Importance in NPD process
Identiy the ways in which a product can ail
Plan how to prevent those ailure
Denition
• Failure odes and !fects "nalysis (F!") is methodology or
analy#ing potential relia$ility pro$lems early in the development
cycle where it is easier to ta%e actions to overcome these
issues& there$y enhancing relia$ility through design'
• F!" is used to identiy potential ailure modes& determine
their efect on the operation o the product& and identiy actions
to mitigate the ailures'
• " crucial step is anticipating what might go wrong with a
product' hile anticipating every ailure mode is not possi$le&
the development team should ormulate as etensive a list o potential
ailure modes as possi$le'
• hen carryover design are used in new system or
environments
• For a design F!"& ater product unctions are dened&
$ut $eore the design is approved and released to manuacturing
• For the process F!"& when preliminary drawings o the
product are availa$le
DF!" timingDF!" timing
When FMEA is complete?
hen the design is released or production the F!" is considered to
$e complete'
Do DF!" once concepts are approved
Failure mode
*he manner in which part or process can ail to meet
specication
+sually associated with a deect or nonconormance
Cause
" deciency that results in ailure mode
,auses are sources o varia$ility associated with the %ey process
input varia$les
Efect
Impact on the customer i ailure mode is not prevented or
corrected
CauseCause FailureFailure
(FMEA)(FMEA) EffectEffect
hat is ailure& it-s cause and efect .hat is ailure& it-s
cause and efect .
!fects will lead to loss o customer condence
Cause 1Cause 1
Effect 1Effect 1
Effect 2Effect 2
Importance to understand relation $etween cause and efectImportance
to understand relation $etween cause and efect
0 cause can have 1 efects or2
1 cause can contri$ute or only one
*here are our steps to a ris% assessment or F!" session
(ollowing the preparation step)3
0) Identiy ris% items& 1) "naly#e 44 rate and prioriti#e
the items& 5) Plan 44 develop an a$atement plan or the highest
ris% items 6) Implement the plan and communicate progress with
all relevant
parties'
7teps or DF!"7teps or DF!"
Prepare F8D to show to the whole DF!" team so that they get
amiliari#e with the product or design
*a%e some prototype or similar parts or DF!" session
Include people rom purchase& 9uality& design and led
eperts or the session
Pro:ect leader should help in maturing o the idea'
Severity
<ow signicant is the impact o the efect to the customer
(internal or eternal)
Occurrence
<ow li%ely is the cause o the ailure mode to occur.
Detection
<ow li%ely will the current system detect the cause or ailure
mode i it occurs
RP
" numerical calculation o the relative ris% o a particular ailure
mode
=PN > 7ev ?cc Det
*his num$er is used to place priority on which items need
additional 9uality planning'
=PN num$er @ signicance=PN num$er @ signicance
<igher the =PN num$er higher the ris% o ailure
5
• Percentage of the failure to be addressed
eg !"#$ %"#$ &'# etc
%",1''' -1''' .%"'
/ence the RPN o be targeted 0ould be around 1'''%"'. 2"'
o An RPN *3er 2"' need to ha3e correcti3e action based on the
e3erit
and *ccurrence
• F!" is designed to assist the engineer improve the 9uality and
relia$ility o design'
• Increase customer satisaction
• !arly identication and elimination o potential
productAprocess ailure modes
• ,apture engineeringAorgani#ation %nowledge
• !mphasi#es pro$lem prevention
• Provide ocus or improved testing and development
• inimi#es late changes and associated cost
• ,atalyst or teamwor% and idea echange $etween
unctions
8enets o F!"8enets o F!"