Metalicity Limited www.metalicity.com.au ASX Code: MCT 6 Outram Street ABN: 92 086 839 992 West Perth WA 6005 ASX RELEASE: 31 JANUARY 2018 DECEMBER 2017 QUARTERLY ACTIVITIES REPORT Completion of the acquisition of the high-grade Napier Range Zinc with drilling planned for March Quarter Successful Metallurgical testwork program on the Admiral Bay Zinc Project with China Minmetals being a key step required to comply with financing requirements of Chinese banks Positive review of the Admiral Bay Zinc Project Pre-Feasibility Study (PFS) Stage 1 completed by China NFC, being a key step required to comply with financing requirements of Chinese banks Significant cobalt intersections at the Kyarra Cobalt project with phase 2 drilling planned Strengthening of the Metalicity board with the appointment of Justin Barton as Executive Director ACQUISITION OF HIGH GRADE LENNARD SHELF ZINC PROJECT (100% MCT) Metalicity Limited (ASX:MCT) (“MCT” or “Company”) strengthened its zinc project pipeline through the completion of the acquisition of the high grade Napier Range Zinc Project and the Emanuel Range Zinc Project (collectively the Lennard Shelf Zinc Project), located in the Lennard Shelf of the Kimberley Region, WA. Napier Range represents a low capital and near term producing zinc production opportunity, while Emanuel Range represents an early stage but highly prospective zinc exploration project with an extensive 30km strike of largely untested targets. These projects will complement the development of its large scale long life Admiral Bay Zinc Project, located in the adjoining Canning Basin of the Kimberley Region, WA. Overview The Napier Range Zinc Project consists of 2 granted mining licenses, an exploration license application and a granted general purpose license (Table 1). It includes the Wagon Pass deposit, with a JORC 2012 compliant Inferred Mineral Resource Estimate (MRE) of 750Kt at 5.8% Zn, 7.2% Pb, 54g/t Ag (13.6% ZnEq) and an adjoining Exploration Target Range (ETR) of 100Kt-200Kt at 10%-13% ZnEq. The most recent MRE of 750Kt at 5.8% Zn, 7.2% Pb, 54g/t Ag (13.6% ZnEq) at Wagon Pass was completed by Cube Consulting in 2016, using a 5% Zn + Pb cut off, 2m downhole compositing, and an assumed bulk density of both waste and mineralised material of 3.0 g/cm 3 . The deposit is located between 150-200m depth below surface. Additional details on key parameters of the MRE are presented in ASX Announcement “High Grade Near Surface Zinc Projects on 30/10/17. Extensions to the Wagon Pass deposit and additional deposits are considered likely if systematically explored, by leading independent geological consultant CSA Global, who recently completed a comprehensive targeting exercise and commented that the area is underexplored (CSA Global 2016). The report outlines 9 targets, 1 for resource extensions to the Wagon Pass deposit and 8 further targets. For personal use only

DECEMBER 2017 QUARTERLY ACTIVITIES REPORT For personal … · On 19 July 2017, the Company signed a MOU with CMN for future offtake from Admiral Bay. The MOU contemplates the supply

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: DECEMBER 2017 QUARTERLY ACTIVITIES REPORT For personal … · On 19 July 2017, the Company signed a MOU with CMN for future offtake from Admiral Bay. The MOU contemplates the supply

MetalicityLimited www.metalicity.com.auASXCode:MCT 6OutramStreetABN:92086839992 WestPerthWA6005

ASXRELEASE:31JANUARY2018

DECEMBER2017QUARTERLYACTIVITIESREPORT

Completionoftheacquisitionofthehigh-gradeNapierRangeZincwithdrillingplannedforMarchQuarter

SuccessfulMetallurgicaltestworkprogramontheAdmiralBayZincProjectwithChinaMinmetalsbeingakeysteprequiredtocomplywithfinancingrequirementsofChinesebanks

PositivereviewoftheAdmiralBayZincProjectPre-FeasibilityStudy(PFS)Stage1completedbyChinaNFC,beingakeysteprequiredtocomplywithfinancingrequirementsofChinesebanks

SignificantcobaltintersectionsattheKyarraCobaltprojectwithphase2drillingplanned

StrengtheningoftheMetalicityboardwiththeappointmentofJustinBartonasExecutiveDirector

