396
0 1 2 3 4 5 6 7 x 10 4 10 5 10 6 10 7 Average Weekday Traffic (AWT) Annual Cost (CHF/km) 1500 0-5% 1500 5-15% 1500 15-25% 1750 0-5% 1750 5-15% 1750 15-25% 2000 0-5% 2000 5-15% 2000 15-25% 2250 0-5% 2250 5-15% 2250 15-25% 2500 0-5% 2500 5-15% 2500 15-25% Design diagrams for road infrastructure elements: High capacity roads Salil Sharma Kay W. Axhausen Arbeitsberichte Verkehrs- und Raumplanung 559 Transport and Spatial Planning July 2009

Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

  • Upload
    others

  • View
    19

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Ann

ual C

ost (

CH

F/k

m)

1500 0−5%1500 5−15%1500 15−25%1750 0−5%1750 5−15%1750 15−25%2000 0−5%2000 5−15%2000 15−25%2250 0−5%2250 5−15%2250 15−25%2500 0−5%2500 5−15%2500 15−25%

Design diagrams for road infrastructure elements:High capacity roads

Salil SharmaKay W. Axhausen

Arbeitsberichte Verkehrs- und Raumplanung 559Transport and Spatial Planning July 2009

Page 2: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Working paper Transport and Spatial Planning 559

Design diagrams for road infrastructure elements: High ca-pacity roads

Salil SharmaIIT GuwahatiGuwahati - 781039Assam, Indiaphone: +91-99546-04244fax:[email protected]

Kay W. AxhausenIVTETHCH - 8093 Zurichphone: +41-44-633-3943fax: [email protected]

July 2009

Abstract

In this paper, the details for the design of road infrastructure elements, including their reliabilityare provided. This design is based on travel time, its uncertainty, and associated generalizedcosts of the road user. The paper presents the methodology developed by Bernard and Axhausen(2007), which deals with this approach. It allows the construction of the design diagrams torepresent annual generalized costs of the road user for relevant values of volume and trafficflow compositions. The methodology is evaluated for Swiss motorways in order to examine itsapplicability for the practical uses. As a result, the scope of the methodology is observed to belimited in the current formulation because of the behavior of schedule delay costs of the roaduser.

KeywordsDesign diagram; Road infrastructure; High capacity roads; Generalized costs of the road users;Value of travel time savings

Preferred citation styleSharma, S. and K.W. Axhausen (2009) Design diagrams for road infrastructure elements: Highcapacity roads, Arbeitsberichte Verkehrs- und Raumplanung, 559, Institute for Transport Plan-ning and Systems (IVT), ETH Zurich, Zurich.

1

Page 3: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

1 Introduction

In Bernard and Axhausen (2007) and Bernard (2008) a highway design concept has beendeveloped, which treats highway cross section capacity and traffic flow as random variables.Capacity and demand are assumed to vary over very short time period. This short termvariation is assumed to follow a normal distribution in both the cases. The choice of highwaydesign is based on the travel times, their variabilities, the values of travel time savings, andon the valuations of the travel time reliability. The methodology is suitable for the design ofinfrastructure elements, for which travel times and delays can be calculated, which in turn aresummarized into the generalized costs of the road users, which include both travel time costsand schedule delay costs (early or late delays). The minimum input data requirements arehourly saturation values based on standard demand profiles, capacity estimates, and occupancyrates. To improve the estimates, the share of heavy goods vehicles (trucks, transporters, busses)should be known. If location specific data for any of these items are available, they can be used.

The methodology allows separate calculations of generalized costs for individual motor-ized traffic and heavy goods traffic. Instead of the previous reliance on a single design volume,say 30th hour, this methodology evaluates the generalized costs encountered across all hours ofthe year. In this way, the methodology avoids cost underestimates or cost overestimates due tothe one selected hour. The difference in generalized costs of the road user between the currentconditions and the various alternatives is the design criterion.

The purpose of this paper is to produce design diagrams derived from the annual gener-alized costs of the road user, which have been calculated for Swiss motorways. These designdiagrams will serve as practical aids to assess the difference between generalized costs of theroad user on existing infrastructure and the costs involved in investments for construction ormodification of road infrastructure elements. The design diagrams will show the characteristicsof annual generalized costs of the road user in terms of specified cross section capacity of themotorway and traffic flow observed on the motorway.

This paper is organized as follows: Section 2 provides an overview of the methodology.The necessary parameters for the methodology are currently available only for motorways;thus, subsequent section 3 and 4 analyze it for Swiss motorways (i.e., for 2 lane and 3 laneroadways). Section 5 presents the design diagrams for annual generalized costs. The lastsection concludes the paper with an evaluation of the methodology.

2

Page 4: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

2 Methodology

The methodology is discussed in the following subsections; the discussion provides the param-eters which were estimated for Swiss motorways. The necessary count data were provided bySwiss Federal Roads Authority (ASTRA, 2003); 13 motorway sites were chosen of which 11sites had a vmax = 120 kmph and 2 sites a vmax = 100 kmph. The costs are calculated on acontinuous scale in units of Swiss Francs and the system is comparable to a points rationingsystem (Bernard and Axhausen, 2007).

2.1 Breakdown probability

A traffic breakdown is the transitions from free to congested flow (i.e., from the upper branchto the lower branch of speed-volume fundamental diagram (Transportation Research Board,2000). The breakdown probability is the product of the distribution of the prevailing traffic flowtogether with the distribution of the capacity (Bernard and Axhausen, 2007). The breakdownprobability for a given saturation rate can be taken from figure [1] or approximated with thefollowing formula:

Pb =1

1 + eα−β.a60[1]

where,

Pb = Breakdown Probabilitya60 = 60-min saturation rate: a60 = Q60/Lsv=0, hourly demand volume Q60 di-

vided by the cross-section capacity Lsv=0 for zero heavy goods vehicles (seeSN 640 018a)

α, β = Parameters (see table [1])

Table 1: Parameters for formula [1]:

Share of heavy goods vehicles α β0 – 5% 11.593 8.8065 – 15% 11.987 9.36115 – 25% 11.481 9.578

3

Page 5: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 1: Mean breakdown probability as function of saturation rate a60 and share of heavygoods vehicles (in classes: 0 - 5 %, 5 - 15 % and 15 - 25 %)

0.5 0.6 0.7 0.8 0.9 1 1.10

0.02

0.04

0.06

0.08

0.1

0.12

0.14

0.16

a60

Pb

0 − 5%5 − 15%15 −25%

The exact breakdown probability can also be calculated with the mean (µR) and standard devi-ation (σR) of the reserve capacity, R (which is defined as R = C−Q, where C is Capacity andQ is traffic flow), especially when for fc, fs, or sd(a) values other than those tabulated beloware chosen:

Pb(β) =1√2π

∫ −β

−∞e−

12x2

dx [2]

where, β is defined as reliability index (coefficient of variation) = µR

σR. The mean (µR) and the

standard deviation (σR) of the reserve capacity are given as:

µR

Lsv=0

= fc − a60 [3]

σR

Lsv=0

=

√fs

2 + sd(a)2 [4]

4

Page 6: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

where,

µR = Mean of the reserve capacity in [Fz/h]σR = Standard deviation of the reserve capacity in [Fz/h]fc, fs = Parameters (see table [2])sd(a) = Standard deviation of the saturation rate a60 can be taken from figure [2] or

calculated as:

sd(a) = −0.5166.a604 + 1.0046.a60

3 − 0.6864.a602 + 0.2561.a60 + 0.0125 [5]

Please note, that for a60 < 50% the breakdown probability can be assumed to be zero.

Table 2: Parameters for formulae [3] and [4]:

Share of heavy goods vehicles fc fs

0 – 5% 1.3305 0.19915 – 15% 1.2885 0.180515 – 25% 1.2004 0.1658

Figure 2: Mean standard deviation of the saturation rate sd(a) given a60

0 0.2 0.4 0.6 0.8 10

0.01

0.02

0.03

0.04

0.05

0.06

0.07

0.08

0.09

a60

sd(a

)

5

Page 7: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

2.2 Speed without breakdowns

The speed vm is the expected speed of a vehicle during undisturbed flow for a given volume tocapacity ratio. This speed vm must be distinguished from the free speed v0 which describes themaximmum (allowed) speed of a road. To estimate this speed vm those observed intervals wereselected which were not affected by a breakdown (Bernard and Axhausen, 2007). It can eitherbe taken from figure [3] or calculated with the BPR-function of Transportation research Board(2000):

vm =v0

1 + α.a60β

[6]

where,

vm = Mean speed without breakdowns in [km/h]v0 = Mean free flow speed in [km/h] (see table [3])α, β = Parameters (see table [3])

Table 3: Parameters for formula [6]:

Motorways with a speed limit Motorways with a speed limitof 120 km/h of 100 km/hmIV HGV mIV HGV

α 0.194 0.119 0.370 0.236β 3.344 1.700 4.656 4.566v0 115.2 96.4 94.4 84.6

2.3 Ratio fmb

The driver’s expected speed needs to account for other factors (e.g., traffic volume, weather, andlight condition) influencing driver’s behavior. In case of a breakdown, travel time will increaseas travel speed will drop down for its duration. The methodology uses ratio fmb to assess thereduced speed during a breakdown (vb = fmb.vm). Here, vb represents reduced speed duringbreakdown (Bernard and Axhausen, 2007). The methodology suggests the calculation of ratiofmb with the figure [4] or with:

fmb = c + δ.a60 +γ

1 + eα−β.a60[7]

6

Page 8: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 3: Mean speed for flow without breakdowns vm as a function of a60 for mIV and HGVon motorways with speed limits of 100 and 120 kmph

