‘CASCADE’ OFFICE BUILDING I. FUNCTIONAL DESCRIPTION OF AUTOMATION SYSTEM 1. Boiler Plant A. Basic Functions In The Manual Operation Mode All on/off controls for pumps and boilers are available on the power and automation panel of the boiler plant (see TFA1_CT diagram). B. Basic Functions In The Automatic Operation Mode The proposed controller for boiler plant automation is pre- programmed and meets the automation requirements. Beside boiler sequence and temperature regulation on individual heating circuits, other functions are provided, such as boiler rotation, detailed time programs for working days, weekend and holidays, hot water temperature correlation with outside temperature and with consumer operating conditions (e.g. air handling units). 1. Temperature Regulation On Individual Heating Circuits The temperature setpoint calculation for the hot water is performed depending on the outside temperature (this is averaged on 1-hour time interval to avoid disturbance errors). The user can select heating diagram parameters for each heating circuit. There is also an individual program control point for every heating circuit, serving for the heating operation validation on the afferent circuit. This point could be used by the dispatcher to stop the heating for service and overhaul works. The heating automatically stops working when the outside temperature exceeds certain limits. There are two such limits available: a short- term average (e.g. one hour) and a long term average (e.g. 3 days). The heating stops working when one of the two limits is exceeded. The heating operation related to the two limits could be schematically represented as follows: Pag. 1 din 34

Descriere Functionala HVAC+BMS ENG 27.10.2003

Embed Size (px)

DESCRIPTION

Descriere Functionala HVAC+BMS ENG 27.10.2003

Citation preview

Page 1: Descriere Functionala HVAC+BMS ENG 27.10.2003

‘CASCADE’ OFFICE BUILDING

I. FUNCTIONAL DESCRIPTION OF AUTOMATION SYSTEM

1. Boiler Plant

A. Basic Functions In The Manual Operation Mode

All on/off controls for pumps and boilers are available on the power and automation panel of the boiler plant (see TFA1_CT diagram).

B. Basic Functions In The Automatic Operation Mode

The proposed controller for boiler plant automation is pre-programmed and meets the automation requirements. Beside boiler sequence and temperature regulation on individual heating circuits, other functions are provided, such as boiler rotation, detailed time programs for working days, weekend and holidays, hot water temperature correlation with outside temperature and with consumer operating conditions (e.g. air handling units).

1. Temperature Regulation On Individual Heating Circuits

The temperature setpoint calculation for the hot water is performed depending on the outside temperature (this is averaged on 1-hour time interval to avoid disturbance errors). The user can select heating diagram parameters for each heating circuit. There is also an individual program control point for every heating circuit, serving for the heating operation validation on the afferent circuit. This point could be used by the dispatcher to stop the heating for service and overhaul works.The heating automatically stops working when the outside temperature exceeds certain limits. There are two such limits available: a short-term average (e.g. one hour) and a long term average (e.g. 3 days). The heating stops working when one of the two limits is exceeded.

The heating operation related to the two limits could be schematically represented as follows:

Figure 1: Heating on/off diagram

Pag. 1 din 25

Page 2: Descriere Functionala HVAC+BMS ENG 27.10.2003

‘CASCADE’ OFFICE BUILDING The heating diagrams are defined using two parameters establishing the heating

diagram slope and the curvature factor (a quicker temperature increase in the proximity of 0˚C). The temperature of the supplied hot water has also an upper limit. The heating diagram sets are represented in figure 2.

The temperature setpoint for the hot water, resulting from this calculation, could be displayed through program points. The program compares the reading of the temperature sensor placed on the hot water supply circuit with the temperature setpoint and shut off/on the three-way control valve accordingly.

Figure 2: Hot water temperature versus outside temperature

The heating pump operates continuously as long as the hot water is supplied. The program module managing the heating for individual circuits has also another

important role. It sends to the boiler strategy the optimum temperature as evaluated for the boiler supply circuit. These values are collected by the strategy from all the heating circuits and from domestic hot water preparing unit. The maximum value is considered, that is the most disadvantageous condition, thus establishing the exact temperature requirement and saving energy. For example, if circuit 1 needs 55˚C and circuit 2 needs 56˚C, the boiler strategy shall supervise a 56˚C temperature in the boiler supply circuit. The exact establishment of temperature needs provides important savings, as the boilers will not be forced to generate more heat than this exactly determined value.

The hot water supply for the heating circuit equipped with heaters and air curtains shall be performed according to a time program and depending on the outside temperature.

The hot water supply for the heating circuit equipped with fan coils shall be performed according a time program, and depending on the outside temperature and the hot water control through the three-way valve.

