31
Dr Khairuddin Abdul Rashid 1 Session 2 PWD Form DB/T (2002) Articles of Agreement Articles of Agreement Conditions of Contract Clause 1 – 15

Design and Build_2

Embed Size (px)

Citation preview

Page 1: Design and Build_2

Dr Khairuddin Abdul Rashid

1

Session 2

PWD Form DB/T (2002)

Articles of AgreementArticles of Agreement

Conditions of Contract

Clause 1 – 15

Page 2: Design and Build_2

Dr Khairuddin Abdul Rashid

2

PWD Form DB/T 2002

Prepared by a Technical Committee set up in 1996

Chair – JKRChair – JKR

Members – representatives from JKR, JPS, DBKL, JPN, KKR, Treasury and MAMPU

1st – 2000

2nd Edition – 2002

Page 3: Design and Build_2

Dr Khairuddin Abdul Rashid

3

PWD Form DB/T 2002

Contents

� Articles of Agreement

� First to Fourth Recital� First to Fourth Recital

� Article 1 to 4

� Conditions of Contract

� Clause 1 to 58

� Special Conditions Clause

59 to 62

� Appendices

Page 4: Design and Build_2

Dr Khairuddin Abdul Rashid

4

PWD Form DB/T 2002

Subsidiary forms

� Form of Tender PWD Form

DB/T-A2002

� Addendum No 1 (Amendments

no. 1 to 10)

� Addendum No 2 (Amendments

no. 1 to 25) for Deferred

Payment only

Also a guide on the use of the form

Page 5: Design and Build_2

Dr Khairuddin Abdul Rashid

5

PWD Form DB/T 2002

Salient points

� Old concepts

Turnkey – contractor design &

supervise

D & B – contractor design,

JKR supervise

� New concepts

Turnkey – contractor design,

supervise & equipt

D & B – contractor design &

supervise

Page 6: Design and Build_2

Dr Khairuddin Abdul Rashid

6

PWD Form DB/T 2002

Salient points

� Design bond no longer required

� DLP 24 months

� 30% Bumi participation

� Bumi consultants only if project value <RM50 m<RM50 m

� Bumi + Non-Bumi JV of local consultants if project value >RM50 m

� Direct payment to contractor’s consultants

� Used when:

No expertise in JKR

Specialist design

Emergency

� Requires Treasury’s approval if to be called on direct negotiation or selective tender

Page 7: Design and Build_2

Dr Khairuddin Abdul Rashid

7

PWD Form DB/T 2002

Articles of Agreement

� Contract No / Expenditure

� Date of signing

� Parties – Government & the � Parties – Government & the contractor

� 1st Recital – project title

� 2nd Recital – Contractor’s Proposal

� 3rd Recital – Contract Sum Analysis

� 4th Recital – meeting the Government’s requirements

Page 8: Design and Build_2

Dr Khairuddin Abdul Rashid

8

PWD Form DB/T 2002

Articles of Agreement

� Article 1 – Contractor agrees to

design and construct

� Article 2 – Government agrees

to pay … Contract Sum

� Article 3 – Government’s

requirements, the Contractor’s

Proposal, the Contract Sum

Analysis, the Contract

Schedule of Rates… signed

and appended

Page 9: Design and Build_2

Dr Khairuddin Abdul Rashid

9

PWD Form DB/T 2002

Articles of Agreement

� Article 4 – Contract documents

i. Articles of Agreement

ii. Conditions of Contract and ii. Conditions of Contract and

Appendices

iii. Government’s Requirements

iv. Contractor’s Proposal

v. Contract Sum Analysis

vi. Schedule of Rates

vii. Form of Tender

viii. Letter of Acceptance

Page 10: Design and Build_2

Dr Khairuddin Abdul Rashid

10

PWD Form DB/T 2002

Articles of Agreement

� Signature of parties

i. Contractor and witness

ii. Government and witness

Page 11: Design and Build_2

Dr Khairuddin Abdul Rashid

11

PWD Form DB/T 2002

Conditions of Contract

Clause 1

� Interpretation, definitions

� Reference to clauses of the

conditions

� Documents read as a whole

� Definitions – see Cl. 1.3 (a) to (r),

p1-3

� New sub-clauses (s) to (x) on

‘deferred payment’

