    1 15891 12151 174748

    2 0.99 0.99 0.99

    3 NA NA NA

    4 0 0 2606

    5 15891 12151 177354

    6 0 59 317

    7 90 90 90

    8 12444 12444 12769

    9 12444 12444 12444

    10 9536 9536 9861

    11 9536 9536 953612 0 0 690

    13 146 85 1662

    14 58 21 570

    15 0 0 17

    16 1 1 12

    HDPL DAILY REPOR

    Description

    CEB Maximum Demand in kva

    DG Power Consumption in kwh

    CEB Power Consumption in kwh

    CEB Power Factor

    Main Sump Water Level in %

    Diesel Stock Opening in Liters

    Total Power Consumption in kwh

    Water consumption in K Liters

    Diesel Stock in bulk tank Closing in LitersDiesel Consumption in Liters

    Diesel Stock Closing in Liters

    Diesel Stock in bulk tank Opening in Litters

    Cafeteria consumption in kwh

    Dialog tower

    Food Stall A (Elephant house) Consumption Kwh

    Food Stall B (Smile & Dine) Consumption Kwh

  • 7/31/2019 Daily Report as on 12th May 2012

    2/34

    Difference

    -3740

    0

    0

    0

    -121

    59

    0

    0

    0

    0

    00

    -61

    -37

    0

    0

    - 12 - 05 - 2012

    Remarks

    * Compare to last Saturday the compressor running hours has increased by 08 hours.Due to ambient temperature and the humidity conditions.

    Actual reading measured was 11199 L

    Actual reading measured is 8194L

    Actual reading measured is 11199 L

    Actual reading measured was 8194L

  • 7/31/2019 Daily Report as on 12th May 2012

    3/34

    Sl.No

    Yesterday

    (11/05/2012)

    Today

    (12/05/2012) MTD Difference

    1 11.5 14.4 156.4 2.9

    2 151.6 53.1 1203.7 -98.5

    3 41.3 31.1 510 -10.24 25 1.2 177.8 -23.8

    5 254.8 46 1789.2 -208.8

    6 23.3 10.6 165.8 -12.7

    7 0 0 35.4 0.0

    8 13.8 3.3 121.2 0.0

    9 0 0 9 3.3

    10 0 0 9.2 0.0

    11 0 0 5.3 0.0

    12 0 0 0 4.4

    13 0 0 0 0.0

    14 0 0 0 0.0

    15 0 0 0 0.016 0 2.2 3.5 2.2

    Garbage Details

    ription of Garbage / wastage

    Shredder

    Tissue

    News Paper

    Lunch Sheet

    IT wastage

    Plastic

    CupsCard Board

    Food

    Lunch Wrapping Paper

    OthersTimber

    Fused Bulbs

    Regiform

    Damaged Glass

    Damaged Plates

  • 7/31/2019 Daily Report as on 12th May 2012

    4/34

    Sl.No Description

    Yesterday

    (11/05/2012)

    Today

    (12/05/2012) Remarks

    1 SAUCERS 40 40

    2 PLATES 430 430

    3 DISHES 40 404 CUPS 31 31

    5 SOUP CUPS 49 49

    6 SMALL SPOONS 7 7

    7 SPOONS 29 29

    8 FORKS 38 38

    9 SIDE PLATES 43 43

    Crokkery

  • 7/31/2019 Daily Report as on 12th May 2012

    5/34

    1 CEB (KWHR) 12151.00 19.10 260003.45

    2 Diesel in ltrs 0 115.00 0.00

    3 Water in ltrs 59 70.00 4130.00

    264133.45

    Energy Consumption cost

    Total cost spent utility & water / day (LKR)

