Desalination & Membrane Technology Division
Ref.: BARC/ChEG/DMTD/AKS/F&R- 10 /2021/ I/6966/2021/P-16171 25th November, 2021
To,
List of Firms in Annexure
Sub: Invitation to submit your quotation
On behalf of the President of India, Head, Desalination & Membrane Technology Division, Bhabha
Atomic Research Centre invites quotation in sealed envelope for the work given below as per the
technical specifications enclosed in Annexure-1.
S. No. Description of Job Completion Period
1
Fabrication, pre-despatch inspection, supply, installation
and commissioning of 1000 LPH capacity, BARC
Technology based Arsenic removal community scale Water
Purification plant with Smart Card Dispenser water ATM
& IOT enabled facility for providing safe drinking water to
the local villagers at Gram Panchayat Icchapur II, Gaighata,
North 24 Parganas, West Bengal
4 months from
the date of issue of
work order
The terms and conditions are given below:
1. Qualifying Criteria for Bidders:
The bidder should be a BARC licensee of membrane-based water purification technologies with
past experience of fabrication, installation and operation of community-scale water treatment
plants.
2. The quotation envelope shall be superscripted with “Arsenic water purification plant” and the
Tender Enquiry Ref. No. mentioned above along with Due Date.
3. Printed Letter Head: Quotation should be printed on the letter head; computer generated &
scanned quotation is not valid.
4. Validity of the Offer: Validity of the offer shall be 90 days from date of opening of quotation.
Amit Singha
Email: [email protected]
Tel: 022 2559 4737
Due Date: 16/12/2021
Time: 16:00 hrs
Trombay, Mumbai -400085
5. Offer of Firm: Offer of those bidders, who do not submit their quotation as per the details given
in the technical specification with price as in the price quote format, and incomplete quotations in
any respect shall not be considered.
6. GST/PAN Number: Quotation must contain the GST and PAN number of the firm.
7. Guarantee/Warrantee: Bidder shall have to give guarantee/warrantee of the quality and
workmanship of work done for the period of 12 months from the date of completion of the work.
8. If any of the employee, consultant or partner of the bidder’s company is an Ex-BARC employee,
the same must be stated in the quotation clearly.
9. The complete quotation shall reach the following address on or before 16/12/2021, by only Indian
Postal Service.
Head, Desalination & Membrane Technology Division,
Bhabha Atomic Research Centre
Trombay, Mumbai - 400 085
Attention: A. K. Singha (SA/E), DMTD
Tel: 25594737
10. Head Desalination & Membrane Technology Division, BARC reserves the right to accept any
quotation or reject any or all quotations without assigning any reason.
11. The department reserves right to extend the date of opening the quotations.
12. Criteria for Evaluation of Tender: Work order will be awarded to technically suitable lowest
bidder.
13. Free Issue Material: No free issue material is involved in this job
14. Inspection Clause: The work will be subjected to inspection by our engineers during fabrication
at vendor’s work place before final acceptance for supply.
i. Piping & tanks, pre filter, of the plant will be subjected to leak-proof / hydrotesting before
acceptance.
ii. Performance Test certificate and material test certificate of Various pump & instruments
are to be provided during inspection
15. Transportation, Unloading, Erection and Commissioning
The water treatment plant duly inspected and cleared by departmental representative is to be
supplied at Gram Panchayat Icchapur II, Gaighata, North 24 Parganas, West Bengal in safe
condition, followed by erection & commissioning. Packing and forwarding is part of the contract.
16. Place of Delivery: Safe transportation and unloading of material are included in the scope of work.
Place of delivery is Village Gutri, PO: Thakunagar, Gram Panchayat Icchapur II, Gaighata, North
24 Parganas, West Bengal
17. Safety Rule: The contractor shall follow all the safety procedures as per the normal industrial
practice during the execution of the job at site. Any mishap occurring during the work due to unsafe
workmanship shall be the contractor’s liability.
18. Job Completion period (Delivery Schedule): The Plant duly inspected and tested is to supplied
installed & commissioned within 4 months from the date of firm purchase order.
19. The execution of the work is to be carried out to the satisfaction of our Engineers.
20. Payment Terms: Accounts Division, BARC, Mumbai-400085 shall make full and final payment
only after submission of the satisfactory work completion certificate & site clearance certificate
issued by the undersigned, bill, advanced stamped receipt, delivery challan and guarantee
certificate. No advance is admissible.
21. GSTN Invoice: GST shall be paid only in case of registered supplier clearly indicating their GSTN
on the invoice. Invoice raised by registered supplier of taxable goods/services should specifically
indicates, along with other details
a. GSTN
b. PAN
c. Location of supply
d. Tax component to be separately indicated in the invoice
e. An undertaking shall be submitted by the registered supplier that the GST has been
promptly deposited with the authorities (as per the format given in Annexure 2)
22. Income Tax Recovery Clause: GST TDS @ 1.5 % or as applicable will be deducted from the bill
and the entire amount will be deposited in GST account of the supplier.
23. Penalty: Any delay, which is attributable to the contractor, is liable for penalty @ 0.5% per week
(max. 5%) and shall be imposed on contractor.
24. Housekeeping at the work place during the course of the work is the sole responsibility of the
contractor.
