CUUATS CHAMPAIGN URBANA URBANIZED AREA TRANSPORTATION STUDY 1776 East Washington Street Urbana, IL 61802
Phone 217.328.3313 Fax 217.328.2426 www.ccrpc.org
Champaign County Regional Planning Commission strives to provide an environment welcoming to all persons regardless of physical or mental challenges, race, gender, or religion. Please call 217-328-3313 to request special accommodations
at least 2 business days in advance.
Announcement of a Meeting for the CUUATS Technical Committee
Champaign-Urbana Urbanized Area Transportation Study (CUUATS)
DATE: Wednesday, June 17, 2015 TIME: 10:30 a.m. PLACE: CCRPC - John Dimit Meeting Room Brookens Administrative Center 1776 E. Washington St. Urbana, Illinois 61802
AGENDA I. Call to Order
II. Roll Call III. Audience Participation IV. Approval of Agenda V. Approval of Minutes
A. CUUATS Technical Committee Meeting of May 6, 2015 VI. New Business
A. Transportation Improvement Program (TIP) FY2015-2018 Modifications – Ashlee McLaughlin B. Approval of Transportation Improvement Program (TIP) FY2016-2019 – Ashlee McLaughlin C. Endorsement of Developmental Service Center Consolidated Vehicle Procurement (CVP) 2015 Application –
Eileen Sierra D. Discussion about payment for CUUATS Data Hosting to the GIS Consortium- Rita Black E. Rotation of CUUATS Technical Committee Chair and Vice-Chair – Rita Black
VII. Old Business A. Committees and Working Groups
1. Olympian Drive – Bill Gray 2. Multimodal Corridor Enhancement (MCORE) Project– Dave Clark 3. Champaign County Rural Transit Advisory Group (RTAG) – Rita Black
B. Agency Reports 1. City of Champaign – Dave Clark 2. City of Urbana – Bill Gray 3. Village of Savoy – Brent Maue 4. C-U MTD – Karl Gnadt 5. Champaign County – Jeff Blue 6. University of Illinois at Urbana-Champaign – Stacey DeLorenzo 7. Village of Mahomet – Patrick Brown 8. CC Regional Planning Commission – Cameron Moore 9. IDOT District 5 –Bob Nelson/ Bryan Trygg 10. IDOT Central Office – Tom Caldwell 11. FHWA – Betsy Tracy
C. Announcements VIII. Audience Participation
IX. Adjournment
CUUATS CHAMPAIGN URBANA URBANIZED AREA TRANSPORTATION STUDY
1776 East Washington Street Urbana, IL 61802
Phone 217.328.3313 Fax 217.328.2426 www.ccrpc.org
Champaign-Urbana Urbanized Area Transportation Study (CUUATS) 1 Technical Committee 2 MINUTES – SUBJECT TO REVIEW AND APPROVAL 3 DATE: Wednesday, May 6, 2015 4 TIME: 9:30 a.m. 5 PLACE: Champaign County Regional Planning Commission 6 John Dimit Meeting Room 7 1776 E. Washington St., Urbana, IL 61802 8 Technical Voting Members 9
Agency Present Absent Champaign County Jeff Blue Champaign County John Cooper Champaign Dave Clark Champaign Rob Kowalski Urbana Craig Shonkwiler
(Proxy) Bill Gray
Urbana Libby Tyler Savoy Dick Helton Savoy Brent Maue (Vice Chair) CCRPC Cameron Moore University of Illinois Pam Voitik (Chair) University of Illinois Stacey DeLorenzo CUMTD Karl Gnadt CUMTD Bryan Smith IDOT Dist. 5 Robert Nelson IDOT Dist. 5 Brian Trygg
10 Others Present: Gary Maxwell (Champaign County), Cynthia Hoyle (CUMTD), Tom Caldwell (IDOT Central 11
Office) 12 CUUATS Staff: Rita Black, Ashlee McLaughlin, Sharif Ullah, Prateek Mittal 13 Recording secretary: Debbie Peterik 14 MINUTES 15
I. Call to Order 16 Ms. Voitik called the meeting to order at 9:30 a.m. 17
II. Roll Call 18 The roll was taken by written record and a quorum was declared present. 19
III. Audience Participation 20 None 21
IV. Approval of Agenda 22 Mr. Smith made a motion to approve the agenda with the modification of moving Old Business to the 23 Policy Committee meeting which immediately follows the Technical Committee meeting. Mr. Blue 24 seconded. 25 26
V. Approval of Minutes 27 A. CUUATS Technical Committee Meeting of April 1, 2015 28 Ms. Tyler made a motion to approve the CUUATS Technical Committee Minutes of April 1, 2015. Mr. 29 Clark seconded. Upon vote, the motion to approve the minutes was unanimously carried. 30 31
VI. New Business 32 A. Transportation Improvement Program (TIP) FY2015-2018 Modifications - Ashlee McLaughlin 33
34 BACKGROUND: The Illinois Department of Transportation has submitted three administrative 35 modifications to Table 1: FY 15 State HIP Projects, Table 17: Village of Mahomet Local Projects FY 36 15, and Table 45: FY 15- 18 Federally Funded Projects. The following describes the modifications: 37 38 Project H381 39 This is an existing project for bridge rehabilitation/bridge deck repairs over IL 10 and the Illinois 40 Central Railroad tracks west of Champaign in FY 15. This project is currently in Advanced 41 Construction status due to the fact that at this time, the Illinois Department of Transportation 42 considers specific apportionment or state contract ceiling insufficient to meet project 43 specifications. Changes were made to the following tables: 1,45 44 45 Project MA-15-02 46 This is an existing project for milling, resurfacing, and shoulder replacement on Main Street (from 47 Jennifer Drive to Division Street) and Franklin Street (from State Street to Lombard St) in the Village 48 of Mahomet in FY 15. This project is currently in Advanced Construction status due to the fact that 49 at this time, the Illinois Department of Transportation considers specific apportionment or state 50 contract ceiling insufficient to meet project specifications. Changes were made to the following 51 tables: 17,45 52 53 Mr. Trygg informed the committee that he was notified by FHWA that this project does not 54 qualify for federal funds. Ms. McLaughlin will follow up with FHWA. 55 56
B. Approval of Draft Transportation Improvement Program (TIP) FY2016-2019 – Ashlee McLaughlin 57 58
BACKGROUND: Every year, CUUATS staff updates the Transportation Improvement Program (TIP) 59 that outlines projects to be completed by CUUATS member agencies in upcoming fiscal years. The 60 FY 16 tables show those projects that have verified funding sources; projects in the FY 17-19 tables 61 have reasonably guaranteed funding sources. The report includes the most recent project cost 62 estimates, including Federal allocations for transportation projects but excluding state allocations 63 because state projects and funding allocations have not yet been announced for FY 16-19, so the 64 State tables (Tables 1-4) are currently blank. The State tables and all other relevant agency tables 65 will be updated as soon as the State’s program is announced. 66 67 One new element in the Transportation Improvement Program is a spread on pages 31-32 68 summarizing the MCORE Projects including funding allocations from the original TIGER grant 69 application. As project details, budgets, and schedules continue to evolve, individual projects will 70
2 CUUATS Technical Committee May 6, 2015
be amended or modified as necessary in Table 40: MCORE Projects as well as all relevant agency 71 tables throughout the document. 72 73 Once CUUATS Technical and Policy Committees have approved the Draft TIP, the document will be 74 sent out for a 30-day public review period. Any pertinent changes will be made based on public 75 comment and/or new information from member agencies. The Final FY 16-19 TIP will be brought 76 back to the committees for approval in June 2015. 77 78 Ms. Tyler made a motion to approve the Draft Transportation Improvement Program (TIP) FY 79 2016-2019. Mr. Clark seconded. Upon vote, the motion unanimously carried. 80 81
C. Approval of Final CUUATS Unified Technical Work Program (UTWP) FY20166 – Rita Black 82 83
BACKGROUND: The Fiscal Year 2016 UTWP covers the period from July 1, 2015 to June 30, 2016. 84 CUUATS UTWP is developed to coordinate transportation and related planning activities for a 85 continuing, cooperative, and comprehensive planning process in the urbanized area. CUUATS 86 UTWP identifies transportation planning priorities for the Champaign-Urbana urbanized area and 87 allocates CUUATS staff resources to particular projects. 88
89 For FY2016, CUUATS received a funding allocation of $258,734 for eight (8) months. The reason for 90
receiving limited funding is that the federal government has not fully funded their current fiscal 91 year. However, IDOT directed CUUATS staff to prepare the UTWP document and budget for Fiscal 92 Year 2016 using the same amount of funding received in the Fiscal Year 2015. Therefore, the Draft 93 UTWP was prepared using $361,394 in Federal funding which is matched with local funding from 94 the CUUATS member agencies in the amount of $90,349. The total funding available for 95 transportation planning in the Champaign-Urbana MPO for fiscal year 2016 is expected to be 96 $451,743. 97
98 The planning priorities for the urbanized area included in the FY2016 CUUATS UTWP will focus on 99
implementation of strategies delineated in the current LRTP: Sustainable Choices 2040 and 100 updating and developing federally required documents as well as coordinating planning activities 101 with CUUATS member agencies to make sure regional transportation plans are consistent with local 102 government comprehensive plans as well as other regional agencies’ plans. 103
104 The Draft CUUATS UTWP FY2016 was approved by the CUUATS Technical and Policy members on 105
April 1 and 8, 2015 respectively. The document was available on the CCRPC/CUUATS website for 106 public review until Tuesday, May 5, 2015. 107
108 Ms. Black made the following comments on the Draft CUUATS UTWP FY2016: 109
• The UTWP was available for a 30 day public comment period. CUUATS did not receive any 110 comments. 111
• The allocation for the full year has not yet been received from IDOT. CUUATS has 112 prepared the document based on the eight months until the complete federal funding is 113 received. Once the full allocation is received, an amendment will be made to the UTWP 114 document. 115
Mr. Clark made a motion to approve the Final CUUATS Unified Technical Work Program (UTWP) FY 116 2016. Ms. Tyler seconded. Upon vote, the motion unanimously carried. 117
3 CUUATS Technical Committee May 6, 2015
118 D. Discussion about payment for CUUATS Data Hosting to the GIS Consortium – Rita Black 119
120 BACKGROUND: The GIS Consortium would like to charge CUUATS for hosting the CUUATS data in the 121
Consortium ArcGIS Server. According to the Director of the Champaign County GIS Consortium, CUUATS 122 data takes about 15% of space in the Consortium ArcGIS server; therefore, CUUATS is being requested 123 to pay an annual fee of $1,478.55. However, the data stored in the Consortium ArcGIS server is data 124 that is being collected and used for CUUATS projects such as Greenways and Trails, sidewalk 125 assessment, traffic counts, etc. These projects have been completed for CUUATS member agencies 126 which, at the same time, are GIS Consortium members and are already paying fees for the same 127 purposes to the GIS Consortium. 128
129 Mr. Gnadt made a motion to request that Ms. Voitik, the Chair of the GIS Policy Consortium 130
Committee, get clarification of the charges at the next GIS Policy Consortium Committee meeting. 131 Mr. Moore seconded. Upon vote, the motion unanimously carried. 132
133 E. Approval of Champaign-Urbana Selected Crash Intersection Locations (SCIL) 2009-2013 – Prateek 134
Mittal 135 136 BACKGROUND: This report summarizes the traffic crash facts in the Champaign-Urbana area based 137
on 2009-2013 traffic crash data. According to the Unified Technical Work Program (UTWP) of the 138 Champaign Urbana Urbanized Area Transportation Study (CUUATS), a study must be completed 139 every two years in order to identify critical crash intersection locations in the Champaign-Urbana 140 area. Identification of these intersection locations is a vital component of traffic safety 141 improvements. 142
143 The Traffic Crash Facts/Selected Crash Intersection Locations report is essentially a summary of 144
traffic crash patterns in the Champaign-Urbana urbanized area over a five year time period. The 145 report is updated every two years by CUUATS staff by including the latest traffic crash data 146 compiled by IDOT. This version of the report presents an extensive spatial and temporal analysis of 147 traffic crashes that occurred in the area between 2009 and 2013. 148
149 The report presents some general traffic crash trends in the region with a special emphasis on 150
pedestrian and bike crashes. The report also presents trends on various crash factors such as traffic 151 controls, weather, road surface conditions, etc. The report has a separate section on driver 152 conditions which highlights traffic crashes that involved impaired drivers and analyzes spatial and 153 temporal distribution of these crashes. A separate section on corridors analysis is included to 154 analyze and present traffic crash patterns along major corridors in the region. Finally, this report 155 identifies the most critical road intersections in the area that have very high frequency of crash 156 incidents and also high number of severe or fatal crashes. 157
158 The SCIL Report 2007-2011 was presented at the last CUUATS Technical Committee meeting, but it 159
was agreed that Mr. Mittal would present as there were members that had not seen the 160 presentation at that meeting. Ms. Black indicated that there were two new topics in the SCIL 161 report that were not in the prior presentation; the rest of the content is the same. 162
163 164 165 166
4 CUUATS Technical Committee May 6, 2015
The following comments were made regarding the presentation: 167 • Ms. Hoyle questioned the classification of a crash on Lincoln Avenue. Mr. Mittal had 168
indicated that the crash was a pedestrian fatality but was considered a fixed-object 169 collision due to the fact that the initial point of impact was the vehicle hitting the curb first 170 and later hitting the pedestrian on the sidewalk. Ms. Black commented on the importance 171 of reading the narrative of crash details for classification purposes. 172
• There have been several severe crashes in downtown Urbana in the area of Race Street 173 and Main Street. Ms. Black commented that improvements were made to this 174 intersection last year. 175
• Florida Avenue and Philo Road had five pedestrian crashes. This area was improved last 176 year. Ms. Black commented that Florida House and Pace are located in the vicinity of this 177 intersection. Both locations serve disabled people, and this is why there are a high number 178 of crashes in this area. 179
• Ms. Hoyle commented that the Lincoln Avenue and Illinois Street bike crashes are due to 180 bike infrastructure changes; bicycles travel everywhere as Lincoln Avenue does not have a 181 bike path. 182
• Ms. Black pointed out that the intersection of Boardwalk Drive and Interstate Drive was 183 already identified for a safety study. The study was already completed by CUUATS staff 184 and recommendations for improvements have been provided to the City of Champaign 185 Staff. 186
• Mr. Ullah indicated that there would be updates to the intersections of First Street and 187 Green Street as well as Fourth Street and White Street. 188
• Ms. Black stated that if federal funding becomes available CUUATS would reactivate the 189 Safety Committee to complete a safety plan for the urbanized area and the county. 190
Mr. Smith made a motion to approve the Champaign-Urbana Selected Crash Locations (SCIL) 191 2009-2013. Ms. Tyler seconded. Upon vote, the motion unanimously carried. 192
193 VII. Old Business 194
Old Business Items (Committees and Working Groups, in addition to the Agency Reports and 195 Announcements) will be moved to the Policy Committee Meeting immediately following this 196 Technical Committee Meeting. 197 198 Ms. Hoyle commented that about 40 children participated in the Bike to School Day today. May 14th is 199 Bike to Work Day. Ms. Hoyle encouraged the committee to sign up online and make a contribution. 200 The contributions will go toward the construction of the Kickapoo Trail. The website is 201 www.champaigncountybikes.org. 202 203 Mr. Nelson announced that Scott Lackey has retired as Local Roads Engineer. Brian Trygg is the Acting 204 Roads Engineer that will be representing IDOT District 5. 205
206 VIII. Audience Participation 207
None 208 209
5 CUUATS Technical Committee May 6, 2015
IX. Adjournment 210 There being no further business, Ms. Tyler made a motion to adjourn. Mr. Blue 211 seconded. Upon vote, the motion unanimously carried. Ms. Voitik adjourned the 212 meeting 10:12 a.m. 213
6 CUUATS Technical Committee May 6, 2015
CUUATS CHAMPAIGN URBANA URBANIZED AREA TRANSPORTATION STUDY
1776 East Washington Street Urbana, IL 61802
Phone 217.328.3313 Fax 217.328.2426 www.ccrpc.org
TO: CUUATS Technical Committee Members FROM: CUUATS Staff DATE: 17 June 2015 RE: FY 2015-2018 Transportation Improvement Program Administrative Modifications BACKGROUND: The Illinois Department of Transportation has submitted one administrative modification to Table 9: City of Urbana Local Projects FY 15 and Table 45: FY 15-18 Federally Funded Projects. The Village of Mahomet has submitted one administrative modification to Table 17: Village of Mahomet Local Projects FY 15, Table 18: Village of Mahomet Local Projects FY 16, Table 46: Village of Mahomet STU Allocation, and Table 45: FY 15-18 Federally Funded Projects. The following describes the modifications: UR-15-06 Tables: 9,45 MA-15-02 MA-16-04 Tables: 17,18,45, 46
This is an existing project for the reconstruction of Windsor Road from Race Street to Philo Road in Urbana in FY 15. This project had been changed from “Advanced Construction” to “Current” status due to the fact that the Illinois Department of Transportation considers specific apportionment or state contract ceiling sufficient to meet project specifications. This is an existing project for milling, resurfacing, and shoulder replacement on Main Street (from Jennifer Drive to Division Street) and Franklin Street (from State Street to Lombard St) in the Village of Mahomet in FY 15. This project is being moved from FY 15 to FY 16 due to a delay in project processing with a letting scheduled for July 2015. All other project details remain the same.
No action is required.
