    eThekwini MUNICIPALITY

    BUDGET PRESENTATIONDCCI

    Cities that have a close relationship /

    partnership with business are winning cities

  • 7/30/2019 Dcci 2013-2014 Budget Presenttaion

    2/114

    INTRODUCTION

    Draft budget presented to DCCI on 20 March 2013

    Regional hearings and Big Mama workshop held

    Varying issues raised depending on the area some areas concerned

    about verge cutting and potholes whilst other areas are concerned

    about housing and basic services

    Crime and unemployment were also raised

    Informal traders

    Need to ensure that the social, economic and rehabilitative balance

    is in place

    Need to focus on ensuring that all have access to basic services and

    maximising job creation opportunities

    Empty pockets teaches you a million things in life. But full pockets spoils you in a millionways

  • 7/30/2019 Dcci 2013-2014 Budget Presenttaion

    3/114

    CONTEXT &

    CHALLENGES

  • 7/30/2019 Dcci 2013-2014 Budget Presenttaion

    4/114

    Good liquidity average cash holdings of R5 billion equating to about96 days cash on hand

    Highest collection rates in the country for the past two financial years(2010/2011 and 2011/2012). In current financial year 2012/2013 thecollection rate is 103.5% year to date up from 97.5% in 2011/2012

    Highest spend on Maintenance and Repairs in the country 11%

    Biggest capital budget in the country R5.432 billion

    Unqualified audit report

    Excellent credit rating best in municipal sector

    However, Municipality not cash rich just prudently and wellmanaged

    Excellent political support in implementing policies

    FINANCIAL POSITION

  • 7/30/2019 Dcci 2013-2014 Budget Presenttaion

    5/114

    Strict compliance with supply chain management policy, VFM &

    benchmarking given key focus Sustainability of housing provision from current financing

    sources

    Infrastructure and service delivery backlogs

    Bulk purchase costs:- Eskom 8% average increase

    - Umgeni Water 8% increase

    Minimal level of growth major costs to unblock development

    return on investments

    Impact of bringing Durban Transport back under the Citys

    control

    Unaccounted for water and theft of electricity

    THE CHALLENGES

  • 7/30/2019 Dcci 2013-2014 Budget Presenttaion

    6/114

    DEVELOPERS

    Want to pay minimal amount for bulk services

    Providing infrastructure without an informed spatialdevelopment framework

    Not prepared to guarantee an uptake

    Only 0.1% of total revenue derived from developmentcharges

    Not sustainable need development levy

    Serviced industrial land business must come up withthe business plan and demonstrate reasonable return on

    investment and take-up

    No enterprise can exist for itself alone. It ministers to some great need, it performs some

    great service, not for itself, but for others.. or failing therein, it ceases to be profitable andceases to exist. Calvin Coolidge

  • 7/30/2019 Dcci 2013-2014 Budget Presenttaion

    7/114

    ECONOMIC DEVELOPMENT REBATE

    Rating Policy targeted relief on big developments being

    considered

    Developments that fall within the Development node approved

    by Council may receive a rebate as approved by Council on

    application and will be limited to :

    - For a period of three years from date of development planapproved, for investments with a property market value,

    between R150 million to R300 million;

    - For a period of five years from the date the development plan

    is approved, for investments with a property market value,between R300 million to R1 billion, post development; and

    - The rebates above will be deferred to the next financial year

    and will be apportioned in accordance with the completion and

    transfer of units within the development in terms of the ratespolicy.

  • 7/30/2019 Dcci 2013-2014 Budget Presenttaion

    8/114

    SDF STRATEGIC INVESTMENT AREAS

    Port of Durban logistics infrastructure

    Illovo freight route, automotive supply park Back of Port economic, manufacturing & trading hub

    Dube Tradeport promotion of international trade - discussed

    later in more detail

    Cato Ridge industrial expansion and dry port

    South Durban Basin regenerating the industrial base

    creating cleaner, greener industries, improving QOL and

    stimulating new development

    Inner City iTRUMP - regeneration

    The first rule of any technology used in a business is

    that automation applied to an efficient operation will

    magnify the efficiency. The second is that automation

    applied to an inefficient operation will magnify theinefficiency. Bill Gates

  • 7/30/2019 Dcci 2013-2014 Budget Presenttaion

    9/114

    USE OF PUBLIC TRANSPORT

    How do we ensure maximum use?

    IRTPN success dependent on densification and effectivenodes being created

    Cannot sustain individuals traveling to work in own vehicles

    need a credible and reliable public transport system

    Never feel bad if people remember

    you only at the time of their need. Feel

    privileged that they think of you like a

    candle in the darkness of their life

  • 7/30/2019 Dcci 2013-2014 Budget Presenttaion

    10/114

    The system consists, inter-alia :

    Roads

    Road works

    Bridges

    Interchanges

    Intersections Associated buildings

    Terminal Stations

    Transfer Stations

    Depots

    Information and Communication

    Technology (ICT)

    Fare and revenue collection systems

    Control Centre

    IRPTN Infrastructure

    In business, Ive discovered that my

    purpose is to do my best to my utmost

    ability every day. Thats my standard. I

    learned early in my life that I had high

    standards. Donald Trump

  • 7/30/2019 Dcci 2013-2014 Budget Presenttaion

    11/114

    b e i n s p i r e d , b e m o v e d

    C O R R I D O R P H A S I N G

    2011/10/2411

    C1

    C9

    C3

    C6

    C6

    C7

    C7

    C5

    Umhlanga

    CBD

    Umlazi

    Mpumalanga

    Pinetown

    Chatsworth

    Rossburgh

    Tongaat

    Hillcrest

    Warwick

    Bridge City

    Airport

    Prospecton

    Merebank

    C8

    C8

    C4

    C2

    Phase 1

    Phase 2

    Phase 3

    Phase 4

    Phase 0: Durban Transport

    Phase 1: C1, C2, C3, C9

    Phase 2: C2, C5, C7

    Phase 3: C4, C8

    Phase 4: C6

    Employment

    Residential

    Mixed

    Park and Ride

    Transfer Station

  • 7/30/2019 Dcci 2013-2014 Budget Presenttaion

    12/114

    UNEMPLOYMENT 2011 census

    % EMPLOYED 79.6%

    % UNEMPLOYED 20.4%

    % FORMAL

    EMPLOYMENT

    76%

    % INFORMAL

    EMPLOYMENT

    24%

    This is based on the official, narrow definition of unemployment

    How are we going to turn this around?

    Job creation must be our priority

    Every formal business, SMME, budding entrepreneur needs to be

    nurtured

  • 7/30/2019 Dcci 2013-2014 Budget Presenttaion

    13/114

    BUSINESS: FORMAL VS INFORMAL

    Need to focus on assisting and facilitating

    Retention, attraction and growth of business - must be a key

    priority Creating zones for informal traders with good footfalls

    Reduce litter

    NO. OF FORMAL

    BUSINESSES

    21 148

    NO. OF INFORMAL

    BUSINESSES

    9 200

    10% of conflicts is due to difference in opinion and 90% is due to wrong tone of voice

  • 7/30/2019 Dcci 2013-2014 Budget Presenttaion

    14/114

    HOUSING

    NUMBER

    FORMAL HOUSING 524 582

    INFORMAL HOUSING

    (including rural)

    421 328

    At a rate of 10 000 houses per annum it will take 43 years to meetthis backlog

    This is subject to there being no further migration and growth

    What is the reality?

    How do we deal with the expectation and frustration?

  • 7/30/2019 Dcci 2013-2014 Budget Presenttaion

    15/114

    SERVICES BACKLOG

    SERVICE NO. OF

    HOUSEHOLDSHAVE SERVICE

    NO. OF

    HOUSEHOLDSWITHOUT

    SERVICE

    ELECTRICITY 651 682 294 228

    WATER 872 629 73 281

    REFUSE 945 910 0

    SANITATION 721 374 224 536

    This is being fast tracked with the interim services programme and a

    major dent in the backlog will be made over the next 5 years

  • 7/30/2019 Dcci 2013-2014 Budget Presenttaion

    16/114

    ACHIEVEMENTS TO DATE

  • 7/30/2019 Dcci 2013-2014 Budget Presenttaion

    17/114

    Refuse Removal

    Formal households 945 910

    100% coverage

    Street Cleaning Service

    All major roads are cleaned and litter picked

    Mechanical sweeping of all freeways and highways

    Develop and market solid waste products to commerce & industry

    Generated Income : R 190 million

    Waste Management Partnerships

    Co-Ops 12 (Handling of SKIPS)

    Community-based Contractors (SMMEs) 375 (R243m)

    Employment created through contractors in excess of 3,800 peopleemployed

    CLEANSING & SOLID WASTE

  • 7/30/2019 Dcci 2013-2014 Budget Presenttaion

    18/114

    WATER

    Pipelines 11500 km.

    945 910 Customers

    860 Mld of water purchased/purified

    474 Storage facilities.

    44 Pump Stations.

    5 Water Treatment Works.

    215 000 households have access via water

    dispensers/standpipes/ablution blocks

    1 287 Plant and Vehicle Fleet

    2 968 Staff Complement

    18

    Life is an echo. What you send out

    comes back. What you so you reap. What

    you give you get. What you see in others

    exists in you. Remember, life is an echo. It

    always gets back to you.

  • 7/30/2019 Dcci 2013-2014 Budget Presenttaion

    19/114

    SANITATION

    7 697 km WastewaterPipes.