ACQUISITIONOFHIGHGRADELENNARDSHELFZINCPROJECT(100%MCT)

Metalicity Limited (ASX:MCT) (“MCT” or “Company”) strengthened its zinc project pipeline through thecompletionoftheacquisitionofthehighgradeNapierRangeZincProjectandtheEmanuelRangeZincProject(collectivelytheLennardShelfZincProject),locatedintheLennardShelfoftheKimberleyRegion,WA.NapierRangerepresentsalowcapitalandneartermproducingzincproductionopportunity,whileEmanuelRangerepresentsanearly stagebuthighlyprospective zincexplorationprojectwithanextensive30kmstrikeoflargelyuntestedtargets.TheseprojectswillcomplementthedevelopmentofitslargescalelonglifeAdmiralBayZincProject,locatedintheadjoiningCanningBasinoftheKimberleyRegion,WA.

Overview

TheNapierRangeZincProjectconsistsof2grantedmininglicenses,anexplorationlicenseapplicationandagrantedgeneralpurposelicense(Table1).ItincludestheWagonPassdeposit,withaJORC2012compliantInferredMineral Resource Estimate (MRE) of 750Kt at 5.8% Zn, 7.2% Pb, 54g/t Ag (13.6% ZnEq) and anadjoiningExplorationTargetRange(ETR)of100Kt-200Ktat10%-13%ZnEq.ThemostrecentMREof750Ktat5.8%Zn,7.2%Pb,54g/tAg(13.6%ZnEq)atWagonPasswascompletedbyCubeConsultingin2016,usinga5%Zn+Pbcutoff,2mdownholecompositing,andanassumedbulkdensityofbothwasteandmineralisedmaterialof3.0g/cm3.Thedepositislocatedbetween150-200mdepthbelowsurface.AdditionaldetailsonkeyparametersoftheMREarepresentedinASXAnnouncement“HighGradeNearSurfaceZincProjectson30/10/17.ExtensionstotheWagonPassdepositandadditionaldepositsareconsideredlikelyifsystematicallyexplored,byleadingindependentgeologicalconsultantCSAGlobal,whorecentlycompletedacomprehensivetargetingexerciseandcommentedthattheareaisunderexplored(CSAGlobal2016).Thereportoutlines9targets,1forresourceextensionstotheWagonPassdepositand8furthertargets.F

or p

erso

nal u

se o

nly

Page 2: DECEMBER 2017 QUARTERLY ACTIVITIES REPORT For personal … · On 19 July 2017, the Company signed a MOU with CMN for future offtake from Admiral Bay. The MOU contemplates the supply

2

Figure1:LocationoftheLennardShelfZincProjects

Source:Metalicity

At Wagon Pass, mineralisation potential exists to extend the resource to west of the deposit, with anExplorationTargetRangeof100-200Ktat10-15%ZnEq.Theremaining8targetsare locatedfurthersouth,mostlyinanalogoussettingstoWagonPass.CSAfurthercommented‘Althoughdrillinghasoccurredintheprojectarea,manydrillholesdidnottestthefavorableLowerNapierstratigraphy.Inaddition,thefootprintoftheWagonPassdepositissmallandtheareaissignificantlyunder-exploredforadditional deposits 0.5 to1Mt size.’ Basedon theCSAGlobal analysis theCompany is targetingmultipleoccurrencesof0.5-1Mtsize,resultinginanExplorationTargetRange(ETR)atNapierRangeof1-4Mt@10-15%ZnEq.ThegradeandtonnagerangeisbasedonthegradeandgeometryoftheWagonPassdeposit,andtheclusteringnatureofthisdeposittype.AdditionaldetailsonkeyparametersoftheETRarepresentedinASXAnnouncement“HighGradeNearSurfaceZincProjects”on30/10/17.TheExplorationTargetRanges(ETR)statedaboveareconceptualinnatureandthe potential quantities and grades are conceptual in nature. There has been insufficient exploration toestimateaMineralResourceEstimateoutsidethatknownatWagonPass,anditisuncertainwhetherfurtherexplorationwillresultintheestimationofadditionalMineralResources.

For

per

sona

l use

onl

y

Page 3: DECEMBER 2017 QUARTERLY ACTIVITIES REPORT For personal … · On 19 July 2017, the Company signed a MOU with CMN for future offtake from Admiral Bay. The MOU contemplates the supply

3

Figure2:ExplorationTargetareas,existingandproposeddrilling,andmajorgossanlocationsatNapierRange.