TABLE 9. CITY OF URBANA LOCAL PROJECTS FY 15
Project Number Project Description
TERMINI
Fund Type Lead Agency
Other Agencies
Your Agency Cost
(in 1,000’s)
Other Agencies
Cost Share Total
(in 1,000’s)
State Cost Share
(in 1,000’s)
Federal Cost Share (in 1,000’s)
TOTAL PROJECT
COST (in 1,000’s)
Description of Proposed ImprovementBeginning End
UR-15-012015 Street
Reconstruction/Resurfacing
Various LocationsMFT, LMFT,
CIRFUR $2,321.25 $2,321.25
Reconstruct/Resurface various streets
UR-15-022015 Pavement
PatchingVarious Locations CIRF UR $595.00 $595.00
Patch various asphalt and concrete streets
UR-15-032015 Pavement
PreservationVarious Locations LMFT UR $100.00 $100.00
Preserve and seal various streets
UR-15-04Bicycle Master Plan bike lanes, routes, signage, sidepaths
Various Locations CIRF UR $55.00 $55.00Installation of Bicycle
Master Plan bike lanes and routes
UR-15-05Airport Road West
ReconstructionWillow Rd
Cunningham Ave
EDP, TIF UR $1,840.00 $1,305.90 $3,145.90
Street reconstruction/signal modernization; IDOT Section #13-
00532-00-PV
UR-15-06Windsor Road Reconstruction
Race St Philo Rd
STU; Local Bond, MFT,
or Local Gas Tax
UR $3,000.00 $3,000.00 $6,000.00Street ReconstructionSec 13-00540-00PV
UR-15-07* CH-15-10* CC-15-01*
Olympian Drive Extension West
Olympian Dr
Duncan Rd
IJN, STU URCH, CC
$935.00 $750.00 $1,685.00
Olympian Dr extension including 10’ HMA shoulders and 10’
bikepath Sec 11-00290-00-PV
UR-15-08Broadway Avenue
Reconstruction
N of Stebbins
Dr
Oakland Ave
CIRF UR $600.00 $600.00 Street reconstruction
FY 15 TOTAL (In 1000’s) $8,511.25 $0 $2,240.90 $3,750.00 $14,502.15
18
CIt
y o
f U
rban
a
FY 2015-2018 Transportation Improvement Program
*Advanced Construction
FY 2015-2018 Transportation Improvement Program
35
TABLE 45. FY 15-18 FEDERALLY FUNDED PROJECTS
Fiscal Year
State ID No., Project Number, or Agency Name
Project Location or Description
TERMINI
Fund Type Lead Agency
Other Agencies
Federal Cost Share
(in 1,000’s)
State Cost Share
(in 1,000’s)
Other Agencies Cost Share
Total (in 1,000’s)
TOTAL PROJECT COST
(in 1,000’s)Description of Proposed Improvement
Beginning End
2015 E042 IL 47 US 136I-74 at
MahometNHPP-State/State Match
State $5,570.00 $1,393.00 $6,963.00Resurfacing (3R)/New Shoulders/Culvert Replacement/ Intersection Improvement/Safety Improvements
2015 E042 IL 47 I-74Franklin St Mahomet
ITEP/Local Match
State MA $235.00 $59.00 $294.00Multi-Use Side Path on East Side
of IL 47
2015 ITS-1 I-57/I-72/I-74Various Locations in Champaign-Urbana
HSIP Safety-State/State
MatchState $966.00 $1,682.00 $2,648.00
Changeable Message Signs / Surveillance
2015 H381* I-57Over IL 10 & IC RR W of
ChampaignNHPP-State/ State Match
State $2,700.00 $300.00 $3,000.00Bridge Rhabilitation/Bridge Deck
RepairsSN 010-0009 & 010-0010
2015 A092* I-740.5 mi W of IL 47 in Mahomet
0.5 mi W of I-57
NHPP-State/ State Match
State $9,342.00 $1,038.00 $10,380.00Resurfacing (INT-3rd)/Safety
Improvements
2015 F202* US 150IL 47 in
MahometMattis Ave in Champaign
STP-URB 5-200K-S/ State Match
State $2,080.00 $520.00 $2,600.00Resurfacing (SMART)/ Guardrail/
Pedestrian Ramps/ADA
2015 E038* IL 130Windsor Rd in
UrbanaMadison St
in Philo
STP-RURAL-STATE/STP-
URB 5-200K-S/State Match
State $2,388.00 $597.00 $2,985.00Resurfacing (3P)
(STR $1,834; STU $414)
2015 SWHSIP2 IL 47S Mahomet Village limit
IL 10HSIP/
Restricted State Match
State $39.94 $4.44 $44.388”, Bicycle Friendly, Milled
Rumble Strips (one location of various district wide: $457,000)
2015UR-15-07* CH-15-10* CC-15-01*
Olympian Drive Extension West
Olympian Dr
Duncan Rd
IJN, STU UR CH, CC $750.00 $935.00 $1,685.00Olympian Dr extension including 10’ HMA shoulders and 10’ bike
path, Sec 11-00290-00-PV
2015 UR-15-06Windsor Road Reconstruction
Race St Philo RdSTU; Local
Bond, MFT, or Local Gas Tax
UR CC $3,000.00 $3,000.00 $6,000.00Street Reconstruction Sec 13-00540-00PV
2015 CC-15-02*Dewey Fisher Road, CR 1
N Champaign City Limits
US 136HSIP, STR,
TARPCC $4,521.00 $900.00 $2,339.00 $7,760.00 Widening, Resurfacing
2015 CUMTDMaintenance
Facility5307 $7,400.00 $6,000.00 $1,300.00 $14,700.00
Maintenance Facility Demolition & Expansion (West)
FY 15 continues on next page >
feD
eral
ly f
Un
DeD
pro
jeC
tS
*Advanced Construction
TABLE 17. VILLAGE OF MAHOMET LOCAL PROJECTS FY 15
Project Number Project Description
TERMINIFund Type
Lead Agency
Other Agencies
Your Agency Cost
(in 1,000’s)
Other Agencies Cost Share
Total (in 1,000’s)
State Cost Share
(in 1,000’s)
Federal Cost Share (in 1,000’s)
TOTAL PROJECT
COST (in 1,000’s)
Description of Proposed ImprovementBeginning End
MA-15-01 Paving Overlay Various Locations MFT MA $125.00 $125.00 Paving Overlay
E042IL 47 Multi-Use
Side PathBriarcliff Dr Franklin St
ITEP, Local Match
State MA $59.00 $235.00 $294.00Multi-Use side path on
East side of IL 47
FY15 TOTAL (In 1,000’s) $184.00 $0 $235.00 $0 $419.00
TABLE 18. VILLAGE OF MAHOMET LOCAL PROJECTS FY 16
Project Number Project Description
TERMINI
Fund Type Lead Agency
Other Agencies
Your Agency Cost
(in 1,000’s)
Other Agencies Cost Share
Total (in 1,000’s)
State Cost Share
(in 1,000’s)
Federal Cost Share (in 1,000’s)
TOTAL PROJECT
COST (in 1,000’s)
Description of Proposed ImprovementBeginning End
MA-16-01 Paving Overlay Various Locations MFT MA $125.00 $125.00 Paving Overlay
MA-16-02Franklin Street Reconstruction
IL 47 State St MFT MA $209.00 $209.00 Street Reconstruction
MA-16-03Main Street
Mill and Resurface Lincoln St to Division St
Jennifer St to Richard St
STU, Local Match
MA $40.00 $160.00 $200.00Milling, resurfacing,
shoulder replacementSec 14-00033-00-RS
MA-16-04*Main Street and Franklin Street
Mill and Resurface
Main St: Jennifer Dr; Franklin St:
State St
Main St: Division St;
Franklin St: N Lombard St
STU, Local Match
MA $40.00 $160.00 $200.00Milling, resurfacing,
shoulder replacementSec 14-00032-00-RS
FY16 TOTAL (In 1,000’s) $414.00 $0 $0 $320.00 $734.00
TABLE 19. VILLAGE OF MAHOMET LOCAL PROJECTS FY 17
Project Number Project Description
TERMINI
Fund Type Lead Agency
Other Agencies
Your Agency Cost
(in 1,000’s)
Other Agencies Cost Share
Total (in 1,000’s)
State Cost Share
(in 1,000’s)
Federal Cost Share (in 1,000’s)
TOTAL PROJECT
COST (in 1,000’s)
Description of Proposed ImprovementBeginning End
MA-17-01 Paving Overlay Various Locations MFT MA $125.00 $125.00 Paving Overlay
MA-17-02Street
ReconstructionBriar Cliff
Subdivision StMFT MA $144.00 $144.00 Street Reconstruction
FY17 TOTAL (In 1,000’s) $269.00 $0 $0 $0 $269.00
23
VIll
age
of
mah
om
etFY 2015-2018 Transportation Improvement Program
*Advanced Construction
24
FY 2015-2018 Transportation Improvement Program
TABLE 20. VILLAGE OF MAHOMET LOCAL PROJECTS FY 18
Project Number Project Description
TERMINI
Fund Type Lead Agency
Other Agencies
Your Agency Cost
(in 1,000’s)
Other Agencies Cost Share
Total (in 1,000’s)
State Cost Share
(in 1,000’s)
Federal Cost Share (in 1,000’s)
TOTAL PROJECT
COST (in 1,000’s)
Description of Proposed ImprovementBeginning End
MA-18-01 Paving Overlay Various Locations MFT MA $125.00 $125.00 Paving Overlay
MA-18-02Sunny Acres
Road
Oak St/
US RT 150
.042 mi S of
US RT 150
STU, Local Match
MA $160.00 $160.00 $320.00Milling, resurfacing, shoulder
replacementSec 14-00034-00-RS
FY18 TOTAL (In 1,000’s) $285.00 $0 $0 $160.00 $445.00
TABLE 46. VILLAGE OF MAHOMET STU ALLOCATIONPrior Usage by Fiscal Year
Project Location FY Obligated (STPU $) FY 16 STPU ALLOTMENT = $74,261.56
FY 17 STPU ALLOTMENT = $74,261.56 *
FY 18 STPU ALLOTMENT = $74,261.56 *
FY 19 STPU ALLOTMENT = $74,261.56 *
STPU $ REFLECT FEDERAL SHARE *FY 17 - FY 19 subject to change
Total -
Active and Proposed Projects FY Programmed FY 15 FY 16 FY 17 FY 18 FY 19 FY20Main Street and Franklin StreetMA-15-02Sec 14-00032-00-RS
FY 16 $160,000.00 $160,000.00
Main StreetMA-16-03 Sec 14-00033-00-RS
FY 16 $160,000.00 $160,000.00
Sunny Acres Road MA-18-02Sec 14-00034-00-RS
FY 18 $160,000.00 $160,000.00
State StreetSec 14-00035-00-RS
FY 19 $80,000.00 $80,000.00
FY Balance STPU (Local) Funds $195,762.47 $-49,975.97 $24,285.59 $-61,452.85 $-67,191.29 $7,070.27
VIll
age
of
mah
om
et
CUUATS CHAMPAIGN URBANA URBANIZED AREA TRANSPORTATION STUDY
1776 East Washington Street Urbana, IL 61802
Phone 217.328.3313 Fax 217.328.2426 ww.ccrpc.org
TO: CUUATS Technical Committee Members FROM: CUUATS Staff DATE: June 17 2015 RE: FY 2016-2019 Transportation Improvement Program REQUESTED ACTION: Approve Final TIP STAFF RECOMMENDATION: Approve Final TIP BACKGROUND: Every year, CUUATS staff updates the Transportation Improvement Program (TIP) that outlines projects to be completed by CUUATS member agencies in upcoming fiscal years. The report includes the most recent project cost estimates, including Federal and State allocations for transportation projects. The FY 16 tables show those projects that have verified funding sources; projects in the FY 17-19 tables have reasonably guaranteed funding sources. The Draft 2016-2019 TIP was approved by the CUUATS Technical and Policy Committees on May 6, 2015 and subsequently posted for a 30-day public comment period. No comments were received from the public during that period, though a few changes were incorporated into the document based on updated project information from Member Agencies that carry over from the FY15-18 TIP. In addition, the following changes were made based on Member Agency feedback:
• The State program, which was not available at the time the draft document was approved, was incorporated into the document and subsequently updated on the website June 1, during the public comment period. Tables 1-8
• The City of Urbana added one illustrative project for street resurfacing/reconstruction on Florida Avenue from Busey Avenue to Vine Street. Table 45
• The following text was added to the Public Involvement Process section (pg 4) to reflect compliance with the public participation requirements for Section 5307 grants received by CUMTD:
Public notice of public involvement activities and time established for public review and comments on the TIP satisfy the public participation requirements for FTA grantees and MPOs as outlined in 49 U.S.C 5307 (b)(1) through (7); The Metropolitan Transportation Planning and Programming requirements at 23 CFR part 450.314, 316, 322, and 324; and FTA Circular 9030.1E, “Urbanized Area Formula Program: Program Guidance and Application Instructions,” Ch. V, Section 6.
STAFF RECOMMENDATION: Approve the Final FY 16-19 TIP
TRANSPORTATION IMPROVEMENT PROGRAMFiscal Years 2016-2019
Pending Approval by CUUATS Policy CommitteeDRAFT June 10, 2015
PrePared for:Champaign-Urbana Urbanized Area Transportation Study,a program of the Champaign County Regional Planning Commission
In cooPeratIon wIth:Illinois Department of Transportation (IDOT)Federal Highway Administration (FHWA)Federal Transit Administration (FTA)
PrePared by:Ashlee McLaughlinTransportation PlannerCUUATS/CCRPC1776 E. Washington St.Urbana, IL 61802Phone: (217) 819-4077Fax: (217) 328-2426Web: www.ccrpc.org
FY 2016-2019 Transportation Improvement Program
ii
Champaign-Urbana Urbanized Area Transportation Study
POLICY COMMITTEEDeb Feinen, Chair .........................................................City of ChampaignRobert McCleary, Vice Chair .................................................Village of SavoyLaurel Prussing .....................................................................City of UrbanaPatsi Petrie ............................................................Champaign County BoardLinda Bauer .........................................................................CUMTD BoardAllan Stratman ...............................................................University of IllinoisCraig Emberton ..................................................................IDOT District 5
TECHNICAL COMMITTEE
Pam Voitik, Chair ............................................................University of IllinoisBrent Maue, Vice Chair ........................................................Village of SavoyStacey DeLorenzo ............................................................University of IllinoisRichard Helton ....................................................................Village of SavoyKarl Gnadt ...................................................................................CUMTDBryan Smith .................................................................................CUMTDJeff Blue ........................................................County Highway DepartmentJohn Cooper .................................................County Highway DepartmentWilliam Gray ......................................................................City of UrbanaElizabeth Tyler .....................................................................City of UrbanaDave Clark ...................................................................City of ChampaignRob Kowalski ................................................................City of ChampaignRobert Nelson ....................................................................IDOT District 5Brian Trygg .........................................................................IDOT District 5Cameron Moore ..........................................Regional Planning Commission
CUUATS Staff
Cameron Moore .................................................... Chief Executive OfficerRita Morocoima-Black ................ Dir. of Planning & Community DevelopmentM. Sharif Ullah ..............................................Senior Transportation EngineerGabriel Lewis .......................................................... Transportation PlannerAshlee McLaughlin .................................................. Transportation PlannerMatt Yoder .............................................................. Transportation PlannerPrateek Mittal .......................................................... Transportation PlannerEileen Sierra Brown ......................................................... HSTP CoordinatorDebbie Peterik ....................................................... Administrative Secretary
FY 2016-2019 Transportation Improvement Program
iii
CONTENTS1. LIST OF TABLES2. LIST OF FIGURES3. ACRONYMS4. INTRODUCTION ............................................................................................ 15. PROJECT CATEGORIES AND PRIORITIZATION ................................................ 16. TIP ANNUAL ELEMENT .................................................................................... 37. TIP SELECTION PROCESS ............................................................................... 38. PUBLIC INVOLVEMENT PROCESS .................................................................... 49. STP-U (LOCAL) ALLOCATION IN AVAILABLE FISCAL YEAR ................................. 510. HIGHWAY .................................................................................................... 511. TRANSIT ....................................................................................................... 512. BICYCLES AND PEDESTRIANS ....................................................................... 613. AIR QUALITY CONSIDERATIONS .................................................................. 614. TIP AMENDMENT & ADMINISTRATIVE MODIFICATION PROCEDURES ............ 715. BACKGROUND ............................................................................................ 716. TYPES OF TIP ALTERATIONS .......................................................................... 717. SPECIAL CASE TIP ALTERATIONS AND CIRCUMSTANCES ............................... 918. FEDERALLY OBLIGATED PROJECTS ............................................................... 1019. REPORT FORMAT ......................................................................................... 11
FY 2016-2019 Transportation Improvement Program
iv
LIST OF FIGURESFigure 1. FY 2016 Major Transportation Projects Champaign-Urbana MPO
Metropolitan Planning Area ................................................. 40
LIST OF TABLESTable 1. Federally Funded Projects FY 16 ............................................ 13Table 2. Federally Funded Projects FY 17 ............................................ 14Table 3. Federally Funded Projects FY 18 ............................................ 14Table 4. Federally Funded Projects FY 19 ............................................ 14Table 5. State HIP Projects FY 16 ....................................................... 15Table 6. State HIP Projects FY 17 ....................................................... 16Table 7. State HIP Projects FY 18 ....................................................... 16Table 8. State HIP Projects FY 19 ....................................................... 16Table 9. City of Champaign Local Projects FY 16 ................................ 17Table 10. City of Champaign Local Projects FY 17 .............................. 18Table 11. City of Champaign Local Projects FY 18 .............................. 19Table 12. City of Champaign Local Projects FY 19 .............................. 19Table 13. City of Urbana Local Projects FY 16 .................................... 20Table 14. City of Urbana Local Projects FY 17 .................................... 21Table 15. City of Urbana Local Projects FY 18 .................................... 21Table 16. City of Urbana Local Projects FY 19 .................................... 22Table 17. Village of Savoy Local Projects FY 16 ................................... 23Table 18. Village of Savoy Local Projects FY 17 ................................... 24Table 19. Village of Savoy Local Projects FY 18 ................................... 24Table 20. Village of Savoy Local Projects FY 19 ................................... 24Table 21. Village of Mahomet Local Projects FY 16 ............................. 25Table 22. Village of Mahomet Local Projects FY 17 ............................. 25Table 23. Village of Mahomet Local Projects FY 18 ............................. 25Table 24. Village of Mahomet Local Projects FY 19 ............................. 26Table 25. Village of Mahomet STP-U Allocation .................................. 26Table 26. Village of Tolono Local Projects FY 16 ................................. 27Table 27. Village of Tolono Local Projects FY 17 ................................. 27Table 28. Village of Tolono Local Projects FY 18 ................................. 27Table 29. Village of Tolono Local Projects FY 19 ................................. 27Table 30. University of Illinois Local Projects FY 16 .............................. 28Table 31. University of Illinois Local Projects FY 17 .............................. 28Table 32. University of Illinois Local Projects FY 18 .............................. 28Table 33. University of Illinois Local Projects FY 19 .............................. 28Table 34. Champaign County Local Projects FY 16 ............................. 29Table 35. Champaign County Local Projects FY 17 ............................. 29Table 36. Champaign County Local Projects FY 18 ............................. 29Table 37. Champaign County Local Projects FY 19 ............................. 29
Table 38. C-U MTD Local Projects FY 2016-2019 .............................. 30Table 39. Champaign County Forest Preserve Projects FY 16-19 .......... 31Table 40. Non-Infrastructure Projects FY 16 ........................................ 32Table 41. Non-Infrastructure Projects FY 17 ........................................ 32Table 42. Non-Infrastructure Projects FY 18 ........................................ 32Table 43. Non-Infrastructure Projects FY 19 ........................................ 32Table 44. MCORE projects ................................................................ 34Table 45. Illustrative Projects ............................................................ 35Table 46. CUUATS STP-U Allocation .................................................. 37Table 47. Multi-Agency Projects FY 16 ................................................ 38Table 48. Multi-Agency Projects FY 17 ................................................ 39Table 49. Multi-Agency Projects FY 18 ................................................ 39Table 50. Multi-Agency Projects FY 19 ................................................ 39
FY 2016-2019 Transportation Improvement Program
v
ACRONYMS3P Pavement Preservation Project
ADA Americans with Disabilities Act
BRRP Bridge Replacement & Rehabilitation Act
CATS Campus Area Transportation Study
CDB Capital Development Board
CDBG Community Development Block Grant
CFR Code of Federal Regulations
CIF Capital Improvement Fund
CIRF Capital Improvement & Replacement Fund
CNIL RR Canadian National/Illinois Central Railroad
CVP Consolidated Vehicle Procurement
DOAP Downstate Operating Assistance Program
EDP Economic Development Program
EIIDP Elderly Individuals and Individuals with Disabilities Program (Section 5310)
FBF Food and Beverage Fund
FED Federal
FY Fiscal Year
HSIP Highway Safety Improvement Program
ITEP Illinois Transportation Enhancement Program
Interstate Maint. Interstate Maintenance
LMFT Local Motor Fuel Tax
LRTP Long Range Transportation Plan
MAP-21 Moving Ahead for Progress in the 21st Century
MCORE Multimodal Corridor Enhancement
MFT Motor Fuel Tax
MVPS Motor Vehicle Parking System
NF New Freedom (Section 5317)
NHPP National Highway Performance Program
NHS National Highway System
NS RR Norfolk Southern Railroad
PKG Parking
PPR Project Priority Review
ROW Right-of-Way
RR Railroad
SAG Savoy General Fund
SBT Sewer Benefit Tax
SEC Demonstration Section Fund
Section 5309 Transit Capital Investment Program
SMART Specific Measurable Achievable Realistic Time-bound
SPR State Planning & Research
SRTS Safe Routes to School
STIP State Transportation Improvement Program
STP-R (local/state) Surface Transportation Program - Rural
STP-U (local/state) Surface Transportation Program - Urban
STP-URB 5-200K-S Surface Transportation Program - Urban
STP-RURAL-STATE Surface Transportation Program - Rural, State Match
SWUF Storm Water Utility Fund
TBD To Be Determined
TBP Township Bridge Program
TCSP Transportation, Community, & System Preservation
TDC Transportation Development Credits
TDM Travel Demand Management Fund
TIF Tax Increment Finance
TIGER Transportation Investment Generating Economic Recovery
TIP Transportation Improvement Program
TPS Technical Planning Studies
AGENCIESCC Champaign County
CH City of Champaign
CCRPC Champaign County Regional Planning Commission
CUUATS Champaign-Urbana Urbanized Area Transportation Study
CUMTD Champaign-Urbana Mass Transit District
FED Federal Government
FHWA Federal Highway Administration
FPD Champaign County Forest Preserve District
FTA Federal Transit Administration
IDOT Illinois Department of Transportation
MA Village of Mahomet
MPO Metropolitan Planning Organization
SA Village of Savoy
TO Village of Tolono
TT Tolono Township
UI University of Illinois
UR City of Urbana
FY 2016-2019 Transportation Improvement Program
1
INTRODUCTIONThe Fiscal Year 2016-2019 Transportation Improvement Program (TIP) is a product of the on-going transportation planning process for the Champaign-Urbana Urbanized Area Transportation Study (CUUATS). It was prepared by CUUATS staff, under the direction of the CUUATS Technical Committee, for the CUUATS Policy Committee. The TIP is based on existing area-wide transportation plans, previous TIPs, Transportation System Management studies and the current construction plans of the implementing agencies.