    31 Wastewater Treatment

    Works

    300 Pump Stations. 362 Ablution Blocks.

    80 000 UDs installed

    560 000 kl/d effluent flows

    into the Works

    300 Plant and Vehicle Fleet

    In the business world, everyone is paid in two coins: cash and experience. Take the

    experience first; the cash will come later. Harold Geneen

  • 7/30/2019 Dcci 2013-2014 Budget Presenttaion

    20/114

    ENGINEERING

    6 252 km of surfaced roads

    1 456 km of gravel roads

    164 811 stormwater manholes & inlets

    4 571 km of river systems 210 km of culverts & canals

    3 494 km of pipework

    30 stormwater detention ponds

    16 major estuaries

    20

    When something bad happens you have three choices. You can either let it define you. Let it

    destroy you. Or you can let it strengthen you.

  • 7/30/2019 Dcci 2013-2014 Budget Presenttaion

    21/114

    ELECTRICITY

    Residential connections 655 338

    Business connections 44 702

    Total connections 700 040

    No. of FBE beneficiaries 82 546

    No of Street Lights 184 950

    No. of reticulation faults 283 097

    21

    Warren Buffet on earning: Never depend

    on a single income. Make investments to

    create a second source

  • 7/30/2019 Dcci 2013-2014 Budget Presenttaion

    22/114

    SAFETY AND SECURITY

    Number of Metro Police Stations 14

    Satellite Police Stations 11

    Number of metro police staff - 2615

    New Emergency Control Centre (Disaster Management, CCTV, VOC,

    JOC,)

    30 additional guards for the beachfront

    Warren Buffet on savings: Do not save what is left after spending, but spend what is left

    after saving.

    SCM IMPROVEMENTS

  • 7/30/2019 Dcci 2013-2014 Budget Presenttaion

    23/114

    SCM IMPROVEMENTS ISO 9001 accreditation - quality management system

    BPI2 (Business and Process Improvement Initiatives):

    - centralised contract register

    - procurement scheduling

    - contract tracking

    - supplier address book consolidation

    - invoice scanning and logging

    SCM Policy review

    E-Procurement Quotes Management System (QMS)

    Letters of award

    Improved internal controls reduce fraud and corruption

    SCM SPEND ANALYSIS

  • 7/30/2019 Dcci 2013-2014 Budget Presenttaion

    24/114

    SCM SPEND ANALYSIS

    LocationNumber of

    awards

    Local 1004

    Provincial 70

    National 116

    International 2

    Local

    84%

    Provincial

    6%

    National10%

    International

    0%

    % of awards per Location

    2011/2012 Financial Year

    SCM spend is local 84% spend on local businesses

    Will unpack remaining 16% for local businesses to identify

    opportunities and gear up to tender for same

    AUSTERITY MEASURES

  • 7/30/2019 Dcci 2013-2014 Budget Presenttaion

    25/114

    AUSTERITY MEASURES

    All budgets were cut to 7% or less. Overtime and Consultants costs have been drastically reduced.

    Utilisation of vehicles to be stringently monitored via the

    vehicle tracking system. Only essential trips to be made.

    All officials to continue to travel in economy class and all travel

    must be approved by the CMs office.

    No overnight stays for team building.

    Bench-marking of prices to be introduced through the Quote

    Management System.

    To be successful, you have to have your heart in your business, and your business in your

    heart. Thomas Watson, Sr.

  • 7/30/2019 Dcci 2013-2014 Budget Presenttaion

    26/114

    AUSTERITY MEASURES Productivity assessment and bench-marking of costs to be

    undertaken by Management Services.

    Security costs to be reviewed.

    Alarm systems to be installed at low risk sites replacing security

    guards.

    Zero tolerance with regard to theft of electricity and water and

    non-payment of accounts.

    Electricity and Water losses to be actively managed.

    Warren Buffet on investment: Do not put all eggs in one basket.

    INTEGRATED MANAGEMENT

  • 7/30/2019 Dcci 2013-2014 Budget Presenttaion

    27/114

    INTEGRATED MANAGEMENT

    An integrated approach regarding maintenance and service in an

    area

    Priority zones commenced with strategic nodes - successful need

    to extend to other areas of beachfront and CBD

    ABMs being rolled out to further support this 13/14

    War rooms in each ward

    Dedicated officials to co-ordinate each area

    I have found no greater satisfaction than achieving success

    through honest dealing and strict adherence to the view that, for

    you to gain, those you deal with should gain as well. Alan

    Greenspan

    iTRUMP

  • 7/30/2019 Dcci 2013-2014 Budget Presenttaion

    28/114

    iTRUMP

    Eradication of bad / dilapidated buildings

    Better buildings programme Clean up operations

    Operational projects

    Look at a stone cutter

    hammering away at his rock,

    perhaps a hundred times without

    as much as a crack showing in

    it. Yet at the hundred-and-firstblow it will split in two, and I

    know it was not the last blow that

    did it, but all that had gone

    before. ~ Jacob A. Riis

  • 7/30/2019 Dcci 2013-2014 Budget Presenttaion

    29/114

    THE 2013/2014 BUDGET

  • 7/30/2019 Dcci 2013-2014 Budget Presenttaion

    30/114

    BROAD BUDGETING PRINCIPLES

    AND GUIDELINES

    BROAD PRINCIPLES

  • 7/30/2019 Dcci 2013-2014 Budget Presenttaion

    31/114

    BROAD PRINCIPLES

    Budget to contribute to achieving strategic objectives of the IDP.

    Sustainable, Affordable , Realistic and Balanced

    Major Tariffs - cost reflective, realistic and affordable tariffs

    Income/Revenue driven budgets affordability ie if funds do not materialise

    review expenditure

    Realistic and achievable collection rates

    Project planning at least 6 months prior to commencement of financial

    year to achieve 100% CAPEX spend

    Loans to be sustainable and affordable and utilised for capital projects only

    Need to ensure rates base growth to ensure sustainability of free basic services

    Balancing capital expenditure for social, economic, rehabilitation and support

    (including fleet and IT)

    GUIDELINES FOR BUDGETING

  • 7/30/2019 Dcci 2013-2014 Budget Presenttaion

    32/114

    GUIDELINES FOR BUDGETING

    CONSUMER PRICE INDEX Current

    DEBT SERVICE COSTS

    GROWTH IN RATES BASE (NEW DEV.)

    SALARY INCREASE

    DEBT COLLECTION RATE - BUDGET

    DEPRECIATION BASED ON USEFUL LIVES OF ASSET

    5.6%

    < 10%

    1% pa

    6.85%

    95%

    The new source of power is not money in the hands

    of a few, but information in the hands of many.

    John Naisbitt

    TOTAL BUDGET

  • 7/30/2019 Dcci 2013-2014 Budget Presenttaion

    33/114

    TOTAL BUDGET

    2013/14 2012/13

    Total Budget - Operating R 28 389.1m R 26 183.5m

    Capital R 5 432.1m R 5 285.2m

    R 33 821.2m R 31 468.7m

    Lets be honest. Theres not a business anywhere that is without problems. Business is

    complicated and imperfect. Every business everywhere is staffed with imperfect human beings

    and exists by providing a product or service to other imperfect human beings. Bob Parsons

    TARIFF INCREASES

  • 7/30/2019 Dcci 2013-2014 Budget Presenttaion

    34/114

    TARIFF INCREASES

    Need to be cost reflective

    Impact of cross subsidisation

    Elasticity

    Affordability

    CPI related

    THE GOOD NEWS: Electricity tariff reduced from 8% by

    a further 2% for business to 6% and 3.9% for indigent

    and general residential to 4.9%

    We use Pencil when we were small but now we use pens Do you know why?? Bcoz mistakes

    in Childhood can be erased. But not now

    COMPARATIVE TARIFF INCREASES

  • 7/30/2019 Dcci 2013-2014 Budget Presenttaion

    35/114

    COMPARATIVE TARIFF INCREASES2013/14 2012/13 2011/12 2010/11 2009/10 2008/09

    Electricity 8% 11% 19.8% 25% 30% 27.25%

    Water:

    Domestic

    Business

    9.5%

    12.5%

    12.5%

    15.5%

    7.5%

    12.5%

    9.5%

    12.5%

    9.9%

    12%

    9.9%

    Refuse

    Removal

    6.9% 7% 6.5% 7.5% NEW

    Sanitation 6.9% 6.5% 6.5% NEW

    Rates:

    Residential

    Business

    6.9% 6.5% 6.5% 7.9% 5.6%

    11.9%

    9.9%

  • 7/30/2019 Dcci 2013-2014 Budget Presenttaion

    36/114

    COMPARISON OF HOUSEHOLD BILLS - NATIONAL TREASURY

    Measure Johannesburg Cape Town eThekwini Ekurhuleni Tshwane

    Nelson

    Mandela Bay Buffalo City Mangaung

    AVERAGE HOUSEHOLD BILLS

    Property rates 162.58 151.55 289.43 173.47 330.06 176.73 298.84 82.34

    Electricity: Basic levy 322.39 0.00 0 0 0 0 0 0

    Electricity: Consumption 448.1 590.3 520.09 453.72 574.36 504.84 464.50 574.45

    Water: Basic levy 0 0 0 0 0 23.66 0 0

    Water: Consumption 201.34 205.44 265.02 176.8 232.24 186.46 257.82 248.37

    Sanitation 98.7 147.98 55.85 85.28 117.67 133.09 173.68 71.76

    Refuse removal 96.78 85.21 49.01 82.77 42.37 61.04 40.00 122.15

    Other 0 0 0 0 0 0 0.00 28.06

    Total Monthly Bill 1329.89 1180.48 1179.4 972.04 1296.7 1085.82 1234.84 1127.13

  • 7/30/2019 Dcci 2013-2014 Budget Presenttaion

    37/114

    OPERATING BUDGET

    TOTAL OPERATING BUDGET

  • 7/30/2019 Dcci 2013-2014 Budget Presenttaion

    38/114

    DETAILS

    ESTIMATE

    2013/14

    R'000

    APPROX

    2012/13

    R'000

    ESTIMATE

    2012/13

    R'000

    EST - EST

    VARIANCE %

    SALARIES AND ALLOWANCES 7,035,897 6,103,231 6,350,359 10.80

    GENERAL EXPENSES 20,554,540 18,961,539 19,558,843 5.09

    REPAIRS AND MAINTENANCE 2,906,845 2,602,380 2,489,702 16.75

    CONTRIBUTIONS 3,960,723 3,542,993 3,356,241 18.01

    TOTAL EXPENDITURE 34,458,004 31,210,143 31,755,144 8.51

    RECOVERIES & CHARGE OUTS (2,611,616) (2,252,055) (2,220,072) 17.64

    NET EXPENDITURE 31,846,388 28,958,088 29,535,072 7.83

    INCOME (31,846,388) (28,958,088) (29,535,072) 7.83

    SURPLUS/DEFICIT (0) (0) (0)

