DECIPHERING OSHA'S SILICA REGULATIONS FOR FRAC SAND RESPONSIBLE PARTY Sand Company REGULATORY AGENCY MSHA Varies by Jurisdiction (MSHA/OSHA) COMPLIANCE DATE Meet Existing MSHA Requirements (MSHA is Proposing to Follow OSHA Requirements) REQUIREMENTS Sand Company, Contractors, Railroad Employees, All Neighboring Properties POTENTIAL STAKEHOLDERS & EMPLOYEES Typically follows OSHA DEADLINE FOR IMPLEMENTATION OF ENGINEERING CONTROLS Value-add to downstream stakeholders, load-out personnel benefit, OSHA RCS compliance at loadout BENEFICIARIES OF SANDTEC SAND PLANT TRANSLOAD REGULATORY AGENCY OSHA June 2018 COMPLIANCE DATE Transloaders, Truck Drivers, Railroad Employees POTENTIAL STAKEHOLDERS & EMPLOYEES June 2018 DEADLINE FOR IMPLEMENTATION OF ENGINEERING CONTROLS REGULATORY AGENCY OSHA June 2021 DEADLINE FOR IMPLEMENTATION OF ENGINEERING CONTROLS RESPONSIBLE PARTY Transload Owner + Possible Multi Employer Worksite REQUIREMENTS Evaluate/Test for Silica Dust Levels. If RCS > 0.025 mg/m 3 then: Written Silica Dust Plan, Medical Monitoring, Site Monitoring, Record Keeping BENEFICIARIES OF SANDTEC Transload personnel and truck drivers are protected. OSHA RCS compliance throughout facility RESPONSIBLE PARTY E&P/Operator Under Multi Employer Worksite + Each Individual Contractor COMPLIANCE DATE June 2018 REQUIREMENTS Evaluate/Test for Silica Dust Levels. If RCS > 0.025 mg/m 3 then: Written Silica Dust Plan, Medical Monitoring, Site Monitoring, Record Keeping POTENTIAL STAKEHOLDERS & EMPLOYEES E&P/Operator, Service Company, Wireline, Coil Tube, Truck Drivers, Fuelers, Water Haulers, Security, Site Cleanup BENEFICIARIES OF SANDTEC All personnel are protected including E&P, Service Co., Wireline, Security. OSHA RCS compliance for all employees and contractors. FRAC SITE PACKAGED SYSTEMS VACUUM SYSTEMS VERTICAL SILO SYSTEMS ARRMAZ SANDTEC ® ENGINEERING CONTROL OPTIONS FRAC SAND LIFE CYCLE OSHA = Occupational Safety and Health Administration MSHA = Mine Safety and Health Administration NIOSH = National Institute of Occupational Safety & Health RCS = Respirable Crystalline Silica PEL = Permissible Exposure Limit AL = Action Level RCS PEL = >0.05 mg/m 3 RCS AL = >0.25 mg/m 3 ; <0.05 mg/m 3 ENGINEERING CONTROLS COLOR LEGEND: NOTES: Meets Action Level Partially Meets Action Level May or May Not Meet Action Level Does Not Meet Action Level

DECIPHERING OSHA'S SILICA REGULATIONS FOR FRAC SAND...4800 State Road 60 East, Mulberry, FL 33860 [email protected] | +1-863-578-1206 aRRM.coazM | Play Total Maintenance Costs ($/ton

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: DECIPHERING OSHA'S SILICA REGULATIONS FOR FRAC SAND...4800 State Road 60 East, Mulberry, FL 33860 SandtEc@aRRMaz.coM | +1-863-578-1206 aRRM.coazM | Play Total Maintenance Costs ($/ton

OSHA = Occupational Safety and Health Administration

MSHA = Mine Safety and Health Administration

NIOSH = National Institute of Occupational Safety & Health

RCS = Respirable Crystalline Silica

PEL = Permissible Exposure Limit

AL = Action Level

RCS PEL = >0.05 mg/m3

RCS AL = >0.25 mg/m3; <0.05 mg/m3

ENGINEERING CONTROLS COLOR LEGEND:

NOTES:

Meets Action LevelPartially MeetsAction Level

May or May NotMeet Action Level

Does NotMeet Action Level

DECIPHERING OSHA'S SILICA REGULATIONS FOR FRAC SAND

RESPONSIBLE PARTY

Sand Company

REGULATORY AGENCY

MSHA

Varies by Jurisdiction (MSHA/OSHA)

COMPLIANCE DATE

Meet Existing MSHA Requirements (MSHA is Proposing to

Follow OSHA Requirements)

REQUIREMENTS

Sand Company, Contractors, Railroad Employees,

All Neighboring Properties

POTENTIAL STAKEHOLDERS& EMPLOYEES

Typically follows OSHA

DEADLINE FORIMPLEMENTATION OF

ENGINEERING CONTROLS

Value-add to downstream stakeholders, load-out personnel benefit,

OSHA RCS compliance at loadout

BENEFICIARIES OF SANDTEC

SAND PLANT

TRANSLOAD REGULATORY AGENCY

OSHA

June 2018

COMPLIANCE DATE

Transloaders, Truck Drivers,Railroad Employees

POTENTIAL STAKEHOLDERS& EMPLOYEES

June 2018

DEADLINE FORIMPLEMENTATION OF

ENGINEERING CONTROLS

REGULATORY AGENCY

OSHA

June 2021

DEADLINE FORIMPLEMENTATION OF

ENGINEERING CONTROLS

RESPONSIBLE PARTY

Transload Owner + Possible Multi Employer Worksite

REQUIREMENTS

Evaluate/Test for Silica Dust Levels. If RCS > 0.025 mg/m3 then:

Written Silica Dust Plan, MedicalMonitoring, Site Monitoring,

Record Keeping

BENEFICIARIES OF SANDTEC

Transload personnel and truck drivers are protected. OSHA RCS

compliance throughout facility

RESPONSIBLE PARTY

E&P/Operator Under Multi Employer Worksite +

Each Individual Contractor

COMPLIANCE DATE

June 2018

REQUIREMENTS

Evaluate/Test for Silica Dust Levels. If RCS > 0.025 mg/m3 then:

Written Silica Dust Plan, Medical Monitoring, Site Monitoring,

Record Keeping

POTENTIAL STAKEHOLDERS& EMPLOYEES

E&P/Operator, Service Company, Wireline, Coil Tube, Truck Drivers, Fuelers, Water Haulers, Security,

Site Cleanup

BENEFICIARIES OF SANDTEC

All personnel are protected including E&P, Service Co., Wireline, Security.

OSHA RCS compliance for all employees and contractors.

FRAC SITE

PAC

KA

GED

SYSTEM

S

VA

CU

UM

SY

ST

EM

S

VE

RT

ICA

L SILO

SY

ST

EM

S

AR

RM

AZ

SA

ND

TE

ENGINEERING CONTROL OPTIONSFRAC SAND LIFE CYCLE

OSHA = Occupational Safety and Health Administration

MSHA = Mine Safety and Health Administration

NIOSH = National Institute of Occupational Safety & Health

RCS = Respirable Crystalline Silica

PEL = Permissible Exposure Limit

AL = Action Level

RCS PEL = >0.05 mg/m3

RCS AL = >0.25 mg/m3; <0.05 mg/m3

ENGINEERING CONTROLS COLOR LEGEND:

NOTES:

Meets Action LevelPartially MeetsAction Level

May or May NotMeet Action Level

Does NotMeet Action Level

Page 2: DECIPHERING OSHA'S SILICA REGULATIONS FOR FRAC SAND...4800 State Road 60 East, Mulberry, FL 33860 SandtEc@aRRMaz.coM | +1-863-578-1206 aRRM.coazM | Play Total Maintenance Costs ($/ton

4800 State Road 60 East, Mulberry, FL [email protected] | +1-863-578-1206 | aRRMaz.coM

Play Total Maintenance Costs ($/ton Sand Pumped)

