    Presentation at Large-Scale Solar Power

    eve opmen or s op

    9 June 2011e ng

  • 8/6/2019 CSP Program in India

    2/20

    Context for ADB InvolvementContext for ADB Involvementn a s o ar nergy rogramn a s o ar nergy rogram

    ADB Solar Support in IndiaADB Solar Support in India

  • 8/6/2019 CSP Program in India

    3/20

    ADB En r P li 2ADB En r P li 2

    ObjectiveObjectiveo help DMCs provide reliable, adequate and affordable energy for

    inclusive growth in a socially, economically and environmentallysustainable way

    Key FeaturesKey Features

    Promoting energy efficiency and renewable energy Promote knowled e mana ement technolo transfer

    Promoting energy sector reform, capacity building and governance Promoting private sector participation for better efficiency

  • 8/6/2019 CSP Program in India

    4/20

    A i l r En r Ini i ivA i l r En r Ini i iv

    Catalyze 3000 MW of solar projects across Asia over aCatalyze 3000 MW of solar projects across Asia over a

    Asia Solar Energy ForumAsia Solar Energy Forum -- Setting up a knowledgeSetting up a knowledgemanagement platform on a nonmanagement platform on a non--profit basisprofit basis

    Focus on the generation of and transmission from

    renewable / low-carbon energy sources. Catalyze private sector participation and the application

    of clean technolo ies throu h innovative PPPapproaches.

  • 8/6/2019 CSP Program in India

    5/20

    ADBADB Win wWin wSouth Asia Regional Department (Public Sector)South Asia Regional Department (Public Sector) Provides financial and technical assistance related to the energy

    sector to governments and government agencies Sovereign (government guaranteed) or non-sovereign operations

    with state owned enterprises (w/o government guarantees) Resident Mission leads Country Program work, coordination with

    government and project implementation

    r va e ec or pera onsr va e ec or pera ons Provides financial and technical assistance to private sector

    enterprises either through direct loans or guarantees

    so nves s n c ean energy un s

  • 8/6/2019 CSP Program in India

    6/20

    ADB En r r Pr fil in In iADB En r r Pr fil in In i

    ADB Public Sector Operations (2008ADB Public Sector Operations (2008--10)10)

    Tradit ional Focus areasTradit ional Focus areas ransmission and distribution ex ansionransmission and distribution ex ansion

    Energy EfficiencyEnergy Efficiency

    Hydropower relatedHydropower relatedPlanned Solar energy related interventionsPlanned Solar energy related interventions

    Policy LevelPolicy Level -- Phase 1 of 20,000 MW Solar MissionPhase 1 of 20,000 MW Solar Mission

    ro ec evero ec eve -- o ar ar pro ec s n u ara ,o ar ar pro ec s n u ara ,Rajasthan and central sector projectsRajasthan and central sector projects

    Prospects including credit lines to FIProspects including credit lines to FI

  • 8/6/2019 CSP Program in India

    7/20

    Context for ADB InvolvementContext for ADB Involvementn a s o ar nergy rogramn a s o ar nergy rogram

    ADB Solar Support in IndiaADB Solar Support in India

  • 8/6/2019 CSP Program in India

    8/20

    InstalledCapacityRequired(GW)

    1000

    1200

    600 PC 8%

    PC 9%

    0

    200

    200607 201112 201617 202122 202627 203132

    Source: Integrated Energy Policy Report, Planning Commission (PC)

  • 8/6/2019 CSP Program in India

    9/20

    DominantCoal(1886MTOE) ForcedRenewable(1536

    MTOE)

    48613

    76 2 185

    185

    104102235

    98

    87

    CrudeOil NaturalGas

    Coal Hydro

    632

    CrudeOil NaturalGas

    Coal Hydro

    Nuclear RenewableNonCommercial

    Nuclear RenewableNonCommercial

    Source: Integrated Energy Policy Report, Planning Commission (PC)

