D. Attié, P. Colas, M. Lupberger, M. Riallot LCTPC WP Phone meeting 109 July 15, 2010 irfu y a l c a s irfu y a l c a s News from “Octopuce” News from “Octopuce”

D. Attié, P. Colas, M. Lupberger, M. Riallot

  • Upload
    posy

  • View
    32

  • Download
    1

Embed Size (px)

DESCRIPTION

News from “ Octopuce ”. D. Attié, P. Colas, M. Lupberger, M. Riallot. LCTPC WP Phone meeting 109 July 15, 2010. News data at higher gain. Gas: ArIso (95:5) V Ingrids = 290 V ! (275 V before) Gain ~550 Stable conditions (no spark) except hot spots (~8 nA) No trigger on cosmics - PowerPoint PPT Presentation

Citation preview

Page 1: D. Attié, P. Colas, M. Lupberger, M. Riallot

D. Attié, P. Colas, M. Lupberger, M. Riallot

LCTPC WP Phone meeting 109 July 15, 2010

i r f u

yalcas

i r f u

yalcas

News from “Octopuce”News from “Octopuce”

Page 2: D. Attié, P. Colas, M. Lupberger, M. Riallot

•Gas: ArIso (95:5)

•VIngrids = 290 V ! (275 V before)

•Gain ~550

•Stable conditions (no spark) except hot spots (~8 nA)

•No trigger on cosmics

•Acquisition time: 0.5 s

•Efficiency to single e- 25 %

News data at higher gainNews data at higher gainNews data at higher gainNews data at higher gain

2July15, 2010 LCTPC WP phone meeting #109

Page 3: D. Attié, P. Colas, M. Lupberger, M. Riallot

•VIngrids = 290V up to 300 V

•Unstable conditions

Weak pointsWeak pointsWeak pointsWeak points

3July15, 2010 LCTPC WP phone meeting #109

Page 4: D. Attié, P. Colas, M. Lupberger, M. Riallot

•Are we ready to go to DESY?

•Any idea how to fix the weak spots?

•First, we can make a long run at VIngrids = 290V in Saclay to check the stability and robustness

•We could have a dedicated beam test of three days in October

Beam test in Large Prototype ?Beam test in Large Prototype ?Beam test in Large Prototype ?Beam test in Large Prototype ?

4July15, 2010 LCTPC WP phone meeting #109