The purpose of the TIP is to document proposed projects for a four-year fiscal period so that project funding can be secured. Any local project that solicits federal or state monies must be in the TIP in order to be considered for such funding.
Projects included in this TIP are proposed for implementation in one or more of the following jurisdictions: City of Champaign, City of Urbana, Village of Savoy, Village of Mahomet, Village of Tolono, the University of Illinois, the State of Illinois, Champaign County, Champaign County Forest Preserve District, or the Champaign-Urbana Mass Transit District. Projects are subject to the financial availability of federal, state and/or local agencies’ funding sources. Approval by the CUUATS Policy Committee certifies that the requirements of 23 CFR, Section 450.308 are met.
The existing transportation system within the Champaign-Urbana Urbanized Area Transportation Study planning boundaries is being adequately operated and maintained with the revenue sources that are provided through federal, state, and local jurisdictions. The FY 2016-2019 TIP is financially constrained, meaning that all funding estimates are based on anticipated state, federal, and local budget constraints.
PROJECT CATEGORIES AND PRIORITIZATIONThe FY 2016-2019 TIP has been developed to meet the guidelines of the Federal Highway Administration and the Federal Transit Administration under the most recent transportation appropriations bill: Moving Ahead for Progress in the 21st Century (MAP-21). As specified in those guidelines, projects from the following categories are included:
• Interstate - This category includes improvements to the Interstate Highway System, which are funded through Interstate 4R funds for reconstruction, rehabilitation, resurfacing, and restoration.
• Operating and Capital Assistance Projects - This category consists of transit projects funded through Sections 3, 5 and 9 of the Urban Mass Transportation Act of 1964. All transit projects in the Champaign-Urbana Urbanized Area are included in this category.
• Major or Area Service Highway Extensions - This category consists of those street projects within the urbanized area that are extensions of major rural roads in the urbanized area. Federal-aid Surface Transportation Program Rural (STP-R) funds are used for projects in this category.
• Urban Systems Projects - This category includes improvements to collector and arterial streets that are Federal-aid Highways. Federal Aid Surface Transportation Program (STP) funds are used for projects in this category.
The continuing, comprehensive, and cooperative (3C) transportation planning process required by federal regulations requires inclusion in the TIP of those projects that will receive federal funding from one or more of the federal transportation programs. These programs include Interstate, Federal-Aid Surface Transportation Program Rural (STP-R) and Urban (STP-U), Highway Bridge Replacement and Rehabilitation (BRRP), Highway Safety Improvement Program (HSIP), and Federal Transit Administration (FTA). IDOT and local projects that are not regionally significant in nature, such as small resurfacing projects or minor railroad
FY 2016-2019 Transportation Improvement Program
2
crossing improvements, might not be individually identified in the TIP even though the projects receive federal funding. Many times the smaller projects are grouped together in similar categories (e.g. resurfacing).
The following national goals established by MAP-21 (23 USC 150 (b)), as performance measures for Metropolitan Planning Organizations, will be phased into the TIP with ongoing implementation of the Long Range Transportation Plan (LRTP): Sustainable Choices 2040:
• Support Economic Vitality
• Increase Safety
• Increase Security
• Increase Accessibility and Mobility
• Environmental Sustainability
• Enhance Mulitimodal Connectivity
• Promote Efficient System Management and Operation
• Emphasize the Preservation of the Existing System
These eight MAP-21 planning factors serve as part of the foundation of Sustainable Choices 2040, which was approved in December, 2014. The TIP will identify projects that address these seven goals according to the projects’ regional contribution to the performance measures currently and over time, as detailed in Sustainable Choices 2040.
The costs shown in this document are estimates of expected costs based on current information available about the projects. Costs shown for some projects are rough estimates, which will be refined after preliminary engineering work has been completed. Any significant changes to the cost of a project is reported as a TIP amendment or modification to the CUUATS Technical and Policy Committees.
This document sets priorities in two ways. First, the report differentiates between projects to be constructed or to receive funding in the first fiscal year (FY 2016 Annual Element) and those to be constructed during the following three fiscal years (FY 2017-2019). The amount of time required for preliminary engineering and right-of-way acquisition,
the availability of funds, and community needs will determine whether a project will be in the Annual Element or the latter portion.
Preliminary activities on some projects take place over multiple fiscal years before construction is able to begin. Unforeseen difficulties in these activities could delay a project for a year or more. Thus a project may be included in the Annual Element for more than one year.
The second prioritization method involves how STP-U Local funds are allocated within each of the four fiscal years in the TIP. STP-U Local project prioritization is determined by the Project Priority Review (PPR) Guidelines created by CUUATS and approved by both the CUUATS Technical and Policy Committees in 2008. Specifically, the PPR Guidelines require that, at a minimum, every project receiving STP-U Local funding meets the following three requirements:
1. Consistency with the Long Range Transportation Plan, local plans, and MAP-21 goals
2. Financial constraint3. Project-specific eligibility and technical justification
Local agencies seeking STP-U Local funding are required to submit an application to CUUATS for each project. Submitted projects are then allocated point values based on PPR assessment factors such as long term regional significance, mobility and safety, vehicular volumes, agency coordination, etc. Projects are finally categorized into high, medium, and low priority levels. This method does not preclude the movement of a project into a higher priority level due to the immediate need for a project or moving a project forward or backward due to unforeseen funding issues.
Projects are prioritized at minimum on an annual basis to reflect changing needs and circumstances.
FY 2016-2019 Transportation Improvement Program
3
TIP ANNUAL ELEMENTIn accordance with 23 CFR 450.220(c), the Metropolitan Planning section of the Federal Register of October 28, 1993, the participating members of the Champaign-Urbana Urbanized Area Transportation Study (CUUATS) agree that the State may propose federal-aid projects funded from the Highway Safety Improvement Program (HSIP). They also may propose projects funded with Interstate, NHS, STP-R, STP-U, and BRRP monies, to be included in the statewide program of projects with these projects being drawn from the annual element of the TIP.
All federally funded projects that significantly alter the functional capacity or capability of a facility will be included in the TIP Annual Element.
All STP projects, regardless of work type, will be included in the TIP Annual Element. Some projects of similar work types will continue to be combined in the TIP Annual Element as categories of improvements such as engineering, intermittent resurfacing, etc.
The Illinois Department of Transportation will continue to provide CUUATS with the Department’s entire annual and multi-year highway program regardless of funding source and work type.
The Illinois Department of Transportation will notify CUUATS of all projects proposed for State letting regardless of funding source and work type, including projects not shown in the TIP Annual Element.
The Champaign-Urbana area TIP will be utilized to develop the State’s STIP. Highway and transit projects eligible for grouping will be summarized by year, fund source, and type of work. The Champaign-Urbana area TIP will be incorporated by reference to the STIP. The STIP will be submitted for FHWA and FTA approval with appropriate documentation of public involvement.
TIP SELECTION PROCESSIn accordance with MAP-21 regulations, the TIP is financially constrained. In other words, all projects in the first year element have verified funding sources and the projects in the second, third, and fourth year elements have reasonably guaranteed funding sources. Project implementation priority is given to the first year of the TIP. However, special circumstances may arise necessitating movement of a second, third, or fourth year project forward to the first year. When this occurs, such a move will take place with no further action required of the Technical or Policy Committees. The Technical and Policy Committees, however, should approve any project subject to amendment. MPO Staff, at the next regularly scheduled committee meetings, will advise the Technical and Policy Committees of the project advancement.
The Champaign-Urbana Urbanized Area Transportation Study receives an allocation of funds each year through formulas determined by the FHWA, FTA, and the Illinois Department of Transportation, administered by the Illinois Department of Transportation. The Surface Transportation Program (STP) funds are the most significant funds for the Champaign-Urbana urbanized area. Agreement among all jurisdictions through action of the Policy Committee determines the best use of these funds.
The implementing agency may elect to change their project fund type via notification to the Policy Committee through the MPO, which also will not require any additional public hearings.
FY 2016-2019 Transportation Improvement Program
4
PUBLIC INVOLVEMENT PROCESSSince its inception in 1964, CUUATS has been actively committed to involving the public in its planning process. Whenever a regular meeting, public hearing, or informational meeting is held, consideration is given to all comments or suggestions. In some instances, responses to resident input are prepared in writing and distributed to interested parties. For major transportation system developments, comments received by the public at a public hearing or by letter are responded to directly in the final report. Past examples of incorporating citizen comments into final reports include the Campus Area Transportation Study (CATS), the Greenways and Trails Plan, and the LRTP: Sustainable Choices 2040. Information about these projects can be found on the CUUATS website at www.ccrpc.org/transportation.
CUUATS takes an active role in identifying public participants. Staff presently maintains an extensive mailing list, which includes active members of CUUATS committees and persons who have requested to be notified of meetings and events.
The public is informed about CUUATS public meetings via announcements that are sent out to all individuals on the mailing list approximately (1) week before the scheduled event. Paid announcements for all CUUATS meetings are placed in the News-Gazette (the only daily circulation newspaper in Champaign-Urbana). Meeting announcements are also published on the CUUATS website.
The public is encouraged to participate at all CUUATS meetings. To facilitate public involvement in the development of a document or project, copies of all documents discussed at the CUUATS meetings are made available for public inspection at Champaign County Regional Planning Commission offices prior to each meeting and are provided to individuals when requested. News releases are distributed periodically to announce the availability of a CUUATS report or to provide background on planning activities. Final copies of all CUUATS documents are made available to the public through the CUUATS website and CUUATS offices.
In addition to the aforementioned formal public involvement process, CUUATS relies on many informal techniques. This is especially important when considering that area residents often bring transportation planning issues and problems to the attention of their elected officials. For these reasons, CUUATS staff members often attend meetings of other governmental agencies. Informal public participation also occurs when an interested citizen contacts the CUUATS office to discuss an issue in which they are interested, or when a citizen or business requests transportation or planning data.
In developing the FY 2016-2019 TIP, CUUATS staff complied with the guidelines set forth in our Public Participation Policy Document, adopted in 2007. Public notice of public involvement activities and time established for public review and comments on the TIP satisfy the public participation requirements for FTA grantees and MPOs as outlined in 49 U.S.C 5307 (b)(1) through (7); The Metropolitan Transportation Planning and Programming requirements at 23 CFR part 450.314, 316, 322, and 324; and FTA Circular 9030.1E, “Urbanized Area Formula Program: Program Guidance and Application Instructions,” Ch. V, Section 6.
FY 2016-2019 Transportation Improvement Program
5
STP-U (LOCAL) ALLOCATIONS BY FISCAL YEARIt is anticipated that funding will be available for all projects presented in the FY 2016-2019 TIP. The programming of STP-U Local funds for projects in the Champaign-Urbana Urbanized Area is a function of program development, project prioritization, and available financial resources.
The programming of STP-U Local funds for projects is based on the average annual urbanized area apportionments projected for the Champaign-Urbana Urbanized Area and the Village of Mahomet Urbanized Area separately. For FY 2016, the Illinois Department of Transportation has determined that the Champaign-Urbana Urbanized Area will receive $1,365,673.95 and the Village of Mahomet Urban Area will receive $74,261.56 (assuming full utility of the estimated apportionment), with the balance of the apportionment (determined by FHWA) being invested in the urbanized and urban areas by the IDOT District 5 office, in consultation and cooperation with the CUUATS Policy Committee and the Village of Mahomet. Refer to Table 46, “CUUATS STP-U Allocation” and Table 25, “Village of Mahomet STP-U Allocation” for more details and periodic updates.
Champaign-Urbana Urbanized Area STP-U (in 1000’s)1
Fund Category FY 16 FY 17 FY 18 FY 19Balance from Previous FY $1,046.00 $-340.33 $1,025.35 $2,391.02
Projected Allotment of STP Funds $1,365.67 $1,365.67 $1,365.67 $1,365.67
Projected Utilization of STP Funds $2,752.00 $0 $0 $2,000.00
Approximate Ending Balance $-340.33 $1,025.35 $2,391.02 $1,756.70
Village of Mahomet Urbanized Area STP-U (in 1000’s)
Fund Category FY 16 FY 17 FY 18 FY 19Balance from Previous FY $195.76 $-49.98 $24.29 $-61.45
Projected Allotment of STP Funds $74.26 $74.26 $74.26 $74.26
Projected Utilization of STP Funds $320.00 $0 $160.00 $80.00
Approximate Ending Balance $-49.98 $24.29 $-61.45 $-67.19
1 Totals may be slightly off due to rounding.
HIGHWAYFY 2016-2019 available Federal funding: the estimate of revenues for all projects is reasonable with respect to such funds anticipated to be available for the listed projects during the programmed TIP period as of the date this document was appoved.
Programmed Federal Funding (in 1,000’s)
Fund Category FY 16 FY 17 FY 18 FY 19STP-U C-U $2,752.00 $0 $0 $2,000.00
STP-U Mahomet $320.00 $0 $160.00 $80.00
SPR $10.01 $0 $0 $0
SRTS $6.34 $0 $0 $0
ITEP $2,168.00 $0 $0 $0
TIGER $15,705.33 $0 $0 $0
Estimated Total Available $20,961.68 $0 $160.00 $2,080.00
TRANSITThe transit portion of the TIP is based on the Champaign-Urbana Mass Transit District’s (CUMTD) continuing efforts to provide modern, efficient, and effective transportation services and facilities. Services are designed to provide myriad public transportation options. The District’s ongoing planning process evaluates and updates both short and long-range mobility needs, and then develops and implements effective solutions.The District has implemented and refined several development proposals including shelters, one-half fare cab program, no-cost fixed route bus service for disabled persons and senior citizens, and 100% community fixed route accessible wheelchair service.