Pag. 2 din 25

Outside temperature

Hot watertemperature

Page 3: Descriere Functionala HVAC+BMS ENG 27.10.2003

‘CASCADE’ OFFICE BUILDING 2. Boiler Sequencing

The two boilers are started depending on the energy demand needed to achieve the desired temperature in the boilers supply circuit. All the users, e.g. the program modules controlling the users operation (the two heating circuits) evaluate the hot water temperature needed for optimum operation. The maximum demand of all the users is considered as temperature setpoint for boilers sequencing. This value could be incremented by the strategy module to balance the line losses.The functions of the boiler sequencing strategy module are the following:

1. Computing the needed number of boilers to achieve the desired temperature in the supply circuit.

2. Supervising the temperature change rate in the supply circuit, thus performing an anticipating function for the needed number of boilers.

3. Periodically rotating the boilers in the boiler group, thus providing an uniform wearing of these boilers.

4. When both boilers are not required to operate simultaneously, the continuous operation of a single boiler is limited.

5. The three-way valves mounted on boilers will protect them against the cold water penetration and consequently against fracture.

The program supervises the number of operating boilers, the number of faulty boilers as well as the operating thermal power.

2. Cooling Plant

C. Basic Functions In The Manual Operation Mode

In this operation mode all the manual procedures for chiller control are available from its interface.

The manual controls for on/off switching the chilled water circulation pumps are also available. The pumps are switched on/off using the push buttons on the power and automation panel of the cooling plant (see TFA2_CF+CTA+GG+Elevator+Fire diagram).

This panel supplies the following users: Chilled water circulation pumps.

D. Basic Functions In The Automatic Operation Mode

In the automatic operating mode the automation panel switches on/off the chillers and the chilled water circulation pumps according to the time programs.

The panel also receives a failure signal from the chiller.The cooling plant is stopped when entering in the winter operation mode.

3. Air Handling Unit

E. Basic Functions In The Manual Operation Mode

In this operation mode the manual controls for switching on/off the fan are available through the push buttons on the panel door. The battery dampers and valves are manually operated (see the TFA2_CF+CTA+GG+Elevator+Fire diagram).

Pag. 3 din 25

Page 4: Descriere Functionala HVAC+BMS ENG 27.10.2003

‘CASCADE’ OFFICE BUILDING The panel supplies the following users: Supply fan Exhaust fan Humidifier

F. Basic Functions In The Automatic Operation Mode

The conditioned air generation should follow several criteria. Therefore the strategy governing the automation process is very important. The strategy objectives are the following:

– Providing conditioned air at the required parameters;– Providing a minimum energy consumption;– Protection of the plant when malfunctions or failures appear;– Using the plant with an operation duty cycle providing the maximum possible

operation life (avoiding the repeated equipment starts and stops, etc.);– Permanent supervising of plant parameters and warning the operator for

malfunctions or failures.The occupied period is programmable through time programs. This can have two

values: Occupied, corresponding to the time period when the building is occupied, and Unoccupied, corresponding to the time period when the building is not occupied. The programming through the time programs ensures energy saving for the time periods when there are no people inside the building.

In the ‘Occupied period’ operating mode the plant generates conditioned air at the preset parameters. The programming of these parameters can also be performed within the time programs.

Depending on the outside temperature, the preset temperature value can be adjusted by the controller. This feature allows the establishment of different comfort conditions during the summer and winter without needing the frequent controller adjustment for temperature setpoint change.

In the time periods when the building is not occupied, the plant could be in the following operating modes, having the associated values:

Night cycle. Even if it is an unoccupied period, a minimum temperature should be maintained. The temperature limits are initially preset, the related parameters being set at 14˚C and 28˚C respectively. This feature drastically reduces the fuel consumption because, for example, the energy needed to heat a room totally cooled under 14˚C during the night is much larger than the necessary energy to maintain the minimum comfort limits.

Frost protection operating mode. This operation mode starts independently of occupied or unoccupied period, when the frost protection thermostats generate a starting signal. In such a case, the controller automatically switches on the heating.

The controller performs the temperature control by driving the related sequence for dampers and heating and cooling battery valves.

Pag. 4 din 25

Page 5: Descriere Functionala HVAC+BMS ENG 27.10.2003

‘CASCADE’ OFFICE BUILDING

II. BMS Overview

BMS (Building Management System)

The BMS dispatcher assigned to the ‘Cascade’ office building supervises and controls the following:

TFA1Boiler Plant START/STOP boilers controls; boiler 3-way valve control; START/STOP controls for boiler re-circulation pumps; START/STOP controls for heating circulation pumps; outside temperature supervising; supervising the supply temperature for boiler 1; supervising the return temperature for boiler 1; supervising the supply temperature for boiler 2; supervising the return temperature for boiler 2; supervising the general supply temperature; supervising the general return temperature; supervising the fan coil supply circuit temperature; supervising the supply circuit temperature for heaters and air curtains; controlling the 3-way valve on the fan coil heating circuit;

