IHEP Cryomodule Status
Jiyuan Zhai
On behalf of the IHEP ILC SRF R&D Team
AWLC14, May 14, Fermilab
2
Outline
• IHEP ILC-TC1 Cryomodule Assembly
• Horizontal Test Facilities
• Cavity Fabrication
IHEP ILC-TC1 Cryomodule
3
• Short cryomodule with one low-loss large grain 9-cell cavity (VT 20MV/m, Q0=1.4E10)
• Cylindrical magnetic shield inside helium vessel
• STF type input coupler and tuner• Module assembly to complete in
July 2014, horizontal test in 2015
4
Cryomodule Assembly
Assembly Hall in IHEP Building #2
5
Cavity Clean Room Assembly
6
Cavity Clean Room Assembly
Careful Clean Room Assembly Operations (PFFA)
Beam Tube Assembly Gate Valve Assembly Cavity Assembly Prep
7
Cavity Clean Room Assembly
• Coupler Mounting Test
• Slow Pumping and N2 Purging
• Middle-position slide jack tuner with four guiding rods
• Helium vessel bellow and tuner flanges sagging when loose the support fixtures; will be restored when the tuner is installed.
2mm
8
Outline
• IHEP ILC-TC1 Cryomodule Assembly
• Horizontal Test Facilities
• Cavity Fabrication
9
Horizontal Test Facility Layout
Power SourceDeliver in end 2014
Cryogenic PlantIn commissioning
TunnelHorizontal test & beam test
Vertical test DewarDeliver in September
IHEP Building #1
10
Cryogenic System in Commissioning
Cold box and compressor: refrigeration [email protected], liquefication: 284 L/h
2K pumps: 8000 m3/h @ 3100 Pa
11
1.3 GHz Klystron and Modulator Ordered• 1.3 GHz 5 MW Klystron and Marx Modulator will deliver in end 2014
12
Outline
• IHEP ILC-TC1 Cryomodule Assembly
• Horizontal Test Facilities
• Cavity Fabrication
13
TESLA-like Cavity Fabrication
• End groups EBW ongoing
• Cavity EBW to be done in July
• Process and test at KEK
14
TESLA Cavity Production
• HERT Company• FG TESLA 9-cell cavity• Pressing and EBW test
and optimization• One prototype in 2014
15
Summary
• IHEP ILC test cryomodule assembly is ongoing and will be finished in July 2014.
• Hardware preparation, environment and component cleanliness, vacuum, alignment and assembly procedures are studied and conducted carefully for cavity clean room assembly.
• Cryogenic system and power source will be ready in end 2014 for the module horizontal test.
• Prototype production of a fine grain TESLA-like 9-cell cavity and a fine grain TESLA 9-cell cavity will be done in mid and end 2014 respectively.
16
Thank you!