Page 12: Design and Build_2

Dr Khairuddin Abdul Rashid

12

PWD Form DB/T 2002

Conditions of Contract

Clause 2 Contractor’s Obligations

Key obligations

� Cl. 2.1(a) Design, construct

and complete the works

� Cl. 2.2 Fully responsible for

the design, execution and

maintenance and guarantee

the Government

� Cl. 2.3.2 Novation

� Cl. 2.4.1 QA System

Page 13: Design and Build_2

Dr Khairuddin Abdul Rashid

13

PWD Form DB/T 2002

Conditions of Contract

Clause 2 Contractor’s Obligations

Key obligations

Cl. 2.7.1 Care of the works up to Practical Completion or Partial Practical Completion or Partial Occupation subject to Cl. 2.7.2 (a) to (f) ‘excepted risks’

� Cl. 2.9 Employ local, regd consultants (PD’s consent)

� Cl. 2.10 Engage Bumiputera as sub-contractors (30% [40%] of CS)

� Cl. 2.11 Submit programme

Page 14: Design and Build_2

Dr Khairuddin Abdul Rashid

14

PWD Form DB/T 2002

Conditions of Contract

Clause 3 PD’s Rights to Take

Action

� Cl. 3 (i) any matter related to:� Cl. 3 (i) any matter related to:

� Cl. 40 (mutual termination)

� Cl. 45 (Delay and EoT)

� Cl. 54 (Determination)

� Cl. 55 (War or Earthquake) or

� Cl. 56 (Arbitration)

is reserved for the Officer

named in Appendix 1

Page 15: Design and Build_2

Dr Khairuddin Abdul Rashid

15

PWD Form DB/T 2002

Conditions of Contract

� Clause 3 (ii) PD’s rights to

issue instructions requiring a

variation under Cl. 27.2 is

subject to the financial limits as subject to the financial limits as

set out in Appendix 1

(Treasury Instructions 202)

Page 16: Design and Build_2

Dr Khairuddin Abdul Rashid

16

PWD Form DB/T 2002

Conditions of Contract

Clause 4 PD’s Instructions

� Cl 4.3 must be in writing

� Cl. 4.1 Contractor shall comply

in 7 days… see Cl 4.2 (non-

compliance), Cl. 27.1

(contractor object with reasons)

� Cl. 4.2 If within 7 days, the

contractor fails to comply, PD

may employ and pay others

(deduct monies due to the

contractor)

Page 17: Design and Build_2

Dr Khairuddin Abdul Rashid

17

PWD Form DB/T 2002

Conditions of Contract

Clause 5 Notices

� Cl. 5 Written notices to be left

at the contractor’s office on at the contractor’s office on

site, to be confirmed by his PM

or send to contractor’s place of

business

Page 18: Design and Build_2

Dr Khairuddin Abdul Rashid

18

PWD Form DB/T 2002

Conditions of Contract

Clause 6 Contract Documents

� Cl. 6.1 PD keeps the original copy, contractor keeps the copy, contractor keeps the duplicate copy

� Cl. 6.2 Contractor submit 8 certified copies, Cl 6.3 2 copies of drawings, etc, Cl. 6.4 one copy of contract documents keep at the site