25. Mode of payment: Payment will be released through ECS, the party has to fill the ECS/RTG form
and submit with the delivery challan and Bill/Tax Invoice.
26. Confidential Clauses:
i. Confidentiality: No party shall disclose any information to any third party concerning matters
under this contract generally, In particular, any information identified as “Proprietary” in nature
by the disclosing party shall be kept strictly confidential by the receiving party shall not be
disclosed to any third party without the prior written consent of the original disclosing party. This
clause shall apply to the sub-contractors, consultants, advisors, or the employees engaged by a
party with equal force.
ii. “Restricted information” categories under Section 18 of the Atomic Energy Act, 1962 and
“Official secrets” under section 5 of the of the Official Secret Act, 1923: Any contravention of the
above mentioned provisions by any contractor, sub- contractor, consultant, advisor or the
employee of a contractor will invite Penal consequences under the aforesaid legislation.
iii. Prohibition against use of BARC’s name without permission for any publicity purpose: The
contractor or sub-contractor, consultant, advisor or the employees engaged by the contractor shall
not use BARC’s name for any publicity purpose through any media like press, TV or internet,
without the prior written approval of BARC.
27. Security Rules:
a) Police verification certificates are required for supervisors and labourers deployed at the site.
b) Security rules and transport rules at BARC, Trombay premises shall be strictly followed.
c) Labourers below 18 years of age shall be not allowed to work at site.
28. Bid Security Declaration: Bid Security Declaration on bidders letter head is to be submitted along
with the bid. Tenders not accompanied with Bid Security Declaration are liable for rejection. If the
bidder withdraws or modify their bid during the period of validity, the bidder will be suspended
from bidding in any BARC NIT, for a period of 1 year from the date of with-drawl / modification.
Thanking you,
Yours faithfully,
A. K. Singha
SA/E, DMTD
1
Annexure-1
Technical Specifications for 1000 LPH Arsenic Removal Plant with Smart Card Dispenser
Water ATM system & IOT enabled at Village Gutri, Ichaapur II GP, Dist. North 24
Parganas, West Bengal
1.1 Scope of work
Setting up of a community scale, 1000 liters per hour (LPH) Arsenic removal plant, Reagent
dosing units, static mixer, pre filter, media Filters, Ultrafiltration membrane module, Tanks,
pumps, Smart card dispenser water ATM system & IOT enabled at Village Ichaapur, Gram
panchayat to provide safe drinking water to the Village population. It includes supply, pre
dispatch inspection, installation and commissioning of the Arsenic water treatment plant at
site with one year of consumable chemicals.
1.2 Place
Village Gutri, PO: Thakunagar, Gram Panchayat Icchapur II, Gaighata, North 24 Parganas,,
West Bengal
1.3 Feed water Characteristics: Source of water (Bore Well Water)
Sr. No. Parameter Value
1 Inlet Water TDS Less than 500 mg / litre
2 Inlet Water Turbidity Less than 5 NTU
3 Inlet Water Chlorine Nil
4 Arsenic 500 ppb (max)
1.4 Guaranteed Product Water Quality & Quantity:
Output Water Quality: IS: 10500, 2012
TDS: Less than 500 ppm
Arsenic: Less than 10 ppb
Output Water Capacity: 1000 Ltrs. / hour
1.5 Treatment process
The feed water will be provided from bore-well source near the plant in which two reagents
chemicals will be dosed while passing through a static mixer which will then be feed to the
water settling. Feed from the settling tank through a feed pump will deliver the feed water
at a pressure of 2 kg/cm2 to the filtration unit having bag filter, PSF, ACF/ Media filter for
removal of particulate solids from the raw feed water. The filtered water will then be passed
through a ultrafiltration membrane unit. The product water will be taken to the storage tank
for distribution from where people will fill water through water ATM dispenser for their
usage. The UF will be intermittently fast flushed and the reject of the fast-flush will be
taken to the raw water storage tank. The raw water storage tank will be cleaned
intermittently and the drain of the tank will be sent to filtration tank for filtration of arsenic
particulates. All the drains, reject stream will also be collected in filtration tank. Item wise
specification are mentioned under the scope of supply table
2
2 Scope of Supply:
Sl.No Equipment/System Qty
1 Intake water system: 1 Set
1.1 Raw water storage tank 2000 lit, MOC: PVC (Make: Sintex or equivalent) with
valves and level switch and level indicator.
1 no
1.2
Raw feed water pump
Capacity:1200 lit/hr, @ 3kg/cm2, Make: Kirloskar or Equivalent
1 no
1.3 Rotameter (Acrylic/Glass) 1 no
1.4
Piping & Valves:
Piping borewell to Lamella clarifier with valves, MOC of Pipe & valves : UPVC
or CPVC or equivalent, Size : 2inch, Pressure rated up to 150 psi
1 no
2
Reagent 1 (2a) and 2 (2b) dosing system 2 Sets.
2.1 Tank : 50 liters FRP/SS304 with drainage valve with agitator mounting support 2 nos.
2.2 Pump: 0–5 liters per hour (lph) @ 3.5kg/cm2, with flow adjustable 2 nos.
2.3 Agitator:
Maximum stirring capacity: 40litrs
Motor rating:100-150 Watt
2 nos.
