Page 1: Deployment of engineering data warehouse system (EDW) for

Deployment of engineering data warehouse system (EDW) for EPC project execution

© 2019 AVEVA Group plc and its subsidiaries. All rights reserved.

Presenter: Maxim Dorozhkin

03-12-2019

Page 2: Deployment of engineering data warehouse system (EDW) for

Digital twins for EPC project and Plant Operations

© 2019 AVEVA Group plc and its subsidiaries. All rights reserved.

Training

Optimization

Digital Twin of EPC project

CAPEX

Operations management

Analysis, planning

and control

Handover

Commissioning

Procurement contracting

Engineering

Startup

Digital Twin of Owner-Operator

OPEX

Fabrication and procurement

Construction management

Upgrades

Maintenance

Page 3: Deployment of engineering data warehouse system (EDW) for

Background

• Russian oil and gas company (Operator) is executing a Plant construction mega-project

• Operator has previously created a Digital Twin at another Plant construction mega-

project using AVEVA solutions

• In order to create a similar Digital Twin at a new Plant Operator developed stringent

engineering data requirements and included them in EPC contract

• Leading Russian engineering, procurement and construction management company (EPC

Co) is participating in a new Plant construction project

• EPC Co decided to deploy EDWS based on AVEVA solutions to comply with Operator’s

contractual requirements

© 2019 AVEVA Group plc and its subsidiaries. All rights reserved.

Page 4: Deployment of engineering data warehouse system (EDW) for

EDW Components

© 2019 AVEVA Group plc and its subsidiaries. All rights reserved.

TOOLSPROCESSES

ENGINEERING DATA REQUIREMENTS

SKILLSAND ROLES OF STAFF

Focal topics

Tags and their attributes from technical

documentation, 1D, 2D and3D CAD, project execution

schedules, procurement and construction management

systems and all combinations of links between tags and

documents

Page 5: Deployment of engineering data warehouse system (EDW) for

EDW Workflow

© 2019 AVEVA Group plc and its subsidiaries. All rights reserved.

Tag import into EDWS

Tag and attributes validation

Tag creation and use

Publishing of validated tags

Handover to Operator

Step 1 Step 2 Step 3 Step 4 Step 5

Page 6: Deployment of engineering data warehouse system (EDW) for

Step 1 – Tag creation and use

© 2019 AVEVA Group plc and its subsidiaries. All rights reserved.

Decision to use a specific pump

Creation of the pump with tag name and attributes in a P&ID master system

Selection of a tag name for the pump and capturing it in a tag list

Issuance of P&ID document with the tagged pump

1

Issuance of a data sheet for the pump with its tag name

Management of change for the pump tag attributes

Modeling of the pump in 3D model with its tag name

NOT EXHAUSTIVE

Issuance of a Purchase Order for the pump with its tag name

2

4

6

8

3

5

7

Tag name must be used consistently across the entire Project/Plant lifecycle

Page 7: Deployment of engineering data warehouse system (EDW) for

Step 2 – Tag import into EDW

© 2019 AVEVA Group plc and its subsidiaries. All rights reserved.

GA

TEW

AYS

• Technical documentation

management system

(TDMS)

• 3D model

• CAD systems

• Internal tag lists developed

by engineers

Page 8: Deployment of engineering data warehouse system (EDW) for

Step 3 – Tag and attribute validation

© 2019 AVEVA Group plc and its subsidiaries. All rights reserved.

Need to fix mandatory attributes

• If mandatory tag

attributes are missing, the

respective tags are moved

to the «Purgatory» for

quick fixing

Ready for publishing

Need to update other attributes

• It is necessary if other

tag attributes have not

been captured in CAD

systems or technical

documentation

• Validated tags and

attributes do not require

any additional work at this

stage

There are 3 typical outcomes of automated tag validation:

Page 9: Deployment of engineering data warehouse system (EDW) for

Step 5 – Handover to Operator

© 2019 AVEVA Group plc and its subsidiaries. All rights reserved.

EPC Co

• Hands over contractually

required engineering data,

technical documentation

and 3D model

• Fixes errors identified by

Operator

• Does not hand over other

engineering data created

and updated during EPC

project

Operator

• Links engineering data with

technical documentation

and 3D model

• Automatically checks

engineering data

• Will get a complete set of

validated engineering data by

the date of Plant handover to

Operations

Page 10: Deployment of engineering data warehouse system (EDW) for

EDWS Tools

© 2019 AVEVA Group plc and its subsidiaries. All rights reserved.

Technical

documentation

mgmt. system

Computer-

aided design

systems

Gateways

Data

preparation

PreProcessor и Gatekeeper

Data validation,

the «Purgatory»

Workhub и Dashboard

Data storage and

visualization

Engineering

Update of missing

attributes

AVEVA Global

Synchronization

with Operator

Information Standards Manager

Information model

management

Engineering data

from suppliers and

subcontractors

Page 11: Deployment of engineering data warehouse system (EDW) for

First Results

© 2019 AVEVA Group plc and its subsidiaries. All rights reserved.

• Project completed on budget and on schedule

• Completed first handover of engineering data to Operator using EDW

• Found and fixed errors in tag registers that were previously handed over to Operator

• Identified errors in engineering data delivered by suppliers

• Project team started to use visualization and reporting capabilities of Net Portal for

3D model progress tracking and for engineering progress reviews at team meetings

EDW deployment completed on 29-11-2019:

Page 12: Deployment of engineering data warehouse system (EDW) for

Lessons Learned

© 2019 AVEVA Group plc and its subsidiaries. All rights reserved.

• Operator developed engineering data

management requirements and

procedures BEFORE signing EPC contract

• EPC Co had engineering data management

competencies prior to the beginning of

EDWS deployment

• EPC Co appointed one of directors to be in

charge of the project

• EPC Co had to put a lot of efforts into

development of internal processes and

managing resistance to change

• Globally, there is lack of skilled engineering

data management professionals. Hiring

right people with right skills takes time

Page 13: Deployment of engineering data warehouse system (EDW) for

linkedin.com/company/aveva

@avevagroup

ABOUT AVEVA

AVEVA is a global leader in engineering and industrial software driving digital transformation across the entire asset and operational life cycle of capital-intensive industries.

The company’s engineering, planning and operations, asset performance, and monitoring and control solutions deliver proven results to over 16,000 customers across the globe. Its customers are supported by the largest industrial software ecosystem, including 4,200 partners and 5,700 certified developers. AVEVA is headquartered in Cambridge, UK, with over 4,400 employees at 80 locations in over 40 countries.

aveva.com

© 2019 AVEVA Group plc and its subsidiaries. All rights reserved.