Cryomodule Integration Plans 3 SPS Test Prototype Cryomodule 3mm Thick MuMetal Magnetic Shield

logo

area 5

Revised Planning

First Re-Baselining after C&S Review I US cavities delayed

CERN cavity production (DQW) for SPS is adopted as baseline

Impact on SPS is significant

26th LARP Hi Lumi Collaboration Meeting - Cryomodule Integration Plans

Page 6: Cryomodule Integration Plans · logo area 26th LARP Hi Lumi Collaboration Meeting - Cryomodule Integration Plans 3 SPS Test Prototype Cryomodule 3mm Thick MuMetal Magnetic Shield

logo

area

Cavity String Assembly

26th LARP Hi Lumi Collaboration Meeting - Cryomodule Integration Plans 6

Assembled in SM18 ISO4 Clean Room

9 Cavity string components loaded on

to assembly trolley using manual crane

Components are individually positioned

and aligned

Sequential positioning with respect to

pervious flange

String is closed (aligned in Z direction)

Gate valves closed for Cryomodule

integration

Page 7: Cryomodule Integration Plans · logo area 26th LARP Hi Lumi Collaboration Meeting - Cryomodule Integration Plans 3 SPS Test Prototype Cryomodule 3mm Thick MuMetal Magnetic Shield

logo

area

Assembled Cavity String

26th LARP Hi Lumi Collaboration Meeting - Cryomodule Integration Plans 7

Common Support Plate

Vacuum Gate Valves

Beam Pipe

Tuner Frame

Fundamental Power Coupler

Dressed Cavity in Helium Tank

High Order Mode Absorbers

FSI

RF Probe

Page 8: Cryomodule Integration Plans · logo area 26th LARP Hi Lumi Collaboration Meeting - Cryomodule Integration Plans 3 SPS Test Prototype Cryomodule 3mm Thick MuMetal Magnetic Shield

logo

area

logo

area

Cryomodule Assembly Welding of Cryogenic lines BCAM Assembly

26th LARP Hi Lumi Collaboration Meeting - Cryomodule Integration Plans 8

Page 9: Cryomodule Integration Plans · logo area 26th LARP Hi Lumi Collaboration Meeting - Cryomodule Integration Plans 3 SPS Test Prototype Cryomodule 3mm Thick MuMetal Magnetic Shield

logo

area

logo

area

Cryomodule Assembly

Top Plate Assembly

Top Plate Integration

26th LARP Hi Lumi Collaboration Meeting - Cryomodule Integration Plans 9

Vacuum Vessel

Top Plate

Warm Magnetic Shield

Upper Assembly

Thermal Shield

Upper Assembly

Page 10: Cryomodule Integration Plans · logo area 26th LARP Hi Lumi Collaboration Meeting - Cryomodule Integration Plans 3 SPS Test Prototype Cryomodule 3mm Thick MuMetal Magnetic Shield

logo

area

logo

area

Flexure

Mounts

Fundamental

Power Coupler

Waveguide-

Coax Transition

Cryomodule Assembly

Cavity Support & Alignment

26th LARP Hi Lumi Collaboration Meeting - Cryomodule Integration Plans 10

Kinematic Adjustment

Tuner Mechanism

Dressed Cavity Support System

Common

Adjustment Plate

with 5-Point Support

Page 11: Cryomodule Integration Plans · logo area 26th LARP Hi Lumi Collaboration Meeting - Cryomodule Integration Plans 3 SPS Test Prototype Cryomodule 3mm Thick MuMetal Magnetic Shield

logo

area

logo

area

Cryomodule Assembly

HOM Coaxial Connection

Thermal Shield Assembly

26th LARP Hi Lumi Collaboration Meeting - Cryomodule Integration Plans 11

6 x HOM Coaxial lines with thermal

intercepts

2mm thick OFE

Copper Panels

Sheet Metal

Stiffeners

Brazed Copper

ETP Pipe

Split Cover

Plates

Contoured for

MLI Envelop

Conduction

Cooled End Caps

U-Panel with

Access Windows

4 x Flexure Mounts

Cu-SS Pipe

Transitions

Page 12: Cryomodule Integration Plans · logo area 26th LARP Hi Lumi Collaboration Meeting - Cryomodule Integration Plans 3 SPS Test Prototype Cryomodule 3mm Thick MuMetal Magnetic Shield

logo

area

logo

area

Cryomodule Assembly

Lifting Frame with 2000 kg

capacity – 3 m stroke

26th LARP Hi Lumi Collaboration Meeting - Cryomodule Integration Plans 12

Drop Down Assembly

Warm Magnetic

Shield Integration

• No connection possible

between upper & lower

MuMetal assemblies

• Shield relies on loose

contact and overlapping

joints for field attenuation

Page 13: Cryomodule Integration Plans · logo area 26th LARP Hi Lumi Collaboration Meeting - Cryomodule Integration Plans 3 SPS Test Prototype Cryomodule 3mm Thick MuMetal Magnetic Shield