TFA2Cooling Plant chiller START/STOP control; chiller pumps START/STOP controls; supervising the chiller operation condition;Air Handling Unit START/STOP control for supply fan; START/STOP controls for exhaust fans; humidifier START/STOP control; START/STOP control for supply and exhaust air dampers; supervising the supply air temperature; supervising the exhaust air temperature; supervising the exhaust air humidity; controlling the three-way valves for heating and cooling battery; humidity proportional control; temperature setpoints;GENERATOR GROUP supervising the operating condition;ELEVATORS supervising the operating condition of elevator 1; supervising the operating condition of elevator 2; elevator failure;FIRE supervising the detection system operating status;

TFA3 START/STOP controls for smoke exhaust fans (2 pieces); shutter control (4 pieces);

Pag. 5 din 25

Page 6: Descriere Functionala HVAC+BMS ENG 27.10.2003

‘CASCADE’ OFFICE BUILDING START/STOP controls for overpressure air supply fans (3 pieces); supervising the domestic water pressure booster group; fuel level supervising;

The BMS dispatcher has the following features:

1.1 Dispatcher Unit

The dispatcher unit, referred to as BMS in the following, performs the following general functions:

Network management

Operator interfacing

Display system in the graphic mode

Data acquisition system and event history

Alarm management

Supervising

Report generation

Hardware Specifications

The hardware BMS dispatcher components should meet the following minimum requirements:

Intel Pentium Processor (or more advanced)

Video Super VGA card providing a 1024 x 768 pixel resolution and 256 colours (2 MB RAM video)

Minimum 32 MB RAM

1.2 GB Hard Disk

I/O Interface with 8 RS-232 ports

Minimum 8x speed CD-ROM drive

Mouse port and mouse

1.44 MB floppy-disk drive

Epson or Hewlett Packard printer

Super VGA non-interlaced monitor having a 1024 x 768 pixel resolution and a minimum refreshing frequency of 70 Hz

Software Specifications

The BMS system is based on the multi-tasking and multi-user Windows NT/Windows 95 operating system.

The standard services provided by the operation system include:

Multi-tasking and multi-user support

Pag. 6 din 25

Page 7: Descriere Functionala HVAC+BMS ENG 27.10.2003

‘CASCADE’ OFFICE BUILDING TCP/IP network support

Data exchange capability with OBDC data bases

Full integration in the Microsoft Windows Network

Remote connection via WAN or PSTN (dial-up)

1.2 Data control and acquisition

The BMS system includes capabilities for data control and acquisition using standard software drivers that need no individual implementing operations. The entire system configuration is accessible during the data acquisition or the use of other communication channels. The BMS nodes do not need restarts for implementing the data base changes.Additionally, the on-line performed data base changes instantaneously apply to the system without needing another network operation system (such as NetWare, LAN Manager, Banyan Vines).

Configuration

The communication driver can be set up on-line by the users by entering an access code. The parameters that can be changed are the following:

Device type

Communication port

Channel name (up to 6 ASCII characters)

Bit-rate and parity (for RS-232 or RS-422)

Communication Time out

Check sum (CRC_16)

Data bit number

Stop bit number

Marginal communications barometer limit

Failed communications barometer limit

Communications

BMS develops a communication system compatible to:

RS-232

RS-422/485

Ethernet, TCP/IP

C-Bus communication networks, etc.

Pag. 7 din 25

Page 8: Descriere Functionala HVAC+BMS ENG 27.10.2003

‘CASCADE’ OFFICE BUILDING

1.3 Data acquisition

The system performs the data acquisition using one of the two following methods: Periodical scanning Exception report

The system provides minimum 9 scanning time intervals between 1 and 900 seconds.To reduce as most as possible the communication traffic, the system automatically locks the data demand using adjacent addresses and scanning intervals to generate data packages, thus optimising the traffic for a preset demand. There are also utility functions allowing data package assigning check for every scanning time interval as well as compiling grouping statistics concerning the communication channel load. When the subsystems allow, the RBE protocols (exception report) can be used to reduce the system load. If necessary, the two methods could be alternately used, providing a correct and optimum data acquisition.

1.4 Controller Communication

The operator commands are sent to controllers using a communication technique, which secure the data integrity. When the operator doesn’t receive a reception notification after a command initiation, which means the command was erroneously transmitted, the operator is informed by an alarm, presettable by the user according to his/her needs. A deliver of an notification message could optionally be associated to each individual point. This message will ask for a supervising confirmation of the operator action before sending the entered value to the controller.

Pag. 8 din 25

Supervising Heating, ventilation, conditioned air

Cooling plant, air handling unit, generator set, elevators, fireBoiler plant

Sm

ok

e ex

hau

st

fan

s

Cooling plant+Air handling unit+Generator set+Elevators+FireBoiler plantSupervising

Ex

hau

st s

hu

tter

s sm

oke

/gar

age

no

xa

No

rma

l exh

aus

t fa

ns

Wat

er p

ress

ure

b

oo

ste

r g

rou

p

sup

ervi

sin

g

CL

U t

an

k le

vel

sup

ervi

sin

g

Co

olin

g p

lan

t

Air

han

dlin

gu

nit

Ele

ctri

c g

ene

rato

r se

t

Ele

vato

rs

Fir

e d

ete

cti

on

sy

ste

m s

tatu

s

Page 9: Descriere Functionala HVAC+BMS ENG 27.10.2003

‘CASCADE’ OFFICE BUILDING

1.5 System Data Base

The system develops a real-time data base, including acquired data from analogue, digital or logic inputs. This data base can be set up by the user without needing other programming actions and without interrupting the system operation. This data base provides an information history concerning events or analogue, digital or logic inputs. This information is accessible in a similar way to other basic system functions, such as displays, reports, supervising, etc.