    Planning Commission outlined need for a solar mission

  • 8/6/2019 CSP Program in India

    10/20

    In 2010, Jawaharlal Nehru National Solar Mission (JNNSM) was unveiled

    to support eventual development of 20,000 MW of solar power by 2022

    Phase 1 Phase 2 Phase 3

    (-2013)

    Grid 1100 MW

    Off Grid 200 MW

    (2014-2017)

    Grid 4000 MW

    Off Grid 1000 MW

    (2018-2022)

    Grid 20, 000 MW

    Off Grid 2000 MW

    Source: JNNSM Document, GoI

  • 8/6/2019 CSP Program in India

    11/20

    Central sector (JNNSM)Central sector (JNNSM)

    Agency to coordinate on power purchase andAgency to coordinate on power purchase andbundling with thermal power for sale to offbundling with thermal power for sale to off--takerstakers

    New Projects and Migration SchemeNew Projects and Migration Scheme

    State Sector(Gujarat,Rajasthan)State Sector(Gujarat,Rajasthan)

    State Government policies provide supportState Government policies provide support

    Typically state trading company coordinate onTypically state trading company coordinate on

    ower urchaseower urchase

  • 8/6/2019 CSP Program in India

    12/20

    Central LevelCentral Level

    State levelState level

    Gujarat Solar Park (Gujarat Solar Park (CharankhaCharankha)) About 150 MWAbout 150 MW

    plannedplanned

    Some IssuesSome Issues

    Supply ChainSupply Chain

    Lead time for developmentLead time for development

  • 8/6/2019 CSP Program in India

    13/20

    covered under commercial projects that could resultcovered under commercial projects that could resultin cost reduction.in cost reduction.

    Suggested configurations include solar gas hybrid,Suggested configurations include solar gas hybrid,air/hybrid cooling, base load solar plant withair/hybrid cooling, base load solar plant withstora e.stora e.

    Feasibility to be assessed and projects to beFeasibility to be assessed and projects to beselected on global bidding basis.selected on global bidding basis.

    Low cost funds for these projects.Low cost funds for these projects. Comments solicited by MNRE by June 17, 2011Comments solicited by MNRE by June 17, 2011

  • 8/6/2019 CSP Program in India

    14/20

    Context for ADB InvolvementContext for ADB Involvementn a s o ar nergy rogramn a s o ar nergy rogram

    ADB Solar Suport in IndiaADB Solar Suport in India

  • 8/6/2019 CSP Program in India

    15/20

    TA Support to MNRE on PPA and eligibility criteria forprojects.

    Review of domestic lending environment for solar power

    Phase 2 Donor coordination to support roadmap for Phase 2 of

    the NSM (2011)

  • 8/6/2019 CSP Program in India

    16/20

    Demo CSP Pro ects

    under JNNSM(currently under

    NTPC - CSP Pro ect

    Technical Assistance

    support and possiblelending

  • 8/6/2019 CSP Program in India

    17/20

    -Solar Parks

    Masterplan Development andphasing plans

    Engineering studies forcommon infrastructure

    ,issues assoc. with evacuation

    Institutional arrangements

    Investment models

    Facilitate stakeholderscuss ons

    Safeguard review

  • 8/6/2019 CSP Program in India

    18/20

    Solar energy R&D

    Human resource development

    Curriculum design for vocational training programs

  • 8/6/2019 CSP Program in India

    19/20

    ,

    CSP projects

    Solar Power Guarantee Facility ($ 150onPartial coverage of risks to reduce financing cost

    o ex en oan enor rom oca an ore gn an sCapacity Building for technical due diligence for local

  • 8/6/2019 CSP Program in India

    20/20

    Thank YouFor further details, please contact:

    Yongping Zhai - Director, Energy Division, South Asia Department

    [email protected]

    - , ,

    [email protected]

    Naoki Sakai - Senior Climate Change Specialist, Energy Division, South [email protected]

    , ,

    [email protected]