5
EQUIPMENTS: Misting machine DENGUE VIRUS EMISSIONS: Fumes of misting machine. OUTPUT: Site Free of Dengue DISCHARGES: Spillage of misting fumes, excess chemical, damaged PPEs INPUTS: Misting machine/sprayer, water ,electricity, manpower, chemical gloves, chemical mask, goggles MASS FLOW MAKATI DEVELOPMENT CORPORATION F-PM-02-07.01B QEHS Management System Date: September 10, 2010 EHS ASPECTS / HAZARDS IDENTIFICATION Project: RED OAK AT TWO SERENDRA Process/Activity: DENGUE VIRUS PREPARED BY: JF MENDOZA REVIEWED BY; GP IGNACIO MDC Safety Officer Project Manager

Dengue Virus

Embed Size (px)

DESCRIPTION

dengue awarenes

Citation preview

Page 1: Dengue Virus

EQUIPMENTS: Misting machine

DENGUE VIRUS

EMISSIONS: Fumes of misting machine.

OUTPUT: Site Free of Dengue

DISCHARGES: Spillage of misting fumes, excess chemical, damaged PPEs

INPUTS: Misting machine/sprayer, water ,electricity, manpower, chemical gloves, chemical mask, goggles

MASS FLOW

MAKATI DEVELOPMENT CORPORATION F-PM-02-07.01B QEHS Management System Date: September 10, 2010

EHS ASPECTS / HAZARDS IDENTIFICATIONProject:RED OAK AT TWO SERENDRA

Process/Activity: DENGUE VIRUS

PREPARED BY: JF MENDOZA REVIEWED BY; GP IGNACIO MDC Safety Officer Project Manager

Page 2: Dengue Virus

Health and Safety HazardsProcess Condition Organization Control

Condition for Hazardsand Impact to happen

Impact

N A E D I

Dengue mosquito X x -Stagnant water where mosquitoes lay their eggs

- Storage materials and hanging clothes in the dark places.

DeathSickness, Ill health

Use of damage electrical cables X x Performing misting and spraying. Electric shock

Misting fumes from machine x x Presence of leak from the machine Respiratory Illness,

Dizziness

Suffocation

MAKATI DEVELOPMENT CORPORATION F-PM-02-07.01A QEHS Management System Date: September 10, 2010

EHS ASPECTS / HAZARDS IDENTIFICATIONProject: RED OAK AT TWO SERENDRA

Process/Activity: PEST CONTROL

PREPARED BY: JF MENDOZA REVIEWED BY; GP IGNACIO MDC Safety Officer Project Manager

Page 3: Dengue Virus

MAKATI DEVELOPMENT CORPORATION F-PM-02-07.01B QEHS Management System Date: September 10, 2010EHS ASPECTS / HAZARDS IDENTIFICATION

Project: RED OAK AT TWO SERENDRAProcess/Activity: PEST CONTROL

Environmental AspectsProcess Condition Organization Control

Condition for Aspect and Impact to happen Impact

N A E D I

Spillage of chemical use in misting

X X -Wrong handling of materials-No proper storage

- Land and water contamination

- Air pollution

Disposal of chemical containers x X - No waste segregation - Land and water contamination

PREPARED BY: JF MENDOZA REVIEWED BY; GP IGNACIO MDC Safety Officer Project Manager

Page 4: Dengue Virus

Aspects C

ode

Aspects Sources Impact

Regulatory Provision

(Refer to EHS Files of

Regulatory Provisions)

Current Control Measures and Performance

Current Risk Level

Additional Measures Needed

Residual Risk Level

P D S R S/NS P D S R S/NS

Spillage of chemicals use in misting.

Wrong handling

No proper storage

Land and water contamination

RA 3931

PD 984 “Pollution Control Law”

Refer to MSDS of chemical regarding proper handling and storage.

Explain to user the health hazard of the chemical

2 2 1 4 NS

Disposal of chemical containers

No waste segregation for chemical containers

Land and Water contamination

RA 3931

PD 984 “Pollution Control Law

Provide waste bin for chemical containers such as,, paint containers, thinner cans and etc.

Proper hauling of waste should be haul by accredited DENR Hauler.

3 3 3 27 S Discuss during Toolbox meeting/safety meeting the importance of proper disposal and housekeeping of workplace.

3 2 2 12 NS

MAKATI DEVELOPMENT CORPORATION F-PM-02-07.02AQEHS Management System Date: September 10, 2010

REGISTRY OF ENVIRONMENTAL ASPECTS

PREPARED BY: JF MENDOZA REVIEWED BY; GP IGNACIO MDC Safety Officer Project Manager

Page 5: Dengue Virus

Hazard C

ode

Hazards Sources Impact

Regulatory Provision

(Refer to EHS Files of

Regulatory Provisions)

Current Control Measures and Performance

Current Risk Level

Additional Measures Needed

Residual Risk Level

P D S RS/NS

P D S R S/NS

Dengue mosquito

Stagnant water where mosquitoes lay their eggs (e.g. balcony, fire drum, flooring slope)

Death,

Sickness, Ill health

OSHS Rule 1070: Occupational Health and Environmental Control.

-Drain out all stagnant water.-Putting salt on the areas which are not possible to drain.-Perform misting on site and temfacil.

3 2 4 24 S Regular monitoring and apply salt on the areas considered

2 2 2 8 NS

Dengue mosquito

Storage materials and hanging clothes in the dark places.

DeathSickness, Ill health

OSHS Rule 1070: Occupational Health and Environmental Control.

-Perform regular housekeeping on the areas.-Instruct workers to avoid hanging clothes.Provide adequate lighting on the dark places.

3 3 3 27 S Regular monitoring and apply salt on the areas considered

2 2 2 8 NS

Use of damage electrical cables

Performing misting and spraying.

Electric shock OSHS D.O. 13 Section 12: Safety and Health Information

-Conduct inspection of tools and wiring cable prior to work.

-Use rated cable or royal cord extension.-Avoid working on wet areas.

3 3 3 27 S 3 2 1 6 NS

Misting fumes from machine.

Poor maintenance of misting machine.

Misting on enclosed area.

Respiratory Illness,

Dizziness

Suffocation

OSHS Rule 1410: Construction Safety

Regular maintenance of misting machine.

Use chemical mask recommended in the MSDS.

Assign two workers when conducting misting, to have an alternate schedule.

3 2 2 12 NS

MAKATI DEVELOPMENT CORPORATION F-PM-02-07.02BQEHS Management System Date: September 10, 2010

REGISTRY OF HEALTH & SAFETY HAZARDS

PREPARED BY: JF MENDOZA REVIEWED BY; GP IGNACIO MDC Safety Officer Project Manager