3 Arsenic Precipitation system 1 Set.
3.1
Static Mixer
0.5 m length, MOC: SS 304
1 nos
3.2
Lamella clarifier
LC Size: Approximate1 mtr x 1mtr x 1.5 mtr, MOC: MSFRP
1 no
3.3
Flash mixture with agitator
Vol.:500 ltrs, MOC: MSFRP
1 no
4 Clarified water hold up tank
2000 lit, MOC: PVC (Make : Sintex or equivalent) with valves and level switch
and level indicator
1 no
5 Feed Water Pump
Flow:1200 lit/hr, @ 3kg/cm2
Make: Kirloskar or Equivalent
1 no
5 Multi media filter skid
Degree of filtration size: 5-10 micron
Pressure drop: 3-7 PSI,flow:1.5 m3/hr.
1 no
6 UF filtration system:
UF Membrane module, FRP vessel, piping & valving with skid
UF Spiral Wound 4040 membrane element with pressure vessel module-4nos
with piping and valving arrangement. SS Square pipe 40x40 mmx1.6mm Mirror
finish
1 no
7 UV System
Treatment of 1000 litr/hr
1 no
8 Product water storage Tank
Volume:2000 liters tank, MOC:SS 304
1 no
3
9 Backwash Pump
Flow:2000 lit/hr, @ 2kg/cm2
Make: Kirloskar or Equivalent
1 no
10 Auto Dispensing system with smart card
Sim card based drinking water (2-4 outlets) dispensing system
1 no
11 Sludge management system 1 no
11.1
Holdup tank
Tank capacity : 2000litr, MOC:PVC
1 no
11.2 Semi automatic filter press
Filter press capacity:500 liters /hr
1 no
12 Control Panel with IOT system 1 no
13 Pipe/fitting/ Valves with skid system
MOC of Pipe : UPVC or CPVC or equivalent, Size : 1.5 inch for 1.5 m3/hr, 1
inch for 1 m3/hr flow rate
Pressure rated up to 150 psi
1 lot
14 Process Instrumentation 1 lot
15 Civil Base work (6mtr X 6mtr)
As per drawing provided
1 lot
16 Plant Shelter room
As per drawing provided
1 no
17 Operators desk
Wooden table with 3 drawers, 1 no. of office chair, 2 nos. of plastic chair
1 set
18 Electrical work
Ceiling fan, Tube light, Exhaust fan, switch board, MCB for incoming line
1 lot
3 Reference Drawings
1. Title
Drawing No.
:
:
GA Layout of Plant Equipments
DMTD/AKS/ARSENIC/01
2 Title
Drawing No.
:
:
P & I Diagram of WTP plant
DMTD/AKS/ARSENIC/02
3 Title
Drawing No.
:
:
Plant Shelter Room
DMTD/AKS/ARSENIC/03
4 Power Supply
During erection &commissioning at site, power supply will be provided at one point.
Electrical cabling, electrical connection up to individual motor/s, Panels, panel indicators
and instruments will be in contractor’s scope.
5 Feed Water Supply
Feed water to water treatment plant will be sourced form a borewell near the plant (not in
the scope of contractor). However, piping@ max 20 meters 1.5” size, & MOC: PVC/CPVC
from the borewell pump to feed holdup tank through static mixer and associated supports
are in contractor’s scope of the present tender.
4
6 Drawings
Drawings annexed are for tender purpose, prepared with a view to give an idea of extent of
work in contractor’s scope. Detailed fabrication drawing shall be made after placement of
work order.
7 Inspection & Testing
Individual equipment/sub-system like pumps, tanks and instruments will be inspected by
the purchaser’s representative/s at vendor’s works or any other place arranged by the
vendor. Necessary tools, gauges and other inspection kits should be arranged by the vendor
at the time of inspection & testing. Vendor should submit material test certificates of the
pumps, motor/s and instruments, from the respective manufacturer at the time of pre
despatch inspection. Only after the clearances obtained from the purchaser, the water
treatment plant should be transported to site for erection & commissioning. Adequate
advance intimation of not less than 7 days (for Mumbai) and 15 days (for outside Mumbai)
should be given in writing to the purchaser to enable him to arrange for inspection.
Inspection will be done online, Virtual/Offline, in presence, depending upon the situation
decided by BARC.
8 Documents
Maintenance and operation manual for bought out items are to be submitted along with the
supply.
9 Packing
The Equipment are to be drained completely after satisfactory pre dispatch inspection
performance test and all openings should be properly closed or sealed before dispatch to
site.
10 Domain of the System
Starting point Pipe connection from borewell pump discharge (Borwell pump
supply out of scope).
Termination
point
(i) Automatic dispensation of purified water into Jars/cans to smart
card holders from product water tank.
(ii) Collection of arsenic sludge from the plant & storage.
(iii) Termination of drains form the plant to nearest main drain line.
11 Guarantee Period
The individual equipment/sub-system and the whole system should be guaranteed by the
contractor for trouble-free & satisfactory operation for a minimum period 12 months from
the date of handing over of the plant. Any cause of non-performance of any equipment/sub-
system/system during the guarantee period should be identified and rectified including free
replacement of parts, if any; by the vendor to the satisfaction of the purchaser and in case
of unreasonable delay (more than 15 days), delay period will be added to the remaining
period of the guarantee.
