DURABLE STRUCTURES LNEC Lisbon 31 May - 1June 2012 REFER Portuguese Railway Network Bridge Inspection and Maintenance Strategy Ana Isabel Silva DURABLE STRUCTURES LNEC Lisbon 31 May - 1June 2012 For Your LOGO The Portuguese Railway Infrastructure Company (REFER) has a long tradition in inspection, maintenance and rehabilitation of railway bridges in Portugal. This important aspect makes possible the use of bridges built 130 years ago. Eiffel Bridge, in Minho Line from 1878 Valença Bridge, in Minho Line from 1886 Marquês de Nisa Bridge, in North Line, from 1856 ICDS12 International Conference DURABLE STRUCTURES: from construction to rehabilitation LNEC • Lisbon • Portugal • 31 May - 1 June 2012

D2_3_AIsabel

Embed Size (px)

DESCRIPTION

fdfdf

Citation preview

  • DURABLE STRUCTURESLNEC Lisbon 31 May - 1June 2012

    REFER

    Portuguese Railway Network

    Bridge Inspection and Maintenance Strategy

    Ana Isabel Silva

    DURABLE STRUCTURESLNEC Lisbon 31 May - 1June 2012

    For YourLOGO

    The Portuguese Railway Infrastructure Company (REFER) has a long tradition ininspection, maintenance and rehabilitation of railway bridges in Portugal. Thisimportant aspect makes possible the use of bridges built 130 years ago.

    Eiffel Bridge, in Minho Line

    from 1878

    Valena Bridge, in Minho Line

    from 1886

    Marqus de Nisa Bridge, in

    North Line, from 1856

    ICDS12 International Conference DURABLE STRUCTURES: from construction to rehabilitation LNEC Lisbon Portugal 31 May - 1 June 2012

    LNEC

    ICD

    S12

  • DURABLE STRUCTURESLNEC Lisbon 31 May - 1June 2012

    For YourLOGO

    At a national level the REFER includes in the Area of Infrastructures aMaintenance Department responsible for the bridges maintenance management.The objectives defined for this organization are basically the following: To assure the safety of the structures, maintaining them at the level of

    capacity predicted in design; To assure that the railway traffic is done without restrictions and under the

    conditions of comfort and velocity predicted; To maintain the register of bridges updated, organising the information

    management in order to plan and optimise the interventions, minimising costsand interferences with the circulation.

    Objectives

    DURABLE STRUCTURESLNEC Lisbon 31 May - 1June 2012

    4

    ICDS12 International Conference DURABLE STRUCTURES: from construction to rehabilitation LNEC Lisbon Portugal 31 May - 1 June 2012

    LNEC

    ICD

    S12

  • DURABLE STRUCTURESLNEC Lisbon 31 May - 1June 2012

    For YourLOGO

    Evolution

    DURABLE STRUCTURESLNEC Lisbon 31 May - 1June 2012

    For YourLOGO

    Evolution

    Team maintenance in Maria Pia Bridge

    ICDS12 International Conference DURABLE STRUCTURES: from construction to rehabilitation LNEC Lisbon Portugal 31 May - 1 June 2012

    LNEC

    ICD

    S12

  • DURABLE STRUCTURESLNEC Lisbon 31 May - 1June 2012

    Inspection and Diagnosis

    DURABLE STRUCTURESLNEC Lisbon 31 May - 1June 2012

    For YourLOGO

    Inspection and Diagnosis

    ICDS12 International Conference DURABLE STRUCTURES: from construction to rehabilitation LNEC Lisbon Portugal 31 May - 1 June 2012

    LNEC

    ICD

    S12

  • DURABLE STRUCTURESLNEC Lisbon 31 May - 1June 2012

    Crack Measurement

    For YourLOGO

    Inspection and Diagnosis - Measurement/ Sampling

    Crack Measurement Crack Measurement

    Carbonation test using fenolfetalaine

    DURABLE STRUCTURESLNEC Lisbon 31 May - 1June 2012

    For YourLOGO

    Inspection and Diagnosis - Measurement/ Sampling

    Rebar detection Termography

    Liquid penetrant testRebound hammer

    ICDS12 International Conference DURABLE STRUCTURES: from construction to rehabilitation LNEC Lisbon Portugal 31 May - 1 June 2012