0 0.2 0.4 0.6 0.8 10

20

40

60

80

100

120

a60

Vm

in k

mph

120 kmph mIV100 kmph mIV100 kmph HGV120 kmph HGV

where,

α, β, γ, δ, c = Parameters (see table [4])

Table 4: Parameters for formula [7]:

Motorways with a speed Motorways with a speed Motorways with a speedlimit of 120 km/h limit of 100 km/h limit of 100 km/h

(Modified Parameters)mIV HGV mIV HGV mIV HGV

α 3.638 3.055 -31.38 -4.129 -3.38 -4.129β 9.223 7.901 -83.61 -18.79 -10.61 -12.79γ -0.511 -0.596 0.457 0.388 0.457 0.388δ 0.415 0.425 0.432 0.321 0.432 0.321c 0.630 0.762 0.127 0.285 0.127 0.285

7

Page 9: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 4: Ratio fmb, of the speed during a breakdown to the speed without breakdown as afunction a60 for mIV and HGV on motorways with speed limits of 100 and 120 km/h

0 0.2 0.4 0.6 0.8 10

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

a60

f mb

120 km/h mIV120 km/h HGV100 km/h mIV100 km/h HGV

The plot for ratio fmb (see figure [4]), which is showing a sharp kink for 100 kmph case, ismodified by changing the parameters α and β (see table [4] and figure [5]). A parallel analysisof the generalized cost calculations (see section [2.8]) is carried out, but only a very slightdifference between previous costs and the newly calculated costs is observed. The analysisshows that the new curve fits well and can replace the previous curve suggested in the originalpaper (Bernard and Axhausen, 2007). In this paper, the design diagrams (see figures [16] to[21] and appendices [B] and [C]) are produced with modified parameters for fmb (see table [4]).

2.4 Mean breakdown duration

In case of a breakdown, the undisturbed travel speed vm drops down to reduced speed duringa breakdown vb, given by a factor fmb (see section [2.3]). The breakdown event is of a certainduration; thus, the duration of breakdown is measured from the instant when a speed drop ob-served in vm to the instant when two consecutive 5-minute intervals with average speeds greaterthan the critical speed are observed (Bernard and Axhausen, 2007). The mean breakdown du-ration tb in [h] can be taken from figure [6] or calculated with:

8

Page 10: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 5: Modified relationship among fmb, a60, number of lanes, and speed limit:

0 0.2 0.4 0.6 0.8 10

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

a60

f mb

120 km/h mIV120 km/h HGV100 km/h mIV100 km/h HGV

tb = c +γ

1 + eα−β.a60[8]

where,

α, β, γ, c = Parameters (see table [5])

For saturation rates of a60 ≤ 65% on motorways with a speed limit of 120 km/h tb can beassumed to be 0.707 h and as tb = 1.066h for those with a speed limit of 100 km/h.

Table 5: Parameters for formula [8]:

Motorways with a speed limit Motorways with a speed limitof 120 km/h of 100 km/h

α 12.39 17.95β 34.16 45.37γ 0.340 0.901c 0.368 0.165

9

Page 11: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 6: Mean breakdown duration tb in [h] as a function of a60

0 0.2 0.4 0.6 0.8 1 1.20

0.2

0.4

0.6

0.8

1

a60

t b in h

120 km/h100 km/h

2.5 Expected speed

The total travel time resulting from both free flow time and congested time is dependent on thedistance traveled. Thus, expected speed will be including free travel speed and the expectedproportion of congestion. According to Bernard and Axhausen, (2007) with Tm being the totaltime (over a year) during which flows of a given volume to capacity ratio are not affected bythe breakdowns and Tb, the sum of all durations of breakdowns for the same traffic volume.The expected speed can be written as:

Ev =Tm

Tm + Tb

vm +Tb

Tm + Tb

vb [9]

where, vm denotes the free speed not affected by breakdowns and vb the reduced speed duringbreakdowns. If times Tm and Tb can be written as Tm = nm.∆t and Tb = n′b.tb and if nm is thenumber of observed 5-minutes intervals (∆t = 5 min) with a free traffic flow and n′b the numberof observed breakdowns with the duration tb, then the breakdown probability can be written asPb = n′b/nm which results in the expression for expected speed:

Ev =1

1 + Pbtb∆t

vm +Pb

tb∆t

1 + Pbtb∆t

vb [10]

10

Page 12: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

or with fmb = vb/vm it can be calculated as:

Ev =∆t + Pbtbfmb

∆t + Pbtb.vm [11]

where,

Ev = Expected speed in [km/h];∆t = 1

12h; interval length for the estimate of Pb in [h]

2.6 Planned for mean speed

The planned for mean speed vp, in contrast to Ev, incorporates the willingness to pay:

vp =kfruh + kspat.Pb.

tb∆t

.fmb

kfruh + kspat.Pb.tb∆t

.vm [12]

where,

kfruh = Value of early delays in [CHF/Pers-h] (based on SN 641 825)kspat = Value of late delays in [CHF/Pers-h] (based on SN 641 825)Pb = Probability of breakdown (see section [2.1])vp = Planned for speed of the traveler in [km/h]vm = Mean speed without breakdown in [km/h] (see section [2.2])fmb = Ratio of mean speed with breakdown to mean speed without breakdowns

(see section [2.3])tb = Mean breakdown duration in [h] (see section [2.4])∆t = 1

12h; interval length for the estimate of Pb in [h]

2.7 Generalized costs of travel

The methodology adopts the concept of willingness to pay for reduction in travel time to mea-sure its benefit. This reduction in travel time is multiplied with the value of travel time savingsfor each user of the infrastructure element to compute the extra benefit. This approach is ex-tended. It includes that a higher willingness to pay exists to reduce late arrivals (e.g., due tocongestion) than to reduce travel time (Bernard and Axhausen, 2007). Thus, the generalizedcosts of travel of a person are calculated as the weighted sum of element specific travel times,early, and late delays:

Kp = kE.tE + (1− Pb).kfruh.tfruh + Pb.kspat.tspat [13]

11

Page 13: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

where,

Kp = Generalized cost of travel of a person [CHF]kE = Value of travel time of the expected travel time [CHF/Pers. h] (based on SN

641 822, SN 641 823, SN 641 827)kfruh = Value of early delays in [CHF/Pers-h] (based on SN 641 825)kspat = Value of late delays in [CHF/Pers-h] (based on SN641 825)tE = Expected travel time [h]tfruh = Early delay in [h] (= Expected travel time - Travel time without breakdowns)tspat = Late delays in [h] (= Travel time with breakdowns - Expected travel time)Pb = Probability of breakdown (see section [2.1])

The ratio of kfruh : kE : kspat is 1:2:3 as stipulated in SN 641 825.

2.8 Assessments of links of high capacity roads

The assessment is based on all hours of the year and all user of a link. The generalized costs oftravel per unit length are:

Kp,h

I= kE.

1

Ev

+∆t

∆t + Pbtbkfruh

(1

vp

− 1

vm

)+

Pbtb∆t + Pbtb

kspat

(1

fmb.vm

− 1

vp

)[14]

where,

Kp,h = Generalized cost per person-h [CHF]I = Link length in [km]Ev = Expected speed in [km/h] (see section 2.5)vp = Planned for speed of the traveler in [km/h] (see section 2.6)vm = Mean speed without breakdown in [km/h] (see section 2.2)fmb = Ratio of mean speed with breakdown to mean speed without breakdowns

(see section 2.3)tb = Mean breakdown duration in [h] (see section 2.4)∆t = 1

12h; interval length for the estimate of Pb in [h]

If there are data, respectively assumptions available for the share of heavy goods vehicles, thenKp,h have to be calculated separately for individual traffic and heavy goods traffic. Assumeone person per heavy goods vehicle.

The annual sum of the generalized costs is:

Ktot,a

I=

8760∑

h=1

Q60,h

((1− SV Ah)BGh

Kmivp,h

I+ SV Ah

KSVp,h

I

)[15]

12

Page 14: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

where,

Ktot,a = Total annual link generalized costs of travel [CHF]Q60,h = Demand volume of the hth hour of the yearSV Ah = Share of heavy good vehicles in hth hour [Pers/veh]BGh = Occupancy ratio for the hth hour [Pers/veh]Kmiv

p,h = Generalized costs of travel of a person in hth hour [CHF]KSV

p,h = Generalized costs of travel of a heavy goods vehicle in hth hour [CHF]

13

Page 15: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

3 Input data

The methodology presented above is evaluated for Swiss motorways. The data are suppliedby Swiss Association of Road and Transport Experts [SN 640 005b]. This standard presents7 weekly (168 hours) and 5 annual (12 months) demand profiles. The profiles are presentedas relative profiles (in terms of percent). The weekly profile is presented in percent of averageweekday traffic (AWT); the annual profile as percent of the average month. The weekly andannual profiles are integrated to obtain the traffic flow data for the whole year (8,760 hours).The integration is done on the assumption that the weekly traffic flow will be same for all theweeks of a particular month. The year is assumed to start from monday i.e., 1st day of January.For all other weeks which contain the days of a different month, the traffic flow is weighedaccordingly on the basis of number of days falling in each month. These profiles obtained areused as input to the methodology. The traffic flow data are then sorted in descending order.Unsorted annual traffic flow profile is shown in figure [7] and sorted annual traffic flow profileis shown in figure [8].