5
12 Desired Completion Period
Fabrication, installation, supply and commissioning of the water treatment plant must be
completed within 4 months from the date of firm work Order.
13 Notes
1. All requirements inclusive of manpower with respect to unloading of equipment/materials/
Unit, erection and installation at site will have to be arranged by the contractor.
2. Commissioning of the plant is the sole responsibility of the contractor.
3. Electrical connection of the electrical panel from the electrical source provided at site is the
responsibility of the contractor.
4. Any cost regarding boarding and lodging of contractor personnel’s are to be borne by the
contractor.
5. One year of consumable chemicals/reagents to be provided along with supply.
6. Site expenses related to Bhoomi Pujan & plant inauguration ceremony are to be considered
in the quote.
Detail description of components
1. Intake water system:
Raw water storage tank with level switch
Purpose : To be used for the storage of raw intake water for purification through plant
Capacity : 2000 Liters tank with removable lid.
MOC : PVC/FRP , Make: Sintex
Nozzles : opening on top of for product inlet
opening on side bottom for pump suction with bypass drain valve
opening on top side of the tank for overflow.
spare opening at side top closed with tank fitting and UPVC valves.
Provide the level switch and interlock with feed water pump.
Overflow line should be provided at top of the tank.
Low level and high level switch interlock should be provided with operation of bore well
pump to maintain the level of the raw water storage tank
Raw feed water pump:
Purpose: The pump is required to continuous supply of the raw water to the Lamella
clarifier.
Pump Type : Centrifugal Pump
Duty : Continuous
Quantity : 1 No.
Make : Grundfos, CRI, Lubi,
Rated Capacity (m3/hr) : 1.2 m3/hr
Total Head at Rated Capacity : 20 meters
Suction : From tank (Flooded Suction)
MOC of wetted parts : SS 304
Drive Motor Conn. : Direct coupled
Motor HP : As offered by pump manufacturer
Type of Enclosure : IP – 65
Class of Insulation : F (with temperature rise limited to class B)
Preferred Make : Crompton/ Bharat Bijlee/ equivalent
Piping: Piping work is to be done from existing borewell point to raw water feed tank.
Provision for bypass the excess water should be made. Approximate 25mtrs line.
6
MOC of pipe & valves : UPVC or CPVC or equivalent
Size : 2inch , Pressure rated up to 150 psi
Rotameter:
Purpose: To measure the desired raw flow rate of water
Flow range : 0-40 lpm with 2 lpm graduation
MOC: Acrylic / Glass
Body and Cover :Powder coated MS/SS 304
Float : Corrosive resistant material
Bore well Pump will be installed at outside of the plant and piping is to be done pump
to plant area. Approximate 1500 lit feed water should be supplied to the (Lamella
clarifier) plant through Rotameter and excess water should be returned back to the
bore well by proper by pass piping system. One sampling point should be provide at
the pump out let.
2. Reagent dosing system:
Tank mounted chemical Reagent 1 & 2 dosing system for two different chemical dosing
into the feed water line. A single skid (base frame,Size:1.5mtrx 0.6mtr) is to be made to
fix the both reagent system. Mountings are to be provided with base skid for fixing the
Pumps and agitators.
Dosing Pump : To dose reagent solutions in the line to incoming feed
Type : Plunger type Electromagnetic Metering Pump
Quantity : 2 Nos.
Capacity : 0 – 2 LPH @ 3.5kg/cm2
Material of construction:
Pump head : PVDF
Suction tubing : PTFE/PU
Discharge tubing : PVC braided hose/PU tubing
Dosing Tank : Tank with removable lid
Capacity : 50 liters
MOC : PVC tank with MS Support mounting
Tubing : 10 mtrs PP tubing of 8-10mm dia.
Note: Both frequency and stroke length adjustment should be available for controlling
the pump flow rate to control the reagent dosing parameter.
Reagent tank: 2 Sets
Tank will be required to mix the 40lit reagent in a batch. It should have a lid (10-
12inch)with opening on top for dosing pump suction tube inlet provision should be made
for mounting the dosing pump with the separate MS support structure.
Tank should have a side mounted Level gauge/indicator. Low level Switch with interlock
with dosing pump and feed pump. A ½” outlet at side bottom for drain should be provided.
Tank MOC: PVC/FRP
Capacity:50 lit
Agitator: 2 Sets
Purpose: Continuous mixing of reagent in the tank during plant operation.
Make : REMI or equivalent
Maximum stirring capacity: 40litrs
Motor rating:100-150 Watt
Max.Torque:60 Ncm
Speed range :50-2200 RPM
7
Speed & Torque display: LCD
Motor Overload protection: LED light flash, auto stop
Chuck ID :13mm , Stirring Shaft Dia. x Length (mm) : 14 x600mm
Protection class acc. to DIN/EN 60529 IP 42
Maintenance free Brushless DC motor ensures high torque
Accurate stirring speed control, Stopper for protection of vessel & shaft.
Special base design for topple free operation and it should be mounted with base structure
of agitation system.