    LNEC

    ICD

    S12

  • DURABLE STRUCTURESLNEC Lisbon 31 May - 1June 2012

    For YourLOGO

    Inspection and Diagnosis

    Inspection Techniques Underwater Inspection

    DURABLE STRUCTURESLNEC Lisbon 31 May - 1June 2012

    For YourLOGO

    Inspection and Diagnosis

    Inspection Techniques -Batimetrics

    ICDS12 International Conference DURABLE STRUCTURES: from construction to rehabilitation LNEC Lisbon Portugal 31 May - 1 June 2012

    LNEC

    ICD

    S12

  • DURABLE STRUCTURESLNEC Lisbon 31 May - 1June 2012

    For YourLOGO

    Inspection and Diagnosis

    Underwater sonar images

    DURABLE STRUCTURESLNEC Lisbon 31 May - 1June 2012

    Maintenance

    ICDS12 International Conference DURABLE STRUCTURES: from construction to rehabilitation LNEC Lisbon Portugal 31 May - 1 June 2012

    LNEC

    ICD

    S12

  • DURABLE STRUCTURESLNEC Lisbon 31 May - 1June 2012

    Periodic Maintenance

    DURABLE STRUCTURESLNEC Lisbon 31 May - 1June 2012

    16

    Preventive Maintenance

    Anticorrosive protection of steel bridges

    ICDS12 International Conference DURABLE STRUCTURES: from construction to rehabilitation LNEC Lisbon Portugal 31 May - 1 June 2012

    LNEC

    ICD

    S12

  • DURABLE STRUCTURESLNEC Lisbon 31 May - 1June 2012

    For YourLOGO

    Preventive Maintenance

    DURABLE STRUCTURESLNEC Lisbon 31 May - 1June 2012

    18

    Corrective Maintenance

    ICDS12 International Conference DURABLE STRUCTURES: from construction to rehabilitation LNEC Lisbon Portugal 31 May - 1 June 2012

    LNEC

    ICD

    S12

  • DURABLE STRUCTURESLNEC Lisbon 31 May - 1June 2012

    Corrective Maintenance

    DURABLE STRUCTURESLNEC Lisbon 31 May - 1June 2012

    For YourLOGO

    Corrective Maintenance

    ICDS12 International Conference DURABLE STRUCTURES: from construction to rehabilitation LNEC Lisbon Portugal 31 May - 1 June 2012

    LNEC

    ICD

    S12

  • DURABLE STRUCTURESLNEC Lisbon 31 May - 1June 2012

    For YourLOGO

    Corrective Maintenance

    DURABLE STRUCTURESLNEC Lisbon 31 May - 1June 2012

    Corrective Maintenance

    ICDS12 International Conference DURABLE STRUCTURES: from construction to rehabilitation LNEC Lisbon Portugal 31 May - 1 June 2012

    LNEC

    ICD

    S12

  • DURABLE STRUCTURESLNEC Lisbon 31 May - 1June 2012

    For YourLOGO

    Replacement of side walk Barriers in disabled bridges

    DURABLE STRUCTURESLNEC Lisbon 31 May - 1June 2012

    24

    Replacement of steel bridges

    Improvement of bridges

    ICDS12 International Conference DURABLE STRUCTURES: from construction to rehabilitation LNEC Lisbon Portugal 31 May - 1 June 2012

    LNEC

    ICD

    S12

  • DURABLE STRUCTURESLNEC Lisbon 31 May - 1June 2012

    Rehabilitation of arch masonry bridges

    DURABLE STRUCTURESLNEC Lisbon 31 May - 1June 2012

    Strengthening of steel bridges

    ICDS12 International Conference DURABLE STRUCTURES: from construction to rehabilitation LNEC Lisbon Portugal 31 May - 1 June 2012

    LNEC

    ICD

    S12

  • DURABLE STRUCTURESLNEC Lisbon 31 May - 1June 2012

    For YourLOGO

    From our experience, the guarantee of an appropriate durability and structuralbehaviour cannot be only based in the maintenance actions done in service. Itshould always start at the design and/or construction phase, with the inclusion ofprocedures necessary to make the actions of inspection and maintenance easier.

    Finally, it is worth to say that however adequate and developed the maintenancestrategy is defined, it will always have as objective to maximise the safety levelsand minimise failure risks, even though it is not possible to eliminate themcompletely.

    Conclusions

    DURABLE STRUCTURESLNEC Lisbon 31 May - 1June 2012

    For YourLOGO

    Thank you for your attention!

    Ana Isabel Silva

    ICDS12 International Conference DURABLE STRUCTURES: from construction to rehabilitation LNEC Lisbon Portugal 31 May - 1 June 2012

    LNEC

    ICD

    S12