3
Vikas Aggarwal 1/2427, East Ram Nagar, Shahdara, Delhi-110032 Mob No. 8376804060, 9711309631 Email Id: [email protected] Segmental Construction…Fabrication, Erection & Operation (Bridgecon Make Launchers) Operation &Maintenance of 30cum Batching Plant, Maintenance of Heavy Earthmoving Equipments Manpower Management… Logistics… Strategic Planning PROFESSIONAL EXPERIENCE ITD CEMENTATION LTD, Delhi Metro CC-26R Project Sep 2013 to till date Launching Incharge, Deputy.Manager, Erection & Operation Led a team of 4-5 Subcontractors & Engineers, Supervisors for a 2-shift facility along with other Construction areas like Span Alignment, Bearing Fixing, Support functions: Logistics, Client Handling, Inventory Control, Quality, Equipment Deployment etc. Planning, Execution for Erection,Dismantling of LGs & preparing Methodology for linked activities Inventory Control for LG along with reconciliation of Materials like HT Strand, Epoxy Glue,Cement,Bearings etc Coordination with Clients along with submission of drawings & methodology for different activities Launching of spans in 145-250mtr curve by Bridgecon LG ITD CEMENTATION LTD, Jaipur Metro C2 Project March 2011 to August 2013 Launching Incharge, Asst.Manager, Fabrication, Erection & Operation of Bridgecon make 300 Ton Launching Girder for dual stage 02no (Road Level & Metro) along with Ground Support Trestle for 110 mtr curve spans & Cantilever Beam Launching of twin spans by one LG via side shift technique on Ist stage Fabrication of LG along with Cantilever Beam Arrangement Reduction in cost by various methods like fabrication of repair frame for metro spans, Launching of segments on already existing bridge without disturbing traffic & crash barrier Hindustan Construction Co.Ltd, Badarpur BOT Toll way Project Ltd Nov2009 to March 2011 Engineer Mechanical, Grade (S3),

Curriculum_Vikas

Embed Size (px)

Citation preview

Page 1: Curriculum_Vikas

Vikas Aggarwal 1/2427, East Ram Nagar, Shahdara, Delhi-110032

Mob No. 8376804060, 9711309631 Email Id: [email protected]

Segmental Construction…Fabrication, Erection & Operation (Bridgecon Make Launchers) Operation &Maintenance of 30cum Batching Plant, Maintenance of Heavy Earthmoving Equipments

Manpower Management… Logistics… Strategic Planning

PROFESSIONAL EXPERIENCE

ITD CEMENTATION LTD, Delhi Metro CC-26R Project Sep 2013 to till date Launching Incharge, Deputy.Manager, Erection & Operation Led a team of 4-5 Subcontractors & Engineers, Supervisors for a 2-shift facility along with other Construction areas like Span Alignment, Bearing Fixing, Support functions: Logistics, Client Handling, Inventory Control, Quality, Equipment Deployment etc. Planning, Execution for Erection,Dismantling of LGs & preparing Methodology for linked activities Inventory Control for LG along with reconciliation of Materials like HT Strand, Epoxy

Glue,Cement,Bearings etc Coordination with Clients along with submission of drawings & methodology for different activities Launching of spans in 145-250mtr curve by Bridgecon LG

ITD CEMENTATION LTD, Jaipur Metro C2 Project March 2011 to August 2013 Launching Incharge, Asst.Manager, Fabrication, Erection & Operation of Bridgecon make 300 Ton Launching Girder for dual stage 02no (Road Level & Metro) along with Ground Support Trestle for 110 mtr curve spans & Cantilever Beam Launching of twin spans by one LG via side shift technique on Ist stage Fabrication of LG along with Cantilever Beam Arrangement Reduction in cost by various methods like fabrication of repair frame for metro spans, Launching of

segments on already existing bridge without disturbing traffic & crash barrier

Hindustan Construction Co.Ltd, Badarpur BOT Toll way Project Ltd Nov2009 to March 2011 Engineer Mechanical, Grade (S3),

Page 2: Curriculum_Vikas

Erection & Operation (Bridgecon make 380 Ton Launching Girder)

Led a team of approximately (70) labours of Subcontractors & Salaried Engineer, Supervisors for a 2-shift facility along with other LG activities like Span Alignment, Bearing Fixing, Expansion joint Laying Reduced Time Cycle of Span Erection by Replacing through enhanced techniques & manpower

training Achieved shortest Time cycle for Span Erection of Three Day (43mtr span) Minimized Injuries or lost time by conducting Tool Box Talks, Use of Correct Safety Tools & Tackles

& Subordinate Development.

Hindustan Construction Co.Ltd, Allahabad Bye Pass-II Project Dec 2003 to Oct 2009

Engineer Mechanical, Grade (S1), Erection & Operation (30cum Batching plant) along with Transit Mixers, Concrete Pump, Boom Placer & Transport Fleet and Maintenance of Heavy Earth Moving Equipments, Manpower Management, Inventory Control Maintenance of Machinery like Dozer Sany TQ160A, Motor Grader Sany PQ190,JCB 4D,Transit

Mixers & Transport Fleet(Tippers & HYVA),Boom Placer Make Cifa model KZ 24 & 32,Concrete Pumps, Roller Bomag BW212D2A, DG, Mini Tandem Roller, Crane Tata 955A, Pilling Rig Soilmec RT-3

Preparation of ISO Documents & Reports

PBIL – APEX Consortium Ltd, Morinda Bye Pass Project July 2001 to Nov 2003

Junior Engineer (Mechanical), Maintenance of Heavy Earth Moving Equipments like Motor Grader, Vib.Compactor, JCB, Wet Mix & Hot Mix Plant, POL Management.

Engineering Training Program

Attended Workshop on Hydraulics (Week Course) from Indian Maritime Training Centre,

Mumbai

Participated in National Level Training Course on Organising & Motivating for Safety (3day

Course) by National Safety Council

Attended the Training Program for Safe Use of Lifting Machines, Tools & Tackles by

Intenco Engineering

Page 3: Curriculum_Vikas

EDUCATION

IASE DEEMED UNIVERSITY, RAJASTHAN B.Tech in Mechanical Engineering,65% FEB 2009 PUSA POLYTECHNIC, DELHI Diploma in Mechanical Engineering,65% July 2001 LITTLE FOLWERS PUBLIC SCHOOL, DELHI, CBSE BOARD Intermediate 1998, 65% Matriculation,1996,70%

ADDITIONAL INFORMATION

Languages: English, Hindi Computer Knowledge: Operating Systems like Ms-Windows, MS Dos. Software Packages Like Ms-office, AutoCAD 2000 Date of Birth: 31.10.1980 Experience : 13 years Current CTC: Expected CTC:

Passport No : L8369236