In the development of the Final FY 2016-2019 Transportation Improvement Program, forecasts for Section 5307 Funds have been incorporated. These forecasts are based upon previous funding levels that have been received by the Champaign-Urbana Mass Transit District. These forecasts will be utilized as a good faith effort to keep the TIP fiscally constrained. All transit projects in the TIP are subject to the CUUATS public involvement policy.
1
FY 2016-2019 Transportation Improvement Program
6
BICYCLES AND PEDESTRIANSThe LRTP: Sustainable Choices 2040 includes several goals related to providing travel options for pedestrians and bicyclists. The intent is that all transportation system users in the urbanized area will have access to a network of transportation modes and “complete street“ infrastructure that:
• Maximizes connectivity between origins and destinations and the modes used to travel between them;
• Improves mobility during peak traffic hours;
• Improves safety and convenience; and
• Considers all users.
Bicycle and pedestrian projects do not have an annual funding allocation at this time. These projects tend to be either part of a larger roadway improvement or construction project, and/or have received grant funding for their construction.
AIR QUALITY CONSIDERATIONSAccording to the IEPA’s Annual Air Quality Report, as of February 2012, Champaign County continues to be an attainment area, which means that air quality is within acceptable parameters for common air pollutants.
Transportation officials in the Champaign-Urbana area recognize that a relationship between transportation and air quality exists. Air quality is one of many determinants in selecting highway or transit projects for implementation, receiving consideration during project planning and implementation procedures. It should be noted that most highway and transit projects considered in the Champaign-Urbana area are designed to improve the area’s overall air quality.
FY 2016-2019 Transportation Improvement Program
7
TIP AMENDMENT & ADMINISTRATIVE MODIFICATION PROCEDURESThe programming of transportation improvements within the urbanized area produces a tension between the need for a fast delivery of project contracts and the more time-consuming need for agency fiscal constraint and a transparent public input process. The development and subsequent approval of the four-year Transportation Improvement Program (TIP) does not mark the end of the MPO’s annual obligation.
The TIP requires routine maintenance as the listed projects evolve throughout the fiscal year. The effective management of the TIP amendment process helps to balance the need for quick turn-around to keep projects on schedule, while still providing fiscal constraint and a transparent public input process. The purpose of this document is to establish the procedures CUUATS staff and member agencies will use in revising the CUUATS TIP.
The procedures described in this document for amending the multi-year TIP have been agreed upon by CUUATS member agencies, and are consistent with federal transportation planning regulation and legislation. The procedures are meant to accommodate higher level complex project changes or additions, as well as permitting a simplified procedure for smaller administrative changes.
BACKGROUNDTitles 23 and 49 of the United States Code require that every MPO produce a multi-year TIP that includes all projects which seek federal funding and other regionally significant transportation projects. The CUUATS TIP is updated annually and covers a four-year period. The Federal Highway Administration (FHWA) and Federal Transit Administration (FTA) will only approve projects and grants for projects that are programmed into the current approved TIP.
During a given fiscal year, CUUATS staff can be called upon to amend the current TIP document if a member agency needs to proceed with a project that is not programmed into a fiscal year. These revisions must maintain year-to-year fiscal constraint for the four years of the TIP.
The amended project must also be in conformity with the approved urbanized area Long Range Transportation Plan.
Federal Transportation Planning Regulations in Title 23 provide the MPO with the discretion to create and approve alternative procedures to more effectively manage actions on the TIP that may occur during a given fiscal year. The regulations require the approval of any alternative procedures developed by the MPO, and that these procedures are documented in the annual TIP. This document lists the procedures for the CUUATS urbanized area regulating TIP amendments and administrative modifications that will be used to revise the TIP in accordance with federal regulations.
TYPES OF TIP ALTERATIONSThere are two primary types of changes that can be made to the TIP: an Administrative Modification and an Amendment. The policies and procedures for each process are outlined on the following pages.
Administrative Modification
An Administrative Modification is a revision to the TIP that includes minor changes to project/projects phase costs, minor changes to funding sources of previously included projects, minor changes to a project description, and the movement of an included project among fiscal years. An Administrative Modification is a revision that does not require public input, redemonstration of fiscal constraint, or a formal approval by the CUUATS Technical and Policy Committees. The following thresholds were established to determine whether an Administrative Modification is possible for a submitted TIP revision.
Administrative Modification Thresholds
1. Modification of a TIP project description, as long as the modification does not significantly change the project’s intended function, nature, costs or environmental impact.
FY 2016-2019 Transportation Improvement Program
8
2. TIP Project Year of Expenditure federal aid cost changes that do not cause a change in funds allocated by the federal agency(ies) exceeding the following thresholds2:
Cost Change Thresholds
Total TIP Project Cost Percent Change in Total TIP Project Cost$0 - $249,999 25%
$250,000 - $999,999 20%
$1,000,000 - $2,999,999 15%
$3,000,000+ 10% (capped at $5 million)
3. Increases or decreases in federal or state funding, or increases or decreases in local matches as long as the total cost meets the cost change thresholds.
4. Changes in federal project funding sources that do not alter the federal project cost, and the project meets the funding category’s eligibility requirements.
5. Changes in state and local funding sources that do not alter the fiscal constraint of the project and meet the cost change thresholds.
6. Moving a project/projects phase from future years of the TIP to the current fiscal year, or vice versa, as long as the project/projects phase was in the originally approved TIP or was included through the TIP amendment process.
7. A split or combination of individually listed projects; as long as cost, schedule, and scope remain unchanged.
8. The addition or deletion of project phases from a TIP Project as long as the funding amounts for the new line items stay within the cost change thresholds and the new line item does not result in a significant change to the original intent of the TIP Project3.
9. Changes to the lead agency identified for a TIP Project or TIP Project Phase.
2 Refers to only Total TIP Project Cost, not the total project cost
3 If an approved TIP Project is listed without a right-of-way phase (ROW), and an incidental ROW need is discovered during the design phase, a ROW purchase can be authorized under either the design or construction phase without amending the TIP. “Incidental” ROW is the purchase of a minor parcel(s) (including utility relocation) that does not involve the taking of any environmentally sensitive land or residential/commercial structure.
10. Additions, deletions, or corrections to projects listed in the Illustrative Table.
11. Data entry or typographical errors.
Any agency requesting an Administrative Modification to a TIP Project or project phase must submit a detailed description of the proposed changes to CUUATS staff including:
• A project/projects phase description
• Cost changes, including cost by agency if more than one agency is involved
• Fund type
Each MPO-approved Administrative Modification will be published online separately from TIP Amendments. The MPO staff should summarize this information at the next CUUATS Technical and Policy meeting following the administrative modification to the TIP. Any Administrative Modifications will be forwarded to the agency(ies) involved with the modification and to IDOT.
Amendment
A TIP Amendment refers to any major change to a project in the TIP including: the addition or deletion of a project, a major change in project cost, or a major change in design concept or project scope (e.g., changing project termini). The movement of a project from the Illustrative Table to a fiscal year in the TIP will require a TIP Amendment; however, changes to projects in the Illustrative Table will remain an Administrative Modification. A TIP Amendment requires a public meeting to redemonstrate fiscal constraint and provide the public with the opportunity to provide input. The following changes will be considered grounds for a TIP Amendment:
1. Addition or deletion of a project (regardless of cost, except for project phases that are in accordance with the Administrative Modification thresholds).
2. Addition or deletion of a new project phase that is beyond the thresholds set for Administrative Modification.
FY 2016-2019 Transportation Improvement Program
9
3. Major changes to the project scope.4. Major changes to the amount of federal aid funding for project
costs exceeding the thresholds set for Administrative Modification.5. Addition of a ROW phase that includes the taking of
environmentally sensitive lands or residential/commercial structures.
Any agency requesting a TIP Amendment must submit a detailed description of the proposed changes to CUUATS staff including:
• A full project/projects phase description including termini or project location
• Cost changes, including costs by agency if more than one is involved
• Fund type
• Lead agency and any other agencies involved
TIP Amendments are subject to the approval of the CUUATS Technical and Policy Committees. During these two meetings, the public will have the opportunity to comment on the proposed amendment(s). Once approved, the amendments will be forwarded to IDOT in accordance with the MPO’s established procedures. As with Administrative Modifications, any TIP Amendment will be posted online under a separate heading for amendments.
SPECIAL CASE TIP ALTERATIONS AND CIRCUMSTANCESEmergency Actions
In accordance with federal rules and regulations, in the event that the State of Illinois or the federal government declares a state of emergency, CUUATS may process any TIP Amendment or Administrative Modification that is related to mitigation of the emergency as an Administrative Modification. If applicable, the TIP changes would be processed in accordance with the TIP Amendment procedures during the next CUUATS Technical and Policy Committee meetings.
Time-Sensitive Actions
In the event that any member agency needs to amend or modify the TIP between regularly scheduled meetings to accommodate a grant deadline, bidding process, or other time-sensitive situation, CUUATS may process any TIP Amendment or Administrative Modification that is related to the deadline as an Administrative Modification. If applicable, the TIP changes would be processed in accordance with the TIP Amendment procedures during the next CUUATS Technical and Policy Committee meetings.
Dispute Resolution
If a question arises on the interpretation of the definition of an Administrative Modification or a TIP Amendment, the MPO, IDOT, FHWA, and FTA (the parties) will consult with each other to resolve the question. If after consultation, the parties disagree on the definition of what constitutes an Administrative Modification or a TIP Amendment, the final decision rests with FHWA for roadway projects and with FTA for transit projects.
TIP Revision Procedures
This document is an agreement between CUUATS member agencies documenting how these planning partners will address TIP revisions. The procedures conform to State and Federal policies and regulations governing the development and modification of the TIP.
FY 2016-2019 Transportation Improvement Program
10
FEDERALLY OBLIGATED PROJECTSFederal regulation requires that the TIP provide reference to projects from the previous fiscal year that have federal funding obligated to them. The following information summarizes those projects from April 1, 2014 through March 31, 2015 that have obligated federal funding:
State Project ID: C-95-012-13Description: Installation of changeable message signs and surveillance cameras at various locations in Champaign-UrbanaTotal Project Cost: $2,463,419Federal Cost Share: $937,104State Cost Share: $104,124Other Cost Share: $1,422,191
State Project ID: C-95-082-07Description: US 150 resurfacing, guardrail, and pedestrian ramps from Sangamon River in Mahomet to Mattis Avenue in Champaign Total Project Cost: $2,600,000Federal Cost Share: $2,080,000State Cost Share: $520,000
State Project ID: C-95-022-09Description: I-74 milling, resurfacing, and safety upgrades from 0.5 miles west of IL 47 in Mahomet to 0.5 miles west of I-57Total Project Cost: $10,380,000Federal Cost Share: $9,342,000State Cost Share: $1,038,000
State Project ID: C-95-001-15Description: NS RR at IL 47 in Mahomet; new circuitry, signals, and gatesTotal Project Cost: $210,000Federal Cost Share: $210,000
State Project ID: C-95-319-13Description: Dewey Fisher Road/CR 1 widening, resurfacing, agregate shoulder, culvert, storm sewer, and pavement markingsTotal Project Cost: $7,750,000Federal Cost Share: $3,865,000State Cost Share: $900,000Local Cost Share: $2,985,000
State Project ID: C-95-017-14Description: CNIC RR at Prospect Avenue in Champaign; new circuitry, signals, gates, cants, and surfaceTotal Project Cost: $400,000Federal Cost Share: $400,000
State Project ID: C-95-011-14Description: IL 130 3P resurfacing from south of Washington Street in Urbana to Madison Street in PhiloTotal Project Cost: $3,000,000Federal Cost Share: $2,400,000State Cost Share: $600,000
State Project ID: C-95-310-13Description: Neil Street raised pedestrian island, sidewalks, signing, pavement markings, and sidewalk improvements from Kenyon Road to North Street (SRTS)Total Project Cost: $202,258Federal Cost Share: $202,258
State Project ID: C-95-013-10Description: IL 47 resurfacing (3R) new shoulders and intersection improvements from US 136 to I-74 in Mahomet Total Project Cost: $7,128,180Federal Cost Share: $5,653,780State Cost Share: $1,387,964Local Cost Share: $85,436Other Cost Share: $1,000
State Project ID: C-95-321-12Description: Olympian Drive extension west to Duncan RoadTotal Project Cost: $1,520,000Federal Cost Share: $750,000State Cost Share: $770,000
State Project ID: C-95-318-14Description: Windsor Road replacement of existing concrete pavement along with curb and gutter while utilizing existing subbase from Race Street to Philo RoadTotal Project Cost: $6,000,000Federal Cost Share: $3,000,000Local Cost Share: $3,000,000
FY 2016-2019 Transportation Improvement Program
11
REPORT FORMATLocal projects may be identified by the CUUATS numbering system. This system lists the primary funding source, the anticipated year of construction, and a second number referencing the project within this report (XX-YR-##). Locally funded projects begin with the following initials:
Champaign County - CCChampaign County Regional Planning Commission - RPCChampaign County Forest Preserve District - FPDChampaign Urbana Mass Transit District - MTDCity of Champaign - CHCity of Urbana - URVillage of Savoy - SAVillage of Mahomet - MAVillage of Tolono - TOUniversity of Illinois - UI
Tables 1-4 list all the projects that receive federal funding in the metropolitan planning area for FY 16-19.
Tables 5-8 describe all the projects that receive state funding in the metropolitan planning area for FY 16-19.
Table 25 details past, present, and proposed STP-U projects for the Village of Mahomet.
Table 38 reflects the Champaign-Urbana Mass Transit District’s transportation improvement program for FY 16-19.
Table 39 reflects the Champaign County Forest Preserve District’s transportation improvement program for FY 16-19.
Tables 40-43 list the non-infrastructure projects in the urbanized area for FY 16-19.
Table 44 details the five projects that make up the Multimodal Corridor Enhancement Project (MCORE).
Table 45 lists illustrative projects, which are examples of projects that local agencies would like to see implemented, but do not yet have funding sources. The projects listed in this table have no particular prioritization as of June 2015.
Table 46 details past, present, and proposed STP-U projects for the CUUATS urbanized area.
Tables 47-50 show a summary of the cost shares for multi-agency projects in the urbanized area.
FY 2016-2019 Transportation Improvement Program
12
Page IntentionallyLeft Blank
FY 2016-2019 Transportation Improvement Program
13
TABLE 1. FEDERALLY FUNDED PROJECTS FY 16
State ID No., Project Number, or Agency Name
Project Location or Description
TERMINIFund Type Lead
AgencyOther
Agencies
FUNDING AMOUNTS IN 1000’sDescription of Proposed Improvement
Beginning End Federal State Lead Agency Other Agencies Total Project Cost
A135 I-57 Sadorus Rd1 mile south
of I-74 in Champaign
NHPP-State/State
MatchState $13,613.00 $1,512.00 $15,125.00
Resurfacing (INT-3RD)/ Bridge Deck Repairs/
Ramp Repairs
A092 I-74
Over IL 47 & Sangmon River at Mahomet and under
Lindsey Rd and Ducan Rd NW of Champaign
NHPP-State/State
MatchState $1,260.00 $140.00 $1,400.00
Thin Concrete Overlay/ Bridge Joint Repair/ Bridge Deck Repairs
C001 US 45North City
Limit of Tolono
I-57 at Pesotum
STP-Rural-State/
STP-Urb 5-200K-S/
State Match
State $1,474.00 $368.00 $1,842.00Resurfacing (SMART)/
Guardrail/ Pedestrain Ramps - ADA
H545Leverett Rd (FAS 502)
Stream at I-57 north of Champaign
STP-Rural-State/ State Match
State $580.00 $145.00 $725.00Culvert Replacement / Bridge
Office PE SN 010-2010
H062Leverett Rd (FAS 502)
Ditch west of Leverett
STP-Rural-State/ State Match
State $640.00 $160.00 $800.00Bridge Replacement
SN 010-0131
UR-16-05 CC-16-01
North Lincoln Avenue
ConstructionSaline Ct Olympian Dr
STU, Local
UR CC $2,752.00 $454.00 $454.00 $3,660.00
Lincoln Ave Extension Incl. 6’ Median Shoulder,
Outside Curb & Gutter Sec 11-00334-01-PV
MA-16-03Main Street
Mill and Resurface
Lincoln St to Division St
Jennifer St to Richard St
STU, Local Match
MA $160.00 $40.00 $200.00Milling, Resurfacing, Shoulder
ReplacementSN 14-00033-00-RS
MA-16-04*
Main Street and Franklin
Street Mill and Resurface
Main St: Jennifer Dr; Franklin St:
State St
Main St: Division St;
Franklin St: N Lombard St
STU, Local Match
MA $160.00 $40.00 $200.00Milling, Resurfacing, Shoulder
ReplacementSN 14-00032-00-RS
CUMTD
Replacement and Expansion 40-Foot Hybrid
Buses
- 5307 MTD $6,528.00 $1,632.00 **
$8,160.00
(3) Replacement 40-Foot Hybrid Buses and (9) Expansion
40-Foot Hybrid Buses (12 total, $680 each)
Continued on the following page...
