    Date:22/11/2014

    Place :Al Kheesa

    During the site inspection at M/s D D C shafts found unsafe condition and

    unsafe act.

    Belo Mentioned !perati"es are or#ing ithout safet$ %nduction. Dilan &uranga

    Kapilasrilal 'a(apa#sha

    &ugatha Krishan

    'a) *autan Chaudhar$

    Belo Mentioned !perati"es ere or#ing ithout su+cient P P ,. -etra Bahadur

    ai#aran Kahar

    Due to the inadeuate super"ision and lac# of safet$ culture !ser"ed poor

    house#eeping condition in shaft no 1 3.

  • 7/24/2019 d d c Site Unsafe Condition.

    2/18

  • 7/24/2019 d d c Site Unsafe Condition.

    3/18

  • 7/24/2019 d d c Site Unsafe Condition.

    4/18

    !ser"ed poor cale )anage)entall around the site hich ill lead the

    tripping haard and electrocution.

  • 7/24/2019 d d c Site Unsafe Condition.

    5/18

  • 7/24/2019 d d c Site Unsafe Condition.

    6/18

    BIER CABLE LEAD TO

    ELECTRICAL SHOCK

    WHICH IS TOUCHED ON THE

    METAL PIPE

  • 7/24/2019 d d c Site Unsafe Condition.

    7/18

    5ea"$ ,uip)ent6Bac#hoe7operating one of the M/s D D C or#er Mr.Birendra

    Ku)ar &hu#la ithout "alid docu)ents.

  • 7/24/2019 d d c Site Unsafe Condition.

    8/18

    &lurr$ accu)ilated all around the or# pre)ises and slurr$ 8oing near the

    other areas especiall$ M/s KA5A'AMA &ustation also slurr$ found the

    asphalt road ecause accu)ilated sluur$ hich is on the construction

    "ehicles t$re9 hile running on the asphalt road hich ill e spread o"er the

    road.

  • 7/24/2019 d d c Site Unsafe Condition.

    9/18

  • 7/24/2019 d d c Site Unsafe Condition.

    10/18

  • 7/24/2019 d d c Site Unsafe Condition.

    11/18

  • 7/24/2019 d d c Site Unsafe Condition.

    12/18

    Da)aging pro"ided arricading hich is crating )an$ issues such as other

    people can easil$ enter the site hich ill lead the accident9 hich ill eect

    the reputation of the co)pan$ and co))ents / letters fro) Consultant and

    Client and loss of ti)e9 )aterial and )one$.

  • 7/24/2019 d d c Site Unsafe Condition.

    13/18

    ;as c$lender not stored properl$ and la$ don in are ground .%t should e placed in upright position in trolle$ ith chain loc#ing

    s$ste).

  • 7/24/2019 d d c Site Unsafe Condition.

    14/18

    DDC operati"es found ith out PP,9 'eoccuring issue .

  • 7/24/2019 d d c Site Unsafe Condition.

    15/18

  • 7/24/2019 d d c Site Unsafe Condition.

    16/18

    DDC PM found ith out PP,9 'eoccuring issue. 5, should e a role )odel for

    his operati"es. Displa$ing ad e

  • 7/24/2019 d d c Site Unsafe Condition.

    17/18

    &oil/ &and hich co)ing fro) &eparator after co)pletion of )icro

    tunneling or# need to e send designated area and also record to

    e )aintained

  • 7/24/2019 d d c Site Unsafe Condition.

    18/18

    !perati"es or#ing ithout induction9 'ecuuring issue.

    5ea"$ euip)ent itout papers and C;C &ac$r inspection stic#er.