8/6/2019 CSP Program in India
1/20
Presentation at Large-Scale Solar Power
eve opmen or s op
9 June 2011e ng
8/6/2019 CSP Program in India
2/20
Context for ADB InvolvementContext for ADB Involvementn a s o ar nergy rogramn a s o ar nergy rogram
ADB Solar Support in IndiaADB Solar Support in India
8/6/2019 CSP Program in India
3/20
ADB En r P li 2ADB En r P li 2
ObjectiveObjectiveo help DMCs provide reliable, adequate and affordable energy for
inclusive growth in a socially, economically and environmentallysustainable way
Key FeaturesKey Features
Promoting energy efficiency and renewable energy Promote knowled e mana ement technolo transfer
Promoting energy sector reform, capacity building and governance Promoting private sector participation for better efficiency
8/6/2019 CSP Program in India
4/20
A i l r En r Ini i ivA i l r En r Ini i iv
Catalyze 3000 MW of solar projects across Asia over aCatalyze 3000 MW of solar projects across Asia over a
Asia Solar Energy ForumAsia Solar Energy Forum -- Setting up a knowledgeSetting up a knowledgemanagement platform on a nonmanagement platform on a non--profit basisprofit basis
Focus on the generation of and transmission from
renewable / low-carbon energy sources. Catalyze private sector participation and the application
of clean technolo ies throu h innovative PPPapproaches.
8/6/2019 CSP Program in India
5/20
ADBADB Win wWin wSouth Asia Regional Department (Public Sector)South Asia Regional Department (Public Sector) Provides financial and technical assistance related to the energy
sector to governments and government agencies Sovereign (government guaranteed) or non-sovereign operations
with state owned enterprises (w/o government guarantees) Resident Mission leads Country Program work, coordination with
government and project implementation
r va e ec or pera onsr va e ec or pera ons Provides financial and technical assistance to private sector
enterprises either through direct loans or guarantees
so nves s n c ean energy un s
8/6/2019 CSP Program in India
6/20
ADB En r r Pr fil in In iADB En r r Pr fil in In i
ADB Public Sector Operations (2008ADB Public Sector Operations (2008--10)10)
Tradit ional Focus areasTradit ional Focus areas ransmission and distribution ex ansionransmission and distribution ex ansion
Energy EfficiencyEnergy Efficiency
Hydropower relatedHydropower relatedPlanned Solar energy related interventionsPlanned Solar energy related interventions
Policy LevelPolicy Level -- Phase 1 of 20,000 MW Solar MissionPhase 1 of 20,000 MW Solar Mission
ro ec evero ec eve -- o ar ar pro ec s n u ara ,o ar ar pro ec s n u ara ,Rajasthan and central sector projectsRajasthan and central sector projects
Prospects including credit lines to FIProspects including credit lines to FI
8/6/2019 CSP Program in India
7/20
Context for ADB InvolvementContext for ADB Involvementn a s o ar nergy rogramn a s o ar nergy rogram
ADB Solar Support in IndiaADB Solar Support in India
8/6/2019 CSP Program in India
8/20
InstalledCapacityRequired(GW)
1000
1200
600 PC 8%
PC 9%
0
200
200607 201112 201617 202122 202627 203132
Source: Integrated Energy Policy Report, Planning Commission (PC)
8/6/2019 CSP Program in India
9/20
DominantCoal(1886MTOE) ForcedRenewable(1536
MTOE)
48613
76 2 185
185
104102235
98
87
CrudeOil NaturalGas
Coal Hydro
632
CrudeOil NaturalGas
Coal Hydro
Nuclear RenewableNonCommercial
Nuclear RenewableNonCommercial
Source: Integrated Energy Policy Report, Planning Commission (PC)
Planning Commission outlined need for a solar mission
8/6/2019 CSP Program in India
10/20
In 2010, Jawaharlal Nehru National Solar Mission (JNNSM) was unveiled
to support eventual development of 20,000 MW of solar power by 2022
Phase 1 Phase 2 Phase 3
(-2013)
Grid 1100 MW
Off Grid 200 MW
(2014-2017)
Grid 4000 MW
Off Grid 1000 MW
(2018-2022)
Grid 20, 000 MW
Off Grid 2000 MW
Source: JNNSM Document, GoI
8/6/2019 CSP Program in India
11/20
Central sector (JNNSM)Central sector (JNNSM)
Agency to coordinate on power purchase andAgency to coordinate on power purchase andbundling with thermal power for sale to offbundling with thermal power for sale to off--takerstakers
New Projects and Migration SchemeNew Projects and Migration Scheme
State Sector(Gujarat,Rajasthan)State Sector(Gujarat,Rajasthan)
State Government policies provide supportState Government policies provide support
Typically state trading company coordinate onTypically state trading company coordinate on
ower urchaseower urchase
8/6/2019 CSP Program in India
12/20
Central LevelCentral Level
State levelState level
Gujarat Solar Park (Gujarat Solar Park (CharankhaCharankha)) About 150 MWAbout 150 MW
plannedplanned
Some IssuesSome Issues
Supply ChainSupply Chain
Lead time for developmentLead time for development
8/6/2019 CSP Program in India
13/20
covered under commercial projects that could resultcovered under commercial projects that could resultin cost reduction.in cost reduction.
Suggested configurations include solar gas hybrid,Suggested configurations include solar gas hybrid,air/hybrid cooling, base load solar plant withair/hybrid cooling, base load solar plant withstora e.stora e.
Feasibility to be assessed and projects to beFeasibility to be assessed and projects to beselected on global bidding basis.selected on global bidding basis.
Low cost funds for these projects.Low cost funds for these projects. Comments solicited by MNRE by June 17, 2011Comments solicited by MNRE by June 17, 2011
8/6/2019 CSP Program in India
14/20
Context for ADB InvolvementContext for ADB Involvementn a s o ar nergy rogramn a s o ar nergy rogram
ADB Solar Suport in IndiaADB Solar Suport in India
8/6/2019 CSP Program in India
15/20
TA Support to MNRE on PPA and eligibility criteria forprojects.
Review of domestic lending environment for solar power
Phase 2 Donor coordination to support roadmap for Phase 2 of
the NSM (2011)
8/6/2019 CSP Program in India
16/20
Demo CSP Pro ects
under JNNSM(currently under
NTPC - CSP Pro ect
Technical Assistance
support and possiblelending
8/6/2019 CSP Program in India
17/20
-Solar Parks
Masterplan Development andphasing plans
Engineering studies forcommon infrastructure
,issues assoc. with evacuation
Institutional arrangements
Investment models
Facilitate stakeholderscuss ons
Safeguard review
8/6/2019 CSP Program in India
18/20
Solar energy R&D
Human resource development
Curriculum design for vocational training programs
8/6/2019 CSP Program in India
19/20
,
CSP projects
Solar Power Guarantee Facility ($ 150onPartial coverage of risks to reduce financing cost
o ex en oan enor rom oca an ore gn an sCapacity Building for technical due diligence for local
8/6/2019 CSP Program in India
20/20
Thank YouFor further details, please contact:
Yongping Zhai - Director, Energy Division, South Asia Department
- , ,
Naoki Sakai - Senior Climate Change Specialist, Energy Division, South [email protected]
, ,