Source:Metalicity

TheEmmanuelRangeZincProjectconsistsofoneexplorationtenementandtwotenementapplications incloseproximitytothePillara,Kapok,CadjebutandGoongewaMines,intheEmmanuelRangeoftheKimberleyRegion,WA.(Figure3).Allofthetenementsinthisprojectcovertheprospectivestratigraphyandstructuralpositions,inverycloseproximitytoexistingdepositsormines.Forexample,E04/2453islocatedlessthan2kmfromthePillaradeposit,thelargestPb-ZndeposityetdiscoveredintheLennardShelf.

For

per

sona

l use

onl

y

Page 4: DECEMBER 2017 QUARTERLY ACTIVITIES REPORT For personal … · On 19 July 2017, the Company signed a MOU with CMN for future offtake from Admiral Bay. The MOU contemplates the supply

4

Anumberofsynergisticopportunitiesmaybe likelywiththedevelopmentof theCompany’s100%ownedlargescalelonglifeandlowcostAdmiralBayZincProject.TheprimarysynergyisthepotentialofNapierRangetobeahighgrade lowcapitalnear termproducingasset, thatwouldgeneratesufficientcashflowtohelpsupportthedevelopmentofAdmiralBay.Other key synergies identified to date include various infrastructure components, mineral processingequipment,humanresources,financingandofftakesynergies.ThesewillbefurtherevaluatedandquantifiedduringtheDueDiligenceperiod.NotethatLennardShelfPtyLtd(a50:50jointventurebetweenGlencoreandTeck)retainanoptiontoearna51%participatinginterestintheWagonPasstenementsifanewJORCInferredResourcehasbeendiscovered,byeithercompletingandsolefundingaFeasibilityStudy,orspending$20Montheassessmentoftheinferredresources.MetalicityhashelddiscussionswithbothGlencoreandTeckregardingthisoptionandwillupdatethemarketshouldanyinvestmentand/oramendmenttotheagreementbereached.ForfurtherinformationrelatedtoGeology,MineralResourceEstimate(MRE),ExplorationTargetRange(ETR)andTermsoftheAcquisitionpleaseseeASXAnnouncement“HighGradeNearSurfaceZincProjects,30/10/17.”

COMPLETIONOFKEYSTEPSOFTHEMOU’SWITHCHINAMINMETALSANDCHINANFC

CHINAMINMETALSMETALLURGICALTESTWORKPROGRAM

On 19 July 2017, the Company signed aMOUwith CMN for future offtake from Admiral Bay. TheMOUcontemplatesthesupplyofaninitial10%offutureofftakefromananticipatedproductionof174,000tofzincconcentrate and 115,000t of lead concentrate per annum from Admiral Bay in exchange for preliminarymetallurgicalandbeneficiationtestwork.ForfurtherdetailsontheMOUseeASX:MCT19/7/17.TheCompany’smetallurgicalandmineralprocessingtestworkcarriedouttodatedeliveredpositiveresultsincluding (1) The material does not currently demonstrate any deleterious metallurgical behaviour (2) Itappearsreadilyamenabletoprocessingthroughasimple,conventionalflotationplanttoachievehighzinc,leadandsilverrecoveries(3)Preliminarymetalrecoveryexpectationsareintherangeof90-95%acrosszinc,leadandsilver(4)Concentrateproductgradesweregood(Pb+60%andZn+48%),althoughselectivityofzincandleadwasnotidealandthereisscopeforfurtheroptimisation(seeASX:MCT27/7/16).The preliminary metallurgical testwork study by CMN was undertaken by Changsha Institute of MiningResearchCo., Ltdunder thecommissioningofCMNon52.4kgofdiamondcore fromdrillholesABRD005,ABRD006,ABRD008andABRD009locatedprimarilywithinthehigh-gradezoneofAdmiralBayandlocatedwithinthegrantedmininglicense(ML4/249).ThecorewasselectedtoberepresentativeoftheAdmiralBayorebodyandanadvanceonprevioustestwork.Sampleswerecrushedandscreenedtoaparticlesizeof-2mm,andwerethenpreparedbymixinganddivision,and taken forbeneficiation tests,analysis,mineralogical studiesandstandbyapplication.Fourcomposites(ABMET1,ABMET2,ABMET3,ABMET4)wereassayedpre-comminution,eachsamplerepresentingsectionsofdifferentdrillholes.CompositesABMET1&ABMET4wherecombinedandselectedfortesting.F

or p

erso

nal u

se o

nly

Page 5: DECEMBER 2017 QUARTERLY ACTIVITIES REPORT For personal … · On 19 July 2017, the Company signed a MOU with CMN for future offtake from Admiral Bay. The MOU contemplates the supply