� Cl. 6.5 On completion contractor to submit as built drawings

Page 19: Design and Build_2

Dr Khairuddin Abdul Rashid

19

PWD Form DB/T 2002

Conditions of Contract

Clause 7 Sufficiency of Contract

Documents

� Cl. 7.1 Contractor to provide � Cl. 7.1 Contractor to provide

everything necessary…

� Cl. 7.2 the Articles of

Agreement, the Conditions and

the Appendices shall prevail

over other documents… any

ambiguity/discrepancy to refer

to PD, contractor to rectify at

his own cost

Page 20: Design and Build_2

Dr Khairuddin Abdul Rashid

20

PWD Form DB/T 2002

Conditions of Contract

Clause 7 Sufficiency of Contract

Documents

� Cl. 7.3.1 (a) and (b) Documents � Cl. 7.3.1 (a) and (b) Documents

are mutually explanatory…

between the Government’s

Requirements and the

Contractor’s Proposal, the

former prevails

Page 21: Design and Build_2

Dr Khairuddin Abdul Rashid

21

PWD Form DB/T 2002

Conditions of Contract

Clause 8 Materials, Goods and

Workmanship

� Cl. 8.1 the works shall be in � Cl. 8.1 the works shall be in

accordance to the contract

� Cl. 8.4 contractor to carry out

checks and tests

� Cl 8.5 PD may issue

instructions to remove from the

site or rectify any work,

materials… not in accordance

to the contract

Page 22: Design and Build_2

Dr Khairuddin Abdul Rashid

22

PWD Form DB/T 2002

Conditions of Contract

Clause 9 Restriction and Procedure

on Use of Imported Materials

and Goods

� Cl. 9.1 Malaysian materials and

goods only

� Cl. 9.2 Imported materials, etc

can only be used if approved

by the Government

Page 23: Design and Build_2

Dr Khairuddin Abdul Rashid

23

PWD Form DB/T 2002

Conditions of Contract

Clause 10 Construction Plan,

Equipment, Vehicles and

Machineries

The contractor is responsible and

shall pay all port dues, prepare

and submit all documents and

abide by the requirements of

the relevant authorities, pay all

charges and expenses and

supply a list to the PD

Page 24: Design and Build_2

Dr Khairuddin Abdul Rashid

24

PWD Form DB/T 2002

Conditions of Contract

Clause 11 Non-removal of

Materials and Equipment on

Site

Equipment, temporary works,

materials… intended for the

works can only be removed

from the site with the written

consent of the PD

Page 25: Design and Build_2

Dr Khairuddin Abdul Rashid

25

PWD Form DB/T 2002

Conditions of Contract

Clause 12 Statutory obligations,

notices, fees and charges

� Cl. 12.1.1 The contractor shall � Cl. 12.1.1 The contractor shall

comply with statutory

requirements

� Cl. 12.2 The Contractor shall

pay/indemnify the Government

against liability of any fees,

charges…

Page 26: Design and Build_2

Dr Khairuddin Abdul Rashid

26

PWD Form DB/T 2002

Conditions of Contract

Clause 12 Statutory obligations,

notices, fees and charges

� Cl. 12.1.2 Divergence to be � Cl. 12.1.2 Divergence to be

brought to attention; the

contractor shall propose

amendments (in case of

emergency see Cl. 12.1.3) and

with the PD’s consent carry out

the works at his own cost

(subject to Cl. 12.3)

Page 27: Design and Build_2

Dr Khairuddin Abdul Rashid

27

PWD Form DB/T 2002

Conditions of Contract

Clause 12 Statutory obligations,

notices, fees and charges

� Cl. 12.3.1 and 12.3.2 Variation � Cl. 12.3.1 and 12.3.2 Variation

in the statutory requirements /

conformity with terms of an

authority’s approval after date

of tender leading to amendment

to contractor’s proposal is

treated as an instruction of the

PD affecting a Variation under

Cl. 27.2

Page 28: Design and Build_2

Dr Khairuddin Abdul Rashid

28

PWD Form DB/T 2002

Conditions of Contract

Clause 13 Custom Dues and

Taxation

� Cl. 13.1 – 13.3 The contractor � Cl. 13.1 – 13.3 The contractor

to pay all duties and taxes and

make arrangement for their

employees to pay income tax

Page 29: Design and Build_2

Dr Khairuddin Abdul Rashid

29

PWD Form DB/T 2002

Conditions of Contract

Clause 14 Antiquities

� Cl. 14.1 found on the site

becomes the property of the becomes the property of the

Government. The contractor

shall not disturb, preserve the

findings, and inform the PD

� Cl. 14.2 PD shall issue

instruction

� Cl. 14.3 Compliance with 14.2

may lead to reimbursement for

loss and or/expense

Page 30: Design and Build_2

Dr Khairuddin Abdul Rashid

30

PWD Form DB/T 2002

Conditions of Contract

Clause 15 Copyright, royalties and

patent rights

� Cl. 15.1 The contractor is � Cl. 15.1 The contractor is

responsible for payment of all

royalties or other sums … of

any patented articles, etc in

respect of the works other than

those provided by the PD

� Cl 15.2 Issue on patent that

arises due to PD’s instruction,

the sum added to the contract

Page 31: Design and Build_2

Dr Khairuddin Abdul Rashid

31

End of Session 2