Fed
eral
** State cost share is provided by Transportation Development Credits (TDC) in lieu of cash funds for this line item.* Advanced Construction
FY 2016-2019 Transportation Improvement Program
14
TABLE 1. FEDERALLY FUNDED PROJECTS FY 16 (CONTINUED)
State ID No., Project Number, or Agency Name
Project Location or Description
TERMINIFund Type Lead
AgencyOther
Agencies
FUNDING AMOUNTS IN 1000’sDescription of Proposed Improvement
Beginning End Federal State Lead Agency Other Agencies Total Project Cost
RPC-16-01Sidewalk
AssessmentVarious SPR, FTA RPC $10.01 $2.50 $12.51
Sidewalk Inventory and Condition Assessment for
Urbana, Champaign, Savoy, Bondville, Tolono, and the
University of Illinois
SRTS-16-01Urbana Active
Routes to School Program
Various SRTS MTD $6.34 $1.60 $7.94
Encourage Walking and/or Bicycling to School, Expand
and Establish Incentive Programs to Improve Safety
and Reduce Traffic Congestion
MTD-16-01 UR-16-08
Green Street Wright St Busey AveTIGER, CIF, MFT, SWUF,
MTD UR $3,540.57 $776.84 $1,050.00 $5,367.41 MCORE Project 1
MTD-16-02 CH-16-10
Green Street Neil St Fourth StTIGER, CIF MFT, FBF
MTD CH $8,050.00 $776.84 $3,197.98 $12,024.82 MCORE Project 2
MTD-16-03 CH-16-11
A:White Street B:Wright Street
A:Second St B:White St
A:Wright St B:Springfield
Ave
TIGER, CIF, MFT, FBF
MTD CH $4,114.76 $776.84 $3,197.98 $8,089.58MCORE Project 3,
Parts A & B
FY 16 TOTAL (In 1,000’s) $42,888.68 $3,959.50 $2,866.12 $7,899.96 $57,614.26
Fed
eral
FY 2016-2019 Transportation Improvement Program
15
Fed
eral TABLE 2. FEDERALLY FUNDED PROJECTS FY 17
State ID No., Project Number, or Agency Name
Project Location or Description
TERMINIFund Type Lead
AgencyOther
Agencies
FUNDING AMOUNTS IN 1000’sDescription of Proposed
ImprovementBeginning End Federal State Lead Agency Other Agencies Total Project Cost
A167I-57 / I-74 /
US 150
I-57 & I-74 under Mattis Ave and I-57 under US 150 NW
of ChampaignState Only State $1,050.00 $1,050.00 Land Acquisition
N019 US 45Saline Branch Ditch south of Thomasboro
North of I-74 at Urbana
STP-Rural-State/STP-Urb
5-200K-L/ State Match
State $4,488.00 $1,122.00 $5,610.00 Resurfacing (3P)
CUMTDReplacement
40-Foot Hybrid Buses
- 5307 MTD $5,600.00 $1,400.00 $7,000.00(10) Replacement 40-Foot Hybrid Buses ($700 each)
FY 17 TOTAL (In 1,000’s) $10,088.00 $3,572.00 $0 $0 $13,660.00
TABLE 3. FEDERALLY FUNDED PROJECTS FY 18State ID No.,
Project Number, or Agency Name
Project Location or Description
TERMINIFund Type Lead
AgencyOther
Agencies
FUNDING AMOUNTS IN 1000’sDescription of Proposed
ImprovementBeginning End Federal State Lead Agency Other Agencies Total Project Cost
A167I-57 / I-74 /
US 150
I-57 & I-74 Under Mattis Ave and I-57 Under US 150 NW of Champaign
State Only State $500.00 $500.00 Utility Adjustment
N019US 45/
Cunningham Ave
North of I-74
University Ave in Urbana
NHPP-State/ State Match
State $1,344.00 $336.00 $1,680.00Pedestrian Ramps - ADA/
Resurfacing (3P)
MA-18-02Sunny Acres
RoadOak St/
US RT 150.042 mi S of US RT 150
STU, Local Match
MA $160.00 $160.00 $320.00Milling, Resurfacing,
Shoulder ReplacementSN 14-00034-00-RS
CUMTDReplacement
40-Foot Hybrid Buses
- 5307 MTD $5,760.00 $1,440.00 $7,200.00(10) Replacement 40-Foot Hybrid Buses ($720 each)
FY 18 TOTAL (In 1,000’s) $7,264.00 $2,276.00 $160.00 $0 $9,700.00
FY 2016-2019 Transportation Improvement Program
16
Fed
eralTABLE 4. FEDERALLY FUNDED PROJECTS FY 19
State ID No., Project Number, or Agency Name
Project Location or Description
TERMINIFund Type Lead
AgencyOther
Agencies
FUNDING AMOUNTS IN 1000’sDescription of Proposed Improvement
Beginning End Federal State Lead Agency Other Agencies Total Project Cost
A142 I-57At Curtis Rd SW of
ChampaignNHPP-State / State Match
State $1,125.00 $125.00 $1,250.00 Pedestrian Overpass
H271 I-57Under Bradley
Ave west of Champaign
NHPP-State / State Match
State $4,050.00 $450.00 $4,500.00 Bridge Replacement
H631 US 150
Ditch SE of Mahomet and Ditch NW of Champign
STP-Rural-State / STP-
Urb 5-200K-L / State Match
State $480.00 $120.00 $600.00 Culvert Replacement
SA-19-01 CH-19-05
Prospect Avenue
Reconstruction
Curtis Rd
Windsor Rd
MFT, STU, CIF
SA CH $2,000.00 $607.85 $1,193.00 $3,800.85Complete Street Eng. and
Reconstruction SN 09-00015-00-PV
MA-19-02State Street
Mill and Resurface
N Dianne
Ln
Western Hills Dr
STU, Local Match
MA $80.00 $20.00 $100.00Milling, Resurfacing, Shoulder
ReplacementSN 14-00035-00-RS
CUMTDReplacement
40-Foot Hybrid Buses
- 5307 MTD $5,920.00 $1,480.00 $7,400.00(10) Replacement 40-Foot Hybrid
Buses ($740 each)
CUMTDReplacement
40-Foot Hybrid Buses
- 5307 MTD $7,200.00 $1,800.00 $9,000.00(5) Replacement 60-Foot Hybrid
Buses ($900 each)
FY 19 TOTAL (In 1,000’s) $20,855.00 $3,975.00 $627.85 $1,193.00 $26,650.85
FY 2016-2019 Transportation Improvement Program
17
Stat
e o
f Ill
Ino
IS TABLE 5. STATE HIP PROJECTS FY 16
State ID No. Project Location
TERMINIFund Type Source of
Local Match
FUNDING AMOUNTS IN 1000’sDescription of Proposed
ImprovementBeginning End Federal State Local Total Project Cost
A135 I-57 Sadorus Rd1 mile south
of I-74 in Champaign
NHPP-State/ State Match
$13,613.00 $1,512.00 $15,125.00Resurfacing (INT-3RD)/ Bridge Deck Repairs/
Ramp Repairs
A092 I-74
Over IL 47 & Sangmon River at Mahomet and under Lindsey
Rd and Ducan Rd NW of Champaign
NHPP-State/ State Match
$1,260.00 $140.00 $1,400.00Thin Concrete Overlay/
Bridge Joint Repair/ Bridge Deck Repairs
C001 US 45North City
Limit of TolonoI-57 at Pesotum
STP-Rural-State/ STP-Urb 5-200K-S/
State Match$1,474.00 $368.00 $1,842.00
Resurfacing (SMART)/ Guardrail/
Pedestrain Ramps - ADA
2015 ADA-2 US 150Market St in Champaign
Berringer Circle in Urbana
State Only $250.00 $250.00 Pedestrian Ramps - ADA
H545Leverett Rd (FAS 502)
Stream at I-57 north of Champaign
STP-Rural-State/ State Match
$580.00 $145.00 $725.00Culvert Replacement/
Bridge Office PE SN 010-2010
H062Leverett Rd (FAS 502)
Ditch west of LeverettSTP-Rural-State/
State Match$640.00 $160.00 $800.00
Bridge Replacement SN 010-0131
FY 16 Total (in 1000’s) $17,567.00 $2,575.00 $0 $20,142.00
FY 2016-2019 Transportation Improvement Program
18
Stat
e o
f Ill
Ino
ISTABLE 6. STATE HIP PROJECTS FY 17
State ID No. Project Location
TERMINIFund Type Source of
Local MatchFUNDING AMOUNTS IN 1000’s
Description of Proposed ImprovementBeginning End Federal State Local Total Project Cost
A167I-57 / I-74 /
US 150
I-57 & I-74 under Mattis Ave and I-57 under US 150
NW of ChampaignState Only $1,050.00 $1,050.00 Land Acquisition
N019 US 45Saline Branch Ditch south of Thomasboro
North of I-74 at Urbana
STP-Rural-State/ STP-Urb 5-200K-L/
State Match$4,488.00 $1,122.00 $5,610.00 Resurfacing (3P)
FY 17 Total (in 1000’s) $4,488.00 $2,172.00 $0 $6,660.00
TABLE 7. STATE HIP PROJECTS FY 18
State ID No. Project Location
TERMINIFund Type Source of
Local MatchFUNDING AMOUNTS IN 1000’s
Description of Proposed ImprovementBeginning End Federal State Local Total Project Cost
A167I-57 / I-74 /
US 150
I-57 & I-74 Under Mattis Ave and I-57 Under US 150
NW of ChampaignState Only $500.00 $500.00 Utility Adjustment
N019US 45 /
Cunningham Ave
North of I-74University
Ave in Urbana
NHPP - State/ State Match
$1,344.00 $336.00 $1,680.00Pedestrian Ramps - ADA/
Resurfacing (3P)
FY 18 Total (in 1000’s) $1,344.00 $836.00 $0 $2,180.00
TABLE 8. STATE HIP PROJECTS FY 19
State ID No.
Project Location
TERMINIFund Type Source of
Local MatchFUNDING AMOUNTS IN 1000’s
Description of Proposed ImprovementBeginning End Federal State Local Total Project Cost
A142 I-57At Curtis Rd SW of
ChampaignNHPP-State/ State
Match$1,125.00 $125.00 $1,250.00 Pedestrian Overpass
H271 I-57Under Bradley Ave west of
ChampaignNHPP-State/ State
Match$4,050.00 $450.00 $4,500.00 Bridge Replacement
H631 US 150Ditch SE of Mahomet and Ditch NW of Champign
STP-Rural-State/ STP-Urb 5-200K-L/
State Match$480.00 $120.00 $600.00 Culvert Replacement
FY 19 Total (in 1000’s) $5,655.00 $695.00 $0 $6,350.00
FY 2016-2019 Transportation Improvement Program
19
Cit
y o
F C
ham
paig
n TABLE 9. CITY OF CHAMPAIGN LOCAL PROJECTS FY 16
Project Number Project Description
TERMINIFund Type Lead
AgencyOther
Agencies
FUNDING AMOUNTS IN 1000’sDescription of Proposed
ImprovementBeginning End Federal State Your Agency Other Agencies
Total Project Cost
CH-16-01Asphalt Overlay
2015Various MFT CH $899.73 $899.73
Rehabilitate Asphalt Streets
CH-16-022015 Local Street Rehab - Asphalt
Various MFT CH $373.57 $373.57Rehabilitate Asphalt
Streets
CH-16-03Asphalt Overlay
2016Various MFT CH $239.98 $239.98
Rehabilitate Asphalt Streets
CH-16-042016 Local Street Rehab - Asphalt
Various MFT CH $6.00 $6.00Rehabilitate Asphalt
Streets
CH-16-05 PCC Patching 2015 Various MFT CH $658.52 $658.52Rehabilitate Concrete
Streets
CH-16-06PCC Patching 2016
- 2024Various MFT CH $203.51 $203.51
Rehabilitate Concrete Streets
CH-16-07 UI-16-01
First Street UIUC Project
Gregory DrKirby Ave
State CH UI $1,584.55 $1,584.55Street Reconstruction SN 14-00299-00-PV
CH-16-08 UI-16-02
Fourth Street UIUC Project
Kirby Ave
St. Mary's Rd
State CH UI $1,899.55 $1,899.55Street Reconstruction
and Signal Replacement SN 14-00300-00-PV
CH-16-09 UI-16-03
Pennsylvania Avenue UIUC Project
Fourth St City Limit State CH UI $313.83 $313.83Street Reconstruction SN 14-00301-00-PV
MTD-16-02 CH-16-10
Green Street Neil St Fourth StTIGER,
CIF, MFT, FBF
MTD CH $8,050.00 $3,197.98 $776.84 $12,024.82 MCORE Project 2
MTD-16-03 CH-16-11
A:White Street B:Wright Street
A:Second St B:White St
A:Wright St B:Springfield
Ave
TIGER, CIF, MFT,
FBFMTD CH $4,114.76 $3,197.98 $776.84 $8,089.58
MCORE Project 3, Parts A & B
FY 16 TOTAL (in 1,000’s) $12,164.76 $3,797.93 $8,777.27 $1,553.68 $26,293.64
FY 2016-2019 Transportation Improvement Program
20
Cit
y o
F C
ham
paig
nTABLE 10. CITY OF CHAMPAIGN LOCAL PROJECTS FY 17
Project Number Project Description
TERMINIFund Type
Lead Agency
Other Agencies
FUNDING AMOUNTS IN 1000’sDescription of Proposed
ImprovementBeginning End Federal State Your Agency Other Agencies
Total Project Cost
CH-17-01Asphalt Overlay
2016Various MFT CH $889.00 $889.00
Rehabilitate Asphalt Streets
CH-17-022016 Local Street Rehab - Asphalt
Various MFT CH $318.08 $318.08Rehabilitate Asphalt
Streets
CH-17-032017 Local Street Rehab - Asphalt
Various MFT CH $55.77 $55.77Rehabilitate Asphalt
Streets
CH-17-04Asphalt Overlay
2017Various MFT CH $240.40 $240.40
Rehabilitate Asphalt Streets
CH-17-05 PCC Patching 2016 Various MFT CH $622.00 $622.00Rehabilitate Concrete
Streets
CH-17-06PCC Patching 2017
- 2025Various MFT CH $222.35 $222.35
Rehabilitate Concrete Streets
CH-17-07 UI-17-01
First Street UIUC Project
Gregory DrKirby Ave
State CH UI $60.46 $60.46Street Reconstruction SN 14-00299-00-PV
CH-17-08 UI-17-02
Fourth Street UIUC Project
Kirby Ave
St. Mary's Rd State CH UI $65.45 $65.45Street Reconstruction
and Signal Replacement SN 14-00300-00-PV
CH-17-09 UI-17-03
Pennsylvania Avenue UIUC Project
Fourth St City Limit State CH UI $2,116.17 $2,116.17Street Reconstruction SN 14-00301-00-PV
FY 17 TOTAL (In 1,000's) $0 $2,242.08 $2,347.60 $0 $4,589.68
FY 2016-2019 Transportation Improvement Program
21
Cit
y o
F C
ham
paig
n TABLE 11. CITY OF CHAMPAIGN LOCAL PROJECTS FY 18
Project Number Project DescriptionTERMINI
Fund Type Lead Agency
Other Agencies
FUNDING AMOUNTS IN 1000’sDescription of Proposed
ImprovementBeginning End Federal State Your Agency Other Agencies
Total Project Cost
CH-18-01 Asphalt Overlay 2017 Various MFT CH $889.00 $889.00 Rehabilitate Asphalt Streets
CH-18-022017 Local Street Rehab - Asphalt
Various MFT CH $318.08 $318.08 Rehabilitate Asphalt Streets
CH-18-04 Asphalt Overlay 2018 Various MFT CH $240.40 $240.40 Rehabilitate Asphalt Streets
CH-18-02Annual Local Street
Rehab - AsphaltVarious MFT CH $55.77 $55.77 Rehabilitate Asphalt Streets
CH-18-05PCC Patching 2016
- 2024Various MFT CH $844.35 $844.35
Rehabilitate Concrete Streets
CH-18-06 UI-18-02
Pennsylvania Avenue UIUC Project
Fourth StCity Limit
State CH UI $80.00 $80.00Street Reconstruction SN 14-00301-00-PV
CH-18-07 SA-18-01
Prospect Avenue Reconstruction
Curtis RdWindsor
RdMFT,
STU, CIFSA $27.15 $27.85 $55.00
Complete Street Plan Updates
SN 09-00015-00-PV
MTD-18-01 CH-18-08 UI-18-01
A:Armory Ave B:Wright Street
A:Fourth St B:Springfield
Ave
A:Wright St
B:Armory Ave
CIF, MFT, FBF
MTD CH, UI $3,197.98 $4,768.84 $7,574.82MCORE Project 4,
Parts A & B
FY 18 TOTAL (In 1,000's) $0 $80.00 $5,572.73 $4,796.69 $10,057.42
TABLE 12. CITY OF CHAMPAIGN LOCAL PROJECTS FY 19
Project Number Project Description
TERMINIFund Type Lead
AgencyOther
Agencies
FUNDING AMOUNTS IN 1000’sDescription of Proposed
ImprovementBeginning End Federal State Your Agency Other Agencies
Total Project Cost
CH-19-01Asphalt Overlay
2018Various MFT CH $889.00 $889.00 Rehabilitate Asphalt Streets
CH-19-02Asphalt Overlay
2019Various MFT CH $240.40 $240.40 Rehabilitate Asphalt Streets
CH-19-03Annual Local Street
Rehab - AsphaltVarious MFT CH $367.85 $367.85 Rehabilitate Asphalt Streets
CH-19-04PCC Patching 2016 - 2024
Various MFT CH $844.35 $844.35Rehabilitate Concrete
Streets
CH-19-05SA-19-01
Prospect Avenue Reconstruction
Curtis Rd
Windsor Rd
MFT, STU, CIF
SA CH $2,000.00 $607.85 $1,193.00 $3,800.85Complete Street Eng. and
Reconstruction SN 09-00015-00-PV
FY 19 TOTAL (In 1,000’s) $2,000.00 $0 $2,949.45 $1,193.00 $6,142.45
FY 2016-2019 Transportation Improvement Program
22
Cit
y o
F U
rban
aTABLE 13. CITY OF URBANA LOCAL PROJECTS FY 16
Project Number Project Description
TERMINIFund Type Lead
AgencyOther
Agencies
FUNDING AMOUNTS IN 1000’sDescription of Proposed
ImprovementBeginning End Federal State Your Agency Other Agencies
Total Project Cost
UR-16-012016 Street
Reconstruction/Resurfacing
Various LocationsMFT, LMFT
UR $200.00 $200.00Reconstruct/Resurface
Various Streets
UR-16-022016 Pavement
PatchingVarious Locations CIRF UR $475.00 $475.00
Patch Various Asphalt and Concrete Streets
UR-16-032016 Pavement
PreservationVarious Locations LMFT UR $250.00 $250.00
Preserve and Seal Various Streets
UR-16-04Bicycle Master Plan Projects
Various Locations CIRF UR $55.00 $55.00Installation of Bicycle
Master Plan Bike Lanes, Routes, Signage, Sidepaths
UR-16-05 CC-16-01
North Lincoln Avenue
ConstructionSaline Ct Olympian Dr
STU, Local
UR CC $2,752.00 $454.00 $454.00 $3,660.00