  • 7/31/2019 Daily Report as on 12th May 2012

    6/34

    System No.1

    System No.2

    System No.3

    System No.1

    System No.2

    System No.3

    System No.1

    System No.2

    System No.3

    Equipment HT Panels

    Status OK

    Equipment UPS

    Status Activated faulty

    Equipment Fire Alarm System

    Status

    Newly installed

    strobes disconnctedby DIMO

    Equipment Road blocker

    Status Ok

    Ambient Temp: C

    Status of Equipment Working Condition

    Sl.No Equipments Status

    1

    DG -1 (1250 KVA) OK

    DG-2 (1250 KVA) OK

    DG-3 (1250 KVA) OK

    OK

    OK2

    Chiller No-1

    OK

    OK

    Compressor out of order

    GI condenser beadings are corroded

    Chiller No-2

    Compressor # 01 under maintenance

    OK

    OKChiller No-3

    OK

    GI condenser beadings are corroded

    4Precision AHU & VRV

    OK3

    Transformer 1

    6BMS

    OK

    5

    Access control system

    OK

  • 7/31/2019 Daily Report as on 12th May 2012

    7/34

    Today

    (12/05/2012)MTD YTD

    0 3.9

    0 3.9

    0 0.2

    24 129

    24 134

    0 0

    0 0

    0 133

    0 124

    0 70

    6 118

    0 53

    MV Panels

    ETU of DG-1

    Incoming breaker

    to be serviced.

    But the breaker isfunctional.

    CCTV

    OK / Put it back to

    Sprinkler pumps

    OK

    Earth pits

    OK

    Total Run Hours

    OK

    Elevators

    OK

    Transformer 2

    Water systems

    OK

    Hydrant Pumps

    * Non-return valve of the main hydrant

    electrical & Diesel pump is leaking

    thus its shut down. But can be used inthe event of an emergency.

    * Couplin of jockey pump brocken

  • 7/31/2019 Daily Report as on 12th May 2012

    8/34

    SI NO.

    1 ELECTRICAL

    2 UPS Main

    3 UPS (Emergency Lighting)

    4 DG

    5 HVAC

    6 FIRE & SECURITY

    7 ELEVATORS

    8 PLUMBING

    9 CARPENTRY

    10 CONDITION OFTR, MEETING, CONFERENCE

    ROOMS

    11 HK ACTIVITIES

    12 STP

    13 OTHER

    * Regular 24 hours operation.* SP2/SP4/SP7/Ph meter/Flow meter /Oil ski

    * Monitored the system and updated the log s

    * Monitored the system and updated the log s

    E. Planned Preventive Maintenance Report

    * painted white coloure in 4F outsude if SMO

    White & Red coloure in GF around ATM door

    * DG - 1, DG - 2, DG - 3, are in auto mode.

    * Cleaned tables & bins in smoking area.

    * Cleaned smoking area, lift lobbies, stair cas

    ladies and gents toilets.

    * Changed TV channels as per the schedule.

    * Cleaned all the pantries at process areas .

    * Checked and cleaned MD/SMO/VIP/ Confer

    rooms.

    Vaccumed 2F,4F,MD,SMO,VIP,TR,Conferen

    * Repaired chaires at 3F & entrance guard ro

    Fixed back the wooden skirting at 1F NE side

    * Checked the condition and cleaned SMO, C

    * Checked and cleaned the training room # 0

    * Checked and cleaned the conference rooms

    Details of activities carried out

    * Elelctrical PPM in 2F LDB,PDB,SLP,SPP,E

    * Repalced 01no 14w lamp in BMS room.

    Replaced 01no 11w lamp in 4F near gents wa

    Replaced 01no 10w exit lamp in 2F lift lobby.

    Cable truncking fixing on GF. GF table nos ar

    * Kept 02 nos of elevators switched off.

    * Applied silicon for 3nos of wash basins in 5

    * Checked all doors in the building to ensure t

    access control system.

  • 7/31/2019 Daily Report as on 12th May 2012

    9/34

    Electrical

    DG

    HVAC

    Plumbing

    DATE EQUIPMENT NAME

    G. Remarks / Other activities

    * Vendor Sperrys bought the dish washer back and found that it was not working after givin

    connection to it. Informed the vendor and technician will come on Monday to check it.

    Vendor Synergy started the UPS power cable laying on 3F and 4F NE side Locker rooms.

    Vendor Fire X is in progress in wiring for the Inergen system from BMS room to main buildi

    Vendor Asoka glass fixed scafoldings for glass panel changing in 3F & 4F.

    Fish pond cleaned the fish tank and fish pond.