Low Dust Cost Reduction Factor (%)

Estimated M&R Savings ($/ton Sand Pumped)

Anardarko $1.33 - $1.71 70% $0.93 - $1.20

Appalachia $1.33 - $1.71 75% $1.00 - $1.28

Bakken $1.33 - $1.71 75% $1.00 - $1.28

Barnett $1.33 - $1.71 65% $0.87 - $1.11

DJ $1.33 - $1.71 75% $1.00 - $1.28

Eagle Ford $1.33 - $1.71 60% $0.80 - $1.03

Fayetteville $1.33 - $1.71 75% $1.00 - $1.28

Haynesville $1.33 - $1.71 75% $1.00 - $1.28

Permian $1.33 - $1.71 60% $0.80 - $1.03

Canada $1.33 - $1.71 75% $1.00 - $1.28

Above the PEL Above the AL Below the AL

IH Monitoring Costs ($/month) $149,400 - $194,200 $149,400 - $194,200 -

Written RCS Plan Yes Yes No

Pulmonary Function Test Yes Yes No

Chest X-ray Yes Yes No

Medical Record Keeping Req’d Yes Yes No

Potential OSHA Fines Yes Yes No

ESTiMATED REDuCED-DuST MAinTEnAnCE & REPAiR (M&R) SAvingS on FRAC SiTE EquiPMEnT (FiLTERS, RADiAToRS, FLuiDS)

The information contained herein is presented in good faith and believed to be accurate, however, ArrMaz Products, LP assumes no responsibility or liability for the information provided. ArrMaz Products, LP further makes no representations or warranties, either express or implied, of merchantability, fitness for a particular purpose or of any other nature with respect to the information or the product(s) to which the information refers.

© 2017 ArrMaz Products, LP. All rights reserved. This material may not be reproduced, displayed, modified or distributed without the express prior written permission of the copyright holder.

Combining the right chemistry with the right coating application method is vital for success. Since 1967, ArrMaz has been a trusted partner to the fertilizer, mining, phosphate and asphalt industries worldwide coating millions of tons of granular substances every year. With SandTec, we have applied our more than 50 years of coating technology expertise and adapted our proven coating application systems to meet the unique requirements of the oil and gas industry. Our team of engineers and technical experts will customize a system to address your specific needs while ensuring a high-quality, silica dust-reducing frac sand for hydraulic fracturing operations.

Be a part of the solution to lowering silica dust in the oil and gas industry. Discover how SandTec can improve your hydraulic fracturing operations. Email [email protected], call +1-863-578-1206 or visit www.ArrMaz.com for further information.

thE aRRMaz advantagE

ESTiMATED inDuSTRiAL HygiEniST (iH) CoSTS & REquiREMEnTS FoR RESPiRABLE CRySTALLinE SiLiCA (RCS) AT vARiouS ExPoSuRE LEvELS

Takeaway: Use of SandTec Results in M&R Equipment Savings of $0.80 - $1.28/ton of sand.

Takeaway: Being Above the AL can add Significant Monitoring Costs and Regulatory Requirements.

Assumptions for IH Monitoring Costs:• Perform (1) month of RCS sampling at hydraulic fracturing sites located in the Permian Basin of West Texas and within (3) hours’ drive from Midland, TX. • A quantity of (6) personnel monitors and (4) area monitors will be required per site per shift. • Operations are 24 hours per day with a (12) hour day shift and a (12) hour night shift. • There will be (26) days of operations per calendar month.• The final report to include all data and calculations required to determine Exposure Levels for total dust, total respirable dust, and total respirable crystalline silica dust, and to provide

the determination if the results indicate exceeding the PEL of 0.05 mg/m3, within the Action Level between 0.025 mg/m3 to 0.05 mg/m3, or below 0.025 mg/m3.• Personnel are responsible for all transportation to/from the site(s), lodging, meals, PPE, etc.

Source: Maintenance cost saving estimates provided by Schlumberger.