Figure 7: Example showing hourly flow variation for whole year - weekly profile 1 and annualprofile 1:

0 1000 2000 3000 4000 5000 6000 7000 8000 90000

5

10

15

20

25

Hour of the year

Mot

or v

ehic

les

in %

of A

WT

The average weekday traffic (AWT) is assumed to vary from 5,000 to 120,000. The high

14

Page 16: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 8: Example showing ranked hourly flow variation for whole year - sorted traffic flowvariation for weekly profile 1 and annual profile 1:

0 1000 2000 3000 4000 5000 6000 7000 8000 90000

5

10

15

20

25

Hours ranked by volume

Mot

or v

ehic

les

in %

of A

WT

range of average weekday traffic is observed in some locations in Switzerland (e.g., Muttenz,Hard (AB) and Baden, Bareggtunnel (AB)) (ASTRA, 2008). The 2 lane and 3 lane cases areevaluated separately. The separate cases for speed limits of 120 kmph and speed limit of 100kmph are considered. The three types of share of heavy goods vehicles are considered in theanalysis: 0 – 5%, 5 – 15%, and 15 – 25%. For calculations, the lower bound of the share ofheavy goods vehicles is used as SV Ah. The cross section capacity for motorways are assumedas 1500, 1750, 2000, 2250, and 2500 [veh/lane/h]. The occupancy ratio for the hth hour (BGh)is considered as 1.1. The willingness to pay figures are (see SN 641 825, SN 641 822, SN 641823 and SN 641 827):

mIV : kE = 19.74, kfruh = 9.87, and kspat = 29.61 [CHF/h-Pers]HGV : kE = 53.72, kfruh = 23.86, and kspat = 80.58 [CHF/h-Fz]

The HGV values incorporate both the willingness to pay of the senders (SN 641 823) and theoperating costs of vehicle (SN 641 827). The hourly generalized costs are calculated for eachhour of the year and then summed up for all hours of the year to obtain annual generalizedcosts. MATLAB is used to perform all the relevant calculations for annual generalized costs ofthe road user (MathWorks, 2009).

15

Page 17: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

4 Behavior of travel time costs and schedule delay costs ofthe road user

The methodology incorporates travel time, schedule delays, and associated costs to producethe assessment of road infrastructure elements in the form of generalized costs of the road user.This section discusses the behavior of schedule delay costs with respect to hourly saturationrate a60 as proposed by the methodology. The variables presented in the methodology are thefunctions of hourly saturation rate a60. Using hourly saturation rate a60 as the base parameter,we have analyzed the behavior of travel time costs and schedule delay costs. The functionsfor travel time costs (see formula [16]), early schedule delay costs (see formula [17]), and lateschedule delay costs (see formula [18]) are as follows:

Kt,h

I= kE.

1

Ev

[16]

where,

Kt,h = Costs associated with travel time per person-h [CHF]

and,

Ke,h

I=

∆t

∆t + Pbtbkfruh

(1

vp

− 1

vm

)[17]

where,

Ke,h = Early schedule delay cost per person-h [CHF]

and,

Kl,h

I=

Pbtb∆t + Pbtb

kspat

(1

fmb.vm

− 1

vp

)[18]

where,

Kl,h = Late schedule delay cost per person-h [CHF]

The plots for travel time costs are presented in figures [9] and [10] and travel time costs showexpected increasing behavior with respect to hourly saturation rate a60. The plots (see figures[12], [13], [14], and [15]) for schedule delay costs show a twist and schedule delay costs beginto decline after a specific value of hourly saturation rate a60. As, these above presented costs

16

Page 18: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 9: Example showing behavior of travel time costs with respect to hourly saturation ratea60 for 100 kmph speed limit, 15 – 25% share of heavy goods vehicles, individualtraffic case:

0 0.5 1 1.5 2 2.50

0.5

1

1.5

2

2.5

3

3.5

a60

Tra

vel t

ime

cost

s (C

HF

/km

)

functions are the composites of continuous functions; thus, these costs functions will also becontinuous. First derivative test and second derivative test are applied to check the possibilityof maxima and behavior of the function. Let us consider the early schedule delay costs functionfor analysis (see formula [17]). The function is tested for 120 kmph speed limit, 0 – 5% shareof heavy goods vehicles, individual motorized traffic case, and for all a60 ∈ (0, 2).

f(a60) =∆t

∆t + Pbtbkfruh

(1

vp

− 1

vm

)[19]

where,

Pb(a60) =1

1 + e11.593−8.806.a60

tb(a60) = 0.368 +0.340

1 + e12.39−34.16.a60

vm(a60) =115.2

1 + 0.194.a603.344

fmb(a60) = 0.630 + 0.415.a60 +−0.511

1 + e3.638−9.223.a60

17

Page 19: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

vp(a60) =9.87 + 29.61.Pb(a60).

tb(a60)∆t

.fmb(a60)

9.87 + 29.61.Pb(a60).tb(a60)

∆t

.vm(a60)

The derivative of the equation [19] is defined continuously over the interval i.e., at each pointof interval the function f(a60) is continuous and differentiable. According to first derivativetest, for a function f which is differentiable in a neighborhood of x, if there exists a positivenumber r such that for every y such that x − r < y < x, we have f ′(y) > 0, and for every y

such that x < y < x + r, we have f ′(y) < 0, then function f has a local maximum at x. Afterapplying first derivative test and second derivative test, the results are:

f ′(a60) = 0 ⇒ a60 = 1.0344

f ′(1.0343) = 1.1420e− 004 ⇒ f ′(1.0343) > 0

f ′(1.0345) = −7.7604e− 005 ⇒ f ′(1.0345) < 0

f ′′(1.0344) = −0.9590

Second derivative test confirms that maxima exists at a60 = 1.0344 and

f(1.0344) = 0.023 ⇒ f(1.0344) ≥ f(a60) ∀ a60 ∈ (0, 2)

the above analysis shows that function f(a60) (see equation [19]) will have global maximumat a60 = 1.0344. The critical values of hourly saturation rate a60, for which the schedule delaycosts showing a twist pattern (occurrence of maxima), are estimated for different cases usingMATLAB (MathWorks, 2009) and tabulated in tables [6] and [7]:

Table 6: Critical values of hourly saturation rate a60 for motorways with a speed limit of 120kmph:

mIV HGVEarly delay Late delay Early delay Late delay

0 – 5% 1.034 1.014 1.009 0.99125 – 15% 1.017 0.9988 0.9938 0.978415 – 25% 0.9448 0.9272 0.9248 0.9106

However, the annual generalized costs seem to increase (see figure [11]) with respect to averageweekday traffic because the travel time costs are always observed in an increasing fashion andthe area under the graph of schedule delay costs is also increasing; therefore, it will incorporatepositive changes in the annual generalized costs pattern. The behavior of schedule delay costsrestricts the applicability of the methodology beyond a definite value of hourly saturation ratea60. In this paper, the methodology is applied for Swiss motorways within the above mentioned

18

Page 20: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

limits (see tables [6] and [7]) and design diagrams (see next section [5]) are produced aftermaking these considerations.

Table 7: Critical values of hourly saturation rate a60 for motorways with a speed limit of 100kmph:

mIV HGVEarly delay Late delay Early delay Late delay

0 – 5% 1.001 0.9786 0.9853 0.96985 – 15% 0.9834 0.9638 0.9692 0.955415 – 25% 0.9076 0.8883 0.8938 0.8803

Figure 10: Example showing behavior of travel time costs with respect to hourly saturation ratea60 for 100 kmph speed limit, 15 – 25% share of heavy goods vehicles, heavy goodstraffic case:

0 0.5 1 1.5 2 2.50

1

2

3

4

5

6

7

a60

Tra

vel t

ime

cost

s (C

HF

/km

)

19

Page 21: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 11: Example showing design diagram without considering the behavior of schedule de-lay costs of the road user for weekly profile 1, annual profile 1, speed limit 100km/h, and number of lanes 3:

0 2 4 6 8 10 12

x 104

105

106

107

108

109

1010

Average Weekday Traffic (AWT)

Ann

ual C

ost (

CH

F/k

m)

1500 0−5%1500 5−15%1500 15−25%1750 0−5%1750 5−15%1750 15−25%2000 0−5%2000 5−15%2000 15−25%2250 0−5%2250 5−15%2250 15−25%2500 0−5%2500 5−15%2500 15−25%

20

Page 22: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 12: Example showing behavior of early schedule delay costs with respect to hourly sat-uration rate a60 for 100 kmph speed limit, 15 – 25% share of heavy goods vehicles,individual traffic case:

0 0.5 1 1.5 2 2.5−0.02

−0.01

0

0.01

0.02

0.03

0.04

a60

Ear

ly S

ched

ule

Del

ay C

osts

(m

IV)

21

Page 23: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 13: Example showing behavior of early schedule delay costs with respect to hourly sat-uration rate a60 for 100 kmph speed limit, 15 – 25% share of heavy goods vehicles,heavy goods traffic case:

0 0.5 1 1.5 2 2.5−0.01

0

0.01

0.02

0.03

0.04

0.05

0.06

0.07

0.08

a60

Ear

ly S

ched

ule

Del

ay C

osts

(H

GV

)

22

Page 24: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 14: Example showing behavior of late schedule delay costs with respect to hourly satu-ration rate a60 for 100 kmph speed limit, 15 – 25% share of heavy goods vehicles,individual traffic case:

0 0.5 1 1.5 2 2.5−0.02

−0.01

0

0.01

0.02

0.03

0.04

0.05

0.06

0.07

a60

Late

Sch

edul

e D

elay

Cos

ts (

mIV

)

23

Page 25: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 15: Example showing behavior of late schedule delay costs with respect to hourly satu-ration rate a60 for 100 kmph speed limit, 15 – 25% share of heavy goods vehicles,heavy goods traffic case:

0 0.5 1 1.5 2 2.5−0.02

0

0.02

0.04

0.06

0.08

0.1

0.12

a60

Late

Sch

edul

e D

elay

Cos

ts (

HG

V)

24

Page 26: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

5 Design diagrams

To assess the differences in the generalized costs of current conditions and various alternatives,the plots of annual generalized costs and average weekday traffic (AWT) are produced in twomanners; first, the plots for specified speed limit and number of lanes, and second, for specifiedshare of heavy goods vehicles and cross section capacity per lane. The cross section capacityper lane considered for both the cases are: 1500, 1750, 2000, 2250, and 2500 [veh/lane/h].