logo

area

logo

area

Final Cryomodule Assembly

26th LARP Hi Lumi Collaboration Meeting - Cryomodule Integration Plans 13

Waveguide

Cryo Jumper

Blow off

Valve

Jack Supports

Lifting Points

BCAM

Vacuum

Gauges

Access

Windows

Top Plate + Cavity String &

Vacuum Vessel Assembly

1.1

m

Page 14: Cryomodule Integration Plans · logo area 26th LARP Hi Lumi Collaboration Meeting - Cryomodule Integration Plans 3 SPS Test Prototype Cryomodule 3mm Thick MuMetal Magnetic Shield

logo

area

Tooling & Assembly Overview

26th LARP Hi Lumi Collaboration Meeting - Cryomodule Integration Plans 14

SM18 External Clean Room Mounting Area

Page 15: Cryomodule Integration Plans · logo area 26th LARP Hi Lumi Collaboration Meeting - Cryomodule Integration Plans 3 SPS Test Prototype Cryomodule 3mm Thick MuMetal Magnetic Shield

logo

area

General layout – SPS Point 6

26th LARP Hi Lumi Collaboration Meeting - Cryomodule Integration Plans 15

Page 16: Cryomodule Integration Plans · logo area 26th LARP Hi Lumi Collaboration Meeting - Cryomodule Integration Plans 3 SPS Test Prototype Cryomodule 3mm Thick MuMetal Magnetic Shield

logo

area

Cryomodule in SPS

26th LARP Hi Lumi Collaboration Meeting - Cryomodule Integration Plans 16

Page 17: Cryomodule Integration Plans · logo area 26th LARP Hi Lumi Collaboration Meeting - Cryomodule Integration Plans 3 SPS Test Prototype Cryomodule 3mm Thick MuMetal Magnetic Shield

logo

area

Cryomodule Summary

26th LARP Hi Lumi Collaboration Meeting - Cryomodule Integration Plans 17

Page 18: Cryomodule Integration Plans · logo area 26th LARP Hi Lumi Collaboration Meeting - Cryomodule Integration Plans 3 SPS Test Prototype Cryomodule 3mm Thick MuMetal Magnetic Shield

logo

area

logo

area

Thank You!

26th LARP Hi Lumi Collaboration Meeting - Cryomodule Integration Plans 18

On Behalf of Cryomodule Design Team

Acknowledgements: R. Calaga, O. Capatina, T. Capelli, T. Jones, P. Minginette, M. Sosin,

G. Vandoni, C. Zanoni

Page 19: Cryomodule Integration Plans · logo area 26th LARP Hi Lumi Collaboration Meeting - Cryomodule Integration Plans 3 SPS Test Prototype Cryomodule 3mm Thick MuMetal Magnetic Shield

logo

area

logo

area

Additional Slides

26th LARP Hi Lumi Collaboration Meeting - Cryomodule Integration Plans 19

Page 20: Cryomodule Integration Plans · logo area 26th LARP Hi Lumi Collaboration Meeting - Cryomodule Integration Plans 3 SPS Test Prototype Cryomodule 3mm Thick MuMetal Magnetic Shield

logo

area

logo

area 26th LARP Hi Lumi Collaboration Meeting - Cryomodule Integration Plans 20

BCAM

BCAM

Reflection shielding

Vacuum viewport

Page 21: Cryomodule Integration Plans · logo area 26th LARP Hi Lumi Collaboration Meeting - Cryomodule Integration Plans 3 SPS Test Prototype Cryomodule 3mm Thick MuMetal Magnetic Shield

logo

area

logo

area 26th LARP Hi Lumi Collaboration Meeting - Cryomodule Integration Plans 21

Page 22: Cryomodule Integration Plans · logo area 26th LARP Hi Lumi Collaboration Meeting - Cryomodule Integration Plans 3 SPS Test Prototype Cryomodule 3mm Thick MuMetal Magnetic Shield

logo

area

Vacuum tank Tolerances

Top view

±6 m

m

±4 mm

26th LARP Hi Lumi Collaboration Meeting - Cryomodule Integration Plans 22

Page 23: Cryomodule Integration Plans · logo area 26th LARP Hi Lumi Collaboration Meeting - Cryomodule Integration Plans 3 SPS Test Prototype Cryomodule 3mm Thick MuMetal Magnetic Shield

logo

area

Top Plate Integration

26th LARP Hi Lumi Collaboration Meeting - Cryomodule Integration Plans 23