5

Table1:SampleInformationfortesting

SampleID DryWeight(kg)

Pbgrade(%)

Zngrade(%)

Augrade(g/t)

Aggrade(g/t)

ABMET1ABRD006 26.12 1.17 4.85 0.1 24.98ABMET2ABRD005 14.44 0.58 3.08 0.23 17.54ABMET3ABRD008 2.18 0.3 2.01 0.23 4.47ABMET4ABRD009 9.62 1.78 2.24 0.21 16.06Calculatedtotalaveragegrade: 52.36 1.08 3.76 0.16 20.44

Bench flotation tests were carried out on the samples to establish the amenability of conventionalbeneficiation. The samples were characterised by a mineralogy study and chemical composition. Theobjectivesofthebenchflotationtestswereto:

(1) To gain a comprehensive understanding of the properties of the samples via amineralogy study,providingabasisforbeneficiationtestworkstudy

(2) Todeterminetheeconomicbeneficiationprocessflowsheet,reagentsystemandperformanceindicesindexes forAdmiralBayZinc-Lead-Silverbyconductingsystematicbeneficiationtests, investigatingthemainmineralogical and technologicalprocess factors that influencebeneficiation indexes,andprovidingthebasisforthenextstepintestworkstudy.

SUMMARYOFMETALLURGICALTESTWORKRESULTSWITHCHINAMINMETALS

SummaryofResults

(1) Sampleswerecharacterisedaszinc-leadprimarysulphideswiththemainrecoverablemineralsbeingsphaleriteandgalena.Themineralogywascharacterisedassphalerite,galena,pyriteandchalcopyrite,withganguemineralsbeingmainlycalcite,quartz,bariteandsericite.

(2) Sequentialflotationisthepreferredmethodwithleadflotationfollowedbyzincflotationfromleadtailings.Thereagent regimesselectedwere: (a)CaO (Lime)waschosentodepresspyrite,with (b)ZnSO4andNaSo3selectedtodepresszincand(c)ETCandBXhaveaselectivecollectingeffectonLeadminerals,thesewereadoptedasacollectorblendintheLeadflotation

(3) Fullprocess,close-circuit,testswerecarriedoutwithZincrecoveriesof88.27%toazincconcentratewithagradeof51.27%Znand181.2g/tAgachieved,whileLeadrecoveriestoleadconcentratewere91.88%ataleadconcentrategradeof65.13%Pband137g/tAg(refertoTable2).

(4) Thegradeofdeleteriouselementswillnotattractpenalties.(5) Goldandsilverareupto0.23g/tAuand23.22g/tAgrespectivelywithasignificantrecoveryvalue.

Table2:TestworksummaryresultsforPb/Zn&Aggradesinconcentratewithrespectiverecoveries

Product

YieldRate(%ofMass)

Pbgrade(%)

Zngrade(%)

Aggrade(g/t)

PbRecovery

(%)

ZnRecovery

(%)

AgRecovery

(%)PbConcentrate 1.89 65.13 3.95 137.65 91.88 1.75 11.25ZnConcentrate 7.36 0.49 51.27 181.20 2.69 88.27 57.72Tailings 90.75 0.08 0.47 7.90 5.43 9.98 31.03

For

per

sona

l use

onl

y

Page 6: DECEMBER 2017 QUARTERLY ACTIVITIES REPORT For personal … · On 19 July 2017, the Company signed a MOU with CMN for future offtake from Admiral Bay. The MOU contemplates the supply