Data Base Setup

The data base setup is accessible to the user through a password even the system is on-line. The setup needs no other programming, compiling or linking operations and doesn’t need the system stop or restart. The event and data history remains unaffected by the data base setup change. Data entering is possible using the following methods, depending on operator knowledge about the system:

Using the “Fill in the blanks” setup

Using the data editor

Using the operator interface

The first setup method allows the data base use without knowing in detail its changing process. The system provides a permanent help window allowing the inexperienced users to set-up this data base. The user can also use as model a point already stored in the data base. A new point storing could be performed by changing the parameters, which are different from on point to another only (such as name, descriptor and address).For experienced operators, a quick way to handle the data base is possible by using a text editor and the ASCII files with setup recordings. If necessary, the data base can be generated off-line and loaded when it is needed. The system is also provided with an access password allowing a remote data base change using a modem, thus providing the possibility of maintenance and failure analyses from a specialised remote engineering centre.

Data Base Structure

The real-time data base allows data storage using the following structures:

Analog point structures

Status type point structures

Data history structures

Accumulator type point structures

User defined structures

Event structures

Every mentioned structure can be compressed in such a way that it can be associated to a single complex type point having associated parameters referred to by using a single

Pag. 9 din 25

Page 10: Descriere Functionala HVAC+BMS ENG 27.10.2003

‘CASCADE’ OFFICE BUILDING terminology. Every structure is accessible using subsystems such graphic operator interface, report generating system or application interface, having a point.parameter type format, without needing to know the internal storing process.The system can keep frequent asked data base segments in a quick access zone (memory resident information), the other segments being placed on hard disk. The memory resident data can be permanently saved on hard disk to avoid data loss in case of power failure.Data base backup is possible with the on-line system, including History backup. The backup copy can be stored on floppy disk or magnetic tape where it is possible.

1. Analog point structure

The analog data is stored in structures having the following parameters:

Point name Point description

Process variable (PV) Setpoint (SP)

Output (OP) Mode (MD)

Up to 4 operator-definable inputs Scanning status

Scanning time interval Scanning address

Alarm flag Alarm status

Alarm status Associated display

0% & 100% range Operator control level

PV Clamp Flag Measuring units

Dead band alarm Dead band movement

Dead band control Control interruption

Normal mode Up to 4 alarm types

Upper limit SP Upper limit SP

Lower limit OP Lower limit OP

2. Status point structure

The status (digital) information is stored in the data base in a point.status type structure. The status type point processes the 1-3 bit digital inputs allowing 8 possible statuses. The status point is a structure including the following parameters:

Point name Point description

Process variable Output

Mode Scanning status

Scanning time interval Scanning address

Alarm flag Alarm priority

Re-alarming status Associated display

Input width Operator control level

Output width Output pulse width

Control error alarm priority Interruption control

Pag. 10 din 25

Page 11: Descriere Functionala HVAC+BMS ENG 27.10.2003

‘CASCADE’ OFFICE BUILDING

Normal mode

3. Accumulator type structure

The data associated with pulse type inputs is stored in accumulator type point structures which will automatically supervise the operating instruments. The accumulator type point is a structure including the following parameters:

Point name Point description

Process variable Rollover value

Raw counts Scaling value

Measuring factor Scanning status

Scanning time interval Scanning address

Alarm flag Alarm status

0% & 100% range Associated display

Operator control level Measuring units

Up to 4 alarm types

4. History data structure

The system point History is configurable due to the point definition. The history is provided for instantaneous or discrete values, having the acquisition rate between 5 seconds and 24 hours. After being saved in the history data base, the point is available through POINT.PARAMETER, in combination with a method to locate a certain searched value. The graphic operator interface, supervising system, report-generating system and the application interface have access to History. A History point change is on-line possible without losing prior collected data.

5. Event data structure

The system generates a log including the following event-related information:

Alarms

Processed alarms

Reset to normal

Operator control commands

Operator password and security level changes

On-line data base changes

Communication alarms

System restart messages

The standard displays are created in such a way that they show the log page including the most recent event in the upper area of the screen. The following pages include the events in the descending order of the occurrence moment. The sorting of log data is possible by using a standard report, which could be set up with the ‘filling-in-the-blanks’ method. No special related coding is provided.