    Diversy conducted the training programe for the KH team.

    Electrical PPM in 2F SLP,SPP,PDB,LDB,ELDB

    BREAK DOWN DESCRIPTION

    Plumbing PPM in Dish wash,food outlets & kitchen

  • 7/31/2019 Daily Report as on 12th May 2012

    10/34

    mer /PLC are out of order.

    eets.

    eets.

    oom. *

    s, E-caf, game room,

    ence rooms and training

    *

    e rooms

    m. *

    near ladies wash room.

    M, VIP, 2F new office.

    1,02,03,04,05.

    at 1F,2F,3F,4F.

    DB's.

    *

    sh room. *

    *

    -65,100,102

    hand wash.

    he proper function of the

  • 7/31/2019 Daily Report as on 12th May 2012

    11/34

    power and water

    *

    ork is in progress. *

    g. *

    * Vendor

    * Vendor Johnson

    ACTION TAKEN

  • 7/31/2019 Daily Report as on 12th May 2012

    12/34

    DepartmentDescription of

    items

    Expenditure

    spent byLocation Remarks

    HSBC

    A/C

    F & S.

    CARPENTRY

    PAINTING

    GENERAL

    ELECTRICAL

    PLUMBING

  • 7/31/2019 Daily Report as on 12th May 2012

    13/34

    MAN

    SHIFTS Facility Manager Asst. Managers Technical Asst. Managers Soft Services

    DAY SHIFT Suranga

    NIGHT SHIFT Mohan

    GENERAL SHIFT Venkatesh Basenbech

    SHIFTS F&S supervisor BMS OPERATORS F&S

    DAY SHIFT Thushan Niranga

    NIGHT SHIFT Chulaka Hansaka

    GENERAL SHIFT

    SHIFTS HVAC Supervisor HVAC OPERATORS Data Entry Operators

    DAY SHIFT

    NIGHT SHIFT

    GENERAL SHIFT Joseph

  • 7/31/2019 Daily Report as on 12th May 2012

    14/34

    OWER DETAILS

    Shift Engineers ELECTRICIANS PLUMBERS PUMP MECHANIC CARPENTER

    Bandara Jayasundara / Nilantha Premadasa

    Amiyu Bandara / Nilanka Wasantha

    Anil

    HELP DESK

    OPERATORSHELPERS IT Boy IT Technician

    WarunaA. C. Pillai / Krishantha /

    Amila / Nishantha / AriSudarshan Eranga

    Waruna

    Gardener DG Operator HK SUPERVISORS JANITORS

    Anthoney Sunil Dulsha / Riyad 18

    Sunil Riyad 13

  • 7/31/2019 Daily Report as on 12th May 2012

    15/34

    PAINTER MASON

    Gunapala

  • 7/31/2019 Daily Report as on 12th May 2012

    16/34

    16898 Mr.Gayan 2353 3F

    ouse

    Painting

    F&S.

