DCS Status Report. Valeri Falaleev , Piotr Golonka , Jonas Arroyo , Roman Fedoseev Siena 2012, NA62 Collaboration meeting Tuesday, 28 th August, 2012. Overview. Dry Run 2012. Detectors and subsystems status review. Tasks for Technical Run 2012. Siena, August 2012, Jonas Arroyo. - PowerPoint PPT Presentation

Citation preview

Page 1: DCS Status Report

European Organization for Nuclear Research

DCS Status Report

Valeri Falaleev, Piotr Golonka, Jonas Arroyo, Roman Fedoseev

Siena 2012, NA62 Collaboration meetingTuesday, 28th August, 2012

Page 2: DCS Status Report

European Organization for Nuclear Research

Overview

• Dry Run 2012.

• Detectors and subsystems status review.

• Tasks for Technical Run 2012.

Siena, August 2012, Jonas Arroyo

Page 3: DCS Status Report

European Organization for Nuclear Research

Dry Run 2012 - Objectives

• Deployment / setup vertical slice of final DCS infrastructure:

• Front-End computers, data servers, console.

• CAN and TCP/IP network infrastructure.

• Software: WinCC OA (PVSS), OPC Servers, integration recent developments into the production application.

• Complete control chain for Wiener crates.

• Initial integration of LAV Front-End boards control.

• DCS – Run Control link: discussion trigger• Initial exercise for integration of two systems.

• Reuse of DCS software components in RC.• Sharing of the computing infrastructure.

Siena, August 2012, Jonas Arroyo

Page 4: DCS Status Report

European Organization for Nuclear Research

Dry Run 2012: Reminder-DCS Architecture

Siena, August 2012, Jonas Arroyo

Page 5: DCS Status Report

European Organization for Nuclear Research

Dry Run 2012: “Vertical Slice” running on final DCS infrastructure

Siena, August 2012, Jonas Arroyo

Page 6: DCS Status Report

European Organization for Nuclear Research

Dry Run 2012 - Full chain Wiener crates

Siena, August 2012, Jonas Arroyo

Page 7: DCS Status Report

European Organization for Nuclear Research

Dry Run 2012 – Initial LAV FE integration

Siena, August 2012, Jonas Arroyo

Page 8: DCS Status Report

European Organization for Nuclear Research

Dry Run 2012: RunControl/DCS link

Siena, August 2012, Jonas Arroyo

RUN CONTROL DCSPVSSDISTRIBUTED SYSTEM

Page 9: DCS Status Report

European Organization for Nuclear Research

Dry Run 2012 - Challenges faced

• Setup of Wiener crates:• CANbus problems: bus terminators, parallel activity of users,

bitrates, distance...

• Hardware failures: LAV_3 crate, CEDAR fan tray, power supply.

• Investigating the cause of high failure rate: • Misplaced hardware: LKr_L0 crate installed in different place,

Clock_02 crate not arrived.

• Setup of LAV Front-End boards:• CANbus problems: bus terminators, parallel activity of users,

bitrates, distance... (more on this later).

Siena, August 2012, Jonas Arroyo

Page 10: DCS Status Report

European Organization for Nuclear Research

Dry Run 2012 - Challenges faced

• Delayed infrastructure delivery impacted the schedule• CAN buses.

• TCP/IP networking.

• Power, racks in the farm room.

• Building works.

• Control room refurbishment.

• Hardware delivery.

• CAEN HV• Integration during the Dry Run dropped due to delays in the

delivery of h/w and s/w (OPC Servers).

• Validation/integration efforts ongoing (more in next slides).

Siena, August 2012, Jonas Arroyo

Page 11: DCS Status Report

European Organization for Nuclear Research

Detectors and subsystems: Readiness for Technical Run 2012

- Common components: Wiener, CAEN

- Detectors review

Page 12: DCS Status Report

European Organization for Nuclear Research

Common components: Wiener

• Based on standard fwWiener component of JCOP Fw• Significantly reduces the hardware-integration effort.

• NA62 enhancements• New operation panels.

• Integration into the FSM tree (hierarchical control).

• Set up of default alarms.

• Request during the Dry Run to enhance information in user interface.

• Status of work: READY • Dry Run: successful control of all 6 available crates.

• Ready for immediate integration of missing/damaged crates.