Pag. 11 din 25

Page 12: Descriere Functionala HVAC+BMS ENG 27.10.2003

‘CASCADE’ OFFICE BUILDING The event data base includes the following information:

Occurrence time and date

Point name

Event type

Alarm priority

Point description

Measuring units

The data base is accessible from other subsystems too, such as operator interface, report generating system or application interface. It is also possible to get an event file completely filling the available space on the hard disk. Depending on the available hard disk space, the file can store up to 1,000,000 (one million) events, having 200,000 events defined by the basic system. The file stores the events in a current buffer. When the file becomes completely filled, an alarm is generated to warn the operator to save the file on an external support. The events will be transferred in an archive to allow saving new events in the buffer. Another memory zone could be provided to keep this archive ready for transfer on an external support. The operators have the possibility to restore the archives using the operator interface and the dedicated displays. The event file is compatible with the report generating system. The system automatically recalls a recorded file when a report needing data covered by this file is requested.The operator can restore archives and to review or print them from the workstation.

6. User definable data structure

To cover all data types that could be used in such applications, the system provides the possibility to create a data base which can be defined by the user and can be completely integrated in the system. This data base can be accessed through:

User graphics

System report

Application programs

Network application using API network interfaces

Data processing algorithms

Pag. 12 din 25

Page 13: Descriere Functionala HVAC+BMS ENG 27.10.2003

‘CASCADE’ OFFICE BUILDING Beside standard process functions, the system allows additional processing by using standard algorithms attachable to an analog, status or accumulator type point. The main functions provided by these algorithms are the following:

Arithmetic calculation

Boolean calculation

Max/min values

Integration calculation

Calculation of total operating hours

Alarm group locking

Report request

Application request

Archiving Data History

The system allows history archiving to perform a continuous supervising of system evolution. The archived data can be stored on hard disk or saved on an external support (floppy disk, magnetic tape, etc.). The number of the archives stored by the system depends on the hard disk size. The system allows the user to define specific history saving intervals to avoid unnecessary saving operations.The history archiving could be activated in one of the following methods:

By operator request

According to a periodical schedule

On the event occurrencesAfter being archived, the data is available for re-evaluation using the system utilities combined with on-line archives or other history data.

1.6 Operator Interface

The operator interface was created to ensure efficient system communication, data transfers and abnormal operation case handling. It is conceived as a pyramidal graphic structure with operating windows.The operator interface is interactive and entirely based on graphic symbols and icons. The interface operation is based on working windows and meets the Windows standard conventions to reduce at most as possible the operator training. Specifically, the command bars, icons and cascaded menus are accessible on each display to allow easy access to basic functions. Similarly, certain functions are accessible through a standard button set, this feature implying no specific configuration.More than 500 user displays can be provided. These displays will be set up by using the Integrated Display Building functions available on the workstation.

Operator Interface Features

Pag. 13 din 25

Page 14: Descriere Functionala HVAC+BMS ENG 27.10.2003

‘CASCADE’ OFFICE BUILDING The system offers an operator interface under Windows environment having the minimum performance presented below. For the following functions no user coding or programmes are needed:

Window resizing, zoom in, zoom out

Dedicated buttons to open menus including:- Associated display- Alarm content- Alarm handling menu- Forward/Back display sequence- Re-entering the previous display (minimum 8)- Graphic call-up - Supervising call-up- Group call-up- Service input/output command- Point details

The alarm zone displays the highest priority alarm and the most recent (the oldest) non-handled alarm

Zone for displaying system internal date and time

Current access level

Station number

Alarm reporting

Communication error reporting

Data marking and entering devices

The operator interface allows to simultaneously use the mouse and the keyboard. The fixed menus and the dedicated keys simplify the operation. The operator interface allows using touch-screen systems to mark and enter commands.The operator interface uses command bars for common operations. It also allows to open/close cascade-type menus and windows.

Operator Interface Functions

The operator interface develops the following functions:

Field equipment display and control

Alarm acknowledgement depending on their priority

Report printing

Event archiving and handling

Password change

On-line generation of data base and graphic display

Supervising the data sent on communication channels

System parameter setup

The computer allows the simultaneous display of several work zones. Each work zone allows the operator to choose between the following working methods:

Pag. 14 din 25

Page 15: Descriere Functionala HVAC+BMS ENG 27.10.2003

‘CASCADE’ OFFICE BUILDING Master operating mode:The operator has normal access to the system

Maintenance and engineering mode: System setup and application programming

Graphic development mode:Graphic application development using the Graphics Display Building packageAll the working modes allow simultaneously displaying and operating several work windows on the screen. The access to these operation modes can be limited through password.

Security Levels

The system accepts 6 security levels. The allowed functions on each level are as follows:

Level 1: Sign-Off mode - Viewing the start-up screen

Level 2: It allows using the functions of previous level plus operator possibility to receive occurred alarms. This level is specific to inexperienced operators.

Level 3: It allows using the functions of previous levels plus operator possibility to use simple functions, such as enable/disable, etc.

Level 4: It allows using the functions of levels 1-3 plus access to time programs, periphery system assigning, point measuring parameter change, reports and relatively complete use of standard display configuration. It is specific for the operating engineer.