Static mixture:
Purpose: It is a static cylindrical pipe with corrugated plates/baffles which provides mixing
of reagent chemicals with feed water by assistance of turbulence. Each one static mixture
will be fixed after one dosing point. It will be fixed as per the reference drawing
3. Flash Mixture and Lamella clarifier
Purpose: To provide residence time for the feed stream to react with reagents& settling of
formed precipitated at the bottom of holdup tank, with clear overflow to the pump suction
chamber.
Supply components:
• Flash mixture tank : Rectangular 500litrs, MOC:FRP with drain valve
• Quantity: 1 no.
• Agitator: Remi make, Slow speed range for proper mixing of chemicals
• Lamella clarifier tanks assembly with required plates (2 sets) MOC: FRP with drain
valve
• Powder coated MS Support structure and platform with ladder etc .
The Tank is having two compartments. Feed stream will overflow from one compartment
to other. First compartment will be flash mixture tank with agitator and second tank is
lamella clarifier.
Flash mixture and Lamella clarifiers should be designed on the Basis of following
parameter
Feed Flow rate: 1200 LPH
Suspended particles in feed :~1000mg/lit
Feed water Turbidity: ~35-40 NTU
Outlet Turbidity: 0-2 NTU
Specification lamella clarifier:
Feed Water Source Under ground water; activated sludge mixed liquor
Max. Suspended Solids 1000 mg/L
Dosing Chemicals for Arsenic (500 ppb) and Iron (5 ppm) precipitation
Suspended Solids Reduction Up to 90% (with coagulation/flocculation)
Lamella Plate Angle: 60 degrees
Lamella Plate Thickness: 6mm
Lamella Plate Spacing: 8-10 cm
LC size: Approximate- ~1mtr. x 1mtr. x1.3mtr.Volume:1200 lit (approximate)
Mounting: To be mounted on the skid with bottom drain from each compartment
Operating flow to the system : 1.2 m3/hr.
MOC : SS 316
Quantity : 2 nos.
Length : 0.5 m
8
Tank and mounting MOC : FRP tanks and plate for lamella with MS powder coated
support structure and MS ladder and platform for Operation and maintenance work.
Note: Vender may quote the standard models close to the specification meeting with
minimum requirements of settling the suspended particles from raw water as mentioned
above.
4. Clarified water hold up tank
Purpose : To be used for the storage of treated feedwater for purification through UF
membrane element/s
Quantity: 1 no.
Capacity : 2000 Liters tank with removable lid.
MOC : PVC/FRP , Make: Sintex
Nozzles : opening on top of for product inlet
opening on side bottom for pump suction
opening on top side of the tank for overflow.
opening on bottom/side for drain
spare opening at side top closed with bush
Provide the low level switch and interlock with feed water pump operation.
5. Feed Pump
Purpose: To pump feed water from feed tank to Prefilter, Media filters, UF element’s
Pump Type : Centrifugal Pump
Duty : Continuous
Quantity : 1 no.
Make : Grundfos, CRI, Lubi,
Rated Capacity (m3/hr) : 1.2 m3/hr
Total Head at Rated Capacity : 30 meters
Suction : From tank (Flooded Suction)
MOC of wetted parts : SS 304
Drive Motor Conn. : Direct coupled
Motor HP : As offered by pump manufacturer
Type of Enclosure : IP – 65
Class of Insulation : F (with temperature rise limited to class B)
Preferred Make : Crompton/ Bharat Bijlee/ equivalent
6. Multi media filter system:
Multi-media filter is a pressure filter vessel with three or more different media above
the gravel bed. The three media are ordered in decreasing porosity.
Purpose: For removal of coarse particles for the feed stream.
Quantity :2 nos.
Inlet flow :1.2 m3/hr
Temperature :Ambient
Pressure Available at the inlet :2 kg/cm2 (max.)
Remove the particle less than 10 micron
Pressure drop in clean media is 3-7 psi
Filter Media: large gravel, Fine gravel, Fine sand (0.4-0.6mm) and Anthracite coal
grains 90.5 -1.2mm)
MOC of housing : FRP with Powder coated MS support structure
Back washing arrangement for each of media column.
This filter assembly will be consisted with two media filtration column ,one in
operation and one will be stand by for backwashing.
9
7. UF Membrane module
Purpose: For removal of arsenic particulates & microbial contaminants for the feed water.
Type: Spiral wound ultrafiltration 4040 Membrane with FRP Pressure vessel.
Membrane area for single 4040 module module :7.2 m2
Max Feed Flow rate :1.5 m3/hr
Min conc Flow rate :1 m3/hr
Max Operating pressure :7.0 bar
Max Operating Temperature :450C
Nominal MWCO :30,000 (30 KD)
Membrane Type :Spiral wound
Membrane Polymer :Polyether Sulphone
Membrane wrapping :FRP Wrapped
Maximum Pressure
drop/element
:1 Bar
Quantity :4 Nos.
8. UV system
Purpose: For treatment of purified water for microbial contaminants before supply
MOC: SS 304
Quantity: 1 no.
Temp: Ambient
Light Source: UV 254 nm
Capacity: suitable for 1200 LPH permeate flow
9. Product water storage tank
Purpose : To be used for the storage of product water for distribution & fast flush/backwash
of UF membrane element/s
Quantity: 1no.
Capacity: 2000 Liters tank with removable lid.