Lincoln Ave Extension Incl. 6’ Median Shoulder, Outside Curb & Gutter Sec 11-00334-01-PV
UR-16-06Broadway Avenue
Reconstruction
N of Stebbins
DrOakland Ave CIRF UR $600.00 $600.00 Street Reconstruction
UR-16-07Airport
Road West Reconstruction
Willow RdCunningham
AveEDP, TIF UR $1,305.90 $1,840.00 $3,145.90
Street Reconstruction/Signal Modernization
SN 13-00532-00-PV
MTD-16-01 UR-16-08
Green StreetWright
StBusey Ave
TIGER, CIF, MFT,
SWUF
MTD UR $3,540.57 $1,050.00 $776.84 $5,367.41 MCORE Project 1
FY 16 TOTAL (In 1000’s) $6,292.57 $1,305.90 $4,924.00 $1,230.84 $13,753.31
FY 2016-2019 Transportation Improvement Program
23
Cit
y o
F U
rban
a TABLE 14. CITY OF URBANA LOCAL PROJECTS FY 17
Project Number Project Description
TERMINIFund Type
Lead Agency
Other Agencies
FUNDING AMOUNTS IN 1000’sDescription of Proposed Improvement
Beginning End Federal State Your Agency Other Agencies
Total Project Cost
UR-17-012017 Street
Reconstruction/Resurfacing
Various Locations
MFT, LMFT
UR $1,510.00 $1,510.00 Reconstruct/Resurface Various Streets
UR-17-022017 Pavement
PatchingVarious
LocationsCIRF UR $350.00 $350.00
Patch Various Asphalt and Concrete Streets
UR-17-032017 Pavement
PreservationVarious
LocationsLMFT UR $150.00 $150.00 Preserve and Seal Various Streets
UR-17-04Bicycle Master Plan Projects
Various Locations
CIRF UR $55.00 $55.00Installation of Bicycle Master Plan Bike
Lanes, Routes, Signage, Sidepaths
FY 17 TOTAL (In 1000’s) $0 $0 $2,065.00 $0 $2,065.00
TABLE 15. CITY OF URBANA LOCAL PROJECTS FY 18
Project Number Project Description
TERMINIFund Type
Lead Agency
Other Agencies
FUNDING AMOUNTS IN 1000’sDescription of Proposed Improvement
Beginning End Federal State Your Agency Other Agencies
Total Project Cost
UR-18-012018 Street
Reconstruction/Resurfacing
Various LocationsMFT, LMFT
UR $650.00 $650.00 Reconstruct/Resurface Various Streets
UR-18-022018 Pavement
PatchingVarious Locations CIRF UR $350.00 $350.00
Patch Various Asphalt and Concrete Streets
UR-18-032018 Pavement
PreservationVarious Locations LMFT UR $150.00 $150.00 Preserve and Seal Various Streets
UR-18-04Bicycle Master Plan Projects
Various Locations CIRF UR $55.00 $55.00Installation of Bicycle Master Plan Bike
Lanes, Routes, Signage, Sidepaths
MTD-18-02 UR-18-05
Green StreetBusey Ave
Race St
CIF, MFT,
SWUFMTD UR $1,050.00 $776.84 $1,826.84 MCORE Project 5
FY 18 TOTAL (In 1000’s) $0 $0 $2,255.00 $776.84 $3,031.84
FY 2016-2019 Transportation Improvement Program
24
Cit
y o
F U
rban
aTABLE 16. CITY OF URBANA LOCAL PROJECTS FY 19
Project Number Project Description
TERMINIFund Type
Lead Agency
Other Agencies
FUNDING AMOUNTS IN 1000’sDescription of Proposed Improvement
Beginning End Federal State Your Agency Other Agencies
Total Project Cost
UR-19-012019 Street
Reconstruct/ResurfaceVarious Locations
MFT, LMFT
UR $750.00 $750.00 Reconstruct/Resurface Various Streets
UR-19-022019 Pavement
PatchingVarious Locations CIRF UR $350.00 $350.00
Patch Various Asphalt and Concrete Streets
UR-19-032019 Pavement
PreservationVarious Locations LMFT UR $200.00 $200.00 Preserve and Seal Various Streets
UR-19-04Bicycle Master Plan
ProjectsVarious Locations CIRF UR $55.00 $55.00
Installation of Bicycle Master Plan Bike Lanes, Routes, Signage, Sidepaths
FY 19 TOTAL (In 1000's) $0 $0 $1,355.00 $0 $1,355.00
FY 2016-2019 Transportation Improvement Program
25
Vill
age
oF
SaVo
y TABLE 17. VILLAGE OF SAVOY LOCAL PROJECTS FY 16
Project Number Project Description
TERMINIFund Type
Lead Agency
Other Agencies
FUNDING AMOUNTS IN 1000’sDescription of Proposed Improvement
Beginning End Federal State Your Agency Other Agencies
Total Project Cost
SA-16-01 Sidewalk Infill Various SAG SA $36.00 $36.00 Sidewalk Infill
SA-16-02Oil and Chip Application
Various SAG SA $100.00 $100.00 Oil and Chip Application
SA-16-03 Street Patching Various SAG SA $350.00 $350.00 Street Patching
SA-16-04GPS Emergency
Pre-EmptionVarious SAG SA $80.00 $80.00
Installation of GPS Emergency Vehicle Pre-Emption Systems at
8 Signalized Intersections
SA-16-05Arbour
Towne Place Reconstruction
Woodfield Dr
West Termini
SAG SA $260.00 $260.00 Widening and Overlay of
Arbour Towne Place
SA-16-06Prairie Fields Bike Path Engineering
Colbert Park
Prospect/Curtis Int
SAG SA $30.00 $30.00 Easement and ROW
Acquisition
SA-16-07Curtis Road Turn Lane
Dunlap Ave
400' West SAG SA $150.00 $150.00 Addition of Right Turn Lane
on EB Curtis Road at Dunlap Avenue
SA-16-08First Street Resurfacing
E. Church St
E. Curtis Rd
SAG SA $250.00 $250.00 Mill and Resurfacing
SA-16-09Airport Road
ReconstructionDunlap
Ave First St SAG SA $150.00 $150.00
Engineering, Utility Reolcation, and ROW Acquisition for
Reconstruction of Airport Road and 1/4 Mile of First Street
FY 16 TOTAL (In 1,000's) $0 $0 $1,406.00 $0 $1,406.00
FY 2016-2019 Transportation Improvement Program
26
Vill
age
oF
SaVo
yTABLE 18. VILLAGE OF SAVOY LOCAL PROJECTS FY 17
Project Number Project Description
TERMINIFund Type Lead
AgencyOther
Agencies
FUNDING AMOUNTS IN 1000’sDescription of Proposed Improvement
Beginning End Federal State Your Agency Other Agencies
Total Project Cost
No projects were submitted for FY 17
FY 17 TOTAL (In 1,000’s) $0 $0 $0 $0 $0
TABLE 19. VILLAGE OF SAVOY LOCAL PROJECTS FY 18
Project Number
Project Description
TERMINIFund Type Lead
AgencyOther
Agencies
FUNDING AMOUNTS IN 1000’sDescription of Proposed Improvement
Beginning End Federal State Your Agency Other Agencies Total Project Cost
SA-18-01 CH-18-07
Prospect Avenue
Curtis RdWindsor
RdMFT,
STU, CIFSA CH $27.85 $27.15 $55.00
Complete Street Plan Updates SN 09-00015-00-PV
FY 18 TOTAL (In 1,000's) $0 $0 $27.85 $27.15 $55.00
TABLE 20. VILLAGE OF SAVOY LOCAL PROJECTS FY 19
Project Number
Project Description
TERMINIFund Type Lead
AgencyOther
Agencies
FUNDING AMOUNTS IN 1000’sDescription of Proposed Improvement
Beginning End Federal State Your Agency Other Agencies Total Project Cost
SA-19-01 CH-19-05
Prospect Avenue
Curtis RdWindsor
RdMFT,
STU, CIFSA CH $2,000.00 $1,193.00 $607.85 $3,800.85
Complete Street Eng. and Reconstruction
SN 09-00015-00-PV
FY 19 TOTAL (In 1,000's) $2,000.00 $0 $1,193.00 $607.85 $3,800.85
FY 2016-2019 Transportation Improvement Program
27
Vill
age
oF
mah
om
et TABLE 21. VILLAGE OF MAHOMET LOCAL PROJECTS FY 16
Project Number Project Description
TERMINIFund Type Lead
AgencyOther
Agencies
FUNDING AMOUNTS IN 1000’sDescription of Proposed
ImprovementBeginning End Federal State Your Agency Other Agencies Total Project Cost
MA-16-01 Paving Overlay Various Locations MFT MA $125.00 $125.00 Paving Overlay
MA-16-02Franklin Street Reconstruction
IL 47 State St MFT MA $209.00 $209.00 Street Reconstruction
MA-16-03Main Street
Mill and Resurface Lincoln St to Division St
Jennifer St to Richard St
STU, Local Match
MA $160.00 $40.00 $200.00Milling, Resurfacing,
Shoulder ReplacementSN 14-00033-00-RS
MA-16-04*Main Street and Franklin Street
Mill and Resurface
Main St: Jennifer Dr; Franklin St:
State St
Main St: Division St;
Franklin St: N Lombard St
STU, Local Match
MA $160.00 $40.00 $200.00Milling, Resurfacing,
Shoulder ReplacementSN 14-00032-00-RS
FY 16 TOTAL (In 1,000’s) $320.00 $0 $414.00 $0 $734.00
TABLE 22. VILLAGE OF MAHOMET LOCAL PROJECTS FY 17
Project Number Project Description
TERMINIFund Type Lead
AgencyOther
Agencies
FUNDING AMOUNTS IN 1000’sDescription of Proposed
ImprovementBeginning End Federal State Your Agency Other Agencies Total Project Cost
MA-17-01 Paving Overlay Various Locations MFT MA $125.00 $125.00 Paving Overlay
MA-17-02Street
ReconstructionBriar Cliff
Subdivision StMFT MA $144.00 $144.00 Street Reconstruction
FY 17 TOTAL (In 1,000’s) $0 $0 $269.00 $0 $269.00
TABLE 23. VILLAGE OF MAHOMET LOCAL PROJECTS FY 18
Project Number Project Description
TERMINIFund Type Lead
AgencyOther
Agencies
FUNDING AMOUNTS IN 1000’sDescription of Proposed
ImprovementBeginning End Federal State Your Agency Other Agencies Total Project Cost
MA-18-01 Paving Overlay Various Locations MFT MA $125.00 $125.00 Paving Overlay
MA-18-02Sunny Acres
Road
Oak St/
US RT 150
.042 mi S of
US RT 150
STU, Local Match
MA $160.00 $160.00 $320.00Milling, Resurfacing,
Shoulder ReplacementSN 14-00034-00-RS
FY 18 TOTAL (In 1,000’s) $160.00 $0 $285.00 $0 $445.00
FY 2016-2019 Transportation Improvement Program
28
Vill
age
oF
mah
om
etTABLE 24. VILLAGE OF MAHOMET LOCAL PROJECTS FY 19
Project Number Project Description
TERMINIFund Type
Lead Agency
Other Agencies
FUNDING AMOUNTS IN 1000’sDescription of Proposed
ImprovementBeginning End Federal State Your Agency Other Agencies Total Project Cost
MA-19-01 Paving Overlay Various Locations MFT MA $125.00 $125.00 Paving Overlay
MA-19-02State Street Mill and Resurface
N Dianne Ln
Western Hills Dr
STU, Local Match
MA $80.00 $20.00 $100.00Milling, Resurfacing,
Shoulder ReplacementSN 14-00035-00-RS
FY 19 TOTAL (In 1,000’s) $80.00 $0 $145.00 $0 $225.00
TABLE 25. VILLAGE OF MAHOMET STP-U ALLOCATIONPrior Usage by Fiscal Year
Project Location FY Obligated (STPU $) FY 16 STP-U ALLOTMENT = $74,261.56
FY 17 STP-U ALLOTMENT = $74,261.56 *
FY 18 STP-U ALLOTMENT = $74,261.56 *
FY 19 STP-U ALLOTMENT = $74,261.56 *
FY 20 STP-U ALLOTMENT = $74,261.56 *
STPU $ REFLECT FEDERAL SHARE *FY 17 - FY 19 subject to change Total $0
Active and Proposed Projects FY Programmed Starting Balance FY 16 FY 17 FY 18 FY 19Main StreetMA-16-03 Sec 14-00033-00-RS
FY 16 $160,000.00 $160,000.00
Main Street and Franklin StreetMA-16-04 Sec 14-00032-00-RS
FY 16 $160,000.00 $160,000.00
Sunny Acres Road MA-18-02Sec 14-00034-00-RS
FY 18 $160,000.00 $160,000.00
State StreetMA-19-02Sec 14-00035-00-RS
FY 19 $80,000.00 $80,000.00
FY Balance STP-U (Local) Funds $195,762.47 $-49,975.97 $24,285.59 $-61,452.85 $-67,191.29
FY 2016-2019 Transportation Improvement Program
29
Vill
age
oF
tolo
no TABLE 26. VILLAGE OF TOLONO LOCAL PROJECTS FY 16
Project Number Project Description
TERMINIFund Type Lead
AgencyOther
Agencies
FUNDING AMOUNTS IN 1000’sDescription of Proposed Improvement
Beginning End Federal State Your Agency Other Agencies
Total Project Cost
TO-16-01Street
MaintenanceVarious Locations MFT TO $72.00 $72.00 Street Maintenance
FY 16 TOTAL (In 1,000’s) $0 $0 $72.00 $0 $72.00
TABLE 27. VILLAGE OF TOLONO LOCAL PROJECTS FY 17
Project Number Project Description
TERMINIFund Type Lead
AgencyOther
Agencies
FUNDING AMOUNTS IN 1000’sDescription of Proposed Improvement
Beginning End Federal State Your Agency Other Agencies
Total Project Cost
TO-17-01Street
MaintenanceVarious Locations MFT TO $72.00 $72.00 Street Maintenance
FY 17 TOTAL (In 1,000’s) $0 $0 $72.00 $0 $72.00
TABLE 28. VILLAGE OF TOLONO LOCAL PROJECTS FY 18
Project Number Project Description
TERMINIFund Type Lead
AgencyOther
Agencies
FUNDING AMOUNTS IN 1000’sDescription of Proposed Improvement
Beginning End Federal State Your Agency Other Agencies
Total Project Cost
TO-18-01Street
MaintenanceVarious Locations MFT TO $72.00 $72.00 Street Maintenance
FY 18 TOTAL (In 1,000’s) $0 $0 $72.00 $0 $72.00
TABLE 29. VILLAGE OF TOLONO LOCAL PROJECTS FY 19
Project Number Project Description
TERMINIFund Type Lead
AgencyOther
Agencies
FUNDING AMOUNTS IN 1000’sDescription of Proposed Improvement
Beginning End Federal State Your Agency Other Agencies
Total Project Cost
TO-19-01Street
MaintenanceVarious Locations MFT TO $72.00 $72.00 Street Maintenance
FY 19 TOTAL (In 1,000’s) $0 $0 $72.00 $0 $72.00
FY 2016-2019 Transportation Improvement Program
30
Un
iVer
Sity
oF
illin
oiSTABLE 30. UNIVERSITY OF ILLINOIS LOCAL PROJECTS FY 16
Project Number Project Description
TERMINIFund Type
Lead Agency
Other Agencies
FUNDING AMOUNTS IN 1000’sDescription of Proposed Improvement
Beginning End Federal State Your Agency
Other Agencies
Total Project Cost
CH-16-07 UI-16-01
First Street UIUC Project
Gregory Dr
Kirby Ave State CH UI $1,584.55 $1,584.55 Street Reconstruction
SN 14-00299-00-PV
CH-16-08 UI-16-02
Fourth Street UIUC Project
Kirby Ave
St. Mary's Rd State CH UI $1,899.55 $1,899.55 Street Reconstruction and Signal
Replacement, SN 14-00300-00-PV
CH-16-09 UI-16-03
Pennsylvania Avenue UIUC Project Fourth St City Limit State CH UI $313.83 $313.83 Street Reconstruction
SN 14-00301-00-PV
FY 16 TOTAL (In 1,000’s) $0 $3,797.93 $0 $0 $3,797.93
TABLE 31. UNIVERSITY OF ILLINOIS LOCAL PROJECTS FY 17
Project Number Project Description
TERMINIFund Type
Lead Agency
Other Agencies
FUNDING AMOUNTS IN 1000’sDescription of Proposed Improvement
Beginning End Federal State Your Agency
Other Agencies
Total Project Cost
CH-17-07 UI-17-01
First Street UIUC Project
Gregory Dr
Kirby Ave State CH UI $60.46 $60.46 Street Reconstruction
SN 14-00299-00-PV
CH-17-08 UI-17-02
Fourth Street UIUC Project
Kirby Ave
St. Mary's Rd State CH UI $65.45 $65.45 Street Reconstruction and Signal
Replacement, SN 14-00300-00-PV
CH-17-09 UI-17-03
Pennsylvania Avenue UIUC Project
Fourth St City Limit State CH UI $2,116.17 $2,116.17 Street Reconstruction
SN 14-00301-00-PV
FY 17 TOTAL (In 1,000’s) $0 $2,242.08 $0 $0 $2,242.08
TABLE 32. UNIVERSITY OF ILLINOIS LOCAL PROJECTS FY 18
Project Number Project Description
TERMINIFund Type
Lead Agency
Other Agencies
FUNDING AMOUNTS IN 1000’sDescription of Proposed
ImprovementBeginning End Federal State Your Agency Other Agencies
Total Project Cost
MTD-18-01 CH-18-08 UI-18-01
A:Armory Ave B:Wright Street
A:Fourth St B:Springfield
Ave
A:Wright St B:Armory
Ave
CIF, MFT, FBF
MTD CH, UI $3,600.00 $3,974.82 $7,574.82 MCORE Project 4, Parts A & B
CH-18-06 UI-18-02
Pennsylvania Avenue UIUC Project Fourth St City Limit State CH UI $80.00 $80.00 Street Reconstruction
SN 14-00301-00-PV
FY 18 TOTAL (In 1,000’s) $0 $80.00 $3,600.00 $3,974.82 $7,654.82
TABLE 33. UNIVERSITY OF ILLINOIS LOCAL PROJECTS FY 19
Project Number
Project Description
TERMINIFund Type
Lead Agency
Other Agencies
FUNDING AMOUNTS IN 1000’sDescription of Proposed Improvement
Beginning End Federal State Your Agency
Other Agencies
Total Project Cost
No projects were submitted for FY 19
FY 19 TOTAL (In 1,000’s) $0 $0 $0 $0 $0
FY 2016-2019 Transportation Improvement Program
31
Ch
ampa
ign C
oU
nty TABLE 34. CHAMPAIGN COUNTY LOCAL PROJECTS FY 16
Project Number Project Description
TERMINIFund Type
Lead Agency
Other Agencies
FUNDING AMOUNTS IN 1000’sDescription of Proposed Improvement