Figures [16] to [19] represent three different sets of lines. Each set represents one spec-ified share of heavy goods vehicles. The topmost set of lines represents 15 - 25% share ofheavy goods vehicles, the middle set represents 5 - 15% share of heavy goods vehicles, and thebottom set represents 0 - 5% share of heavy goods vehicles. Each set consists of 5 differentlines; each line represents annual cost for specified cross section capacity per lane. In eachset of lines, the topmost line represents 1500 [veh/lane/h] and the bottommost line represents2500 [veh/lane/h]. Figures [20] and [21] contain a set of 4 lines. Each line represents specificshare of heavy goods vehicles, cross section capacity per lane, speed limit, and number of lanes.

The actual design diagrams are produced for average weekday traffic varying from 0 to120,000. In order to provide more clear visualization, we have presented them in this paperconsidering the variation of average weekday traffic from 0 to 70,000.

25

Page 27: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 16: Example showing design diagram for weekly profile 4, annual profile 1, speed limit120 km/h, and number of lanes 2:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Ann

ual C

ost (

CH

F/k

m)

1500 0−5%1500 5−15%1500 15−25%1750 0−5%1750 5−15%1750 15−25%2000 0−5%2000 5−15%2000 15−25%2250 0−5%2250 5−15%2250 15−25%2500 0−5%2500 5−15%2500 15−25%

26

Page 28: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 17: Example showing design diagram for weekly profile 4, annual profile 1, speed limit120 km/h, and number of lanes 3:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Ann

ual C

ost (

CH

F/k

m)

1500 0−5%1500 5−15%1500 15−25%1750 0−5%1750 5−15%1750 15−25%2000 0−5%2000 5−15%2000 15−25%2250 0−5%2250 5−15%2250 15−25%2500 0−5%2500 5−15%2500 15−25%

27

Page 29: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 18: Example showing design diagram for weekly profile 4, annual profile 1, speed limit100 km/h , and number of lanes 2:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Ann

ual C

ost (

CH

F/k

m)

1500 0−5%1500 5−15%1500 15−25%1750 0−5%1750 5−15%1750 15−25%2000 0−5%2000 5−15%2000 15−25%2250 0−5%2250 5−15%2250 15−25%2500 0−5%2500 5−15%2500 15−25%

28

Page 30: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 19: Example showing design diagram for weekly profile 4, annual profile 1, speed limit100 km/h , and number of lanes 3:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Ann

ual C

ost (

CH

F/k

m)

1500 0−5%1500 5−15%1500 15−25%1750 0−5%1750 5−15%1750 15−25%2000 0−5%2000 5−15%2000 15−25%2250 0−5%2250 5−15%2250 15−25%2500 0−5%2500 5−15%2500 15−25%

29

Page 31: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 20: Example showing design diagram for weekly profile 4, annual profile 1, share ofheavy goods vehicles 0%, cross section capacity 1750 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Ann

ual C

ost (

CH

F/k

m)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

30

Page 32: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 21: Example showing design diagram for weekly profile 4, annual profile 1, share ofheavy goods vehicles 0%, cross section capacity 2000 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Ann

ual C

ost (

CH

F/k

m)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

31

Page 33: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

6 Conclusions

We have presented design diagrams based on the methodology for Swiss motorways. Themethodology offers a way to integrate travel speed and random delays in to a cost benefitanalysis. It also provides a detailed description of effects that influence travel speed in contrastto existing design concept for motorways (Bernard and Axhausen, 2007). The design diagramsprovide an outlook to assess the differences between current conditions and various possiblealternatives.

A modification for the functional parameters of ratio fmb is proposed; it is observed thatthis modification has unnoticeable influence on the annual generalized costs of the road users.The limitations of the methodology have also come to notice. The behavior of schedule delaycosts narrows the applicability of the methodology for practical considerations. The limits arecalculated and presented for which the methodology works best and these limits are dependenton various factors: the type of traffic demand profile being input and resulting hourly saturationrate a60 of considered motorway. The next step will be to reestimate these schedule delay costcurves so that they remain valid across the relevant range of a60 between zero and two.

32

Page 34: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

7 Acknowledgements

The authors would like to thank Bundesamt für Strassen, Bern for providing average dailytraffic and average weekday traffic data for the analysis.

The first author would like to express his deep sense of gratitude to Prof. Axhausen forproviding him an opportunity to work on interesting subject of highway design concept andguiding him throughout the project.

33

Page 35: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

8 References

Bernard M. (2008) Entwicklung eines Bemessungskonzepts für Autobahnabschnitte unterBerücksichtigung der Zufallsgrößen Verkehrsnachfrage und Kapazität in der Risikoanalyse,Dissertation, ETH Zurich, Zurich.

Bernard, M. and K.W. Axhausen (2007) A highway design concept based on probabilistic op-erational reliability, paper presented at the 11th World Conference of Transport Research,Berkeley, June 2007.

Bundesamt für Strassen (ASTRA) (2008) Monats und Jahresmittel des 24 Stuendigen Verkehrs,2008, ASTRA, Bern.

Bundesamt für Strassen (ASTRA) (2003) Automatische Strassenverkehrszählung, 2003,ASTRA, Bern.

MathWorks (2009) MATLAB version 7.8.0.347, MathWorks, Natick.

Transportation Research Board (2000) Highway Capacity Manual 2000, National ResearchCouncil, Washington D.C.

Vereinigung Schweizerischer Strassenfachleute (VSS) (2009) SN 640 005b: Ganglinientypenund durchschnittlicher werktäglicher Verkehr, VSS, Zürich.

Vereinigung Schweizerischer Strassenfachleute (VSS) (2007) SN 641 827: Kosten-Nutzen-Analysen im Strassenverkehr, Betriebskosten von Strassenfahrzeugen, VSS, Zürich.

Vereinigung Schweizerischer Strassenfachleute (VSS) (2007) SN 641 823: Kosten-Nutzen-Analysen im Strassenverkehr, Zeitkosten im Güterverkehr, VSS, Zürich.

Vereinigung Schweizerischer Strassenfachleute (VSS) (2007) SN 641 822a: Kosten-Nutzen-Analysen im Strassenverkehr, Zeitkosten im Personenverkehr, VSS, Zürich.

Vereinigung Schweizerischer Strassenfachleute (VSS) (2006) SN 640 018a: Leistungsfähigkeit,Verkehrsqualität, Belastbarkeit, VSS, Zürich.

Vereinigung Schweizerischer Strassenfachleute (VSS) SN 641 825: Kosten-Nutzen-Analysenim Strassenverkehr, Bewertung und Abschätzung der Zuverlässigkeit, VSS, Zürich.

34

Page 36: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

9 Appendix A: Annual traffic demand profiles

This section contains all annual traffic demand profiles derived from the integration of weeklyand annual profiles supplied by the standard (see section [3]).

35

Page 37: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 22: Ranked hourly flow variation for weekly profile 1 and annual profile 1:

0 1000 2000 3000 4000 5000 6000 7000 8000 90000

5

10

15

20

25

Hours ranked by volume

Mot

or v

ehic

les

in %

of A

WT

Figure 23: Ranked hourly flow variation for weekly profile 1 and annual profile 2:

0 1000 2000 3000 4000 5000 6000 7000 8000 90000

2

4

6

8

10

12

14

16

18

20

Hours ranked by volume

Mot

or v

ehic

les

in %

of A

WT

36

Page 38: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 24: Ranked hourly flow variation for weekly profile 1 and annual profile 3:

0 1000 2000 3000 4000 5000 6000 7000 8000 90000

5

10

15

20

25

30

35

40

Hours ranked by volume

Mot

or v

ehic

les

in %

of A

WT

Figure 25: Ranked hourly flow variation for weekly profile 1 and annual profile 4:

0 1000 2000 3000 4000 5000 6000 7000 8000 90000

5

10

15

20

25

Hours ranked by volume

Mot

or v

ehic

les

in %

of A

WT

37

Page 39: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 26: Ranked hourly flow variation for weekly profile 1 and annual profile 5:

0 1000 2000 3000 4000 5000 6000 7000 8000 90000

5

10

15

20

25

30

35

Hours ranked by volume

Mot

or v

ehic

les

in %

of A

WT

Figure 27: Ranked hourly flow variation for weekly profile 2 and annual profile 1:

0 1000 2000 3000 4000 5000 6000 7000 8000 90000

2

4

6

8

10

12

14

16

Hours ranked by volume

Mot

or v

ehic

les

in %

of A

WT

38

Page 40: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 28: Ranked hourly flow variation for weekly profile 2 and annual profile 2:

0 1000 2000 3000 4000 5000 6000 7000 8000 90000

2

4

6

8

10

12

14

16

Hours ranked by volume

Mot

or v

ehic

les

in %

of A

WT

Figure 29: Ranked hourly flow variation for weekly profile 2 and annual profile 3:

0 1000 2000 3000 4000 5000 6000 7000 8000 90000

5

10

15

20

25

30

Hours ranked by volume

Mot

or v

ehic

les

in %

of A

WT

39

Page 41: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 30: Ranked hourly flow variation for weekly profile 2 and annual profile 4:

0 1000 2000 3000 4000 5000 6000 7000 8000 90000

2

4

6

8

10

12

14

16

18

20

Hours ranked by volume

Mot

or v

ehic

les

in %

of A

WT

Figure 31: Ranked hourly flow variation for weekly profile 2 and annual profile 5:

0 1000 2000 3000 4000 5000 6000 7000 8000 90000

5

10

15

20

25

Hours ranked by volume

Mot

or v

ehic

les

in %

of A

WT

40

Page 42: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 32: Ranked hourly flow variation for weekly profile 3 and annual profile 1:

0 1000 2000 3000 4000 5000 6000 7000 8000 90000

2

4

6

8

10

12

Hours ranked by volume

Mot

or v

ehic

les

in %

of A

WT

Figure 33: Ranked hourly flow variation for weekly profile 3 and annual profile 2:

0 1000 2000 3000 4000 5000 6000 7000 8000 90000

2

4

6

8

10

12

Hours ranked by volume

Mot

or v

ehic

les

in %

of A

WT

41

Page 43: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 34: Ranked hourly flow variation for weekly profile 3 and annual profile 3:

0 1000 2000 3000 4000 5000 6000 7000 8000 90000

2

4

6

8

10

12

14

16

18

20

Hours ranked by volume

Mot

or v

ehic

les

in %

of A

WT

Figure 35: Ranked hourly flow variation for weekly profile 3 and annual profile 4:

0 1000 2000 3000 4000 5000 6000 7000 8000 90000

2

4

6

8

10

12

14

Hours ranked by volume

Mot

or v

ehic

les

in %

of A

WT

42

Page 44: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 36: Ranked hourly flow variation for weekly profile 3 and annual profile 5:

0 1000 2000 3000 4000 5000 6000 7000 8000 90000

2

4

6

8

10

12

14

16

18

Hours ranked by volume

Mot

or v

ehic

les

in %

of A

WT

Figure 37: Ranked hourly flow variation for weekly profile 4 and annual profile 1:

0 1000 2000 3000 4000 5000 6000 7000 8000 90000

1

2

3

4

5

6

7

8

9

10

Hours ranked by volume

Mot

or v

ehic

les

in %

of A

WT

43

Page 45: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 38: Ranked hourly flow variation for weekly profile 4 and annual profile 2:

0 1000 2000 3000 4000 5000 6000 7000 8000 90000

1

2

3

4

5

6

7

8

9

10

Hours ranked by volume

Mot

or v

ehic

les

in %

of A

WT

Figure 39: Ranked hourly flow variation for weekly profile 4 and annual profile 3:

0 1000 2000 3000 4000 5000 6000 7000 8000 90000

2

4

6

8

10

12

14

16

18

Hours ranked by volume

Mot

or v

ehic

les

in %

of A

WT

44

Page 46: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 40: Ranked hourly flow variation for weekly profile 4 and annual profile 4:

0 1000 2000 3000 4000 5000 6000 7000 8000 90000

2

4

6

8

10

12

Hours ranked by volume

Mot

or v

ehic

les

in %

of A

WT

Figure 41: Ranked hourly flow variation for weekly profile 4 and annual profile 5:

0 1000 2000 3000 4000 5000 6000 7000 8000 90000

5

10

15

Hours ranked by volume

Mot

or v

ehic

les

in %

of A

WT

45

Page 47: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 42: Ranked hourly flow variation for weekly profile 5 and annual profile 1:

0 1000 2000 3000 4000 5000 6000 7000 8000 90000

2

4

6

8

10

12

14

16

Hours ranked by volume

Mot

or v

ehic

les

in %

of A

WT

Figure 43: Ranked hourly flow variation for weekly profile 5 and annual profile 2:

0 1000 2000 3000 4000 5000 6000 7000 8000 90000

5

10

15

Hours ranked by volume

Mot

or v

ehic

les

in %

of A

WT

46

Page 48: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 44: Ranked hourly flow variation for weekly profile 5 and annual profile 3:

0 1000 2000 3000 4000 5000 6000 7000 8000 90000

5

10

15

20

25

30

Hours ranked by volume

Mot

or v

ehic

les

in %

of A

WT

Figure 45: Ranked hourly flow variation for weekly profile 5 and annual profile 4:

0 1000 2000 3000 4000 5000 6000 7000 8000 90000

2

4

6

8

10

12

14

16

18

20

Hours ranked by volume

Mot

or v

ehic

les

in %

of A

WT

47

Page 49: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 46: Ranked hourly flow variation for weekly profile 5 and annual profile 5:

0 1000 2000 3000 4000 5000 6000 7000 8000 90000

5

10

15

20

25

Hours ranked by volume

Mot

or v

ehic

les

in %

of A

WT

Figure 47: Ranked hourly flow variation for weekly profile 6 and annual profile 1:

0 1000 2000 3000 4000 5000 6000 7000 8000 90000

5

10

15

Hours ranked by volume

Mot

or v

ehic

les

in %

of A

WT

48

Page 50: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 48: Ranked hourly flow variation for weekly profile 6 and annual profile 2:

0 1000 2000 3000 4000 5000 6000 7000 8000 90000

2

4

6

8

10

12

14

Hours ranked by volume

Mot

or v

ehic

les

in %

of A

WT

Figure 49: Ranked hourly flow variation for weekly profile 6 and annual profile 3:

0 1000 2000 3000 4000 5000 6000 7000 8000 90000

5

10

15

20

25

30

Hours ranked by volume

Mot

or v

ehic

les

in %

of A

WT

49

Page 51: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 50: Ranked hourly flow variation for weekly profile 6 and annual profile 4:

0 1000 2000 3000 4000 5000 6000 7000 8000 90000

2

4

6

8

10

12

14

16

18

Hours ranked by volume

Mot

or v

ehic

les

in %

of A

WT

Figure 51: Ranked hourly flow variation for weekly profile 6 and annual profile 5:

0 1000 2000 3000 4000 5000 6000 7000 8000 90000

5

10

15

20

25

Hours ranked by volume

Mot

or v

ehic

les

in %

of A

WT

50

Page 52: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 52: Ranked hourly flow variation for weekly profile 7 and annual profile 1:

0 1000 2000 3000 4000 5000 6000 7000 8000 90000

2

4

6

8

10

12

Hours ranked by volume

Mot

or v

ehic

les

in %

of A

WT

Figure 53: Ranked hourly flow variation for weekly profile 7 and annual profile 2:

0 1000 2000 3000 4000 5000 6000 7000 8000 90000

2

4

6

8

10

12

Hours ranked by volume

Mot

or v

ehic

les

in %

of A

WT

51

Page 53: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 54: Ranked hourly flow variation for weekly profile 7 and annual profile 3:

0 1000 2000 3000 4000 5000 6000 7000 8000 90000

2

4

6

8

10

12

14

16

18

20

Hours ranked by volume

Mot

or v

ehic

les

in %

of A

WT

Figure 55: Ranked hourly flow variation for weekly profile 7 and annual profile 4:

0 1000 2000 3000 4000 5000 6000 7000 8000 90000

2

4

6

8

10

12

14

Hours ranked by volume

Mot

or v

ehic

les

in %

of A

WT

52

Page 54: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 56: Ranked hourly flow variation for weekly profile 7 and annual profile 5:

0 1000 2000 3000 4000 5000 6000 7000 8000 90000

2

4

6

8

10

12

14

16

18

Hours ranked by volume

Mot

or v

ehic

les

in %

of A

WT

53

Page 55: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

10 Appendix B: Design diagrams set 1

This section contains the design diagram produced for particular speed limit and number oflanes. Average weekday traffic is considered from 0 to 70,000 in order to have more clear vi-sualization. On each page, the design diagrams are arranged for 2 lane and 3 lane at a specifiedspeed limit.

54

Page 56: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

10.1 Speed Limit 120 kmph

Figure 57: Design diagram for weekly profile 1, annual profile 1, speed limit 120 km/h, andnumber of lanes 2:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CHF/

km)

1500 0−5%1500 5−15%1500 15−25%1750 0−5%1750 5−15%1750 15−25%2000 0−5%2000 5−15%2000 15−25%2250 0−5%2250 5−15%2250 15−25%2500 0−5%2500 5−15%2500 15−25%

Figure 58: Design diagram for weekly profile 1, annual profile 1, speed limit 120 km/h, andnumber of lanes 3:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CHF/

km)

1500 0−5%1500 5−15%1500 15−25%1750 0−5%1750 5−15%1750 15−25%2000 0−5%2000 5−15%2000 15−25%2250 0−5%2250 5−15%2250 15−25%2500 0−5%2500 5−15%2500 15−25%

55

Page 57: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 59: Design diagram for weekly profile 1, annual profile 2, speed limit 120 km/h, andnumber of lanes 2:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

1500 0−5%1500 5−15%1500 15−25%1750 0−5%1750 5−15%1750 15−25%2000 0−5%2000 5−15%2000 15−25%2250 0−5%2250 5−15%2250 15−25%2500 0−5%2500 5−15%2500 15−25%

Figure 60: Design diagram for weekly profile 1, annual profile 2, speed limit 120 km/h, andnumber of lanes 3:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

1500 0−5%1500 5−15%1500 15−25%1750 0−5%1750 5−15%1750 15−25%2000 0−5%2000 5−15%2000 15−25%2250 0−5%2250 5−15%2250 15−25%2500 0−5%2500 5−15%2500 15−25%

56

Page 58: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 61: Design diagram for weekly profile 1, annual profile 3, speed limit 120 km/h, andnumber of lanes 2:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

1500 0−5%1500 5−15%1500 15−25%1750 0−5%1750 5−15%1750 15−25%2000 0−5%2000 5−15%2000 15−25%2250 0−5%2250 5−15%2250 15−25%2500 0−5%2500 5−15%2500 15−25%

Figure 62: Design diagram for weekly profile 1, annual profile 3, speed limit 120 km/h, andnumber of lanes 3:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