6

SUMMARYOFTHECHINANFCPROJECTREVIEW

During the quarter, China Non-Ferrous Metals (NFC) formally notified the Company of the successfulcompletionofadetailedreview(Review)ofthetechnicalandfinancialparametersoftheAdmiralBayZincProjectPFSStage1report(seeASX:MCT10/10/17)supportingtheMemorandumofUnderstanding(“MOU”)signedwiththeNFCholdingcompanyCNFCforthefeasibility,developmentandfinancingofAdmiralBay(seeASX:MCT8/2/17).CNFC is the major engineering and equipment arm of NFC in the resources and mining sector and hasestablishedmarketsintheMiddleEast,CentralandNorthAsia,CentralandSouthAfrica,andisseekingfurtherprojects related to resources in developed resources and mining markets such as Australia. CNFC is anorganizationwithastrongtrackrecordinsupportingthedevelopmentof large, longlifeprojects, incudingMehdiabad,Citronen,TallaHamzaandotherprojectsinNorthernChinaincludingthe“CityofZinc”.NFChasenteredtheShenzen100StockIndexandShanghai-Shenzen300CompositeIndex.TheReviewisakeytermoftheMOUbetweentheCompaniesandastrongendorsementofthetechnicalandfinancialparametersoftheAdmiralZincProjectPFSStage1report,establishingaframeworkfortheProjectStudy at the completion of the PFS, incorporating NFC EPC costings. The Project Study is anticipated tosignificantlyreduceoverallcapitalandoperatingcosts,reducelongleaditemstimes,acceleratedevelopmenttimelines and overall economics, and in turn support a binding agreement regarding the feasibility,developmentandfinancingofAdmiralBay.

Figure3:AdmiralBayZincProject:MREandETRinplanview

Source:Metalicity

For

per

sona

l use

onl

y

Page 7: DECEMBER 2017 QUARTERLY ACTIVITIES REPORT For personal … · On 19 July 2017, the Company signed a MOU with CMN for future offtake from Admiral Bay. The MOU contemplates the supply

7

TheExplorationTargetRanges(ETR)statedaboveareconceptualinnatureandthepotentialquantitiesandgrades are conceptual in nature. There has been insufficient exploration to estimate aMineral ResourceEstimateoutsidetheMineralResourceEstimateatAdmiralBay,anditisuncertainwhetherfurtherexplorationwillresultintheestimationofadditionalMineralResources.

Figure4:AdmiralBayZincProjecthighgradezoneextendingovera2.1kmstrike

Source:Metalicity

SIGNIFICANTCOBALTINTERSECTIONSATTHEKYARRAPROJECT(100%MCT)

KyarraCobaltProjectThe Company completed an initial 1,800mRC drill program at the Kyarra Cobalt project following recentdesktopandfieldworkwhereanother65rockchipsampleswerecollectedincludingsignificantresultsofupto1500ppmCoand>1%Zninweatherednear-surfacerockchipswerereceived,acrosstheentireoutcroparea sampled. Some of the cobalt anomalism has been observed to be associated with west-north-weststrikingbrecciazonesinterpretedtoberelatedtodeep-seatedstructuresandtorepresentpartofaplumbingsystemformetalliferousfluidsupwardandsouthwardsintosuitabletraphorizons.Ofparticularnoteare thegenerally steepdipsofunits (typically >50° to the southand southeast),whichindicatesignificantdisruptionoftheunitsinthisareaincontrasttothegenerallyheldviewoftheYerridaBasinunitsbeingflatlying.Duetosignificantdelaysinthedeliveryandthenprocessingofthesamples,largelyoutofthecontroloftheCompany,resultsandinterpretationoftheprogramwillbedueshortly.

For

per

sona

l use

onl

y

Page 8: DECEMBER 2017 QUARTERLY ACTIVITIES REPORT For personal … · On 19 July 2017, the Company signed a MOU with CMN for future offtake from Admiral Bay. The MOU contemplates the supply