    Electrical

    Carpentry

    Plumbing

    A/C

    Mason

    Total Calls

    Ser. NoRequestor Details

    Name LocationExtn

  • 7/31/2019 Daily Report as on 12th May 2012

    17/34

    Nature of

    CallsHouse

    KeepingPainting

    F&S

    Electrical

    Carpentry

    Plumbing

    A/C

    Mason

    Total Calls

  • 7/31/2019 Daily Report as on 12th May 2012

    18/34

  • 7/31/2019 Daily Report as on 12th May 2012

    19/34

    No Complains

    Switch on the lights at desk # 190

    No Complains

    Complaints

    Closed

    0

    0

    0

    0

    0

    0

    0

    0

    0

    12th May 2012 Day Co

    12th May Night Requ

    12th May 2012 Night Co

    12th May Day Requ

    HELP DESRequest Details

    Description

    Category Wise Repor

    12th May 2

  • 7/31/2019 Daily Report as on 12th May 2012

    20/34

    Requests

    Closed

    0

    0

    0

    0

    0

    0

    0

    00

    House Keeping, 0,

    Painting, 0, 0%

    Electrical, 0, 0%

    Carpentry, 0, 0Plumbing, 0, 0%

    M

    F&S, 0, 0%

    Carpentry, 0, 0%Plumbing,

    A/C 0 0%

    Total C, 0, 0%

    Category Wise Repo

    12th May 2

  • 7/31/2019 Daily Report as on 12th May 2012

    21/34

    , ,

  • 7/31/2019 Daily Report as on 12th May 2012

    22/34

    Switched on by Mr.Nilantha E/L Mr.Waruna Mr.Nilantha

    Pending Total

    0 0

    0 0

    0 0

    0 0

    0 0

    0 0

    0 0

    0 0

    0 0

    plains

    ests

    mplains

    sts

    REPORT 12TH MAY 2012

    Remarks NAT Allocated toReceived by

    t (Complaints)

    012

  • 7/31/2019 Daily Report as on 12th May 2012

    23/34

    Pending Total

    0 0

    0 0

    0 0

    0 0

    0 0

    0 0

    0 0

    0 0

    0 0

    0%

    F&S., 0, 0%

    A/C, 0, 0%

    son, 0, 0%

    Electrical, 0, 0%0, 0%

    Mason, 0, 0%

    lls, 0, 0%

    rt (Request)

    12

  • 7/31/2019 Daily Report as on 12th May 2012

    24/34

  • 7/31/2019 Daily Report as on 12th May 2012

    25/34

    11:15 11:20 0:05

    Comp at

    Speed of Response

    Recd. At TAT

  • 7/31/2019 Daily Report as on 12th May 2012

    26/34

  • 7/31/2019 Daily Report as on 12th May 2012

    27/34

  • 7/31/2019 Daily Report as on 12th May 2012

    28/34

    9:00 12:00 16:00 19:00

    Pepsi Machine Ok Ok Ok OkMilo/Nescafe

    MachineOk Ok Ok Ok

    Water dispenser Ok Ok Ok Ok

    Tea Machine Ok Ok Ok Ok

    Nescafe Machine Ok Ok Ok Ok

    Water dispenser Ok Ok Ok Ok

    Coca Cola Machine Ok Ok Ok Ok

    o esca e Ok Ok Ok Ok

    Water dispenser Ok Ok Ok Ok

    o esca eOk Ok Ok Ok

    Water dispenser Ok Ok Ok Ok

    Coca Cola Machine Ok Ok Ok Ok

    Tea Machine Ok Ok Ok Ok

    Water dispenser Ok Ok Ok Ok

    Milo Machine Ok Ok Ok Ok

    Water dispenser Ok Ok Ok Ok

    Pepsi Machine Ok Ok Ok Ok

    Tea Machine Ok Ok Ok Ok

    Water dispenser Ok Ok Ok Ok

    Nescafe Machine Ok Ok Ok Ok

    Water dispenser Ok Ok Ok Ok

    Coca Cola Machine Ok Ok OK Ok

    Milo/Nescafe

    MachineOk Ok Ok Ok

    Third Floor - P1

    9

    First Floor - P2

    7

    Second Floor - P3

    8

    5

    Second Floor - P1

    6

    Second Floor - P2

    3

    First Floor - P1

    4

    1

    Ground Floor - P2 (Inside GPS)

    2

    Ground Floor-P3 (Near HR)

    Sl.No

    Vending Machines Condition

    PROCESSInspected time

    Ground Floor- P1 (Inside Process)