MOC : SS 304/FRP ,
Nozzles: opening on top of for product inlet
opening on side bottom for pump suction
opening on top side of the tank for overflow.
opening on bottom/side for drain
spare opening at side top closed with bush
10. Fast flush/Backwash Pump
Purpose: For intermittent cleaning/backwashing of Media filter, membrane elements
during operation
Pump Type : Centrifugal Pump
Duty : Intermittent
Quantity : 1 no.
Make : Grundfos, CRI. Lubi
Rated Capacity (m3/hr) : 2 m3/hr
Total Head at Rated Capacity : 20 meters
Suction : From product water tank (Flooded Suction)
Liquid Handled; TDS (ppm) : UF product water
Pump Wetted parts (MOC) : SS 304
10
Drive Motor Conn. : Direct coupled
Motor HP : as offered by pump manufacturer
Type of Enclosure : IP – 65
Class of Insulation : F (with temperature rise limited to class B)
Preferred Make : Crompton/ Bharat Bijlee/equivalent
11. Auto Dispensing System with smart card and tap bank
Nozzle with flow sensors & solenoid valve
SIM card sensor facility with 2 hrs. Battery backup
Tap bank containing 4 nos. of tap.
Smart Cards: 400 nos. synchronized with Auto Dispensing System
12. Sludge management system
Purpose: Sludge dewatering after chemical precipitation of contaminated water. A
batch operation, fixed volume machine that separates liquids and solids using pressure
filtration. A slurry is pumped into the filter press and dewatered under pressure to
separate the solid particles.
Sludge water hold up tank:
Sludge water storage tank capacity: 2000 lit
Mounting: To be mounted on the skid with opening at side bottom & bottom of tank for
drain
MOC: PVC/FRP
Filter press:
Technical features of filter press:
Type: Semi Automatic filter press
Type of Element: Polypropelene recess
Capacity :500 litrs/hr
Solid content in the slurry: Maximum 10%
Bulk density of wet solid:1.1gm/cc
pH of slurry:8.5
Plate size:610mm x 610mm (to be confirmed by vendor)
Number of plate : 10 nos (to be confirmed by vendor)
Closing device: Hydraulic closing device with mechanical lock nut system
Type of delivery: Open delivery
Type of feed: Center feed
MOC of components:
Plate: Polypropylene
Body & structure: MS material IS 2062
Filter cloth: Polypropylene Butterfly type cloth 540GSM
Note: Vender may quote the standard models close to the specification meeting with
minimum requirements of slurry capacity and cake holding capacity.
Piping and valves:
Lines (1.5 inch) are to be drawn from lamella clarifier, the feed holdup tank & Reject
line of UF system, Line of back wash water of MMF & UF are to be connected with
sludge water holding tank.
13. Electrical Panel with IOT system
Panel for on/off Switches, lamp indicators &housing MCB, terminals, wiring, Relay cards,
Power supply etc. The control panel should be Aluminum/MS fabricated & powder coated.
IOT panel for display of plant parameters in single panel.
11
14. Pipe Fittings and Valves:
Pipes, pipe fittings & valves covered here are meant for piping of the plant as per Drg.No.
DMTD/AKS/Ar/02. The material of the pipes, pipe fittings and ball valves (socket type)
should be UPVC Schedule 80(DIN 8063/DIN 8062/EN ISO 15493/ASTM-D 1785) or
CPVC Schedule 80(ASTM D 1785/2466), suitable for solvent cement connections. The
scope includes pipe line and fittings and valves for the full domain of the system already
mentioned. All the line should be fabricated as per the Process lay out diagram .
Sample Points:
Sampling point should be provided following position to check/analysis the water quality
• After Lamella clarifier/hold up tank
• After multi media filter
• After UF unit or at Product tank
• After sludge treatment
Over flow and Drain Points:
Over flow & Drain point should be provided following system ,Flash mixture tank, lamella
clarifier, Hold up tank, Product tank, Sludge filtration System.
All the drain lines , over flow lines and by pass of reject & product of UF should be
connected with single header and which will be drained outside the plant area.
Specifications
Pipes:
Size Range : 50NB & 32 NB
MOC :UPVC, Sch 80
Make :PRINCE/ ASTRAL/Eqvt
Ball Valve
Size Range :50 NB & 32 NB
Pressure rating : 10 Bar (150 psi) at 20°C (68°F)
Ball seats in PTFE
Body UPVC
15. Skid
The Skid is to be made from Structural material with base material & support material of
SS Square pipe size 40x40x1.6 mm.MOC:SS304
Skid -1:For accommodating of Flash mixture & Lamella clarifier
Skid-2: For accommodating raw water pump
Skid-3: For accommodating Reagent 1 and 2 dosing system
Skid-4: For accommodating Feed pump, MMF,UF system & backwash pump
Skid-5: For accommodating Sludge management system
16. Process Instrumentation
Sr. No Name Quantity
1 Flow Indicator 3 nos.
2 Pressure Indicator 10 nos.
3 Low pressure switch 2 nos.
4 Level Switch 4 nos.
12
5 Hand Held instrument 2 nos.
6 Analytical balance 1 no.
7 Arsenic spot test kit 2 nos.
8 Arsenic spot test kit 2 nos.
16.1 Flow Indicator
Type : Rotameter
Medium : Ground water
Flow range : 0-2000 liters per hour & 0 – 1000 liters per hour
Tube material :Acrylic Body
Float material :Stainless steel
U-PVC unions for socket welding/gluing connections
Quantity : 4 nos. for raw Water, Filtrate (UF Product) & Reject
16.2 Pressure Indicator
Type : Dial Gauge
Fluid : Bore well water
Dial size : 63 mm.