1500 0−5%1500 5−15%1500 15−25%1750 0−5%1750 5−15%1750 15−25%2000 0−5%2000 5−15%2000 15−25%2250 0−5%2250 5−15%2250 15−25%2500 0−5%2500 5−15%2500 15−25%

57

Page 59: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 63: Design diagram for weekly profile 1, annual profile 4, speed limit 120 km/h, andnumber of lanes 2:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

1500 0−5%1500 5−15%1500 15−25%1750 0−5%1750 5−15%1750 15−25%2000 0−5%2000 5−15%2000 15−25%2250 0−5%2250 5−15%2250 15−25%2500 0−5%2500 5−15%2500 15−25%

Figure 64: Design diagram for weekly profile 1, annual profile 4, speed limit 120 km/h, andnumber of lanes 3:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

1500 0−5%1500 5−15%1500 15−25%1750 0−5%1750 5−15%1750 15−25%2000 0−5%2000 5−15%2000 15−25%2250 0−5%2250 5−15%2250 15−25%2500 0−5%2500 5−15%2500 15−25%

58

Page 60: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 65: Design diagram for weekly profile 1, annual profile 5, speed limit 120 km/h, andnumber of lanes 2:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

1500 0−5%1500 5−15%1500 15−25%1750 0−5%1750 5−15%1750 15−25%2000 0−5%2000 5−15%2000 15−25%2250 0−5%2250 5−15%2250 15−25%2500 0−5%2500 5−15%2500 15−25%

Figure 66: Design diagram for weekly profile 1, annual profile 5, speed limit 120 km/h, andnumber of lanes 3:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

1500 0−5%1500 5−15%1500 15−25%1750 0−5%1750 5−15%1750 15−25%2000 0−5%2000 5−15%2000 15−25%2250 0−5%2250 5−15%2250 15−25%2500 0−5%2500 5−15%2500 15−25%

59

Page 61: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 67: Design diagram for weekly profile 2, annual profile 1, speed limit 120 km/h, andnumber of lanes 2:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

1500 0−5%1500 5−15%1500 15−25%1750 0−5%1750 5−15%1750 15−25%2000 0−5%2000 5−15%2000 15−25%2250 0−5%2250 5−15%2250 15−25%2500 0−5%2500 5−15%2500 15−25%

Figure 68: Design diagram for weekly profile 2, annual profile 1, speed limit 120 km/h, andnumber of lanes 3:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

1500 0−5%1500 5−15%1500 15−25%1750 0−5%1750 5−15%1750 15−25%2000 0−5%2000 5−15%2000 15−25%2250 0−5%2250 5−15%2250 15−25%2500 0−5%2500 5−15%2500 15−25%

60

Page 62: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 69: Design diagram for weekly profile 2, annual profile 2, speed limit 120 km/h, andnumber of lanes 2:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

1500 0−5%1500 5−15%1500 15−25%1750 0−5%1750 5−15%1750 15−25%2000 0−5%2000 5−15%2000 15−25%2250 0−5%2250 5−15%2250 15−25%2500 0−5%2500 5−15%2500 15−25%

Figure 70: Design diagram for weekly profile 2, annual profile 2, speed limit 120 km/h, andnumber of lanes 3:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

1500 0−5%1500 5−15%1500 15−25%1750 0−5%1750 5−15%1750 15−25%2000 0−5%2000 5−15%2000 15−25%2250 0−5%2250 5−15%2250 15−25%2500 0−5%2500 5−15%2500 15−25%

61

Page 63: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 71: Design diagram for weekly profile 2, annual profile 3, speed limit 120 km/h, andnumber of lanes 2:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

1500 0−5%1500 5−15%1500 15−25%1750 0−5%1750 5−15%1750 15−25%2000 0−5%2000 5−15%2000 15−25%2250 0−5%2250 5−15%2250 15−25%2500 0−5%2500 5−15%2500 15−25%

Figure 72: Design diagram for weekly profile 2, annual profile 3, speed limit 120 km/h, andnumber of lanes 3:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

1500 0−5%1500 5−15%1500 15−25%1750 0−5%1750 5−15%1750 15−25%2000 0−5%2000 5−15%2000 15−25%2250 0−5%2250 5−15%2250 15−25%2500 0−5%2500 5−15%2500 15−25%

62

Page 64: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 73: Design diagram for weekly profile 2, annual profile 4, speed limit 120 km/h, andnumber of lanes 2:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

1500 0−5%1500 5−15%1500 15−25%1750 0−5%1750 5−15%1750 15−25%2000 0−5%2000 5−15%2000 15−25%2250 0−5%2250 5−15%2250 15−25%2500 0−5%2500 5−15%2500 15−25%

Figure 74: Design diagram for weekly profile 2, annual profile 4, speed limit 120 km/h, andnumber of lanes 3:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

1500 0−5%1500 5−15%1500 15−25%1750 0−5%1750 5−15%1750 15−25%2000 0−5%2000 5−15%2000 15−25%2250 0−5%2250 5−15%2250 15−25%2500 0−5%2500 5−15%2500 15−25%

63

Page 65: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 75: Design diagram for weekly profile 2, annual profile 5, speed limit 120 km/h, andnumber of lanes 2:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

1500 0−5%1500 5−15%1500 15−25%1750 0−5%1750 5−15%1750 15−25%2000 0−5%2000 5−15%2000 15−25%2250 0−5%2250 5−15%2250 15−25%2500 0−5%2500 5−15%2500 15−25%

Figure 76: Design diagram for weekly profile 2, annual profile 5, speed limit 120 km/h, andnumber of lanes 3:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

1500 0−5%1500 5−15%1500 15−25%1750 0−5%1750 5−15%1750 15−25%2000 0−5%2000 5−15%2000 15−25%2250 0−5%2250 5−15%2250 15−25%2500 0−5%2500 5−15%2500 15−25%

64

Page 66: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 77: Design diagram for weekly profile 3, annual profile 1, speed limit 120 km/h, andnumber of lanes 2:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

1500 0−5%1500 5−15%1500 15−25%1750 0−5%1750 5−15%1750 15−25%2000 0−5%2000 5−15%2000 15−25%2250 0−5%2250 5−15%2250 15−25%2500 0−5%2500 5−15%2500 15−25%

Figure 78: Design diagram for weekly profile 3, annual profile 1, speed limit 120 km/h, andnumber of lanes 3:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

1500 0−5%1500 5−15%1500 15−25%1750 0−5%1750 5−15%1750 15−25%2000 0−5%2000 5−15%2000 15−25%2250 0−5%2250 5−15%2250 15−25%2500 0−5%2500 5−15%2500 15−25%

65

Page 67: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 79: Design diagram for weekly profile 3, annual profile 2, speed limit 120 km/h, andnumber of lanes 2:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

1500 0−5%1500 5−15%1500 15−25%1750 0−5%1750 5−15%1750 15−25%2000 0−5%2000 5−15%2000 15−25%2250 0−5%2250 5−15%2250 15−25%2500 0−5%2500 5−15%2500 15−25%

Figure 80: Design diagram for weekly profile 3, annual profile 2, speed limit 120 km/h, andnumber of lanes 3:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

1500 0−5%1500 5−15%1500 15−25%1750 0−5%1750 5−15%1750 15−25%2000 0−5%2000 5−15%2000 15−25%2250 0−5%2250 5−15%2250 15−25%2500 0−5%2500 5−15%2500 15−25%

66

Page 68: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 81: Design diagram for weekly profile 3, annual profile 3, speed limit 120 km/h, andnumber of lanes 2:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

1500 0−5%1500 5−15%1500 15−25%1750 0−5%1750 5−15%1750 15−25%2000 0−5%2000 5−15%2000 15−25%2250 0−5%2250 5−15%2250 15−25%2500 0−5%2500 5−15%2500 15−25%

Figure 82: Design diagram for weekly profile 3, annual profile 3, speed limit 120 km/h, andnumber of lanes 3:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

1500 0−5%1500 5−15%1500 15−25%1750 0−5%1750 5−15%1750 15−25%2000 0−5%2000 5−15%2000 15−25%2250 0−5%2250 5−15%2250 15−25%2500 0−5%2500 5−15%2500 15−25%

67

Page 69: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 83: Design diagram for weekly profile 3, annual profile 4, speed limit 120 km/h, andnumber of lanes 2:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

1500 0−5%1500 5−15%1500 15−25%1750 0−5%1750 5−15%1750 15−25%2000 0−5%2000 5−15%2000 15−25%2250 0−5%2250 5−15%2250 15−25%2500 0−5%2500 5−15%2500 15−25%

Figure 84: Design diagram for weekly profile 3, annual profile 4, speed limit 120 km/h, andnumber of lanes 3:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

1500 0−5%1500 5−15%1500 15−25%1750 0−5%1750 5−15%1750 15−25%2000 0−5%2000 5−15%2000 15−25%2250 0−5%2250 5−15%2250 15−25%2500 0−5%2500 5−15%2500 15−25%

68

Page 70: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 85: Design diagram for weekly profile 3, annual profile 5, speed limit 120 km/h, andnumber of lanes 2:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

1500 0−5%1500 5−15%1500 15−25%1750 0−5%1750 5−15%1750 15−25%2000 0−5%2000 5−15%2000 15−25%2250 0−5%2250 5−15%2250 15−25%2500 0−5%2500 5−15%2500 15−25%

Figure 86: Design diagram for weekly profile 3, annual profile 5, speed limit 120 km/h, andnumber of lanes 3:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

1500 0−5%1500 5−15%1500 15−25%1750 0−5%1750 5−15%1750 15−25%2000 0−5%2000 5−15%2000 15−25%2250 0−5%2250 5−15%2250 15−25%2500 0−5%2500 5−15%2500 15−25%

69

Page 71: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 87: Design diagram for weekly profile 4, annual profile 1, speed limit 120 km/h, andnumber of lanes 2:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