    TOTAL OPERATING BUDGET

    MAJOR EXPENDITURE ITEMS

  • 7/30/2019 Dcci 2013-2014 Budget Presenttaion

    39/114

    MAJOR EXPENDITURE ITEMS2013/2014

    ESTIMATES

    2013/14

    %

    R000 R000 R000 R000 R000

    4,540,518 4,822,931 6,487,630 6,350,359

    5,495,517 6,666,970 7,839,667

    2,193,111 1,793,026 1,804,496 2,489,702

    1,428,598 1,455,464 1,777,563

    687,345 855,249 1,152,295

    SUB TOTAL 12,825,621 14,227,417 17,269,809 19,609,586 21,175,723 83.8

    DETAILS ACTUAL

    2009/2010

    ACTUAL

    2010/2011

    ACTUAL

    2011/2012

    2012/2013

    ESTIMATE

    SALARIES AND

    ALLOWANCES

    1,799,457 7.1

    7,035,897 27.8

    BULK PURCHASES 4,531,944 8,380,735 33.2

    INTEREST ON

    LOANS 480,942 1,052,789 4.2

    OFTOTAL

    OPEX

    REPAIRS AND

    MAINTENANCE 2,906,845 11.5

    DEPRECIATION 1,079,106

    CONSOLIDATED BUDGET: Rate & General

  • 7/30/2019 Dcci 2013-2014 Budget Presenttaion

    40/114

    40

    CONSOLIDATED BUDGET: Rate & General

    DETAILS

    ESTIMATE

    2013/14R'000

    APPROX

    2012/13R'000

    ESTIMATE

    2012/13R'000

    EST - EST

    VARIANCE %

    SALARIES AND ALLOWANCES 5,467,750 4,807,710 4,978,490 9.83

    GENERAL EXPENSES 8,841,671 8,151,620 8,099,408 9.16REPAIRS AND MAINTENANCE 1,233,196 1,309,901 1,234,158 -0.08

    CONTRIBUTIONS 2,622,980 2,239,614 2,262,699 15.92

    TOTAL EXPENDITURE 18,165,597 16,508,845 16,574,756 9.60

    RECOVERIES (927,789) (870,365) (871,611) 6.45

    CHARGE OUTS (895,215) (629,141) (651,125) 37.49

    NET EXPENDITURE 16,342,592 15,009,339 15,052,020 8.57

    INCOME (16,342,592) (15,009,339) (15,052,020) 8.57

    RATE AND GENERAL (CONTD)

  • 7/30/2019 Dcci 2013-2014 Budget Presenttaion

    41/114

    41

    Total Rates and General Budget increased by R1.3bn (8.57%) to R16.3bn

    The Rates and General budget per cluster as follows :

    Office of the City Manager

    Budget increased by R76.8m(6.2%) to R 1.2bn

    Treasury

    Budget increased by R6.2m(0.2%) to R3.5bn

    Community and Emergency Services Budget increased by R189.7m(7.9%) to R2.6bn

    Corporate Human Resources

    Budget increased by R31.5m(10.8%) to R402.4m.

    Sustainable Development and Planning

    Budget increased by R50.4m(6.8%) to R793.3m .

    Human Settlements and Infrastructure

    Budget increased by R885.7m(13.7%) to R7.3bn

    Governance

    Budget increased by R50m(13.4%) to R424.4m

    RATE AND GENERAL (CONTD)

    RATE AND GENERAL (CONTD)

  • 7/30/2019 Dcci 2013-2014 Budget Presenttaion

    42/114

    42

    SALARIES & ALLOWANCES

    Increase of 9.83% due to national negotiated salary increase of 6.85% as

    well as provision being made for conversion of temporary staff to

    permanent , filling of vacancies and annual notch increments.

    GENRAL EXPENSES

    Some of the major items contributing to the increase are fuel costs,

    electricity costs, water costs and inflationary increases on other itemsREPAIRS & MAINTENANCE

    Decreased by 0.08% mainly due a decrease of R21.6m in the priority zone

    areas as much of the planned work was done in the current year

    INCOME

    Income increased mainly as a result of the rates increase of 6.9% a, increasesin the minor tariffs and fees and increases in grant income which is offset by

    decrease in Equitable Share of R 30.1m and Fuel Levy of R4.2m

    RATE AND GENERAL (CONTD)

    Definition of a birthday: The only day in your life your mother smiled when you cried.

    WATER SERVICES

  • 7/30/2019 Dcci 2013-2014 Budget Presenttaion

    43/114

    WATER SERVICES

    DETAILS

    2013/2014

    ESTIMATE

    R000

    2012/2013

    APPROX

    R000

    2012/2013

    ESTIMATE

    R000

    EST-EST VARIANCE

    %SALARIES &

    ALLOWANCES 577,217 457,226 477,651 20,8

    GEN EXPENSES 3,374,619 3,109,696 3,566,810 -5.4

    REPAIRS &

    MAINTENANCE 498,133 473,847 432,562 15,2

    CONTRIBUTIONS 286,118 277,936 264,846 8.0

    TOTAL EXPENDITURE 4,736,087 4,318,705 4,741,869 -0.1

    RECOVERIES &CHARGE OUT

    -430,784-134,603

    -406,993-119,865

    -385,293-117,795

    11,814,3

    NET EXPENDITURE 4,170,700 3,791,847 4,238,781 -1,6

    INCOME -4,170,700 -3,791,847 -4,238,781 -1,6

    DEPARTMENT TOTAL 0 0 0 43

    WATER SERVICES

  • 7/30/2019 Dcci 2013-2014 Budget Presenttaion

    44/114

    44

    WATER SERVICES

    (Major variances and major additional items and highlights)

    Expenditure decreased by R68,1m from R4,24bn to R4,17bn

    Bulk Water Purchasesbudget increased by R116,8m from R1.3billion to R1,5billion

    (8% tariff increase by Umgeni Water and 34,5% Water Loss)

    Repairs & Maintenance-budget increased by R65,6m from R432,6m to R498,1m(increased repairs to Infrastructure with expanded area of supply)

    Salaries & Allowances-budget increased by R99,6m from R477,6m to R577,2m

    (6,95% salary increase, conversion of temporary to permanent staff and provision fortop level restructure).

    Electricity Costsbudget increased by R6,2m from R49,1m to R55,3m

    (Includes 8% tariff increase for Eskom charges)

    Income Foregone budget decreased by R320,8m from R902,8m to R582,0m so as toaccurately reflect the cost of free basic services . Equivalent decease made in Income as

    well Contributions to Capital (USDG Grant) budget increased by R11.7 from R235,0 to

    R246.7m

    Its through curiosity and looking at opportunities in new

    ways that weve always mapped our path at Dell. Theres

    always an opportunity to make a difference. Michael Dell

    WATER SERVICES delivery

  • 7/30/2019 Dcci 2013-2014 Budget Presenttaion

    45/114

    WATER SERVICES delivery

    8600 new connections provided for

    Reduce water loss (from 35,5% to 34,5%) through zonal meters,

    combating illegal connections.

    Increasing capacity - Western Aqueduct R 244m and Northern

    Aqueduct R190m

    Capital budget R2.5bn over 3 years

    Targeted tariff increase: Domestic - 9,5%

    Business -12,5%

    Belief in the possibility of change and renewal is perhaps one of the

    defining characteristics of politics and religion. Nelson Mandela

    SANITATION SERVICES

  • 7/30/2019 Dcci 2013-2014 Budget Presenttaion

    46/114

    SANITATION SERVICES

    DETAILS

    2013/2014

    ESTIMATE

    R000

    2012/2013

    APPROX

    R000

    2012/2013

    ESTIMATE

    R000

    EST-EST VARIANCE

    %SALARIES &

    ALLOWANCES 305,294 260,072 261,528 16.73

    GEN EXPENSES 811,573 762,419 785,518 3.30

    REPAIRS &

    MAINTENANCE 269,275 259,474 254,834 5.67

    CONTRIBUTIONS 510,145 488,555 160,970 216.92

    TOTAL EXPENDITURE 1,896,287 1,770,520 1,462,850 29.63

    RECOVERIES &CHARGE OUT -149,113 -139,534 -139,534 6.87

    NET EXPENDITURE 1,747,174 1,630,986 1,323,316 32.03

    INCOME -1,747,174 -1,661,876 -1,323,316 32.03

    DEPARTMENT TOTAL 0 -30,890 0 46

    SANITATION SERVICES

  • 7/30/2019 Dcci 2013-2014 Budget Presenttaion

    47/114

    SANITATION SERVICES

    (Major variances and major additional items and highlights)