Level 5: It allows using the functions of levels 1-4 plus access to functions such as building and connection displays, assigning functions to buttons, etc. It is reserved to the operational supervisor.

Level 6: The highest access level. It allows unlimited access to all the system work stations. It is reserved to the operational manager.

Sign-On/Sign-Off

The operator can switch the system in the sign-on status if the ID and access password were correctly entered (both up to 6 characters). After entering incorrect passwords three times in succession, the workstation is locked during a preset time interval, which can be set by the system setup. Other workstation or central computer will not be affected.The operators can login with single or multi-user passwords. The single-user passwords allow a single operator to switch a single workstation in the sign-on status, but the multi-user passwords are usually entered by operators at high security levels, which need to simultaneously switch several workstations in the sign-on status. A password and specific enabled operating zones can be defined for each operator. Switching to the sign-off status is performed using the related command having the same name.A keyboard interruption is also provided, so that the operator is automatically switched off after a preset inactivity time interval. An automatic screen switch-off can optionally be set up to protect certain information if necessary.

7. Zone assigning

Specific zones in the district heating system can be assigned to each operator with related control and supervising responsibilities. A zone will be defined as a logical entity including a

Pag. 15 din 25

Page 16: Descriere Functionala HVAC+BMS ENG 27.10.2003

‘CASCADE’ OFFICE BUILDING system point set. Physically, this zone will be a part from the ventilation/air conditioning system. An operator can see and operate the points in the assigned zone only.

8. Password authentication

Each password shall be an alphanumeric character string having up to 6 characters but not less than 5 characters. The system allows the operator to change his/her password without restrictions. When changing the password, the new password must be different from the last ten ones previously entered in the last three months. Otherwise the system will not allow entering a new password.

1.7 Time Programs

The system provides a storing capacity of at least 1,000 time programs.

The time programs allow the control of system points at preset times.All the time programs can be set up through the workstations.Each program includes:

Date

Time

Point name

Point parameter

Required value

Programming type

Minimum types of time programs:

One shot – it will be run once and afterwards it will be deleted

Daily – it will be run every day

Working days – it will be run from Monday to Friday

Weekend – it will be run every Saturday and Sunday

Holiday – it will be run in holidays

Special days – it will be run on special days (for example on Mondays)

When the control devices have internal time programs, BMS can download, change, display or forward these programs.

1.8 Standard display systems

The following displays could be included as system components:

Alarm content

Event content

Point Detail Template displays

Pag. 16 din 25

Page 17: Descriere Functionala HVAC+BMS ENG 27.10.2003

‘CASCADE’ OFFICE BUILDING Trend Set Template displays

Group Control and Group Trend Template displays

Communication statuses

System statuses

Scratch-pad display

The Trend and Group displays setup needs entering the point name only. The other displays need no setup.

9. Managing displays

The system provides the following full-screen displays:

Master menu

Report summary

Alarm summary

Event summary

Display summary

System parameter setup

Work station setup

Zone assigning

Time period assigning

Holiday assigning

History assigning

Button assigning

Operator defining

Operator message board

Events and recovering archive

Time periods and setup summary

Point Detail for each configured point

Display Systems

The system setup is displayed on the screen using the Graphic Display Building editor. The Graphic Display Building editor can operate both in the operator interface window of the BMS server and if connected to the workstations. Each program sequence is displayed through static and dynamic objects. Each operation of the WYSIWYG (What You See Is What You Get) editor displays the performed action exactly to the used workstation. Usually the static objects created with the Graphic Display Building editor are not associated with dynamic objects. The static objects could include static text, rectangles, circular arcs and circles. Anyway, there is the possibility to animate the static objects, thus resulting dynamic

Pag. 17 din 25

Page 18: Descriere Functionala HVAC+BMS ENG 27.10.2003

‘CASCADE’ OFFICE BUILDING characteristics. For example, a tank could be drawn and animated, and its filling level could be read in a basic file.The dynamic objects can be attached to the BMS system data bases. Any information in data base can be displayed when requested by the operator, being sorted by the changing order in the data base and by the control system performance. The dynamic objects can include dynamic text, driving buttons, indicators, maps, validation boxes and scroll bars.It is possible to include the displayed static and dynamic objects in a single screen. The displayed objects can be handled through pointing, keying and dragging using the editor. They can also be moved, resized, copied, grouped, aligned and superposed using the same editor. It is also possible to copy and mark objects as well as to switch or change the displays.The Graphic Display Building editor provides the following features:

Displaying the system step by step diagram

Point and key operation

Clipboard

Placing the objects on standard co-ordinates

Graduated lines

Colour palette and lines

Dialogue boxes to define the object details

Drafting and paging the building diagram

Help

Importing drawings and graphics generated in standard Windows Metafiles and Bitmap files

Standard diagram library

3-D effects including outlining, rotation and line change

Pag. 18 din 25

Page 19: Descriere Functionala HVAC+BMS ENG 27.10.2003

‘CASCADE’ OFFICE BUILDING

1.9 Alarm Management

The system can detect a large alarm range and it has management features to quickly and precisely detect and acknowledge all the process abnormal operating conditions.