8

ThedrillingintersectedsandstonesoftheYelmaFormationunconformablyoverlyingMaralooFormationblackshales.Holeswere terminatedwithinblack shaleat apredetermineddepth. Locally, anomalousanalyticalresults were associated with quartz veining, related to fractures and brecciation, was intersected. Thedownholequartzzonesarepossiblycorrelativewithquartzfloatatsurface,andrelatedtothewest-north-westtrendingbrecciazones.Drillholesencounteredaconsistentnear-surfacebasemetalenrichmentzone,interpretedtobearegolithenrichment zone, which may account for some of the anomalous results in surface samples. Moreinterestingly,an8mto12mthick,shallowsouth-dippingzoneofanomalousbasemetal(400–500ppmCuand50–60ppmCo)was intersected inalldrillholes.Thesevalues representaround4x theCubackgroundandabout2xtheCobackgroundvalues(Table1).This anomalism is considered significant because in the Central African Copperbelt – the source of theexplorationmodel–therearemultiplemineralisedhorizons(associatedwithminorredoxboundaries)foundabovethebasalproductivezone.TheCompanywillnowfocus iseffortstotargetthebaseoftheMaralooFormation and themain transition zone from the underlying “red-bed” sandstones,which represents theprimarytargetandmostprospectivesettingforsignificantmineralisation.ForfurtherinformationrelatedtoKyarraCobaltProjectseeASXAnnouncement“SignificantCobaltintersectionsatKyarra”14/11/17.

For

per

sona

l use

onl

y

Page 9: DECEMBER 2017 QUARTERLY ACTIVITIES REPORT For personal … · On 19 July 2017, the Company signed a MOU with CMN for future offtake from Admiral Bay. The MOU contemplates the supply

9

Figure5:RegionalLocationMapshowingMetalicity’sKyarraProjectinrelationtonearbytenementholders

Source:Metalicity

E51/1756

E51/1755

E53/1894

248ppm Co, 553ppmNi

808ppmZn

839ppm Co, 2,100ppmNi

6,400ppmCo,3,000ppmCu

544ppmCo,2,400ppmNi

1,220ppmCo,3,590ppmNi

AreashowninFigure3

For

per

sona

l use

onl

y

Page 10: DECEMBER 2017 QUARTERLY ACTIVITIES REPORT For personal … · On 19 July 2017, the Company signed a MOU with CMN for future offtake from Admiral Bay. The MOU contemplates the supply

10

LITHIUMPROJECTS(100%MCT)

PilbaraLithiumProjectsThe Company completed an initial 500-600mRC drill program at the PilgangooraNorth Project aimed attesting for mineralized pegmatites extending north into the southern parts of the tenement, below thepegmatitesalreadymappedatsurface.Drillingintersectedpegmatitesineveryhole.Anomalouslithiumwasintersectedineveryhole.Subsequenttothedrillingprogram,theCompanyappointedlithiumexpertsfromCSAGlobaltoundertakeaprojectreviewandtargetingexerciseacrosstheCompany’sPilbaraLithiumprojects.Theresultswereverypositive with a number of new targets identified that have yet to be systematically tested withmodernexplorationtechniques.

CORPORATEANDFINANCIAL

The Company is completing a capital raising via an equity placement to institutional and sophisticatedinvestorsinNorthAmericaandAustralia.ProceedsoftheraisingaretobeinvestedindrillingtheNapierRangeZincProject,progressingtheAdmiralBayZincProjectPFS,andphase2drillingoftheKyarraCobaltProject.

DuringthequartertheCompanyappointedJustinBartontotheboardasanExecutiveDirector.

For

per

sona

l use

onl

y

Page 11: DECEMBER 2017 QUARTERLY ACTIVITIES REPORT For personal … · On 19 July 2017, the Company signed a MOU with CMN for future offtake from Admiral Bay. The MOU contemplates the supply

11

ENQUIRIES

Investors Media/InvestorRelations

MattGauci DavidTaskerManagingDirector ChapterOneAdvisors+61893241053 [email protected] david.tasker@lateral.com.auCompetentPersonStatementRegardingNapierRangeZincProjectSeeMetalicityAnnouncement30/10/17CompetentPersonStatementRegardingAdmiralBayProjectSeeMetalicityASXAnnouncement19/04/2017.

CompetentPersonStatementRegardingLithiumProjects

SeeMetalicityASXAnnouncement28/04/2017

CompetentPersonStatementRegardingKyarraCobaltProject

SeeMetalicityASXAnnouncementsof21/06/2017and21/07/2017

InaccordancewithListingRule5.23.2,theCompanyisnotawareofanynewinformationordatathatmateriallyaffectstheinformationincludedintheQuarterlyReportandtherelevantannouncementsreferredaboveand,inthecaseofestimatesofmineralresourcesororereserves,thatallmaterialassumptionsandtechnicalparametersunderpinningtheestimatesintheQuarterlyReportandrelevantannouncementsreferredabovecontinuetoapplyandhavenotmateriallychanged.