    SANITATION

    Expenditure increased by R423,9m from R1.3bn to R1,7bn

    Temporary Staff budget increased by R14,7m from R3,5m to R18,2m(increased no. of caretakers for ablutions)

    Consumables budget increased by R4,3m from R8,8m to R 13,1m (increasednumber of ablution facilities)

    Water - budget increased by R12,2m from R17,4m to R29,6m (increasedablution facilities)

    Contributions to Capital (USDG Grant) budget increased by R357,3m fromR222,7m to R 580,0m

    Provision for 5 year VIP pit latrine clearance (R46.5m)

    47

    The most serious mistakes are not being made as a result of wrong answers. The truly

    dangerous thing is asking the wrong question. Peter Drucker

    SANITATION delivery

  • 7/30/2019 Dcci 2013-2014 Budget Presenttaion

    48/114

    SANITATION delivery

    Expand waste water treatment at Northern , KwaMashu and Toti

    Works Desludging of 35 000 VIP pit latrines

    250 additional ablution facilities for informal settlements per year

    Capital Budget R2,2bn over a three year period

    Expanding services to rural areas , informal settlements and transit

    camps

    Zero based tariffs for households with property values less than or

    equal to R 250 000

    Cash hand outs might sustain you for a few

    months, at the end of which your problems

    remain. Nelson Mandela

    SANITATION

  • 7/30/2019 Dcci 2013-2014 Budget Presenttaion

    49/114

    SANITATION

    DETAILS

    2013/2014

    ESTIMATE

    R000

    2012/2013

    APPROX

    R000

    2012/2013

    ESTIMATE

    R000

    EST-EST

    VARIANCE

    %SALARIES &

    ALLOWANCES 305,294 260,072 261,528 17

    GEN EXPENSES 811,573 762,419 785,518 3

    REPAIRS &

    MAINTENANCE 269,275 259,474 254,834 6

    CONTRIBUTIONS 510,145 519,445 160,970 217

    TOTAL EXPENDITURE 1,896,287 1,801,410 1,462,850 30

    RECOVERIES &CHARGE OUT -149,113 -139,533 -139,534 7

    NET EXPENDITURE 1,747,174 1,661,877 1,323,316 32

    INCOME -1,747,174 -1,661,877 -1,323,316 32

    DEPARTMENT TOTAL 0 0 0 49

    CLEANSING & SOLID WASTE

  • 7/30/2019 Dcci 2013-2014 Budget Presenttaion

    50/114

    CLEANSING & SOLID WASTE(Major variances and major additional items and highlights)

    MAJOR ADDITIONAL ITEMS

    Expenditure increased by R258.4m from R1.27bn to R1.53bn

    Electron Road transfer station at a cost of R120m will be operational inSeptember 2013 due to the partial closure of Bisasar Road Landfill. Provision ofadditional staff and operating costs of R7.9m

    Contributions to Capital (USDG Grant) budget increased by R127.3m to R136.0m

    Increased Community Based Contractors (R3,0m) to service expanded and new

    areas

    50

    I wasnt satisfied just to earn a good living. I was looking to

    make a statement. Donald Trump

    CLEANSING AND SOLID WASTE deli er

  • 7/30/2019 Dcci 2013-2014 Budget Presenttaion

    51/114

    CLEANSING AND SOLID WASTE delivery

    Extend refuse removal to 100% coverage

    Gradual closure of the Bisasar Road Landfill site and the

    commissioning of the Electron Road Transfer Station by September

    2013.

    Expand recycling (cans, glass) and waste minimisation projects.

    Proposed tariff increase of 6,9%

    3 year capital budget of R288m

    Zero based tariffs for households with property values less than or

    equal to R 250 000

    A child asked God: If everything is already written in

    our destiny, then why pray? God smiled and said: May

    be in a few places I have written As u wish.

    ELECTRICITY SERVICES

  • 7/30/2019 Dcci 2013-2014 Budget Presenttaion

    52/114

    ELECTRICITY SERVICES

    DETAILS

    2013/2014

    ESTIMATE

    R000

    2012/2013

    APPROX

    R000

    2012/2013

    ESTIMATE

    R000

    EST-EST VARIANCE

    %SALARIES &

    ALLOWANCES 943,056 798,219 849,886 11

    GEN EXPENSES 8,222,588 7,582,056 7,778,779 6

    REPAIRS &

    MAINTENANCE 809,977 743,600 748,646 8

    CONTRIBUTIONS 1,047,462 1,016,560 825,027 27

    TOTAL EXPENDITURE 11,023,083 10,140,435 10,202,338 8

    RECOVERIES &

    CHARGE OUT -223,224 -225,691 -194,247 15

    NET EXPENDITURE 10,799,859 9,914,744 10,008,091 8

    INCOME -10,799,859 -9,914,744 -10,008,091 8

    DEPARTMENT TOTAL 0 0 0 0

    ELECTRICITY SERVICES

  • 7/30/2019 Dcci 2013-2014 Budget Presenttaion

    53/114

    ELECTRICITY SERVICESSALARIES & ALLOWANCES

    Besides the salary increase of 6.85%, provision has been made to fill 498 vacant posts. There

    is a dire shortage of critical staff.GEN EXPENSES

    The primary reason for the increase is the bulk purchase of electricity from Eskom which has

    increased by 8% for 2013/2014 this is partially offset by a reduction in consumption.

    REPAIRS & MAINTENANCE

    As a result of increases in the number of faults due to the ageing infrastructure,

    maintenance expenditure on the electrical network has increased. Theft and vandalism are

    also major contributors.

    CONTRIBUTIONS

    The increase is due to contributions to the Capital Replacement Reserve resulting from the

    restatement of the Contingency provision for a decrease in Consumption previously

    reflected as a debit against Sales. RECOVERIES

    Recoveries have increased due to an increase in the no. of technical staff being employed

    who contribute to the increased hours that are now being recovered.

    INCOME

    Income has increased as a result of the electricity sales tariff increase of 8%. This is

    necessary to balance the Electricity budget.

    ELECTRICITY SERVICES delivery

  • 7/30/2019 Dcci 2013-2014 Budget Presenttaion

    54/114

    ELECTRICITY SERVICES delivery Proposed tariff increase 8% - is being reviewed

    ESKOM increase of 8% - to be reduced

    Final tariff increase depends on NERSAs approval

    Electricity loss in distribution at 5.8% - lowest in the country and below

    International norms

    Theft of Electricity and Electricity infrastructure continues to be a challenge

    Free Basic Electricity allocation for poor residents is 65 KwH for those

    consuming less than 150KwH

    Maintenance budget increase from R748.6 to R809.7m

    No of Electricity customers 700 040

    10 000 new customers each year on average Capital budget of 1.97 bn over the next 3 years.

    Statistics suggest that when customers complain, business

    owners and managers ought to get excited about it. The

    complaining customer represents a huge opportunity for more

    business. Zig Ziglar

    CCTV - CAMERAS

  • 7/30/2019 Dcci 2013-2014 Budget Presenttaion

    55/114

    CCTV CAMERAS262 Existing Sites

    Proposed new sites from 2013/14 to 2015/16 Financial Years.

    Umbogintwini

    Galleria and Arbor Town King Shaka International Airport and Dube Trade Port.

    National Route Interchange [N2/N3]

    Mpumalanga / Cato Ridge is being considered.

    Links into the Kingspark Rugby Stadium VOC

    Interface with the SANRAL camera network.

    Chatsworth Shopping and Sports precinct.

    National Key Points

    SABC

    Reserve Bank

    Major Electricity Substations

    Umgeni Heights Reservoir

    Proposed 3 year Budget

    2013/14: R34.2m

    2014/15: R34.8m

    2015/16: R23.9m

    Business is a game, played for fantastic stakes,

    and you're in competition with experts. If you

    want to win, you have to learn to be a master of

    the game.

    Sidney Sheldon, Master of the Game

    ETHEKWINI TRANSPORT AUTHORITY

    http://www.goodreads.com/author/show/9068.Sidney_Sheldonhttp://www.goodreads.com/work/quotes/1686217http://www.goodreads.com/work/quotes/1686217http://www.goodreads.com/author/show/9068.Sidney_Sheldonhttp://en.wikipedia.org/wiki/File:Moses_Mabhida_Durban_Stadium.jpg
  • 7/30/2019 Dcci 2013-2014 Budget Presenttaion

    56/114

    ETHEKWINI TRANSPORT AUTHORITY

    Expenditure increased by R220,9m to R1,1 bn.

    PUBLIC TRANSPORT

    Expenditure increased by R253,1m to R473,7m

    People Mover budget increased by R3,5m to R30,0m

    Durban Transport Bus Service (Subsidy) budget increased by R10,8m

    toR152,8m Transport for the Disabledbudget increased by R 3,6m to R10,0m

    INTEGRATED RAPID PUBLIC TRANSPORT NETWORK (IRPTN)

    New department responsible for planning and implementation of Rapid PublicTransport projects.

    IRPTN Planning R50,9m

    Consultants fees for development and management of IRPTN projectsR6,0m

    Brand Advertising R5,0m

    ETHEKWINI TRANSPORT AUTHORITY

  • 7/30/2019 Dcci 2013-2014 Budget Presenttaion

    57/114

    ETHEKWINI TRANSPORT AUTHORITY(CONT)

    ROAD SYSTEM MANAGEMENT

    Expenditure increased by R0,822m to R83,18m

    Traffic lines and signsbudget increased by R0,388m to R8,1m

    Traffic signals budget increased by R0,473 to R8,3m

    Maintenance of traffic signals ,road markings, traffic signage, traffic areas

    and related control systems.