Alarm Types

The system can detect the following alarm types:

PV HI

PV LOW

PV HI HI

PV LOW LOW

Hi Deviation

Low Deviation

Change speed

System alarms

Invalidated data

Faulty transmission

For any four of these alarms an individual analog or accumulator type point can be defined as part of the process setup points.

Alarm Priorities

The system recognises four alarm priority levels as follows:

Urgent

High

Low

Journal

Each point-described alarm is included in one of these categories. The alarms having Urgent, High and Low priority can be displayed in the system alarm list. Only the Journal priority alarm is sent to the system alarm printer and it is recorded in the event data base.Any alarm type can be configured with sound warning. If configured, the sound warning appears at the workstation and optionally, through an additional contact, it can enable an external sound warning system. An operator-driven push button is recommended to shut-off the sound alarm. Should the failure not be cleared, the alarm and the sound alarm system restart. The system can re-enable the sound alarm after a preset time interval if the operator doesn’t remove the detected failure.

Pag. 19 din 25

Page 20: Descriere Functionala HVAC+BMS ENG 27.10.2003

‘CASCADE’ OFFICE BUILDING

Alarm Processing

The automatic attachment of a point at the occurrence of each alarm changes the system influence on performance in the following manner:

If the alarm is cleared during the preset time, the point name, alarm type, alarm priority, point description, new value and development company will be recorded in the event data base

The virtual point attached to the alarm can be displayed in red colour (steady or flashing) when this point is used

If the alarm source is unknown the Low, High and Urgent alarm list should be analysed

Sound alarm enabling (if configured)

Alarm indicator flashes.

Additionally, the operator interface alarm zone displays the last (optionally the oldest) alarm, the priority level and the non-handled system alarms.

Alarm Handling

To perform an efficient handling of system alarms, the following methods are available:

Selecting any point parameter in the system diagram and assigning a recognising push button

Dividing alarms in system alarming zones and pushing the assigned recognising button

Dividing alarms in displayed alarm lists and pushing the assigned recognising button

A paging of the displayed alarm list is performed to improve performance.

To allow the operator a better recognising, the flashing indicator will be steady lit and PV will remain red as preset. The alarm handling will be thus performed by operator-led or station-led identification in the event data base. The point must be switched off the alarm status before being handled by the operator, the alarm being described by reverse video displaying and re-entering in the specification list for operator-recognised alarms.It is very easy for the server-connected controller to confirm to the operator the recognition of critical alarm conditions before taking an action.

Pag. 20 din 25

Page 21: Descriere Functionala HVAC+BMS ENG 27.10.2003

‘CASCADE’ OFFICE BUILDING

Alarm reporting

The alarms can be reported as follows:

Alarm message displayed on the operating interface alarm line.

Alarm message in the displayed alarm list.

Sound warning (if PC Speaker or sound card is used)

Alarm messages written on the alarm printerThe alarms can be reported on station if there is no a permanent supervising operator. These features are operational if the workstations are permanently connected to the network and computer and if the workstation software is running and remains connected to the network.Non-reporting alarms could be due to the point detail settings.

Special Alarm Line

The special alarm line appears on all the displays when there are high priority, new or old (configurable) alarms which were not handled by the system. This line will be deleted when there are no non-handled alarms for the process operator.According to alarms, the graphic display shows the identified point, point type, and special line description. If multiple alarms occur, several status condition changes and sub-segment messages will be displayed, if having highest priority. The displayed sub-segment alarms as well as the information about the previous alarms will be moved in the non-handled alarm list, waiting to be handled by the operator.

Alarm Removing

If not listed on printer, the alarms are recorded in the event file to allow a subsequent reporting or archiving.

Functional Keys For Alarm Responding

The following dedicated functional keys and the corresponding images on the function bar can be recalled as alarm responding functions:ACKNOWLEDGE – After moving the cursor on the screen point in alarm and after selecting the point, the operator can handle (read) the alarm by pressing this key. This action can be done by the operator either in the event file or when the messages are listed on the printer.ALARM SUMMARY – By pressing this key in any moment, the operator can view on the screen all the currently active alarms. The alarm messages can be coloured according to priorities. The operator can view the alarms according to priorities too. It is possible to handle alarms from the current display or from an associated display defined for the related point.ASSOCIATED DISPLAY – After moving the cursor on the screen point and after selecting the point, by pressing this key, the operator gets an application on a display associated to this alarm.

Pag. 21 din 25

Page 22: Descriere Functionala HVAC+BMS ENG 27.10.2003

‘CASCADE’ OFFICE BUILDING 1.10 Supervising

The system provides supervising capabilities using the following functions:

Real-time supervising

Time supervising

Archiving

Table supervising

Window supervising

Measuring or percentage units

Displayed cursor for data supervising

Supervising comparisons between archived, real-time and history data (for example this year and last year). Comparisons between equally time-spaced recordings of a certain point or between different points are possible.

