cyberGRID EDRC

  • Upload
    ion1212

  • View
    217

  • Download
    0

Embed Size (px)

Citation preview

  • 8/12/2019 cyberGRID EDRC

    1/9

    1

    European Demand Response Center

    cyberGRID, Feb. 2012

  • 8/12/2019 cyberGRID EDRC

    2/9

    European Demand Response Center (EDRC)

    cyberGRID, Feb. 2012Funded by the Klima- und Energiefonds, NEUE ENERGIEN 2020 4thCall

    EU has 27 countries and 27 different markets

    for VPPs based on DR.The only way to access targeted markets

    efficiently is in partnership with strong market

    playersTSOs, Utilities and ESCOs.

    Good overview is provided by SEDCs snapshot

    of EU DR potential and the barriers.

    SUMMARY:

    This project focuses on development of an

    automated European Demand Response

    Centre (EDRC) through aggregation and

    intelligent networking of industrial and

    commercial consumers and suppliers withintegration of renewable energy sources (RES)

    for economic and ecological optimization of

    balance energy actions, such as peak power,

    grid stability and congestion issues.

    http://www.klimafonds.gv.at/
  • 8/12/2019 cyberGRID EDRC

    3/9

    Demand response measures in Austria could be equivalent to the capacity of a state-of-the-artcombined cycle unit

    (400 MW) or even more.

    0

    1000

    2000

    3000

    4000

    5000

    6000

    7000

    8000

    9000

    10000

    0 1000 2000 3000 4000 5000 6000 7000 8000 9000

    Dauer [h]

    L

    eistung[MW]

    2005

    2004

    2003

    2002

    7500

    8000

    8500

    9000

    9500

    0 100 200 300 400 500 600

    2005

    2004

    2003

    2002

    47 h

    400 MW

    Figure 1: Duration curves of electricity demand in Austria (TU Graz)

    CHALLENGE - PEAKING CAPACITIES

    cyberGRID, Feb. 2012

  • 8/12/2019 cyberGRID EDRC

    4/9

    3.005

    1.868

    1.573

    1.512

    1.129

    1.112

    777

    758

    589

    521

    495

    464

    383

    367

    357

    292

    273

    269

    246

    223

    199

    177

    125

    122

    98

    45

    32

    32

    20

    17

    13

    0

    500

    1.000

    1.500

    2.000

    2.500

    3.000

    3.500

    Pulp&paper

    Iron&steel

    Mining

    Chemicals

    Nonferrousmetals

    Foundry

    Districtheating

    Glas&ceramics

    Rubber&plastics

    Textiles

    Woodprocessing

    Publicwatersupply

    Foods,beverages,tobaccos

    Puplicpowersupply

    Hotels&restaurants

    Automotiveindustry

    Otherlandtraffic

    Airtraffic

    Metalproducts

    Leather&shoes

    Electrotechnics,finemechanics

    Printing&publishing

    Toys&sportinggoods

    Machineconstruction

    Tradeandvehicleservices

    Tourism&telecommunication

    Civil

    engineering&construction

    Banking&insurance

    Watertransport

    Realestateservices

    Publicgassupply

    Specificco

    nsumptionofelectricityinkWh/1000

    .

    Average power consumption per

    gross value added (GVA) in 2002

    High potential for DR

    Low potential for DR

    Figure 2: Electricity-intensity of industrial sectors in Austria (Technical University of Graz 2007)

    Average Peak Saving Potential 9-25,1%

    Resources

    Demand Response potential by industry

    cyberGRID, Feb. 2012

  • 8/12/2019 cyberGRID EDRC

    5/9

    European Demand Response Center (EDRC)

    cyberGRID, Feb. 2012

    Project partners cyberGRIDtechnology provider

    Brimatechmarket research

    Graz University of Technology, Institute for

    Electricity Economics and Energy Innovation

    Austrian Power Grid (APG)TSO

    Start 03/201110/2012

    7 LOIs from companies in different industries

    Funded by the Klima- und Energiefonds, NEUE ENERGIEN 2020 4thCall

    Aims of the project: Identification of applications and use cases from

    different stakeholder perspectives

    Profound know-how of demand response potential andinnovation environment in Austria

    Identification of drivers and barriers

    Identification of stakeholder needs and requirements Development and evaluation of algorithms and business

    models

    Deduction of recommendations and relevance for thelegal and regulatory framework

    http://www.klimafonds.gv.at/
  • 8/12/2019 cyberGRID EDRC

    6/9

    European Demand Response Center (EDRC)

    cyberGRID, Feb. 2012Funded by the Klima- und Energiefonds, NEUE ENERGIEN 2020 4thCall

    FOCUS OF THE PROJECT Regional focus

    Austria

    European perspective and validation through international expertworkshops

    Follow-Up project within EU FP 7 Program ICT Call iBADGE Cross-BorderBalancing MarketTool: Austria, Italy and Slovenia

    Follow-Up Commercial: Cloud for Stakeholders across Europe

    Stakeholder focus Energy-intensive consumers (industry), consumers with emergency power

    generator, transmission system operator, distribution system operator,regulator, traders, municipal utility, suppliers, etc.

    Energy-intensive industry (consumer/prosumer): selection based on theenergy consumption/1000production

    7 industries were selected based on their potential for DRM Private households were not considered

    http://www.klimafonds.gv.at/
  • 8/12/2019 cyberGRID EDRC

    7/9

    COMMERCIAL VPPMAX FINANCIAL OUTCOME

    The electricity retailer challenges are:

    - Retaining customers

    - Increasing revenues

    TECHNICAL VPPOPTIMIZE POWER SUPPLY &

    DISTRIBUTION

    The power sector specific challenges are:

    - Increasing share of RES; distribution of RES

    - Underinvested aging infrastructure with long lead

    times for new projects- Public resistance against new projects

    (transmission lines, nuclear, coal, etc.)

    - Increasing consumption

    - Environmental issues

    European Demand Response Center (EDRC)

    VPP DRIVERS / HOW TO DEFINE VALUE

  • 8/12/2019 cyberGRID EDRC

    8/9

    Optimizing Energy Value Chain

    RKPS 2011 cyberGRID, Feb. 2012

  • 8/12/2019 cyberGRID EDRC

    9/9

    9

    e-mail: [email protected]

    web: www.cyber-grid.com