1500 0−5%1500 5−15%1500 15−25%1750 0−5%1750 5−15%1750 15−25%2000 0−5%2000 5−15%2000 15−25%2250 0−5%2250 5−15%2250 15−25%2500 0−5%2500 5−15%2500 15−25%

Figure 88: Design diagram for weekly profile 4, annual profile 1, speed limit 120 km/h, andnumber of lanes 3:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

1500 0−5%1500 5−15%1500 15−25%1750 0−5%1750 5−15%1750 15−25%2000 0−5%2000 5−15%2000 15−25%2250 0−5%2250 5−15%2250 15−25%2500 0−5%2500 5−15%2500 15−25%

70

Page 72: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 89: Design diagram for weekly profile 4, annual profile 2, speed limit 120 km/h, andnumber of lanes 2:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

1500 0−5%1500 5−15%1500 15−25%1750 0−5%1750 5−15%1750 15−25%2000 0−5%2000 5−15%2000 15−25%2250 0−5%2250 5−15%2250 15−25%2500 0−5%2500 5−15%2500 15−25%

Figure 90: Design diagram for weekly profile 4, annual profile 2, speed limit 120 km/h, andnumber of lanes 3:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

1500 0−5%1500 5−15%1500 15−25%1750 0−5%1750 5−15%1750 15−25%2000 0−5%2000 5−15%2000 15−25%2250 0−5%2250 5−15%2250 15−25%2500 0−5%2500 5−15%2500 15−25%

71

Page 73: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 91: Design diagram for weekly profile 4, annual profile 3, speed limit 120 km/h, andnumber of lanes 2:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

1500 0−5%1500 5−15%1500 15−25%1750 0−5%1750 5−15%1750 15−25%2000 0−5%2000 5−15%2000 15−25%2250 0−5%2250 5−15%2250 15−25%2500 0−5%2500 5−15%2500 15−25%

Figure 92: Design diagram for weekly profile 4, annual profile 3, speed limit 120 km/h, andnumber of lanes 3:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

1500 0−5%1500 5−15%1500 15−25%1750 0−5%1750 5−15%1750 15−25%2000 0−5%2000 5−15%2000 15−25%2250 0−5%2250 5−15%2250 15−25%2500 0−5%2500 5−15%2500 15−25%

72

Page 74: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 93: Design diagram for weekly profile 4, annual profile 4, speed limit 120 km/h, andnumber of lanes 2:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

1500 0−5%1500 5−15%1500 15−25%1750 0−5%1750 5−15%1750 15−25%2000 0−5%2000 5−15%2000 15−25%2250 0−5%2250 5−15%2250 15−25%2500 0−5%2500 5−15%2500 15−25%

Figure 94: Design diagram for weekly profile 4, annual profile 4, speed limit 120 km/h, andnumber of lanes 3:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

1500 0−5%1500 5−15%1500 15−25%1750 0−5%1750 5−15%1750 15−25%2000 0−5%2000 5−15%2000 15−25%2250 0−5%2250 5−15%2250 15−25%2500 0−5%2500 5−15%2500 15−25%

73

Page 75: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 95: Design diagram for weekly profile 4, annual profile 5, speed limit 120 km/h, andnumber of lanes 2:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

1500 0−5%1500 5−15%1500 15−25%1750 0−5%1750 5−15%1750 15−25%2000 0−5%2000 5−15%2000 15−25%2250 0−5%2250 5−15%2250 15−25%2500 0−5%2500 5−15%2500 15−25%

Figure 96: Design diagram for weekly profile 4, annual profile 5, speed limit 120 km/h, andnumber of lanes 3:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

1500 0−5%1500 5−15%1500 15−25%1750 0−5%1750 5−15%1750 15−25%2000 0−5%2000 5−15%2000 15−25%2250 0−5%2250 5−15%2250 15−25%2500 0−5%2500 5−15%2500 15−25%

74

Page 76: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 97: Design diagram for weekly profile 5, annual profile 1, speed limit 120 km/h, andnumber of lanes 2:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

1500 0−5%1500 5−15%1500 15−25%1750 0−5%1750 5−15%1750 15−25%2000 0−5%2000 5−15%2000 15−25%2250 0−5%2250 5−15%2250 15−25%2500 0−5%2500 5−15%2500 15−25%

Figure 98: Design diagram for weekly profile 5, annual profile 1, speed limit 120 km/h, andnumber of lanes 3:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

1500 0−5%1500 5−15%1500 15−25%1750 0−5%1750 5−15%1750 15−25%2000 0−5%2000 5−15%2000 15−25%2250 0−5%2250 5−15%2250 15−25%2500 0−5%2500 5−15%2500 15−25%

75

Page 77: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 99: Design diagram for weekly profile 5, annual profile 2, speed limit 120 km/h, andnumber of lanes 2:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

1500 0−5%1500 5−15%1500 15−25%1750 0−5%1750 5−15%1750 15−25%2000 0−5%2000 5−15%2000 15−25%2250 0−5%2250 5−15%2250 15−25%2500 0−5%2500 5−15%2500 15−25%

Figure 100: Design diagram for weekly profile 5, annual profile 2, speed limit 120 km/h, andnumber of lanes 3:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

1500 0−5%1500 5−15%1500 15−25%1750 0−5%1750 5−15%1750 15−25%2000 0−5%2000 5−15%2000 15−25%2250 0−5%2250 5−15%2250 15−25%2500 0−5%2500 5−15%2500 15−25%

76

Page 78: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 101: Design diagram for weekly profile 5, annual profile 3, speed limit 120 km/h, andnumber of lanes 2:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

1500 0−5%1500 5−15%1500 15−25%1750 0−5%1750 5−15%1750 15−25%2000 0−5%2000 5−15%2000 15−25%2250 0−5%2250 5−15%2250 15−25%2500 0−5%2500 5−15%2500 15−25%

Figure 102: Design diagram for weekly profile 5, annual profile 3, speed limit 120 km/h, andnumber of lanes 3:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

1500 0−5%1500 5−15%1500 15−25%1750 0−5%1750 5−15%1750 15−25%2000 0−5%2000 5−15%2000 15−25%2250 0−5%2250 5−15%2250 15−25%2500 0−5%2500 5−15%2500 15−25%

77

Page 79: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 103: Design diagram for weekly profile 5, annual profile 4, speed limit 120 km/h, andnumber of lanes 2:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

1500 0−5%1500 5−15%1500 15−25%1750 0−5%1750 5−15%1750 15−25%2000 0−5%2000 5−15%2000 15−25%2250 0−5%2250 5−15%2250 15−25%2500 0−5%2500 5−15%2500 15−25%

Figure 104: Design diagram for weekly profile 5, annual profile 4, speed limit 120 km/h, andnumber of lanes 3:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

1500 0−5%1500 5−15%1500 15−25%1750 0−5%1750 5−15%1750 15−25%2000 0−5%2000 5−15%2000 15−25%2250 0−5%2250 5−15%2250 15−25%2500 0−5%2500 5−15%2500 15−25%

78

Page 80: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 105: Design diagram for weekly profile 5, annual profile 5, speed limit 120 km/h, andnumber of lanes 2:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

1500 0−5%1500 5−15%1500 15−25%1750 0−5%1750 5−15%1750 15−25%2000 0−5%2000 5−15%2000 15−25%2250 0−5%2250 5−15%2250 15−25%2500 0−5%2500 5−15%2500 15−25%

Figure 106: Design diagram for weekly profile 5, annual profile 5, speed limit 120 km/h, andnumber of lanes 3:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

1500 0−5%1500 5−15%1500 15−25%1750 0−5%1750 5−15%1750 15−25%2000 0−5%2000 5−15%2000 15−25%2250 0−5%2250 5−15%2250 15−25%2500 0−5%2500 5−15%2500 15−25%

79

Page 81: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 107: Design diagram for weekly profile 6, annual profile 1, speed limit 120 km/h, andnumber of lanes 2:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

1500 0−5%1500 5−15%1500 15−25%1750 0−5%1750 5−15%1750 15−25%2000 0−5%2000 5−15%2000 15−25%2250 0−5%2250 5−15%2250 15−25%2500 0−5%2500 5−15%2500 15−25%

Figure 108: Design diagram for weekly profile 6, annual profile 1, speed limit 120 km/h, andnumber of lanes 3:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

1500 0−5%1500 5−15%1500 15−25%1750 0−5%1750 5−15%1750 15−25%2000 0−5%2000 5−15%2000 15−25%2250 0−5%2250 5−15%2250 15−25%2500 0−5%2500 5−15%2500 15−25%

80

Page 82: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 109: Design diagram for weekly profile 6, annual profile 2, speed limit 120 km/h, andnumber of lanes 2:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

1500 0−5%1500 5−15%1500 15−25%1750 0−5%1750 5−15%1750 15−25%2000 0−5%2000 5−15%2000 15−25%2250 0−5%2250 5−15%2250 15−25%2500 0−5%2500 5−15%2500 15−25%

Figure 110: Design diagram for weekly profile 6, annual profile 2, speed limit 120 km/h, andnumber of lanes 3:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

1500 0−5%1500 5−15%1500 15−25%1750 0−5%1750 5−15%1750 15−25%2000 0−5%2000 5−15%2000 15−25%2250 0−5%2250 5−15%2250 15−25%2500 0−5%2500 5−15%2500 15−25%

81

Page 83: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 111: Design diagram for weekly profile 6, annual profile 3, speed limit 120 km/h, andnumber of lanes 2:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

1500 0−5%1500 5−15%1500 15−25%1750 0−5%1750 5−15%1750 15−25%2000 0−5%2000 5−15%2000 15−25%2250 0−5%2250 5−15%2250 15−25%2500 0−5%2500 5−15%2500 15−25%