Beginning End Federal State Your Agency Other Agencies Total Project Cost
UR-16-05 CC-16-01
North Lincoln Avenue
ConstructionSaline Ct
Olympian Dr
STU, Local
UR CC $2,752.00 $454.00 $454.00 $3,660.00
Lincoln Ave Extension Including 6’ Median Shoulder and Outside Curb & Gutter SN 11-00334-01-PV
CC-16-02 County Road
FY 16 TOTAL (In 1,000’s) $2,752.00 $0 $454.00 $454.00 $3,660.00
TABLE 35. CHAMPAIGN COUNTY LOCAL PROJECTS FY 17
Project Number Project Description
TERMINIFund Type Lead
AgencyOther
Agencies
FUNDING AMOUNTS IN 1000’sDescription of Proposed
ImprovementBeginning End Federal State Your Agency Other Agencies
Total Project Cost
No projects were submitted for FY 17
FY 17 TOTAL (In 1,000’s) $0 $0 $0 $0 $0
TABLE 36. CHAMPAIGN COUNTY LOCAL PROJECTS FY 18
Project Number Project Description
TERMINIFund Type Lead
AgencyOther
Agencies
FUNDING AMOUNTS IN 1000’sDescription of Proposed
ImprovementBeginning End Federal State Your Agency Other Agencies
Total Project Cost
No projects were submitted for FY 18
FY 18 TOTAL (In 1,000’s) $0 $0 $0 $0 $0
TABLE 37. CHAMPAIGN COUNTY LOCAL PROJECTS FY 19
Project Number Project Description
TERMINIFund Type Lead
AgencyOther
Agencies
FUNDING AMOUNTS IN 1000’sDescription of Proposed
ImprovementBeginning End Federal State Your Agency Other Agencies
Total Project Cost
No projects were submitted for FY 19
FY 19 TOTAL (In 1,000’s) $0 $0 $0 $0 $0
FY 2016-2019 Transportation Improvement Program
32
CU
mtd
TABLE 38. CHAMPAIGN-URBANA MASS TRANSIT DISTRICT LOCAL PROJECTS FY 2016-2019NOTE: Capital items are listed in priority order, figures listed are in 1,000’s
Fiscal Year Project Description
Federal Fund Type
Unit Cost TOTAL PROJECT COST Federal Cost ShareFederal ARRA
Funding
Federal TIGER Funding
State Cost Share
Local Cost Share
2016
(3) Replacement 40-Foot Hybrid Buses and (9)
Expansion 40-Foot Hybrid Buses (12 total)5307 $680.00 $8,160.00 $6,528.00 $1,632.00**
Data Communications Upgrade 5307 $600.00 $390.00 $210.00
Land Acquisition $4,000.00 $2,600.00 $1,400.00
Fueling System 5317 $185.00 $120.25 $64.75
MCORE Project 1: MTD-16-01, UR-16-08 $5,367.41 $3,540.57 $1,826.84
MCORE Project 2: MTD-16-02, CH-16-10 $12,024.82 $8,050.00 $3,974.82
MCORE Project 3: MTD-16-03, CH-16-11 $8,089.58 $4,114.76 $3,974.82
FY 2016 Total $680.00 $38,426.81 $6,528.00 $0 $15,705.33 $4,742.25 $11,451.23
2017 (10) Replacement 40-Foot Hybrid Buses 5307 $700.00 $7,000.00 $5,600.00 $1,400.00
2018
MCORE Project 4: MTD-18-01, CH-18-08, UI-18-01 $7,574.82 $7,574.82
MCORE Project 5: MTD-18-02, UR-18-05 $1,826.84 $1,826.84
(10) Replacement 40-Foot Hybrid Buses 5307 $720.00 $7,200.00 $5,760.00 $1,440.00
2019(10) Replacement 40-Foot Hybrid Buses 5307 $740.00 $7,400.00 $5,920.00 $1,480.00
(5) Replacement 60-Foot Hybrid Buses 5307 $900.00 $9,000.00 $7,200.00 $1,800.00
FY 2017-2019 Total $3,060.00 $40,001.66 $24,480.00 $0 $0 $6,120.00 $9,401.66
** State cost share is provided by Transportation Development Credits (TDC) in lieu of cash funds for this line item.
FY 2016-2019 Transportation Improvement Program
33
CC
Fpd TABLE 39. CHAMPAIGN COUNTY FOREST PRESERVE PROJECTS FY 16-19
Project Number Project Description
TERMINIFund Type Lead
Agency Other AgenciesFUNDING AMOUNTS IN 1000’s
Description of Proposed ImprovementBeginning End Federal State Your Agency Other
AgenciesTotal Project
Cost
FPD-16-01
Kickapoo Rail-Trail
Construction - Stage I
Main Street in Urbana
Main Street in St.
Joseph
IDNR Bike Path Grant;
IDOT ITEP
CCFPD
Vermilion County
Conservation District
$1,963.00 $200.00 $607.00 $2,770.00
Construction of Stage 1 of Rails-to-Trails Project in Champaign County.
Federal = ITEP and Federal Flex Match,
State = DNR Bike Path
FPD-16-02
Kickapoo Rail-Trail
Construction Engineering -
Stage I
Main Street in Urbana
Main Street in St.
Joseph
IDOT ITEP CCFPD
Vermilion County
Conservation District
$205.60 $51.40 $257.00
Transportation Enhancement Program Grant for Construction Engineering Related to Stage I of Rails-to-Trails Project in Champaign
County.
FY 16-19 TOTAL (In 1,000's) $2,168.60 $200.00 $658.40 $0 $3,027.00
FY 2016-2019 Transportation Improvement Program
34
no
n-in
FraS
trU
CtU
reTABLE 40. NON-INFRASTRUCTURE PROJECTS FY 16
Project Number Project Description
TERMINIFund Type
Lead Agency
Other Agencies
FUNDING AMOUNTS IN 1000’sDescription of Proposed Improvement
Beginning End Federal State Your Agency
Other Agencies
Total Project Cost
RPC-16-01Sidewalk
AssessmentVarious
SPR, FTA
RPC $10.01 $2.50 $12.51Sidewalk Inventory and Condition Assessment for
Urbana, Champaign, Savoy, Bondville, Tolono, and the University of Illinois
SRTS-16-01Urbana Active
Routes to School Program
Various SRTS MTD $6.34 $1.60 $7.94Encourage Walking and/or Bicycling to School,
Expand and Establish Incentive Programs to Improve Safety and Reduce Traffic Congestion
SA-16-04Village Bike/
Pedestrian PlanVarious SAG SA $16.00 $16.00
Development of a Pedestrian and Bike Plan for the Village
FY 16 TOTAL (In 1,000’s) $16.35 $2.50 $17.60 $0 $36.45
TABLE 41. NON-INFRASTRUCTURE PROJECTS FY 17
Project Number
Project Description
TERMINIFund Type
Lead Agency
Other Agencies
FUNDING AMOUNTS IN 1000’sDescription of Proposed Improvement
Beginning End Federal State Your Agency Other Agencies
Total Project Cost
No projects were submitted for FY 17
FY 17 TOTAL (In 1,000’s) $0 $0 $0 $0 $0
TABLE 42. NON-INFRASTRUCTURE PROJECTS FY 18
Project Number
Project Description
TERMINIFund Type
Lead Agency
Other Agencies
FUNDING AMOUNTS IN 1000’sDescription of Proposed Improvement
Beginning End Federal State Your Agency Other Agencies
Total Project Cost
No projects were submitted for FY 18
FY 18 TOTAL (In 1,000’s) $0 $0 $0 $0 $0
TABLE 43. NON-INFRASTRUCTURE PROJECTS FY 19
Project Number
Project Description
TERMINIFund Type
Lead Agency
Other Agencies
FUNDING AMOUNTS IN 1000’sDescription of Proposed Improvement
Beginning End Federal State Your Agency Other Agencies
Total Project Cost
No projects were submitted for FY 19
FY 19 TOTAL (In 1,000’s) $0 $0 $0 $0 $0
FY 2016-2019 Transportation Improvement Program
35
mC
ore
TIGER VI GRANT: MULTIMODAL CORRIDOR ENHANCEMENT PROJECT (MCORE)Project SummaryThe Champaign-Urbana Mass Transit District, City of Champaign, City of Urbana, and the University of Illinois received a TIGER VI grant of $15.7 million. The overall project also includes local match funds of $19.1 million for a total overall project budget of $34.8 million. Estimated construction costs account for approximately $29.3 million of the total. The TIGER funding will be administered by the Federal Highway Authority (FHWA) through the Illinois Department of Transportation (IDOT).
The proposed improvements will consist of changing the cross-sections of each street to create a more balanced and complete street network that supports safe transportation for pedestrian, bicycle, transit, and vehicular travel. Each street could be improved with curb, gutter, storm sewer, bicycle facilities, bus stop enhancements, and streetscape to encourage development within the surrounding area. The following describes the five different MCORE projects.
Project 1: Green Street (Wright Street to Busey Avenue)This project will look closely at how best to manage the large number of pedestrians that cross over the street and the bus/bike interaction. On street bicycle lanes and bus/bike interaction at new bus stop locations will be a key area of consideration.
Project 2: Green Street (Neil Street to Fourth Street)This project builds on the ongoing Green Street Streetscape Project and will evaluate a number of features for incorporation into the final design. The team will recommend changes to the existing streetscape standards and look at new and emerging technologies and best practices to ensure the new Green Street is a complete street and manages all modes of transportation. Through this project, Green Street will be a model corridor in terms of safety, mobility, and economic strength.
Project 3:Part A - White Street (Second Street to Wright Street) Part B - Wright Street (White Street to Springfield Avenue)This project will reconstruct the roadway with a primary focus on bus and bike traffic. The sidewalks will be reconstructed and street trees maintained. Transit stops will be consolidated to improve the flow through the corridor. The roadway will be redesigned to safely accommodate all users including the implementation of bicycle facilities and enhancements to bus stops throughout the corridor.
Project 4Part A - Armory Avenue (Fourth Street to Wright Street)Part B - Wright Street (Springfield Avenue to Armory Avenue)This project will look closely at how best to manage the large number of pedestrians and bicyclists that utilize this corridor as well as the high frequency of public transportation services. The project aims to bring the streets to a state of good repair and improve mobility choices throughout the corridor. The roadway will be redesigned to safely accommodate all users including the implementation of bicycle facilities and enhancements to bus stops throughout the corridor.
Project 5: Green Street (Busey Avenue to Race Street)At the completion of this project, pedestrians will find walking easier with the inclusion of ADA accessible ramps and sidewalk improvements. Mass transit improvements along the MTD bus routes, such as pads, shelters, and real time bus schedule information will encourage bus ridership and make travel to bus stops more convenient for travel beyond the neighborhood. Designated bicycle facilities and improved roadway surfaces will provide a safe space for bicyclists. Motorists will find travel easier with improved drainage resulting from curb and gutter repair and replacement. The improvements will reallocate space to encourage travel for all modal users along this corridor. The increases in mobility options created by better transportation systems will make access to jobs, healthcare and services easier for more individuals.
FY 2016-2019 Transportation Improvement Program
36
mC
ore
TABLE 44. MCORE PROJECTS
Project Number Project Description Beginning End Lead Agency Agency Cost Share Federal Cost Share Total Project CostGRANT TIMELINE
Bid LettingConstruction
Start DateOpen to Traffic
1 MTD-16-01
UR-16-08
Green Street Wright Street Busey AvenueCity of Urbana $ 1,050,000.00
June
2016
(FY 16)
August
2016
December
2017
C-U MTD $ 776,840.00
PROJECT 1 TOTAL $ 1,826,840.00 $ 3,540,567.00 $ 5,367,407.00
2 MTD-16-02
CH-16-10
Green Street Neil Street Fourth StreetCity of Champaign $ 3,197,979.00
C-U MTD $ 776,840.00
PROJECT 2 TOTAL $ 3,974,819.00 $ 8,050,000.00 $ 12,024,819.00
3 MTD-16-03
CH-16-11
A White Street Second Street Wright StreetCity of Champaign $ 3,197,979.00
B Wright Street White Street Springfield Avenue
A White Street Second Street Wright StreetC-U MTD $ 776,840.00
B Wright Street White Street Springfield Avenue
PROJECT 3 TOTAL $ 3,974,819.00 $ 4,114,760.00 $ 8,089,579.00
4MTD-18-01
CH-18-08
UI-18-01
A Armory Avenue Fourth Street Wright Street UIUC $ 3,600,000.00
January
2018
(FY 18)
June
2018
December
2019
B Wright Street Springfield Avenue Armory Avenue City of Champaign $ 3,197,980.00
A Armory Avenue Fourth Street Wright StreetC-U MTD $ 776,840.00
B Wright Street Springfield Avenue Armory Avenue
PROJECT 4 TOTAL $ 7,574,820.00 - $ 7,574,820.00
5 MTD-18-02
UR-18-05
Green Street Busey Avenue Race StreetCity of Urbana $ 1,050,000.00
C-U MTD $ 776,840.00
PROJECT 5 TOTAL $ 1,826,840.00 - $ 1,826,840.00
ALL PROJECTS TOTAL $ 19,178,138.00 $ 15,705,327.00 $ 34,883,465.00
For more information and ongoing updates, visit www.mcoreproject.com
FY 2016-2019 Transportation Improvement Program
37
illU
Stra
tiVe TABLE 45. ILLUSTRATIVE PROJECTS
Lead Agency Project Location Project DescriptionCOST ESTIMATES IN 1,000'S
NotesConstruction R.O.W.
Engineering Design
UtilityTotal Project
Cost
City of Urbana I-74 InterchangeConstruction,
design engineering, right-of-way for interchange
TBD TBD TBD TBD TBD Location Undetermined
City of UrbanaFlorida Avenue from
Abercorn Street to High Cross RoadStreet construction including bike path & intersection work including signals
TBD TBD TBD TBD $1,800.00Street Installation, Partial
Developer Funded
City of UrbanaWashington Street from
Pfeffer Road to Scottswood DriveStreet reconstruction TBD TBD TBD TBD $1,800.00
Reconstruct as Urban Cross Section
City of UrbanaBroadway Avenue, Park Street to
Country Club Road; and Park Street, McCullough Street to Broadway Avenue
Multi-use Pathway TBD TBD TBD TBD $600.00
City of UrbanaFlorida Avenue from
Lincoln Avenue to Race StreetMulti-use Pathway TBD TBD TBD TBD $350.00
City of UrbanaOlympian Drive between
Lincoln Avenue and US 45Location study update, design
engineering, right-of-way, constructionTBD TBD TBD TBD TBD
City of UrbanaFlorida Avenue from
Busey Avenue to Vine StreetStreet Resurfacing/Reconstruction TBD TBD TBD TBD TBD
Village of SavoyWest Church Street from
Dunlap Avenue to Mattis AvenueRoad widening and pavement TBD TBD TBD TBD $3,000.00
Village of SavoyMattis Avenue from
Church Street to Corp. LimitsRoad widening and pavement TBD TBD TBD TBD $2,500.00
Village of SavoyFirst Street from
Church Street to Airport RoadRoadway improvement TBD TBD TBD TBD $3,000.00
Village of SavoyCurtis Road from
Wesley Avenue to First StreetConstruction, design engineering,
railroad grade separationTBD TBD TBD TBD TBD
Village of SavoyColbert Park to Prospect Avenue through Prairie Fields Subdivision
Design and Construction of 10' Wide Multi-Use Path
$1,500.00 TBD TBD TBD TBD
Champaign Co. Forest Preserve
DistrictMain St (St Joe) to Vermilion County line
Kickapoo Trail - Stage II Design Engineering
TBD TBD $136.00 TBD $136.00
Champaign Co. Forest Preserve
DistrictMain St (St Joe) to Vermilion County line
Kickapoo Trail - Stage II Construction Engineering
TBD TBD $170.00 TBD $170.00
Champaign Co. Forest Preserve
DistrictMain St (St Joe) to Vermilion county line
Kickapoo Trail - Stage II Construction
$1,700.00 TBD TBD TBD $1,700.00
Continued on the next page
FY 2016-2019 Transportation Improvement Program
38
illU
Stra
tiVeTABLE 45. ILLUSTRATIVE PROJECTS (CONTINUED)
Lead Agency Project Location Project DescriptionCOST ESTIMATES IN 1,000'S
NotesConstruction R.O.W.