Siena, August 2012, Jonas Arroyo

Page 13: DCS Status Report

European Organization for Nuclear Research

Common components: CAEN HV• Control based on JCOP fwCaen component

• “Classic” CAEN SY1527/2527 and A1833 board:

• Will be used by LKr, CHOD for Technical Run 2012.

• Status of work: READY (already demonstrated in 2011).

• New CAEN SY4527 crate and A1536N board:

• Will be used by LAV, MUV, CEDAR, SAC for Technical Run 2012.

• Completely new control chain, late delivery (h/w and s/w):

• New OPC Server (v5), firmware from CAEN (beta only in July).

• Not validated, not integrated with JCOP Fw/PVSS .

• Issues with backward compatibility with older crates, OS.

• Significant effort in EN/ICE to validate/integrate as soon as possible: Benjamin Farnham, Roman Fedoseev, Manuel Gonzalez.

• Status of work: ADVANCED .

• To complete: final validation, panel enhancements.

Siena, August 2012, Jonas Arroyo

Page 14: DCS Status Report

European Organization for Nuclear Research

Common components: CAEN SY4527 integration

Siena, August 2012, Jonas Arroyo

Firmwareupgraded

OPC items modification

fwCaen JCOP/Fw update

Page 15: DCS Status Report

European Organization for Nuclear Research

LKr for 2012 Technical Run

• User Requirement Document received.√

• Status: no changes since Spring• LKr Low Voltage: READY for commissioning.

• LKr High Voltage (1, SY1527): READY, crate still to be integrated in FSM.

• LKr L0 Wiener crate: software READY, crate not installed in the right place.

Siena, August 2012, Jonas Arroyo

Page 16: DCS Status Report

European Organization for Nuclear Research

LKr for 2012 Technical Run: UI

Siena, August 2012, Jonas Arroyo

Page 17: DCS Status Report

European Organization for Nuclear Research

LAV for 2012 Technical Run

• User Requirement Document received. √

• LAV Front End boards, initial integration by Vito Palladino:

• Managed to control in spite of CANbus problems (more in next slide).• Standalone application, pending integration with FSM in the final

application.

• Wiener crates: • READY LAV_01, LAV_02, LAV_03 h/w damaged.

• CAEN HV (3 SY4527 for 3 station): PENDING (Vito?)

• LAV Environment Monitor:• Application running again.

• To be replaced by VAISALA sensor: PENDING (men power).

Siena, August 2012, Jonas Arroyo

Page 18: DCS Status Report

European Organization for Nuclear Research

LAV FE boards: CANbus communication

• Problem exposed during Dry Run 2012

• Diagnostic effort with EN/ICE expert help and tools• voltage levels out of CAN specification:

• exact reason/impact not yet understood; grounding?

• Needs to be understood

Siena, August 2012, Jonas Arroyo

Kvaser LAV FE Kvaser LAV FE

Page 19: DCS Status Report

European Organization for Nuclear Research

LAV Environment Monitor

Siena, August 2012, Jonas Arroyo

Page 20: DCS Status Report

European Organization for Nuclear Research

CEDAR readiness for 2012 Technical Run

• User Requirement Document received. √

• Wiener crate: s/w READY, crate in repair.

• High Voltage: • 1 SY4527 h/w, boards: awaiting delivery.

• FwCaen component in progress for final integration of crates.

• Initial version of operation panels for discussion (next slide).

• Motor control• Hardware detailed report from Ryan (??).

• PLC and PVSS applications READY for commissioning.

Siena, August 2012, Jonas Arroyo

Page 21: DCS Status Report

European Organization for Nuclear Research

Proposal for CEDAR operation panel

Siena, August 2012, Jonas Arroyo

Channel 01 ON ON 1000 1000.5 200.3READY

ERROR flags

Page 22: DCS Status Report

European Organization for Nuclear Research

MUV for 2012 Technical Run

• User Requirement Document received: √• High Voltage structure and labeling for MUV-1/2.

• High Voltage structure and labeling for MUV-3.

• 2 CAEN HV power supplies, SY4527 to integrate.

• State of work: clarifying requirements.• segmentation of hierarchical control• operation panels• Hardware mapping

• Wiener crate: READY.

Siena, August 2012, Jonas Arroyo

Page 23: DCS Status Report

European Organization for Nuclear Research

CHOD for 2012 Technical Run

• User Required Document received. √

• Wiener crate: READY.

• High Voltage:• 2 SY1527 crates will be integrated.