Scale : Aluminum
Casing : SS 304 weather proof casing.
Range : 0 -5kg /cm2
Mounting : Direct
Type of measuring element: SS Bourdon tube
Process temperature : Ambient
Nature of pressure : Steady
Equipment vibration : Nil
Preferred make : Baumer/WIKA/Aira
Quantity : 10 nos.
Location :After raw water pump, Before MMF, Before UF, After UF,
After back washable pump-2 nos, After sludge pump etc
16.3 Low pressure Switch
Range setting : Adjustable: Min - 0.2 kg/Cm2; Max- 3kg/Cm2
Fluid : Borewell water
Temperature : AmbientC
Sensing element : Bellow
Material of element : SS
Contact Rating : 3 Amps, 250 V AC
Quantity : 2 Nos. (Raw water Pump and UF feed water pump)
Preferred make : Baumer (Waaree), Switzer
16.4 Level Switch
MOC : PP/SS
Switch Capacity : 10VA
Max. Switch Voltage : 230 VAC/DC
Max Switching current : 0.5 A
Differential : 3 - 5 mm
Switch Action : Reversible
Max Test pressure : 1 kg.cm2
Preferred make : Pune Techtrol/Equivalent
13
Quantity : 4 nos. (Reagent tanks, Holdup tank, Product water
Tank)
16.5 Control panel:
One control panel is to be provided to accommodate the all ON/OFF switches
electrical components, Indicators of sensor and power etc.
Enclosure detail:
Enclosure and door: Dipcoat primed/Powder coated on outside. Color: Light
gray, using sheet metal of 1.5mm and door will be all round PU seal.
Protection category: IP65
Control should be included following components
• One MCB for ON/OFF control of panel
• Individual ON/OFF switches of each pump with indicator & MCB protection
Raw water feed pump, Reagent dosing pumps-2 nos, UF feed pump,
Backwash pump, Sludge transfer pump
• ON/OFF switches for Auto Dispensing System
• Display of Sensors & Indicators
• Emergency ON/OFF
Interlocks:
• Raw water feed pump with low level switch of raw water storage tank (Sr.
No.:1a)
• UF feed pump with low level switch of Intermediate tank (Sr. No.:4)
• Back wash pump with low level switch of Product tank (Sr. No.:9)
• Auto Dispensing System with low level switch of Product tank (Sr. No.:9)
• Filter press with low level switch of Product tank (Sr. No.:9)
16.6 Hand Held Instruments; 1 no. each
Digital pH Meter Range: 1 – 14pH
Digital TDS meter range: 0 to 2000 ppm
16.7 Analytical Balance (1 no.)
Range: 0-2 Kg
Resolution 0.01 Gm
Precision: +/- 0.01 gm
16.8 Arsenic and Iron Spot test Kit
Reagent chemicals & 100 strips for testing
Make: Merck
Quantity: 2 sets each (Iron and Arsenic)
17. Civil base platform/ foundation with brick boundary wall: As per Architectural
drawing attached
The Plant base (typical) is to be raised 2 Ft above the surrounding level with required
ground clearing/improvement, PCC (4-5 inch thick, 1:2:4) followed by RCC floor of
required loading suiting to plant equipment weights, Area of floor will be (6mtr x4mtr.) All
around periphery brick wall boundary of 6 ft high (2’-6” in Rough cast plaster & 3’-6” in
plain surface for slogan and drawing) above the base platform is to be provided with MS
duly painted plant entry gate (7 ft x 7 ft, in two door forms for double door entry) and
steps/ramp to the plant base platform. Both sides of the boundary walls are to be painted
suitably with water related slogans, design/art work/ plant title tag and BARC logo, MS
access gate-1 no.
14
18. Plant Shelter house (Brick work & site civil work) As per attached architectural
drawing
The plant should be housed inside a Shelter Room as required having necessary lighting
facility, 2 nos. of windows with exhaust fan, ventilation area with entry door of appropriate
size and net flooring with waterproofing admixture. Roof of the structure should be of GI
corrugated sheet having a Pyramid structure roof.
Panting of walls should be with acrylic smooth exterior paint of required shade of approved
brand Asian paints/ Nerolac (Apex ultima weather proof or equivalent) with two or more
coats applied over and including base coat water proofing of cement paint applied complete.
Wall painting with plastic emulsion paint (two or more coats, Royale Luxury Emulsion or
equivalent) of required colour of approved brand Asian paint, Nerolac to give an even
shade.
The shelter room should have BARC logo and various water slogans written on it as per
BARC requirements. The external walls of building should be having with artistic
drawings to increase the aesthetic of the building. Total drawing surface area 2 sq. mt. for
Shelter room (inside wall) & 5 Sq. mt. on outside wall.
19. Operators Desk
Table: Godrej T9 table with 6 mm glass top.