    57

    The organizational architecture is really that a

    centipede walks on hundred legs and one ortwo dont count. So if I lose one or two legs,

    the process will go on, the organization will go

    on, the growth will go on. - Mukesh Ambani

    http://www.woopidoo.com/business_quotes/authors/mukesh-ambani-quotes.htmhttp://www.woopidoo.com/business_quotes/authors/mukesh-ambani-quotes.htmhttp://www.woopidoo.com/business_quotes/authors/mukesh-ambani-quotes.htmhttp://www.woopidoo.com/business_quotes/authors/mukesh-ambani-quotes.htm
  • 7/30/2019 Dcci 2013-2014 Budget Presenttaion

    58/114

    58

    SECTORS

    JOB CREATION AND SKILLS DEVELOPMENT

  • 7/30/2019 Dcci 2013-2014 Budget Presenttaion

    59/114

    JOB CREATION AND SKILLS DEVELOPMENT

    Use of approximately 600 plumbing contractors on a rotational basis toundertake water related services

    370 caretakers employed at Ablution Facilities with a further 250 to beemployed within the next 6 months as further Ablution Facilities arecompleted

    Use of 372 Community Based Contractors utilising about 3770 people forRefuse Removal services

    20 trainee engineers employed under the mentorship programme

    EPWP Grant (R47.4m), Maximum payable is R100 per day of which R50 issubsidised by National Treasury

    Zibambele Poverty Alleviation (R75m) 6600 jobs created.

    Work place Skills Plan(WSP)

    600 Community Based Contractors utilised in the roll out of rural waterand sanitation projects

    In the past a leader was a boss. Todays leaders must be partners with their people.. they no

    longer can lead solely based on positional power. - Ken Blanchard

    ECONOMIC DEVELOPMENT

    http://www.woopidoo.com/business_quotes/authors/ken-blanchard-quotes.htmhttp://www.woopidoo.com/business_quotes/authors/ken-blanchard-quotes.htmhttp://www.woopidoo.com/business_quotes/authors/ken-blanchard-quotes.htm
  • 7/30/2019 Dcci 2013-2014 Budget Presenttaion

    60/114

    ECONOMIC DEVELOPMENT

    Investment in Economic Infrastructure

    In Former Townships Umlazi, INK, Clermont/Kwa-Dabeka, Mpumalanga

    Town Centres (Pinetown / Isipingo / Tongaat, etc.)

    Tourism Nodes and Corridors (eg.Central Beachfront, Umgababa, etc.)

    Industrial Areas (eg. Cornubia)

    Provision of High Quality Economic Intelligence / Research

    Finalisation of Key Economic Strategies and Plans (eg. Economic Development andJob Creation Plan, Industrial Strategy and Plan, Industrial Land Strategy)

    Sector Support Programmes - Promoting Job Creation and Job Retention

    Focused Investment Promotion and Facilitation Targeting Key Sectors in Local, plusForeign Business. (Additional capacity in place for 2013/14)

    Best Practice City Commission (R3.1m)

    Durban Film Office Programmes:-

    Durban Film Mart (International Co-production Development Programme forIndustry Professionals R1.8m budget)

    Development Programme (Intermediate and Entry Level Producers R1mbudget)

    ECONOMIC DEVELOPMENT(contd)

  • 7/30/2019 Dcci 2013-2014 Budget Presenttaion

    61/114

    ECONOMIC DEVELOPMENT(contd) Economic Development Programmes (R24m)

    Best Practice City Commission ( R3.1m)

    Durban Film Office Programme ( R4.6m)

    Town Centre Renewals Capital (R79m)

    Tourism Nodes - Capital (R10.5m)

    Furniture IncubatorCapital (R5.5m)

    Kings Park Sport & Recreational Precinct Management in support of

    Infrastructure upgrades and promotion of sport Tourism/ Events.

    Capital budget - R6 million.

    Central Beachfront precinct management (including beachfront

    leases) in support of infrastructure upgrades and promotion of keytourism asset. Operating budgetR16.2 million.

    Town Centre Renewals Prioritised Attention

    Industrial Renewal Commencement of Programme

    TOURISM

  • 7/30/2019 Dcci 2013-2014 Budget Presenttaion

    62/114

    TOURISM Durban is the domestic tourism capital: 1.7m visitors p.a.

    Citys visitor industry under stress due to declining visitors and

    reducing spends

    Three cities international marketing campaign flighting highlights of

    the citys urban centre on National Geographic and Discovery

    Channels (R 20m over 3 years)

    Increased visible policing and additional CCTV cameras

    Continued focus on mega-eventing: national and international events

    Additional investments in tourism infrastructure upgrades &

    modernise attractions (beachfront, valley of a thousand hills etc) tomaintain competitive tourism edge

    The political tradition of ancient thought, filtered in Italy by Machiavelli, says one thing

    clearly: every prince needs allies, and the bigger the responsibility, the more allies he needs. -

    Silvio Berlusconi

    TOURISM

    http://www.woopidoo.com/business_quotes/authors/silvio-berlusconi-quotes.htmhttp://www.woopidoo.com/business_quotes/authors/silvio-berlusconi-quotes.htmhttp://www.woopidoo.com/business_quotes/authors/silvio-berlusconi-quotes.htm
  • 7/30/2019 Dcci 2013-2014 Budget Presenttaion

    63/114

    TOURISM

    THREE CITIES GLOBAL MARKETING STRATEGY (R14.1m)

    Viewership of 363 million in 160 countries in 60 languages. In April 2013 National

    Geographic will launch a 30 minute documentary on Durban. This will be

    broadcasted more than 4 times across all its channels.

    TOURISM INDABA ( R17.4m)

    Africas largest travel & tourism trade show. Attracts 2000 Exhibitors and 12500

    Delegates .Socio economic impact in excess of R250 million and creates about

    1500 jobs.

    TRADE SHOWS (R1.2m)

    CONVENTION SUPPORT (R2.5m)

    MARKETING AND PUBLICITY FOR TOP GEAR (R3m)

    TOURISM ENTERPRISE DEVELOPMENT / COMMUNITY TOURISM ORGANSATIONS( CTOs) - (R1.5m)- providing opportunities for Local Communities in tourism

    ventures

    No South African should rest and wallow in the joy of freedom. Nelson Mandela

    BUSINESS SUPPORT TRAINING AND DEVELOPMENT

  • 7/30/2019 Dcci 2013-2014 Budget Presenttaion

    64/114

    BUSINESS SUPPORT TRAINING AND DEVELOPMENT

    SMMES/CO-OPTS

    SECTOR DEVELOPMENT PROGRAMES

    Arts & Crafts (R0.6m)Manufacturing (R0.5m)Business to Business Linkages (R1m)

    Construction Incubator (R1.6m)

    Incubation Program/ Co-operative Development ( R1.7m)

    Fashion Development Programme (R3.1m)

    Strategic Workshops / BBBEE ( R0.6m)

    Strategic Sector Empowerment Workshops

    Women empowerment (R1.1m)

    Tourism marketing awareness (R 1.6m)

    At the end of the day government is about teamwork and

    partnership and we will be proving that by working together.

    Julia Gillard

    BUSINESS SUPPORT TRAINING AND DEVELOPMENT

    http://www.woopidoo.com/business_quotes/authors/julia-gillard/index.htmhttp://www.woopidoo.com/business_quotes/authors/julia-gillard/index.htm
  • 7/30/2019 Dcci 2013-2014 Budget Presenttaion

    65/114

    SMMES/CO-OPTS (contd)

    Support to Agencies providing assistance to small and medium

    businesses

    ie. Seda eThekwini (R3.5m) and Tradepoint (R1.2m)

    Informal Economy and Retail Markets( R 1.5m)

    Skilling of SMMEs in management, production and services

    Access to international markets

    Durban Business Fair (R8m) -

    Create platforms for interactions and networking amongst

    businesses through SMME fairs.

    Freedom cannot be achieved unless women have

    been emancipated from all forms of oppression.

    Nelson Mandela

  • 7/30/2019 Dcci 2013-2014 Budget Presenttaion

    66/114

    CAPITAL BUDGET 2013-14 MTREF

  • 7/30/2019 Dcci 2013-2014 Budget Presenttaion

    67/114

    27 %

    30 %

    40 %

    1 % 2 %

    Capital budget split for 2015/16 - MSFM Model-

    Social Economic Rehab

    Environment Admin

  • 7/30/2019 Dcci 2013-2014 Budget Presenttaion

    68/114

    DRAFT CAPITAL BUDGET

    DRAFT CAPITAL BUDGET -2013/14 TO 2015/16

  • 7/30/2019 Dcci 2013-2014 Budget Presenttaion

    69/114

    R'000 % R'000 % R'000 %

    Total Capital Budget 5,432.2 5,767.1 6,441.9

    Funded as follows:

    Grant Funding 3,355.5 61.8 3,830.0 66.4 4,341.4 67.4Internal Funding 1,076.7 19.8 937.1 16.2 1,100.5 17.1

    Borrowings 1,000.0 18.4 1,000.0 17.3 1,000.0 15.5

    5,432.2 5,767.1 6,441.9

    Details 2013/2014 2015/20162014/2015

    I felt fear more times than I can remember, but I hid it

    behind a mask of boldness. Nelson Mandela

    CAPITAL FUNDING more detail

  • 7/30/2019 Dcci 2013-2014 Budget Presenttaion

    70/114

    CAPITAL FUNDING more detailBUDGET

    2013/14

    BUDGET

    2014/15

    BUDGET

    2015/16

    R '000 R '000 R '000

    GRANTS 3,355,508 3,830,013 4,341,357

    CONDITIONAL 3,298,308 3,709,313 4,213,057

    Public Transport and Infrastructure

    Systems Grant 707,366 884,751 937,287

    Neighborhood Development Grant 3,555 70,000 75,000

    Urban Settlements Development

    Grant 1,580,999 1,800,075 1,863,667

    Department of Housing 639,306 577,587 941,500

    Integrated National Electrification

    Grant 35,000 35,000 40,000

    Integrated City Development Grant 9,539

    National Treasury Fuel Levy 322,543 341,900 355,603

    OTHER 57,200 120,700 128,300

    PROVINCIAL SUBSIDY 44,000 119,700 122,000

    Lotto Museum 13,200 1,000 6,300.00BORROWINGS 2013/14 1,000,000 1,000,000 1,000,000