Supervising the disconnection through the on/off method

The independent Y-axis by points, multi-plot supervising. It is possible to display the Y-axis for each point by supervising, simply selecting the point with the mouse or the keyboard.

Copying the current and displayed window, having the supervised data in clipboard for moving them in another window or document.

The supervising setup is simply performed with a Name.Point input for the used configuration. All the supervising configurations are performed on-line, without interrupting the system operation. The data history is not affected by the supervising configuration changes.

Supervising types

The system can supervise real-time, history or multi-format archived data, the related formats being previously defined:

Simple supervising bar Plotting the value history for a certain pointDouble supervising bar Plotting the value history for two pointsTriple supervising bar Plotting the value history for three pointsMulti-plot supervising Plotting the value history for up to 8 pointsMulti-range supervising Plotting the re-aligned value history for up to 8

pointsDigital supervising Plotting the digital value history for up to 8 pointsX-Y-Plot supervising Graphic comparison between 2 points

For each set of supervised data the operator can set up a number of history samples and displayable ranges. The set up points in the supervising sets can be changed on-line.

The operators can read the displayed information in the supervising set for a final check. Using the scroll bars, the supervising sets can be moved before or after data recordings. The supervising sets shall have automatic access to the archived files, without operation setup.

Pag. 22 din 25

Page 23: Descriere Functionala HVAC+BMS ENG 27.10.2003

‘CASCADE’ OFFICE BUILDING 1.11 Reporting

The system includes a report flexible package for an easier generation of reported data. The reports comprise standard pre-established forms for common requirements concerning the alarm (event) reporting and for generating user-configurable reports.

Standard Reports

The system includes the following preset reports:

Alarm/Event report

Operator order report

Point order report

Alarm duration report

Point attribute report

Data base reference report

The configuration of these reports can be found by entering the information book. There are several other parameters for a complete report configuration, such as point name, filter information, searching time interval and printer destination. The non-programmed information can specifically be recognised.

10.Alarm/Event report

This report will generate a list including all the events, along with type and time specification.

11.Operator order report

This report will generate a list including all the operator actions as well as information concerning the operator and operating time period.

12.Point order report

This report provides the following information about a specified point or each point included in a specified set:

List with displayed numbers defining the point

List of algorithm numbers and corresponding blocks defining the point.

List of other reports concerning the related point13.Report concerning the point attributes

It is recommended to get a report concerning the points selected using one of the following criteria:

Out-of-service

Suppressed alarm

Abnormal input levels

Operation in manual mode

Pag. 23 din 25

Page 24: Descriere Functionala HVAC+BMS ENG 27.10.2003

‘CASCADE’ OFFICE BUILDING

Free Format Report

Additionally, the configurable report generation allows the user to generate own reports. These reports can be generated on-line. They can have access to any data base and can perform operations to get other derived values. These values can be stored in files or other data bases. The report can include up to 132 columns of unlimited width. The report generator has the following features:

Access to all the data bases and to History

Access to the user-entered data

Arithmetic calculation capability

Statistic calculation capability

User-defined report format

Report Enabling

The reports can be enabled in the following circumstances:

Periodical enabling at user-specified time intervals

At the operator request

Started by events

Started by applications

Data Export To Other Application

The system allows data export to other applications, such those including spreadsheets, using methods such as CSV or copying with direct on-screen marking. The real-time data transfer using Windows 3.x Dynamic Data Exchange (DDE) or Windows95 OBDC can be performed in such a way that the requirements of POINT. PARAMETER be observed. The History is also accessible via DDE or OBDC.

Pag. 24 din 25

Page 25: Descriere Functionala HVAC+BMS ENG 27.10.2003

‘CASCADE’ OFFICE BUILDING

1.12 System Security

The system provides up to 6 security levels ensuring a graduated access to the operating and setup functions. If necessary, each operator can be associated with a profile defined by the following parameters:

Security level (1-6)

Control level (1-255)

Operator ID

Unique password

Any action started by the operator can be recorded in the event data base with the operator ID. Moreover, a point operation will not be accepted if the correspondence between the operator profile and the level assigned to the related point is not achieved. A password management mode can be provided.

1.13 LAN Network Integration

BMS Network Server

This feature allows using computers with real-time access to BMS system data base and History, using a TCP/IP LAN communication. The access is permitted in the following circumstances:

Microsoft DDE applications using DDE or OBDC network software

Other BMS systems via Network Node Scanning

Applications developed by the user based on Network Application Programming Interface libraries supplied by the BMS provider

SQL Reporting System

This system allows the user to get a report using SQL commands for data transfer between BMS data base and a local or remote SQL server, and a relational data base (Sybase for example).

Network printing

BMS allows the multiple workstations to be ‘screen dumps’ connected to a printer. The printer must be connected to a parallel port on a sole workstation.