• FSM ready, panels almost ready, working on synoptic panel.

Siena, August 2012, Jonas Arroyo

Page 24: DCS Status Report

European Organization for Nuclear Research

CHOD: operation panels

Siena, August 2012, Jonas Arroyo

Page 25: DCS Status Report

European Organization for Nuclear Research

SAC for 2012 Technical Run

• User Required Document not received. X

• High Voltage:• Only 4 channels needed.

• SAC will make use of MUV’s SY4527 CAEN crate.

Siena, August 2012, Jonas Arroyo

Page 26: DCS Status Report

European Organization for Nuclear Research

Tasklist for 2012 Technical Run

Siena, August 2012, Jonas Arroyo

DETECTOR TASK

COMMON Move remaining equipment and frontend PCs to NA62DCS network; clean install of OS and software.

COMMON Integrate the complete application, deploy on NA62’s own Data Servers.

COMMON (!)Parameterize the parameters of application: archiving, alarms, smoothing, connection to Oracle DB.

COMMON Patch panel for CANbus on Front-End PC side. Also debugging ground/shielding.

COMMON Finish PVSS component to control SY1527, SY2527, SY4527 CAEN High Voltage crates/boards/channels.

COMMON Select eLogBook.

COMMON Alert screen

CHOD Integration SY1527 High Voltage crates in the panels.

CEDAR• Finish High Voltage.• Complete and commission motor control system.• KTAG ELMB measurements: (User Requirement Documents integrate them).

MUV Implement and integrate High Voltage system (operation panels, configuration, ...) using common component.

LAV• Implement High Voltage system (As in MUV).• FSM for Front End boards(?).

SAC High Voltage system (As MUV).

LKr•Integrate the monitoring of High Voltage crate (minor).•Debugging of LV hardware.

... ...

Page 27: DCS Status Report

European Organization for Nuclear Research

Detectors Summary

Siena, August 2012, Jonas Arroyo

DETECTOR URD HV + FSM LV + FSM Wiener + FSM CUSTOM + FSM

LKr √ Integrate crate in FSM Commisioning Reallocate CANbus

LAV √ Pending LAV3 broken

LAV Front End board: CANbus signal issue + FSM.

Integrate Vaisala sensor.

CEDAR √ Waiting for hardwarePower supply and fan

tray broken.Hardware for motor

control.

MUV √ Integrate all READY

CHOD √ Crates FSM and synoptic panel

READY

SAC X 4 HV Channels ?

Page 28: DCS Status Report

European Organization for Nuclear Research

Conclusions

Siena, August 2012, Jonas Arroyo

• Good progress during summer despite of the delays:

• Objectives of 2012 Dry Run achieved.

• Contributions from subdetectors very welcome (eg. Vito from LAV).

• Initial exploratory work on the interplay with Run Control carried out.

• NA62 DCS very well fitted in the CERN context:• Usage of CERN standard components and technologies.• Fruitful collaboration between EN/ICE and NA62 (h/w, OPC

Servers, PVSS development, FSM expertise, CAN bus debugging...).

• Collaboration with BE/CO made the DCS computing infrastructure setup much easier!

• STILL a lot of work ahead before we are ready for Technical Run.

Page 29: DCS Status Report

European Organization for Nuclear Research

Questions ???

?Siena, August 2012, Jonas Arroyo

QUESTIONS ???

Page 30: DCS Status Report

European Organization for Nuclear Research

Questions ???

?Siena, August 2012, Jonas Arroyo

QUESTIONS ???

Page 31: DCS Status Report

European Organization for Nuclear Research

SLIDE NA62 DCS ARCHITECTURE

Siena, August 2012, Jonas Arroyo

Page 32: DCS Status Report

European Organization for Nuclear Research

Dry Run – Wiener connection state

• Wiener crate:• Effort to integrate Wiener crate in FSM

• New panels, alarms and component done.

• Request in Dry Run to modify information in panels.

• CAEN crate and boards:• New CAEN crate in beta state NEW CONTROL CHAIN.

• Effort to validate Hardware and fwCaen component.

• New OPC server based in Windows 7 is back compatible with “old crates” (SY1527).

• Thanks also to Roman Fedoseev and Benjamin Farnham.

Siena, August 2012, Jonas Arroyo

Page 33: DCS Status Report

European Organization for Nuclear Research

LAV - Architecture

Siena, August 2012, Jonas Arroyo