  • 7/31/2019 Daily Report as on 12th May 2012

    29/34

    Water dispenser Ok Ok Ok Ok

    Tea Machine Ok Ok Ok Ok

    Water dispenser Ok Ok Ok Ok

    Pepsi Machine

    Water dispenser Ok Ok Ok Ok

    Coca Cola Machine Ok Ok Ok Ok

    Water dispenser Ok Ok Ok Ok

    Pepsi Machine Ok Ok Ok Ok

    Tea Machine Ok Ok Ok Ok

    Water dispenser Ok Ok Ok Ok

    Milo/Nescafe

    MachineOk Ok Ok Ok

    Water dispenser Ok Ok Ok Ok

    Tea Machine Ok Ok Ok Ok

    Nescafe Machine Ok Ok Ok Ok

    Water dispenser Ok Ok Ok Ok

    11To be Fixed

    Fourth Floor - P1

    Third Floor - P2

    10

    Third Floor - P3

    14

    Fifth Floor

    15

    12

    Fourth Floor - P2

    13

    Fourth Floor - P3

  • 7/31/2019 Daily Report as on 12th May 2012

    30/34

    23:00 4:00

    Ok Ok

    Ok Ok

    Ok Ok

    Ok OK

    Ok Ok

    Ok Ok

    Ok Ok

    Ok Ok

    Ok Ok

    Ok Ok

    Ok Ok

    Ok Ok

    Ok Ok

    Ok Ok

    Ok Ok

    Ok Ok

    Ok Ok

    Ok Ok

    Ok Ok

    Ok Ok

    Ok Ok

    OK OK

    Ok Ok

    Remarks

  • 7/31/2019 Daily Report as on 12th May 2012

    31/34

    Ok Ok

    Ok Ok

    Ok Ok

    Ok Ok

    Ok Ok

    Ok Ok

    Ok Ok

    Ok Ok

    Ok Ok

    Ok Ok

    Ok Ok

    Ok Ok

    Ok Ok

    Ok Ok

  • 7/31/2019 Daily Report as on 12th May 2012

    32/34

    Locati 7:00 8:00 9:00 10:00 11:00 12:00 13:00

    1

    HR

    Corridor Ok Ok Ok Ok Ok Ok Ok

    2S/S side

    entranceOk Ok Ok Ok Ok Ok Ok

    3GPS

    sideOk Ok Ok Ok Ok Ok Ok

    4Receptio

    nOk Ok Ok Ok Ok Ok Ok

    5Guard

    roomOk Ok Ok Ok Ok Ok Ok

    6Loading

    bayOk Ok Ok Ok Ok Ok Ok

    7BMS

    entranceOk Ok Ok Ok Ok Ok Ok

    8G/W

    sideOk Ok Ok Ok Ok Ok Ok

    9IT

    entrnaceOk Ok Ok Ok Ok Ok Ok

    10G/W

    sideOk Ok Ok Ok Ok Ok Ok

    11L/W side

    entranceOk Ok Ok Ok Ok Ok Ok

    12G/W

    side Ok Ok Ok Ok Ok Ok Ok

    13L/W side

    entranceOk Ok Ok Ok Ok Ok Ok

    14

    side Ok Ok Ok Ok Ok Ok Ok

    15L/W side

    entranceOk Ok Ok Ok Ok Ok Ok

    Hand Sanitizers Condition

    Sl

    Third Floor

    Fourth Floor

    Inspected t

    Ground Floor

    First Floor

    Second Floor

  • 7/31/2019 Daily Report as on 12th May 2012

    33/34

    14:00 15:00 16:00 17:00 18:00 19:00

    Ok Ok Ok Ok Ok Ok

    Ok Ok Ok Ok Ok Ok

    Ok Ok Ok Ok Ok Ok

    Ok Ok Ok Ok Ok Ok

    Ok Ok Ok Ok Ok Ok

    Ok Ok Ok Ok Ok Ok

    Ok Ok Ok Ok Ok Ok

    Ok Ok Ok Ok Ok Ok

    Ok Ok Ok Ok Ok Ok

    Ok Ok Ok Ok Ok Ok

    Ok Ok Ok Ok Ok Ok

    Ok Ok Ok Ok Ok Ok

    Ok Ok Ok Ok Ok Ok

    Ok Ok Ok Ok Ok Ok

    Ok Ok Ok Ok Ok Ok

    ime

  • 7/31/2019 Daily Report as on 12th May 2012

    34/34

    Date

    Time D W Difference RH %

    2:00 28 25 3 78

    4:00 27 24.5 2.5 82

    6:00 29 24.5 4.5 82

    8:00 30.5 25 5.5 72

    10:00 31.5 25.5 6 67

    12:00 32 26 6 65

    14:00 31 26 5 62

    16:00 29.5 25.5 4 64

    18:00 29 25.5 3.5 73

    20:00 28.5 25 3.5 72

    22:00 28 25 3 76

    0:00 28 25 3 78

    Ambient Temperature & RH Readings