Engineering Design
UtilityTotal Project
Cost
University of Illinois
St. Mary's Rd - Fourth St to Neil StComplete Street-Including pavement
rehab, bike lanes and sidewalks $1,800.00 $200.00 $100.00 $2,100.00
University of Illinois
Peabody Dr - Fourth St to Wright StSidewalk and bike path
improvements $850.00 $100.00 $50.00 $1,000.00
University of Illinois
Sixth St - Gregory Dr to Pennsylvania Ave Complete Street $160.00 $40.00 $10.00 $210.00
University of Illinois
Oak St - Kirby Ave to Hazelwood Dr Complete street + sidewalk work $250.00 $35.00 $285.00
University of Illinois
Goodwin Ave North of Hazelwood DrModified subgrade and resurfacing,
with limited curb work. $200.00 $50.00 $250.00
University of Illinois
Pennsylvania Ave - Wright St to Goodwin Ave
Reconstruction with bike lane, sidewalk, and ramp improvements
$2,200.00 $400.00 $2,600.00
University of Illinois
Kirby Ave at Oak St Traffic signal controller upgrades $100.00 $10.00 $110.00
University of Illinois
Gregory St - Nevada St to Oregon St Reconstruction $150.00 $25.00 $175.00
University of Illinois
Goodwin Ave - Pennsylvania Ave to Peabody Dr
Reconstruction $120.00 $20.00 $140.00
As of May 2015, projects do not have a particular prioritization
Illustrative Projects are projects which could be included in local TIP tables, but are not because they currently have no identified funding source.
FY 2016-2019 Transportation Improvement Program
39
CU
Uat
S St
p-U TABLE 46. CUUATS STP-U ALLOCATION
Prior Usage by Fiscal Year
Project Location FYObligated STPU
(in 1,000’S)Windsor Road, Champaign/Champaign County FY 94 765.70 FY 09 STPU ALLOTMENT = $989,731
Olympian Drive, Champaign/Urbana/Champaign County FY 95 231.50 FY 10 STPU ALLOTMENT = $1,076,517
Windsor Road, Champaign/Champaign County FY 96 886.20 FY 11 STPU ALLOTMENT = $1,103,332
Windsor Road, Champaign/Champaign County FY 97 647.00 FY 12 STPU ALLOTMENT = $1,001,072
Windsor Road, Champaign/Champaign County FY 98 259.90 FY 13 STPU ALLOTMENT = $1,081,526
Windsor Road, Champaign/Champaign County FY 99 103.30 FY 14 STPU ALLOTMENT = $1,297,404
Lincoln Avenue, University of Illinois FY 00 581.40 FY 15 STPU ALLOTMENT = $1,198,159
Lincoln Avenue, Urbana FY 00 190.50 FY 16 STPU ALLOTMENT = $1,365,674
Curtis Road, Duncan Road to First Street FY 02 160.00 FY 17 STPU ALLOTMENT = $1,365,674 *
Windsor Road - Philo Road to IL 130 Location Study FY 03 105.00 FY 18 STPU ALLOTMENT = $1,365,674 *
Olympian Drive - Mattis Avenue to Apollo Drive FY 03 2,913.00 FY 19 STPU ALLOTMENT = $1,365,674 *
Curtis Road - Duncan Road to Wynstone Drive FY 06 2,500.00
STPU $ REFLECT FEDERAL SHARE IN THOUSANDS
*FY 17 - FY 19 subject to change
Philo Road - Colorado Avenue to Mumford Drive FY 06 600.00
Windsor Road - Boulder Drive to IL 130 FY 09 3,500.00
Update Lincoln Avenue Phase I Engineering - I-74 to Olympian Drive FY 12 60.00
Olympian Drive - Apollo Drive to Lincoln Avenue FY 14 1,193.00
Windsor Road Reconstruction - Race Street to Philo Road FY 15 3,000.00
Olympian Drive - Duncan Road eastward 0.3 mi. FY 15 750.00
CUUATS Member STPU Total $18,446.50
Active and Proposed Projects FY Programmed FY 15
Ending BalanceFY 16 FY 17 FY 18 FY 19
Lincoln Avenue - Saline Court to Olympian Drive Sec 11-00334-01-PV Urbana/Champaign Co
FY 16 $2,752.00 $2,752.00
Prospect Avenue - Windsor Road to N of Curtis RoadSec 09-00015-00-PV Savoy
FY 19 $2,000.00 $2,000.00
FY Balance STPU (Local) Funds $1,046.00 $-340.33 $1,025.35 $2,391.02 $1,756.70
FY 2016-2019 Transportation Improvement Program
40
mU
lti-a
gen
CyTABLE 47. MULTI-AGENCY PROJECTS FY 16
Project Number
Project Description
TERMINILead
Agency
FUNDING AMOUNTS IN 1000’sDescription of Proposed
ImprovementBeginning End Federal State CH UR SA CC UI Other local agency
Total Project Cost
CH-16-07 UI-16-01
First Street UIUC Project
Gregory Dr
Kirby Ave
CH $1,584.55 $1,584.55Street Reconstruction SN 14-00299-00-PV
CH-16-08 UI-16-02
Fourth Street UIUC Project
Kirby Ave
St. Mary's Rd
CH $1,899.55 $1,899.55
Street Reconstruction and Signal
Replacement SN 14-00300-00-PV
CH-16-09 UI-16-03
Pennsylvania Avenue
UIUC ProjectFourth St City Limit CH $313.83 $313.83
Street Reconstruction SN 14-00301-00-PV
UR-16-05 CC-16-01
North Lincoln Avenue
ConstructionSaline Ct
Olympian Dr
UR $2,752.00 $454.00 $454.00 $3,660.00
Lincoln Ave Extension Incl. 6’ Median
Shoulder, Outside Curb & Gutter
Sec 11-00334-01-PV
MTD-16-01 UR-16-08
Green Street Wright St Busey Ave MTD $3,540.57 $1,050.00 $776.84 $5,367.41MCORE Project 1
MTD-16-02 CH-16-10
Green Street Neil St Fourth St MTD $8,050.00 $3,197.98 $776.84 $12,024.82MCORE Project 2
MTD-16-03 CH-16-11
A:White Street B:Wright Street
A:Second St B:White St
A:Wright St B:Springfield
AveMTD $4,114.76 $3,197.98 $776.84 $8,089.58
MCORE Project 3, Parts A & B
FY 16 TOTAL (In 1,000’s) $18,457.33 $3,797.93 $6,395.96 $1,504.00 $0 $454.00 $0 $2,330.52 $32,939.74
FY 2016-2019 Transportation Improvement Program
41
mU
lti-a
gen
Cy TABLE 48. MULTI-AGENCY PROJECTS FY 17
Project Number Project Description
TERMINILead
Agency
FUNDING AMOUNTS IN 1000’sDescription of Proposed Improvement
Beginning End Federal State CH UR SA CC UI Other local agency
Total Project Cost
CH-17-07 UI-17-01
First Street UIUC Project
Gregory Dr
Kirby Ave
CH $60.46 $60.46Street Reconstruction SN 14-00299-00-PV
CH-17-08 UI-17-02
Fourth Street UIUC Project
Kirby Ave
St. Mary's
RdCH $65.45 $65.45
Street Reconstruction and Signal Replacement
SN 14-00300-00-PV
CH-17-09 UI-17-03
Pennsylvania Avenue UIUC Project
Fourth StCity Limit
CH $2,116.17 $2,116.17Street Reconstruction SN 14-00301-00-PV
FY 17 TOTAL (In 1,000’s) $0 $2,242.08 $0 $0 $0 $0 $0 $0 $2,242.08
TABLE 49. MULTI-AGENCY PROJECTS FY 18
Project Number Project Description
TERMINILead
Agency
FUNDING AMOUNTS IN 1000’sDescription of Proposed
ImprovementBeginning End Federal State CH UR SA CC UI Other local agency
Total Project Cost
CH-18-06 UI-18-02
Pennsylvania Avenue UIUC
ProjectFourth St City Limit CH $80.00 $80.00
Street Reconstruction SN 14-00301-00-PV
SA-18-01CH-18-07
Prospect Avenue
Reconstruction
Curtis Rd
Windsor Rd
MFT, STU, CIF
$27.15 $27.85 $55.00 Complete Street Plan
Updates SN 09-00015-00-PV
MTD-18-01 CH-18-08 UI-18-01
A:Armory Ave B:Wright Street
A:Fourth St B:Springfield
Ave
A:Wright St B:Armory
AveMTD $3,197.98 $3,600.00 $776.84 $7,574.82
MCORE Project 4, Parts A & B
MTD-18-02 UR-18-05
Green Street Neil St Fourth St MTD $1,050.00 $776.84 $1,826.84MCORE Project 5
FY 18 TOTAL (In 1,000’s) $0 $80.00 $3,225.13 $1,050.00 $27.85 $0 $3,600.00 $1,553.68 $9,536.66
TABLE 50. MULTI-AGENCY PROJECTS FY 19
Project Number Project Description
TERMINILead
Agency
FUNDING AMOUNTS IN 1000’sDescription of Proposed
ImprovementBeginning End Federal State CH UR SA CC UI Other local agency
Total Project Cost
SA-19-01CH-19-05
Prospect Avenue Reconstruction
Curtis Rd
Windsor Rd
MFT, STU, CIF
$2,000.00 $607.85 $1,193.00 $3,800.85 Complete Street Eng. and Reconstruction
SN 09-00015-00-PV
FY 19 TOTAL (In 1,000’s) $2,000.00 $0 $607.85 $0 $1,193.00 $0 $0 $0 $3,800.85
FY 2016-2019 Transportation Improvement Program
42
map
#*
#*#*
XY
600N
I-57
100E
1800
E
I-74
I-72
300E
700N
500E
0E
900N
700E
400E
N 1
400E
2400N
1200
E
1100N
1000N
1900
E
1500
E
2200N
1500N
2500N
1300N
200E50
E
350E
900E
1400
E
S F
irst S
t
W Kirby Ave
1600
E
2100N
2000N
1850N
1675N
Leverett Rd
1600N
W Curtis Rd
1400N
1250N
Phi
lo R
d
1700
E
Bloomington Rd
1000
E
W Bradley Ave
N M
arke
t St
N M
attis
Ave
S R
isin
g R
d
S S
tale
y R
d
W Windsor Rd
250E
525E
E Oak St
S R
ace
St
800N
S M
attis
Ave
E Ford Harris Rd
S B
arke
r Rd
Airport Rd
S D
unca
n R
d
150E
W Springfield Ave80
0E
1975
E
N P
rosp
ect A
veE Curtis Rd
2175N
N H
igh
Cro
ss R
d
Cunn
ingh
am A
ve
1950N
2300N
1700N
1800N
425E
1350
E
N C
otto
nwoo
d R
d
N R
isin
g R
d
N B
arke
r Rd
W Hensley Rd
675E
Cardinal Rd
N 1
450E
600E
1100
ES
Nei
l St
N N
eil S
t
W Old Church Rd
N D
uncan Rd
E Windsor Rd
1525N
S C
otto
nwoo
d R
d
2425N
S V
ine
St
125E
E University Ave
E Old Church Rd
N L
inco
ln A
ve
E Washington St
S F
ourth
St
US Route 150
1950
E
750E
E 3100N
W Oak St
550N
2150N
E 1200N
E 1400N
E 1800N
Will
ow R
d
E 1700N
E 1500N
E 2750N
E 2000N
E 2100N
1650N
US
Rou
te 4
5
1300
E
1200N
S D
unla
p Av
e
1550N
1900N
E 2950N
N D
unla
p Av
e
550E
E Florida Ave
325E
E Main St
Mar
tin R
d
N L
omba
rd S
t
E 1900N
E 1300N
1575NW University Ave
Golf Dr
Oak
St
Perkins RdM
ullik
in D
r
Paula Dr
Kerr Ave
William St
750N
Mid America Rd
W Green St
1450
E
S L
inco
ln A
ve
E 2575N
Tin Cup Rd
S M
arke
t St
Eads St
Wal
nut S
t
Farb
er D
r
S M
ain
St
W Church St
E 2275N
S L
ong
St
S G
arfie
ld S
t
W Central Ave
Slade Ln
Nicklaus Dr
1200
E
400E
0E
200E0E
500E
1600
E
800E0E
0E
1700
E
1000
E
300E
2500N
1950
E
900N
1300
E
1100N
1000
E
900E
2300N
0E
600E
1100N
2300N
800N
1100N
W Old Church Rd
400E
2400N
500E
1350
E
1000N
700N
750N
600N
900E
1200
E
1500
E
700N
1600N
800N
800E
1000
E
1550N
800N
2300N
1700N70
0E
150E
1900N
1600
E
400E
900N
2500N
1300
E
1200N
2200N
1600N
1100
E
2400N
300E
2000N
900N
1800
E
1900
E
1600
E
1100N
1900
E
200E
1400N
700E
FY 2016 Major Transportation ProjectsChampaign-Urbana MPO Metropolitan Planning Area
LegendXY Intersection Improvement#* Signal Improvement
ExtensionReconstructionResurfacingRails-to-trailsEasement and ROW AquisitionMCORERailroadsStreetsInterstatesUS RoutesState RoutesChampaignUrbanaSavoyMahometBondvilleTolonoMetro Planning Area BoundaryChampaign County Boundary
Bondville
Champaign
Urbana
Savoy
Tolono
Mahomet
¯0 1 2 30.5Miles
FIGURE 1. FY 2016 MAJOR TRANSPORTATION PROJECTS, CHAMPAIGN-URBANA MPO METROPOLITAN PLANNING AREA
CUUATS CHAMPAIGN URBANA URBANIZED AREA TRANSPORTATION STUDY
1776 East Washington Street Urbana, IL 61802
Phone 217.328.3313 Fax 217.328.2426 www.ccrpc.org
TO: CUUATS Technical Committee Members FROM: HSTP Coordinator DATE: Wednesday, June 17th, 2015 RE: Developmental Service Center 2015 CVP Application (Section 5310)
REQUESTED ACTION: Review, discuss, and endorse grant application for Urbanized Area HSTP
BACKGROUND: Under MAP-21’s Section 5310 Older American Act funds the Illinois Department of Transportation – Division of Public and Intermodal Transportation’s Consolidated Vehicle Procurement (IDOT-DPIT’s CVP) 2015 grant application cycle that provides an opportunity for human service agencies with transportation clients to replace aging vehicles. This federal funding is passed through with rolling stock covered at 80% and 20% local match funded by an IDOT-DPIT bond. Eligibility requirements for replacing vehicles include: 1) meeting mileage and/or vehicle age; 2) received a support letter from the public transit operator confirming the requested vehicles are not duplicative of existing public transit services; and lastly 3) endorsed by the MPO considering the applicant’s active participation in coordination efforts and the proposed project is part of the Urbanized Area adopted plan.
Developmental Service Center (DSC) is a not-for-profit community service agency providing educational, training, and rehabilitation services to persons who are developmentally disabled and/or have physical disabilities. On May 21st, the Human Service Transportation Plan (HSTP) Region 8’s Technical and Policy committees reviewed and voted to provide a letter of support for this application. In previous years, DSC’s CVP applications were endorsed by Region 8; however, in this year’s application DSC is requesting vehicles serving the C-U Urbanized Area (a separate IDOT-DPIT funding allocation) and therefore requires CUUATS Technical and Policy Committees’ endorsement and upon award inclusion in the TIP. Click here to review the entire grant application along with support documents. DSC CVP application highlights include: Total project cost is $126,000 for replacing two 14-passenger Medium Duty Paratransit vehicles. In the table below, both requests exceed Criteria One (120,000 miles) and based on IDOT-DPIT’s
current delivery timeframe of 2016 - will eventually exceed Criteria Two (8 years of age). On average, their program utilizes 20 vehicles daily and in the last year provided a total of 103,520
trips. Under project justification, DSC notes, “via service contracts, DSC currently coordinates with: SHOWBUS
for consumers based in Ford, Iroquois, and Champaign Counties; and Piattran for Piatt County consumers. DSC regularly attends, participates, and hosts HSTP Region 8’s committee meetings. DSC has a full-time technician on staff for preventive maintenance. The majority of vehicle repairs are completed by the regional maintenance center (SMTD) in Springfield. In the past, DSC has taken in IDOT vehicles from agencies that stated had no service life left in them, and were able to turned them around and extend their useful life by several thousand miles.”
DSC has received support letters from the Champaign Urbana Mass Transit District, Piattran, and SHOWBUS.
CVP Vehicles Requested Unit Cost
Vehicle Being Replaced Information
Priority Type Requested Purpose Type Year Mileage VIN CVP No
1st MDL Replacement $63,000 MDL 2008 136,476 1FD4E45S98DA41991 515CVP 2nd MDL Replacement $63,000 MDL 2008 128,241 1FD4E45SO8DA41992 515CVP STAFF RECOMMENDATION: Endorse the attached grant application and encourage DSC to continue participating in HSTP meetings, actively communicate on-going transportation needs, and seek new alternatives to continually improve upon their level of coordination locally.
CUUATS CHAMPAIGN URBANA URBANIZED AREA TRANSPORTATION STUDY
1776 East Washington Street Urbana, IL 61802
Phone 217.328.3313 Fax 217.328.2426 www.ccrpc.org
TO: CUUATS Technical Committee Members FROM: Rita Morocoima-Black DATE: 16 June 2015 RE: CUUATS Technical Committee Chairperson and Vice-Chairperson Rotation CUUATS Technical Committee Chairperson and Vice-Chairperson Rotation Article V: CUUATS Technical Committee Formation, Voting, Quorum B. The CUUATS Technical Committee shall rotate the Chair and Vice Chair positions for a two-year term
beginning in July of every odd-numbered year, or when a vacancy occurs. The Vice-Chair shall assume the Chair position at the end of the two-year term or if a vacancy occurs. The rotation shall be in the following order:
i. City of Urbana ii. City of Champaign iii. University of Illinois iv. Village of Savoy v. Champaign County vi. Champaign-Urbana Mass Transit District
-------------------------------------------------------------------------------------------------------------------------- Savoy – Chair 2015-2017 County – Vice-Chair 2015-2017, Chair 2017-2019 CUMTD –Vice-Chair 2017-2019, Chair 2019-2021 Urbana – Vice-Chair 2019-2021, Chair 2021-2023 Champaign - Vice-Chair 2021-2023, Chair 2023-2025 UIUC –Vice-Chair 2023-2025, Chair 2025-2027 Savoy – Vice-Chair 2025-2027, Chair 2027-2029