2
Lucy Burns | Phone: 214.270.0998 | [email protected] | billingsleyco.com Developed by FOR INFORMATION: DATA CENTER AND FIBER CAPABILITIES CREATING THE FUTURE PROOF DATA CENTER ENVIRONMENT The ideal data center site requires the ability to efficiently manage power and utility needs to maximize production and adapt for future technological and cooling advancements. Billingsley Company’s data center sites address all of these needs with a highly adaptable space that provides the ability to respond quickly and easily to client, organizational, and technological changes. FLEXIBLE, ADAPTIVE, SCALABLE AND EFFICIENT Available data center sites at Cypress Waters feature favorable site characteristics as well as local and state tax incentives. Cypress Waters was designed to accommodate your company’s data center needs: Dual-feed substation set up Up to 10 MW redundant power capacity Minimal distances to substations Restrictive acoustical and fuel storage requirements Adequate area utilities Low risk factors FIBER PROVIDERS Several fiber providers are present in the area: PRECISION ENVIRONMENT Your company’s need for a scalable and flexible data center relies heavily on choosing the right location. New technologies are adopted and implemented very quickly in the data center market, so facilities must be able to accommodate current systems while being flexible enough to protect the investment and remain reliable and competitive in an unknown future. Selecting the right location is the first and most critical step in the path to success for the future of your company’s data. AT&T Fiber AT&T Copper Verizon Above.net Zayo Metro Windstream Level 3 Fiber Light Time Warner SureWest CenturyLink Metro Belt Line Road Southwestern Blvd Hackberry Road ß DFW International Airport Belt Line Road Freeport Pkwy IH 635 IH 635

DATA CENTER AND FIBER CAPABILITIES - …billingsleyco.com/wp-content/uploads/2014/05/CW-Fiber...Lucy Burns | Phone: 214.270.0998 | [email protected] | billingsleyco.com Developed

  • Upload
    hadien

  • View
    226

  • Download
    7

Embed Size (px)

Citation preview

Page 1: DATA CENTER AND FIBER CAPABILITIES - …billingsleyco.com/wp-content/uploads/2014/05/CW-Fiber...Lucy Burns | Phone: 214.270.0998 | lburns@billingsleyco.com | billingsleyco.com Developed

Lucy Burns | Phone: 214.270.0998 | [email protected] | billingsleyco.com

Developed byFOR INFORMATION:

DATA CENTER AND FIBER CAPABILITIES

CREATING THE FUTURE PROOF DATA CENTER ENVIRONMENT The ideal data center site requires the ability to efficiently manage power and utility needs to maximize production and adapt for future technological and cooling advancements.

Billingsley Company’s data center sites address all of these needs with a highly adaptable space that provides the ability to respond quickly and easily to client, organizational, and technological changes.

FLEXIBLE, ADAPTIVE, SCALABLE AND EFFICIENTAvailable data center sites at Cypress Waters feature favorable site characteristics as well as local and state tax incentives. Cypress Waters was designed to accommodate your company’s data center needs:

•Dual-feed substation set up•Up to 10 MW redundant power capacity•Minimal distances to substations•Restrictive acoustical and fuel storage requirements•Adequate area utilities•Low risk factors

FIBER PROVIDERSSeveral fiber providers are present in the area:

PRECISION ENVIRONMENTYour company’s need for a scalable and flexible data center relies heavily on choosing the right location. New technologies are adopted and implemented very quickly in the data center market, so facilities must be able to accommodate current systems while being flexible enough to protect the investment and remain reliable and competitive in an unknown future. Selecting the right location is the first and most critical step in the path to success for the future of your company’s data. •AT&T Fiber

•AT&T Copper•Verizon•Above.net

•Zayo Metro•Windstream•Level 3•Fiber Light

•Time Warner•SureWest•CenturyLink Metro

Belt Line Road

Southwestern Blvd

Hackberry Road

ßDFW International

Airport

Belt Line Road

Free

port

Pkw

y

IH 635

IH 635

Page 2: DATA CENTER AND FIBER CAPABILITIES - …billingsleyco.com/wp-content/uploads/2014/05/CW-Fiber...Lucy Burns | Phone: 214.270.0998 | lburns@billingsleyco.com | billingsleyco.com Developed

Lucy Burns | Phone: 214.270.0998 | [email protected] | billingsleyco.com

Developed byFOR INFORMATION:

Above.net

Property BoundaryLEGEND

AT&T Fiber

Verizon

AT&T Copper

Fiber Light

Time Warner

CenturyLink Metro

Level 3 Metro

SureWest

Windstream

Zayo Metro

Substation

BELT

LIN

E RO

AD

BELT LINE ROAD

635

635

FIBER MAP