Chair: 2 nos., Make: Neelkamal or equivalent
20. Electrical work
Electrical power supply is to be provide in the plant room. Following things should be
provide for plant area.
Sr. No. Description Quantity
1 Switch for incoming power supply is to be provided IP65 Junction
box with socket 2 core MCB module Make: Havells/Siemens 40
amps or as required single pole/three pole.
1 no
2 LED tube light/Industrial ceiling light 20 watt , Make: Crompton 6 nos
3 Wall/Ceiling mounted 450mm sweep fan, Make: Crompton 2 nos
4 Exhaust fan (12 inch), Make: Crompton 1 no
5 Switch board included 5/15 amps switch & socket -4nos 2 nos
Note: Total cabling/wiring work to fixing of the electrical components of plant with
Control panel, Light, Fans and Switch board will be in the scope of work. All the PVC
insulated wire/cable should be lay by using proper casing capping.
Note:
Raw water feed tank, Flash mixture & lamella clarifier, Clarified water tank, Sludge
water tank will be placed outside (back side) of the enclosed room.
Other skids, tank and Control panel will be placed at inside the enclosed room.
Detailed GA layout attached for reference.
21. Inspection
All works covered & systems specified in this document shall be subjected to quality surveillance
by BARC as per the stipulated codes and the bidder. Inspection and tests shall be carried out as per
following.
A. Factory Acceptance Tests (Integrated Skid)
Pumps
15
1) Material test certificate for major part are to be provided for review at the time of
inspection
2) The pump will be witnessed for performance tests at duty point &Mechanical
performance with respect to vibration, noise level, and temperature.
Tanks
1) Dimensional check-up and nozzle orientation
2) Water fill test.
Pipes & fittings
1. Review of Material test certificate for pipes & fittings
2. Hydro test for pipes & fittings shall be carried out in assembled condition.
Instruments
1. Material test certificate for the MOC, Calibration test certificate.
2. Guarantee/ warranty certificate pertaining to the equipment.
Overall Skid
Leak testing in operation & stability testing.
22. Site Acceptance Tests
Installation should follow standard safe engineering practices.
Performance demonstration of plant (leak tight system, Water quality (Arsenic) in purified
drinking water, functional test for all instruments, water dispensation through ATM, IOT
system performance. After successfully installation of the units feed & Product (two sets
of samples) should be tested in any NABL accredited laboratory and test report should be
submitted to BARC.
TITLE GENERAL LAYOUT OF PLANTS EQUIPMENTS
GOVT. OF INDIA
DEPT. OF ATOMIC ENERGY
BHABHA ATOMIC RESEARCH CENTRE
DESALINATION AND MEMBRANE TECHNOLOGY DIVISION
FILE NO. :
TITLE GENERAL LAYOUT OF PLANTS EQUIPMENTS
PROJECT 1000 LPH CAPACITY WATER TREATMENT PLANT
GOVT. OF INDIA
DEPT. OF ATOMIC ENERGY
BHABHA ATOMIC RESEARCH CENTRE
DESALINATION AND MEMBRANE TECHNOLOGY DIVISION
AT VILLAGE GUTRI, ICHAAPUR-II-GP, 24TH PARGANA, WB
DRG. NO. : DMTD / AKS/ ARSENIC / 01
FILE NO. :
TITLE P & I DIAGRAM OF WATER PURIFICATION PLANTS
PROJECT 1000 LPH CAPACITY WATER TREATMENT PLANT
GOVT. OF INDIA
DEPT. OF ATOMIC ENERGY
BHABHA ATOMIC RESEARCH CENTRE
DESALINATION AND MEMBRANE TECHNOLOGY DIVISION
AT VILLAGE GUTRI, ICHAAPUR-II-GP, 24TH PARGANA, WB
DRG. NO. : DMTD / AKS/ 1000 LPH WPP / 02
FILE NO. :
9'-6"
4'-6"
3'
1'-6"
1'-6"
3"
3"
3"
2' wide clay jali as
per site availability
Side Elevation - A
Corrugated G.I sheet
13'-8"
2mm thk corrugated
Polycarbonate sheet
for skylight
6 mtr
11'-8"
9'-6"
6 mtr
1'-6"
4" high 1" thk band
in cement plaster
around door
Corrugated G.I sheet
2mm thk corrugated
Polycarbonate sheet
for skylight
Shutter Door
9' x 7'
Plinth beam
150mm
Front Elevation - A
2"
RO Water Treatment Plant
sponsored
Bhabha Atomic Research Centre
G:\ghosh\North gate\BARC_logo.png
4'
4'
3" 3"
Tapbank
Plinth beam
150mm
2'
8-10mm cement plaster
around window
TITLE PLANT SHELTER ROOM
PROJECT 1000 LPH CAPACITY WATER TREATMENT PLANT
GOVT. OF INDIA
DEPT. OF ATOMIC ENERGY
BHABHA ATOMIC RESEARCH CENTRE
DESALINATION AND MEMBRANE TECHNOLOGY DIVISION
AT VILLAGE GUTRI, ICHAAPUR-II-GP, 24TH PARGANA, WB
FILE NO. :
DRG. NO. : DMTD / AKS/ ARSENIC / 03