    Additional Borrowings/ Internal 1,076,638 937,061 1,100,523

    TOTAL 5,432,146 5,767,074 6,441,880

    PROJECTED LOANS OUTSTANDING -

  • 7/30/2019 Dcci 2013-2014 Budget Presenttaion

    71/114

    Loans O/S

    2011/06/30

    R000

    New Loan

    2011/12

    R000

    Net

    Repayment

    2011/12

    R000

    Loans O/S

    2012/06/30

    R000

    New Loan

    2012/13

    R000

    Net

    Repaym

    ent

    2012/13

    R000

    Loans O/S

    2012/13

    R000

    %

    Electricity 1,999,342 200,000 42,427 2,156,914 187,500 142,782 2,201,632 20.7

    Water 3,924,632 150,000 121,826 3,952,806 187,500 242,390 3,897,916 36.6

    Sanitation 732,134 14,364 717,770 45,448 672,322 6.3

    Solid Waste 69,612 1,296 68,316 4,808 63,508 0.6

    Roads

    1,953,948 320,000 113,463 2,160,485 185,000 158,468 2,187,017 20.6

    ETA

    Infrastructure

    HSS

    1,430,786 330,000 138,074 1,622,716 190,000 192,885 1,619,831

    Note

    15.2

    SSS

    SDCETreasury

    Governance

    OCM

    TOTAL 10,110,454 1,000,000 431,450 10,679,006 750,000 786,781 10,642,226 100

    Note: Included in the 15.2% is infrastructure costs relating to Halls, Libraries etc which with take the

    total loans allocated to infrastructure to 90% (Loans only fund Capital Expenditure)

    30 JUNE 2013

  • 7/30/2019 Dcci 2013-2014 Budget Presenttaion

    72/114

    HIGH LEVEL SUMMARY

    DRAFT CAPITAL BUDGET-HIGH LEVEL SUMMARY

  • 7/30/2019 Dcci 2013-2014 Budget Presenttaion

    73/114

    Total Budget2013/14

    Total Budget

    2014/15

    Total Budget

    2015/16

    HUMAN SETTLEMENTS &

    INFRASTRUCTURE 4,753,608 4,865,577 5,504,138

    Housing 789,306 707,587 1,327,400

    Engineering 729,805 727,785 721,641

    Water 744,430 841,400 806,100

    Electricity 568,798 642,352 653,774

    Sanitation 770,400 700,750 677,400

    Solid Waste 82,800 85,635 90,773

    ETA 1,068,069 1,160,068 1,227,050

    % of total budget 88% 85% 85%

    DRAFT CAPITAL BUDGET-HIGH LEVEL SUMMARYTotal Budget Total Budget Total Budget

  • 7/30/2019 Dcci 2013-2014 Budget Presenttaion

    74/114

    Total Budget

    2013/14

    Total Budget

    2014/15

    Total Budget

    2015/16

    HEALTH & SOCIAL SERVICES 135,410 273,189 270,900

    Establishment of parks & gardens 4,685 13,437 9,900

    Sport fields 10,020 11,994 16,937

    Community halls 2,163 2,332 2,471

    Cemeteries 450 3,457 3,630

    Libraries 59,589 179,640 185,900

    Recreation facilities 14,592 33,832 35,861

    Museums & art galleries 13,650 3,497 6,300

    Clinics 30,262 25,000 9,900

    SOCIAL & SECURITY SERVICES 81,521 93,878 91,790

    Fire & Emergency Services 35,072 51,938 60,072

    Emergency Control & Disaster

    Management 34,200 34,857 23,850

    Metro Police 2,277 7,083 7,868

    Security Management 9,972 0 0

    DRAFT CAPITAL BUDGET-HIGH LEVEL SUMMARYT t l B d t T t l B d t T t l B d t

  • 7/30/2019 Dcci 2013-2014 Budget Presenttaion

    75/114

    Total Budget

    2013/14

    Total Budget

    2014/15

    Total Budget

    2015/16

    SUSTAINABLE DEVELOPMENT

    & CITY ENTERPRISES 160,156 204,740 247,100

    Economic Development ' 105,188 154,300 181,000

    Business Support 1,152 1,170 4,200

    D'Moss 3,587 3,150 3,600

    Markets 4,230 3,420 19,800

    Strategic Projects 45,999 42,700 38,500TREASURY 110,580 144,750 115,932

    GOVERNANCE 13,500 23,680 14,310

    CORPORATE HUMAN

    RESOURCE 10,170 2,250 810

    OFFICE OF THE CITYMANAGER 167,200 159,010 196,900

    Information Technology 97,200 89,010 99,900

    Strategic Projects 70,000 70,000 97,000

    TOTAL 5,432,146 5,767,074 6,441,880

  • 7/30/2019 Dcci 2013-2014 Budget Presenttaion

    76/114

    MAJOR PROJECTS

    MAJOR CAPITAL PROJECTS MTREF

  • 7/30/2019 Dcci 2013-2014 Budget Presenttaion

    77/114

    BUDGET 2013/14 BUDGET 2014/15 BUDGET 2015/16

    Rm Rm Rm

    Treasury

    Fleet Replacement & Maintenance- R & G 29 41 47

    RMS 40 52 0

    Libraries

    New Central Library 34 112 122

    Solid Waste Projects 83 86 91

    Roads

    Road Rehabilitation and reconstruction 323 372 385

    Port Expansion & Freight 90 108 0

    N2 Interchange 43 22 0

    Bellair Road Upgrade Phase 2 30 40 40

    Northern Areas Road Upgrades 23 23 81

    Economic development Projects - Various 105 205 247

    Strategic Projects 70 70 70

    MAJOR CAPITAL PROJECTS MTREF

  • 7/30/2019 Dcci 2013-2014 Budget Presenttaion

    78/114

    BUDGET 2013/14 BUDGET 2014/15 BUDGET 2015/16

    Rm Rm Rm

    Water

    Water Flagship Project - Western Aqueduct 244.000 300.000 380.000

    Mini Hydro Power Stations 25.000 10.000 5.000

    Waterloss 35.000 65.000 50.000

    Relays & Extension 40.000 25.000 25.000

    Northern Aqueduct 190.000 100.000 90.000

    Water - Plant and Equipment 27.900 22.500 27.000

    Electricity

    Durban South S/S 25.000 0.000 0.000Control Centre Buildings 27.000 27.000 9.000

    Sapref 33.800 11.000 0.000

    Jameson Park S/S 20.000 37.000 0.000

    MVLV Replacement Reticulation 35.000 30.000 10.000

    Klaarwater S/S 42.000 22.000 0.000

    Himalayas / Austerville Link 25.000 33.000 0.000

    Umgeni / Klaarwater OHTL 32.000 7.000 0.000

    Prepayment Connection Costs 35.000 30.000 30.000

    MVLV New Supply - Sundry 45.000 45.000 45.000

    Housing Infrastructure Development

    Cornubia Ph 2 44.000 80.000 0.000

    Etafuleni Ph2 20.000 10.000 20.400

    Ntuzuma D Ph 2 & 3 48.306 0.000 0.000

    Etafuleni Phase 1 60.000 0.000 0.000

    MAJOR CAPITAL PROJECTS 2013/14

  • 7/30/2019 Dcci 2013-2014 Budget Presenttaion

    79/114

    BUDGET 2013/14 BUDGET 2014/15 BUDGET 2015/16

    Rm Rm Rm

    Information Technology

    Major System Enhancement 22 14 0

    Ethekwini Transport Authority

    PTIS Blocksum 679 896 887

    Bayhead Edwin Swales Link 255 183 153

    Stormwater

    Storm Damage 50 0 0

    Sanitation

    New Airport - Infrastructure 27 60 62

    Water Reuse 49 10 0

    Expansion of Phoenix WTW 80 75 40

    Ablution Blocks - In Situ Upgrade 233 240 230SWWTW Digester Online 32 42 50

    Tongaat Central WTW Expansion 50 40 10

    Informal Settlements W & S plus 42 10 20

    Kwa Mashua WWTW 50 10 10

    Block Sum 36 7 7

  • 7/30/2019 Dcci 2013-2014 Budget Presenttaion

    80/114

    MAJOR DEVELOPMENTS

    DCT BERTH DEEPENING 1 2 Port:Short term expansion

  • 7/30/2019 Dcci 2013-2014 Budget Presenttaion

    81/114

    Key Economic Infrastructure

    MAYDON WHARF CT

    BAYHEAD

    EXPANSION

    CONTAINER EXPANSION SEQUENCE

    DCT AND PIER 1 : 3.6m TEU : 2013

    PIER 1 CT PHASE 2 : +0.7m TEU : 2015

    DCT DEEPENING : -1.0m TEU: 2014/15-

    2017/18

    MAYDON WHARF CT : +0.6m TEU :

    2017

    AIRPORT SITE : +9.6m TEU : 2019 TO2037

    3

    Short-term expansion

    New dig-out basin in

    Bayhead

    Durban-Gauteng

    Freight Corridor

    Phase 1 to

    4

    Container

    Terminals

    Liquid

    Bulk

    Terminal

    Vehicle

    Terminal

    Dig-Out Port

    DIG OUT PORT

  • 7/30/2019 Dcci 2013-2014 Budget Presenttaion

    82/114

    Old airport site secured by Transnet unlocking multibillionrand plans

    Development of site is a mega engineering project, couldemploy +/- 20 000 workers directly (cost over R 100bn over25 years)

    Development of terminal with 16 container berths, 5automotive berths and 4 liquid berths

    Construction to be done in collaboration with the privatesector

    First phase to complete in 2019 at a cost of R 50 billion

    One of the largest port projects undertaken by Transnet

    National Ports Authority

    I don't want to be just a voice on the phone. I have to get to know these guys face-to-face

    and develop a sincere relationship. That way, if we run into problems in a deal, it doesn't get

    adversarial. We trust each other and have the confidence we can work things out. -

    Wayne Huizenga

    DIG OUT PORT

    http://www.woopidoo.com/business_quotes/authors/wayne-huizenga/index.htmhttp://www.woopidoo.com/business_quotes/authors/wayne-huizenga/index.htm
  • 7/30/2019 Dcci 2013-2014 Budget Presenttaion

    83/114

    National government set aside R 21.3bn on Durban portinfrastructure over seven years

    Once operational it would employ 12 000 people directly and another16 000 indirectly.

