1. Coating inspector (May 2013 – Present): PT. McDermott Indonesia Duties & Responsibility :
Enforcement and verification of work performed in accordance with specification, manufacturer recommendations and coating procedure. Measure ambient conditions, surface temperature and air quality requiremants Inspect type of blasting equipment and tools to be used Inspect type and size of blasting media Inspect metal surface imperfections / defect Test indication of oil or water in compressed Test analysis of water-soluble ionic contamination ofblasting media air Inspect pre-cleaning, solven cleaning of surface, mechanical surface preparation during pre-fabrication and onsite portable centrifugal blasting,open air blast cleaning,vacuum blast cleaning, hand and power tool cleaning Measure compressad air pressure Inspect degree of cleanliness required Measure surface profile of blast cleaned surface Assess surface cleanliness of blast cleaned surface Inspect coating material storage conditions Monitor thinning, mixing,induction time and pot life Inspect type of coating application equipment,Thermal sprayed aluminium, Insulation, Passive fire protection, Self leveling compounds, Anti-skid deck coatings, Coated Hot dip Galvanizing and its acceptance. Monitor application method, type and pattern Measure wet film thickness by notch gages Non-destructive measurement of dry film thickness of non magnetic coating / non conductive coatings applied to ferrous surface Monitor re-coating and final curing schedules Test discontinuity (holidays or pinholes) of coating and linings Inspection of defects on coated surface To stop non-conforming work and inform the production supervisor of required corrective rework Documentation of the daily inspection activities and others as per the project recuirement
. Project Assigned & Involved Project : Kepodang gas developmentRev.1, Date: 28/03/2014 Page 1 of 17 Muhammad Nasir
Client : Petronas
Project : Vetco grey Client : Chevron
Project : Inpex Client :
2. Blasting / Painting Foreman (Sept 2005 – May 2013): PT. McDermott Indonesia - Batam Island, Indonesia.
Duties & Responsibility Foreman Foreman (all Pain system) Check and record Material Take Number (Material Treacebility Number) Visual Inspection after Blasting & Painting
Project Assigned & Involved : Project : Woodside Client : Foste wheeler LNG –V Expansion Project : Sutu Vang Client : Cuulong Project : Maersk Client : Peregrino Fpso Topside Project : KTT Module Platform, Jacket and flare Boom Client : Esso Project : Gorgon Client : Chevron
3. Blasting/Painting Applicator (November 2002 – October 2004): PT. McDermott Indonesia - Batam Island, Indonesia.
Duties & Responsibility : Applicator Blasting Painter (all Paint system) Check and record Material Take Number ( Material Treacebility Number ) Visual Inspection after Blasting
Project Assigned & Involved : Project : Belanak Wellheads Central Processing Platform Project Client : Conoco Philips Project : FPSO Belanak Natuna Client : Conoco Philips
Education
Senior High Scool
Rev.1, Date: 28/03/2014 Page 2 of 17 Muhammad Nasir
On Job Training and Courses
SSPC PCI Protective Coating Inspector Level 2 ID #25934 (expires 12/31/2016). In house Training for Implementasion and Inspecsion of Blasting and painting by
NACE Certified Inspector # 6858 Mr Mujianto Ali Thermal Spraying Aplicator By CHT Internasional Pte Ptd Basic Painting & Blasting Certificate no CC18-057 PTW & CSE By Industrialindo Konsultrain Services Certivicate no.PTW
13774/IKS/08 Quality Awareness Level I Scafolding Awareness Training Fist Aid & CPR Training
Firms
September 2005 – Present PT. McDermott Indonesia
November 2002 – Oct 2004 PT. McDermott Indonesia
Personal Details
Name : Muhammad Nasir
Nationality : Indonesia
Place, Date of Birth : Bangkalan 08 Januari 1973
Gender : Male
Address : Taman laguna indah Blok B3/ 32 Tanjung Riau
Sekupang Batam
Phone Number : 082126758703 (mobile phone)
E-mail : [email protected]
Civil Status : Maried
Emp. No : 3083B / 102280
Rev.1, Date: 28/03/2014 Page 3 of 17 Muhammad Nasir
Rev.1, Date: 28/03/2014 Page 4 of 17 Muhammad Nasir
Rev.1, Date: 28/03/2014 Page 5 of 17 Muhammad Nasir
Rev.1, Date: 28/03/2014 Page 6 of 17 Muhammad Nasir
Rev.1, Date: 28/03/2014 Page 7 of 17 Muhammad Nasir
Rev.1, Date: 28/03/2014 Page 8 of 17 Muhammad Nasir
Rev.1, Date: 28/03/2014 Page 9 of 17 Muhammad Nasir
Rev.1, Date: 28/03/2014 Page 10 of 17 Muhammad Nasir
Rev.1, Date: 28/03/2014 Page 11 of 17 Muhammad Nasir
Rev.1, Date: 28/03/2014 Page 12 of 17 Muhammad Nasir
Rev.1, Date: 28/03/2014 Page 13 of 17 Muhammad Nasir
Rev.1, Date: 28/03/2014 Page 14 of 17 Muhammad Nasir
Rev.1, Date: 28/03/2014 Page 15 of 17 Muhammad Nasir
Rev.1, Date: 28/03/2014 Page 16 of 17 Muhammad Nasir
Rev.1, Date: 28/03/2014 Page 17 of 17 Muhammad Nasir