    Catalyst for economic development in south Durban

    Boost to the local economy and increase in national and international

    trade with many spin-offs Enhances competitive edge over other provinces

    This will cement Durbans place as the major container hub in Africaby doubling the capacity of current berths

    Could propel the city to take over as economic hub of the country

    I really want people to know that Ive worked hard, very hard, to get to where I am today

    this didnt just happen overnight. I started in business over 25 years ago and have found a way

    to build on what Ive learned through every partnership and opportunity. - Magic Johnson

    SMME F i

    http://www.woopidoo.com/business_quotes/authors/magic-johnson/index.htmhttp://www.woopidoo.com/business_quotes/authors/magic-johnson/index.htmhttp://www.woopidoo.com/business_quotes/authors/magic-johnson/index.htm
  • 7/30/2019 Dcci 2013-2014 Budget Presenttaion

    84/114

    Enterprise Development

    84

    SMME Fair

    Other SMMEProgrammes:

    1. Women Empowerment

    2. Construction

    3. Support to Enterprises

    4. Business Linkages5. Sister Relationships

    6. Finance Strategy

    7. Partnerships with

    Financial Institutions

    8. Financial Education

    1. Bridge City

  • 7/30/2019 Dcci 2013-2014 Budget Presenttaion

    85/114

    Key Projects

    5. Umlazi-KwaMnyanda Node

    4. PRASA Upgrade &

    Commercial Development

    at StationsUmlazi-KwaMashu

    Pinetown-Umgeni

    3. Dube Trade Port:Development of

    AgriZone

    2. Cornubia

    g y

    CORNUBIA

  • 7/30/2019 Dcci 2013-2014 Budget Presenttaion

    86/114

    Multi billion rand mixed use and mixed development project

    Largest sustainable integrated human settlement project in the

    province and one of the biggest in the country Home of the next major industrial area in the north

    Total estimated investment of R 24 billion in buildings andinfrastructure

    Provision of 20 000 housing opportunities as well as employmentand economic opportunities

    Envisage to create about 48 000 permanent and 15 000 constructionjobs over a 15 year period

    We intend to conduct our business in a way that not only meets but exceeds the expectations

    of our customers, business partners, shareholders, and creditors, as well as the communities in

    which we operate and society at large. - Akira Mori

    http://www.woopidoo.com/business_quotes/authors/akira-mori/index.htmhttp://www.woopidoo.com/business_quotes/authors/akira-mori/index.htmhttp://www.woopidoo.com/business_quotes/authors/akira-mori/index.htm
  • 7/30/2019 Dcci 2013-2014 Budget Presenttaion

    87/114

    BENEFITS - SUMMARY

  • 7/30/2019 Dcci 2013-2014 Budget Presenttaion

    88/114

    DESPITE FEW SOCIAL COSTS, NET EFFECT IS POSITIVE;

    BULK INFRASTRUCTURE INVESTMENT OF R5.13 BILLION WILL UNLOCK -

    INTERNAL SERVICES OF R3Bn

    LAND AND BUILDING INVESTMENT OF R17.5Bn

    IN EXCESS OF R200 MILLION IN ANNUAL MUNICIPAL RATES GENERATION FROM THE

    PARTNERSHIP ALONE;

    VAT PAYMENTS OF R1.5Bn

    ANNUAL TAXES OF R1.5Bn THOUSANDS OF FAMILIES WILL BE LIVING IN AN EXTREMELY WELL-LOCATED AREA IN NEW

    LOW-INCOME HOMES;

    OPPORTUNITY TO LINK IMPOVERISHED AREAS TO MORE UPMARKET & AFFLUENT ONES;

    INCREASED ACCESS TO NEW URBAN OPPORTUNITIES;

    HUGE JOB CREATION OPPORTUNITIES:

    387 000 CONSTRUCTIONS JOBS

    42 830 PERMANENT JOBS

    FACILITATE THE SERVICE PROVISION FOR THE REMAINDER OF THE CATCHMENT

    FACILITATE THE UNLOCKING OF CORNUBIA NORTH AND ACTIVITY CORRIDOR TO THE AIRPORT

    88

    DUBE TRADEPORT

  • 7/30/2019 Dcci 2013-2014 Budget Presenttaion

    89/114

    Unique airport city north of Durban

    Currently 2 040ha in extent, with 60 year developments master plan:

    expansion to 20 000ha

    Proximity to ports gives edge as a transport and logistics hub

    Proposals for dedicated light railway network to link Dube TradePortwith north coast and Durbans CBD

    Road and rail links along the coast to the ports will make it easier toswitch cargo between different modes of transport

    What lies behind us and what lies before us are

    tiny matters compared to what lies within

    us. ~Henry S. Haskins, Meditations in Wall

    Street, 1940

    DUBE TRADEPORT

  • 7/30/2019 Dcci 2013-2014 Budget Presenttaion

    90/114

    Important initiative in the economic integration through aDurban-Free State-Gauteng logistics and industrial corridor

    Dube city part of a bigger strategic vision to create a world-class aerotropolis over the next 20 years

    Will incorporate office, hospitality, entertainment and retailexperiences

    A successful person is one who can lay a

    firm foundation with the bricks that others

    throw at him or her. ~ David Brinkley

    Integrated Freight & Logistics

  • 7/30/2019 Dcci 2013-2014 Budget Presenttaion

    91/114

    g g gStrategic Framework & Action Plan

    Aim of the project

  • 7/30/2019 Dcci 2013-2014 Budget Presenttaion

    92/114

    Aim of the project

    Build on freight plans already developed byeThekwini Municipality, Transnet & DubeTradeport;

    Develop a set of interventions that will essentiallyaddress freight & logistics infrastructure &operations within the municipal area;

    Minimize logistics costs; &

    Enhance the cities industrial competitiveness bytaking advantage of freight & logisticsinfrastructure & operators located in the

    municipal area.

    Plans objectives

  • 7/30/2019 Dcci 2013-2014 Budget Presenttaion

    93/114

    Plans objectives

    Data analysis

    & literature review

    Stakeholder

    engagement

    Data collection

    International best

    practice

    Status Quo

    Analysis

    Reduce logistics

    costs

    Increase logistics

    efficiency

    Reduce negative

    trucking impact

    Increase competitive

    advantage

    Strategic

    Framework

    Infrastructure

    Operations

    Regulations

    Communication &

    networking

    Action Plan

    Stakeholder Engagement

    Dedicated Freight Route

  • 7/30/2019 Dcci 2013-2014 Budget Presenttaion

    94/114

    Dedicated Freight Route

    94

    Port of Durban

    Pinetown

    Cato Ridge

    DURBANCENTRALLIBRARY

  • 7/30/2019 Dcci 2013-2014 Budget Presenttaion

    95/114

    Building is 15000sqm

    Development Manager Appointment justgone through Bid Adjudication

    Construction complete in 2016/17

    Budget R 496 M (excl Vat)

    Project is being funded by: Carnegie Corporation of New York

    eThekwini Municipality Provincial Department of Arts & Culture

    The project has significant legacy impacts

  • 7/30/2019 Dcci 2013-2014 Budget Presenttaion

    96/114

    The project has significant legacy impacts

    The Central Library will help to build a strong urban core,

    help attract and retain people,

    build and sustain an educated workforce,

    demonstrate eThekwinis commitment to leveraging past

    and future public investment,

    position the urban core as a competitive and liveable

    location, and contribute to overall economic growth.

    These are key objectives of the eThekwini Municipalitys

    Economic Development Strategy.

    Sectors alignedwith New Growth

    Path focus areas

  • 7/30/2019 Dcci 2013-2014 Budget Presenttaion

    97/114

    Sectors97

    Clusters

    Materials Recovery

    Durban Automotive

    Chemicals

    Metals & Tooling

    Clothing & Textiles

    Furniture

    Maritime & Logistics

    Arts & Crafts

    Fashion

    Durban Film Office

    I C T

    at ocus a eas

    N h

    Spatial DevelopmentPlans:

  • 7/30/2019 Dcci 2013-2014 Budget Presenttaion

    98/114

    Planning

    Secondary CBDs:Isipingo

    Others are: Pinetown,

    Verulam & Tongaat

    Northern

    Urban Development

    Corridor (NUDC)

    Priority Nodes:KwaMashu Town Centre

    Others are:

    Umlazi-Malukazi

    Bridge City

    INK

    Mpumulanga Town

    CentreClermont-KwaDabeka

    BEACHFRONT DEVELOPMENT

  • 7/30/2019 Dcci 2013-2014 Budget Presenttaion

    99/114

    OBJECTIVES

    Integrate the 7 km CentralBeachfront

    Providing amenity for adiverse range of beachusers.

    Greening Creating a Safe

    environment

    Promoting a healthy

    lifestyle

    Ifyou can run the company a bit more

    collaboratively, you get a better result, because you

    have more bandwidth and checking and balancing

    going on. - Larry Page

    BEACHFRONT DEVELOPMENT

    http://www.woopidoo.com/business_quotes/authors/larry-page-quotes.htmhttp://www.woopidoo.com/business_quotes/authors/larry-page-quotes.htmhttp://www.woopidoo.com/business_quotes/authors/larry-page-quotes.htm
  • 7/30/2019 Dcci 2013-2014 Budget Presenttaion

    100/114

    Redevelopment in two mainphases

    Phase 1 Ushaka through toCountry Club Beach

    Realignment of promenade

    New nodes

    Dune rehabilitation 257 Trading stalls developed

    Successfully completed before the2010 FIFA World Cup

    Since I'm fortunate enough to be neither hesitant nor

    indecisive, I've always made a point of consulting my

    partners and associates whenever a major decision has

    to be made. This is not to say that I have always been

    right! - Guy de Rothschild

    BEACHFRONT DEVELOPMENT

    http://www.woopidoo.com/business_quotes/authors/guy-de-rothschild/index.htmhttp://www.woopidoo.com/business_quotes/authors/guy-de-rothschild/index.htmhttp://www.woopidoo.com/business_quotes/authors/guy-de-rothschild/index.htm
  • 7/30/2019 Dcci 2013-2014 Budget Presenttaion

    101/114

    Redevelopment of existingPromenade between North

    Pier and Bay of Plenty Extension of Sylvester Ntuli

    Road through Natal Commandsite to Suncoast Boulevard

    Additional stormwater

    drainage at Snell Parade &Erskine Terrace

    Footpaths to certain side-roadsat Snell Parade & ErskineTerrace

    "Few companies have everything that they need.

    You may need money, customers, or product. No

    matter what you need, there is someone who has

    it. That someone is a potential Corporate Partner."

    Curtis E. Sahakian

    BEACHFRONT DEVELOPMENT

  • 7/30/2019 Dcci 2013-2014 Budget Presenttaion

    102/114

    Extension of promenade to Umgeni River

    Redevelopment of public facilities within this area includingclub facilities, ablutions, swimming pools and possible

    commercial node development

    Realignment of Snell Parade to slow traffic and include cycle

    route

    Extensionof the promenade from Count

    Cl b B h I Bl L B h/Elli

  • 7/30/2019 Dcci 2013-2014 Budget Presenttaion

    103/114

    Club Beach I to Blue Lagoon Beach/Ellis

    Brown Bridge with associated road work

    and parking

    proved maintenance of the Central Beachfront

    om Country Club Beach I through to Blue Lagoon,

    cluding public ablutions.

    he replacement of street furniture and lighting

    om Country Club Beach I through to Blue Lagoona way that creates a common standard for the

    hole Beachfront

    he rehabilitation and extension of the vegetated

    une abutting the proposed promenade.

    KINGS PARK SPORTS AND RECREATION DEVELOPMENT PLAN

    CONCEPT SPATIAL PLAN

  • 7/30/2019 Dcci 2013-2014 Budget Presenttaion

    104/114

    1

    2B2A3

    45A

    5

    8

    7

    6

    1110

    912

    13/14/15

    11

    16

    17A

    17B

    1819

    1. Cricket 2. Hotel/sports fields 3. Baseball/Softball

    4. Hotel/sports accommodation 5. Peoples Park & underground 5/A. Potential Training Fields

    6. Football/athletics 7. Proposed railway station 8. Aquatics

    9. Rugby 10.Athletics 11. Archery

    12. Cycling 13. High performance centre 14. Indoor sports centre

    15. Tennis 16. Equestrian 17A/B. Golf/trails

    18. Canoeing 19. A1 Racing

    RURAL DEVELOPMENT, FOOD SECURITYAND LAND REFORM

    CORPORATE SOCIAL RESPONSIBILITY

  • 7/30/2019 Dcci 2013-2014 Budget Presenttaion

    105/114

    AND LAND REFORM

    Can partner with the city on the

    following

    RURAL DEVELOPMENT, FOOD SECURITYAND LAND REFORM

    RURAL DEVELOPMENT, FOOD SECURITY ANDLAND REFORM

  • 7/30/2019 Dcci 2013-2014 Budget Presenttaion

    106/114

    AND LAND REFORMENGINEERING IMS DEPARTMENT

    Structure has been created within IMS dealing with Agriculture,Aquaculture and Rural Development.

    AQUACULTURE

    Northdene Fish hatchery developed to support the program.

    Produced young male (4000) ready to be transported and stock ponds anddams

    Rural Fish Farming -10 fish farming sitesbeing developed

    RESEARCH AND DEVELOPMENT

    Northdene ;Inchanga, Marianhill, Umbumbulu , Hambanathi and SterkspruitHubs being upgraded.

    KwaXimba Green Soya trials within the community

    Newlands research hub on DEWATS concept.

    LAND REFORM

    RURAL DEVELOPMENT, FOOD SECURITY AND LANDREFORM

  • 7/30/2019 Dcci 2013-2014 Budget Presenttaion

    107/114

    AGRICULTURE

    Community Gardens Phase 1 -33 gardens 80% complete

    Phase 2 Gardens 40 gardens 25% complete.

    Phase 3 Gardens being assessed .

    Fruit trees average of 10 trees per garden

    Testing of soil & water

    Supported with organic fertilizer and compost .

    Provision of fencing, storage containers, toilets and water provision

    infrastructure

    Provision of farming tools EPWP Grant funding 2012/2013. Used to create employment

    Total Agric Budget of R20M

    EPWP funding used to create sustainable food arms and payment of stipends

    Budget of R42 M.

    RURAL DEVELOPMENT, FOOD SECURITYAND LAND REFORM

  • 7/30/2019 Dcci 2013-2014 Budget Presenttaion

    108/114

    AND LAND REFORM

    Creation of dedicated structure to drive Agriculture, Aqua and Poultryfarming

    Aquaculture Umgababa

    Agriculture Projects include Soya Bean project, 20 Community

    Support Farms, 423 Community Gardens

    Seedling and compost together expertise to be provided to

    communities to alleviate poverty

    EPWP funding to be used to create sustainable food farms and forests

    The children who sleep in the streets, reduced to begging to make a living, are testimony to

    an unfinished job. Nelson Mandela

    SOUP KITCHENS

  • 7/30/2019 Dcci 2013-2014 Budget Presenttaion

    109/114

    No. of volunteers (19 drivers & 129 assistants) 148

    No. of Soup Kitchens 18

    No. of Indigent people fed per month per site daily

    500

    Each site is servicing 4 wards

    Budget Provision 2013/14 R12,3m

    There can be no keener revelation of a societys soul

    than the way in which it treats its children. Nelson

    Mandela

    YOUTH DEVELOPMENT

  • 7/30/2019 Dcci 2013-2014 Budget Presenttaion

    110/114

    Youth Development : To mainstream youths ito economic

    development / create job opportunities / Capacity building. Achievement : More than 10 000 youths have benefited from

    this programme.

    Budget Provision 2013/14 R 661 500 in CPAS

    Youth Sports Program - R 1.6m provided in 2013/14

    Youth Football Development - R 1.1m provided in 2013/14

    Street Children Project - R 1.68m provided in 2013/14

    What is important is not only to attain victory

    for democracy, it is to retain democracy.

    Nelson Mandela

    CLIMATE CHANGE

  • 7/30/2019 Dcci 2013-2014 Budget Presenttaion

    111/114

    Buffelsdraai and Inanda Reforestation ( R 10.9m)

    DMOSS Capital R 3.9m

    Development of the Durban Climate Change Strategy (R 915,000)

    Implementation of the Durban Adaptation Charter (externallyfunded)

    EM UKZN Joint Research Partnership (R 1.65m over three years)

    Green Roof Pilot Programme (R 65,640)

    Corruption in government that is a plague that must be erased from every regime in every

    place in the world. Nelson Mandela

    CONCLUSION Security we have invested a lot in this, for example, 30 new

  • 7/30/2019 Dcci 2013-2014 Budget Presenttaion

    112/114

    Security we have invested a lot in this, for example, 30 new

    security guards on beachfront and CCTV cameras and 2 615 Metro

    police person

    How do we retain businesses?

    Growth how do we attract new businesses?

    Also need to work together to grow existing business so that

    business can create more jobs business ideas and developmentsmust be supported by business plan and ROI analysis

    Partnershipsfor example, Cape Town has about 40 UIPs whereas

    we only have 9. Business needs to partner with usUIPs, priority

    zones, PPPs, CSR initiatives, etc.

    Cities that have a close relationship / partnership with business

    are winning cities

    CONCLUSION Services enabling environment

  • 7/30/2019 Dcci 2013-2014 Budget Presenttaion

    113/114

    Services enabling environment

    Need to work together to reduce the environmental impact

    of business and industry

    Developmental Charges

    Local Business Tax City Planning Commission

    Best Practices City Commission

    Blue Flag Status

    Derelict Buildings

    Water Loss

    "Partnering should be wielded as a sword, not a shield.

    It best suits companies with aspirations that exceed

    their resources. You should be driven by a motivation

    to reach out and gain market share, develop new

    markets, and leverage your current position."

    Curtis E. Sahakian