Figure 112: Design diagram for weekly profile 6, annual profile 3, speed limit 120 km/h, andnumber of lanes 3:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

1500 0−5%1500 5−15%1500 15−25%1750 0−5%1750 5−15%1750 15−25%2000 0−5%2000 5−15%2000 15−25%2250 0−5%2250 5−15%2250 15−25%2500 0−5%2500 5−15%2500 15−25%

82

Page 84: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 113: Design diagram for weekly profile 6, annual profile 4, speed limit 120 km/h, andnumber of lanes 2:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

1500 0−5%1500 5−15%1500 15−25%1750 0−5%1750 5−15%1750 15−25%2000 0−5%2000 5−15%2000 15−25%2250 0−5%2250 5−15%2250 15−25%2500 0−5%2500 5−15%2500 15−25%

Figure 114: Design diagram for weekly profile 6, annual profile 4, speed limit 120 km/h, andnumber of lanes 3:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

1500 0−5%1500 5−15%1500 15−25%1750 0−5%1750 5−15%1750 15−25%2000 0−5%2000 5−15%2000 15−25%2250 0−5%2250 5−15%2250 15−25%2500 0−5%2500 5−15%2500 15−25%

83

Page 85: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 115: Design diagram for weekly profile 6, annual profile 5, speed limit 120 km/h, andnumber of lanes 2:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

1500 0−5%1500 5−15%1500 15−25%1750 0−5%1750 5−15%1750 15−25%2000 0−5%2000 5−15%2000 15−25%2250 0−5%2250 5−15%2250 15−25%2500 0−5%2500 5−15%2500 15−25%

Figure 116: Design diagram for weekly profile 6, annual profile 5, speed limit 120 km/h, andnumber of lanes 3:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

1500 0−5%1500 5−15%1500 15−25%1750 0−5%1750 5−15%1750 15−25%2000 0−5%2000 5−15%2000 15−25%2250 0−5%2250 5−15%2250 15−25%2500 0−5%2500 5−15%2500 15−25%

84

Page 86: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 117: Design diagram for weekly profile 7, annual profile 1, speed limit 120 km/h, andnumber of lanes 2:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

1500 0−5%1500 5−15%1500 15−25%1750 0−5%1750 5−15%1750 15−25%2000 0−5%2000 5−15%2000 15−25%2250 0−5%2250 5−15%2250 15−25%2500 0−5%2500 5−15%2500 15−25%

Figure 118: Design diagram for weekly profile 7, annual profile 1, speed limit 120 km/h, andnumber of lanes 3:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

1500 0−5%1500 5−15%1500 15−25%1750 0−5%1750 5−15%1750 15−25%2000 0−5%2000 5−15%2000 15−25%2250 0−5%2250 5−15%2250 15−25%2500 0−5%2500 5−15%2500 15−25%

85

Page 87: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 119: Design diagram for weekly profile 7, annual profile 2, speed limit 120 km/h, andnumber of lanes 2:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

1500 0−5%1500 5−15%1500 15−25%1750 0−5%1750 5−15%1750 15−25%2000 0−5%2000 5−15%2000 15−25%2250 0−5%2250 5−15%2250 15−25%2500 0−5%2500 5−15%2500 15−25%

Figure 120: Design diagram for weekly profile 7, annual profile 2, speed limit 120 km/h, andnumber of lanes 3:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

1500 0−5%1500 5−15%1500 15−25%1750 0−5%1750 5−15%1750 15−25%2000 0−5%2000 5−15%2000 15−25%2250 0−5%2250 5−15%2250 15−25%2500 0−5%2500 5−15%2500 15−25%

86

Page 88: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 121: Design diagram for weekly profile 7, annual profile 3, speed limit 120 km/h, andnumber of lanes 2:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

1500 0−5%1500 5−15%1500 15−25%1750 0−5%1750 5−15%1750 15−25%2000 0−5%2000 5−15%2000 15−25%2250 0−5%2250 5−15%2250 15−25%2500 0−5%2500 5−15%2500 15−25%

Figure 122: Design diagram for weekly profile 7, annual profile 3, speed limit 120 km/h, andnumber of lanes 3:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

1500 0−5%1500 5−15%1500 15−25%1750 0−5%1750 5−15%1750 15−25%2000 0−5%2000 5−15%2000 15−25%2250 0−5%2250 5−15%2250 15−25%2500 0−5%2500 5−15%2500 15−25%

87

Page 89: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 123: Design diagram for weekly profile 7, annual profile 4, speed limit 120 km/h, andnumber of lanes 2:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

1500 0−5%1500 5−15%1500 15−25%1750 0−5%1750 5−15%1750 15−25%2000 0−5%2000 5−15%2000 15−25%2250 0−5%2250 5−15%2250 15−25%2500 0−5%2500 5−15%2500 15−25%

Figure 124: Design diagram for weekly profile 7, annual profile 4, speed limit 120 km/h, andnumber of lanes 3:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

1500 0−5%1500 5−15%1500 15−25%1750 0−5%1750 5−15%1750 15−25%2000 0−5%2000 5−15%2000 15−25%2250 0−5%2250 5−15%2250 15−25%2500 0−5%2500 5−15%2500 15−25%

88

Page 90: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 125: Design diagram for weekly profile 7, annual profile 5, speed limit 120 km/h, andnumber of lanes 2:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

1500 0−5%1500 5−15%1500 15−25%1750 0−5%1750 5−15%1750 15−25%2000 0−5%2000 5−15%2000 15−25%2250 0−5%2250 5−15%2250 15−25%2500 0−5%2500 5−15%2500 15−25%

Figure 126: Design diagram for weekly profile 7, annual profile 5, speed limit 120 km/h, andnumber of lanes 3:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

1500 0−5%1500 5−15%1500 15−25%1750 0−5%1750 5−15%1750 15−25%2000 0−5%2000 5−15%2000 15−25%2250 0−5%2250 5−15%2250 15−25%2500 0−5%2500 5−15%2500 15−25%

89

Page 91: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

10.2 Speed Limit 100 kmph

Figure 127: Design diagram for weekly profile 1, annual profile 1, speed limit 100 km/h, andnumber of lanes 2:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CHF/

km)

1500 0−5%1500 5−15%1500 15−25%1750 0−5%1750 5−15%1750 15−25%2000 0−5%2000 5−15%2000 15−25%2250 0−5%2250 5−15%2250 15−25%2500 0−5%2500 5−15%2500 15−25%

Figure 128: Design diagram for weekly profile 1, annual profile 1, speed limit 100 km/h, andnumber of lanes 3:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CHF/

km)

1500 0−5%1500 5−15%1500 15−25%1750 0−5%1750 5−15%1750 15−25%2000 0−5%2000 5−15%2000 15−25%2250 0−5%2250 5−15%2250 15−25%2500 0−5%2500 5−15%2500 15−25%

90

Page 92: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 129: Design diagram for weekly profile 1, annual profile 2, speed limit 100 km/h, andnumber of lanes 2:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

1500 0−5%1500 5−15%1500 15−25%1750 0−5%1750 5−15%1750 15−25%2000 0−5%2000 5−15%2000 15−25%2250 0−5%2250 5−15%2250 15−25%2500 0−5%2500 5−15%2500 15−25%

Figure 130: Design diagram for weekly profile 1, annual profile 2, speed limit 100 km/h, andnumber of lanes 3:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

1500 0−5%1500 5−15%1500 15−25%1750 0−5%1750 5−15%1750 15−25%2000 0−5%2000 5−15%2000 15−25%2250 0−5%2250 5−15%2250 15−25%2500 0−5%2500 5−15%2500 15−25%

91

Page 93: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 131: Design diagram for weekly profile 1, annual profile 3, speed limit 100 km/h, andnumber of lanes 2:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

1500 0−5%1500 5−15%1500 15−25%1750 0−5%1750 5−15%1750 15−25%2000 0−5%2000 5−15%2000 15−25%2250 0−5%2250 5−15%2250 15−25%2500 0−5%2500 5−15%2500 15−25%

Figure 132: Design diagram for weekly profile 1, annual profile 3, speed limit 100 km/h, andnumber of lanes 3:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

1500 0−5%1500 5−15%1500 15−25%1750 0−5%1750 5−15%1750 15−25%2000 0−5%2000 5−15%2000 15−25%2250 0−5%2250 5−15%2250 15−25%2500 0−5%2500 5−15%2500 15−25%

92

Page 94: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 133: Design diagram for weekly profile 1, annual profile 4, speed limit 100 km/h, andnumber of lanes 2:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

1500 0−5%1500 5−15%1500 15−25%1750 0−5%1750 5−15%1750 15−25%2000 0−5%2000 5−15%2000 15−25%2250 0−5%2250 5−15%2250 15−25%2500 0−5%2500 5−15%2500 15−25%

Figure 134: Design diagram for weekly profile 1, annual profile 4, speed limit 100 km/h, andnumber of lanes 3:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

1500 0−5%1500 5−15%1500 15−25%1750 0−5%1750 5−15%1750 15−25%2000 0−5%2000 5−15%2000 15−25%2250 0−5%2250 5−15%2250 15−25%2500 0−5%2500 5−15%2500 15−25%

93

Page 95: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 135: Design diagram for weekly profile 1, annual profile 5, speed limit 100 km/h, andnumber of lanes 2:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

1500 0−5%1500 5−15%1500 15−25%1750 0−5%1750 5−15%1750 15−25%2000 0−5%2000 5−15%2000 15−25%2250 0−5%2250 5−15%2250 15−25%2500 0−5%2500 5−15%2500 15−25%

Figure 136: Design diagram for weekly profile 1, annual profile 5, speed limit 100 km/h, andnumber of lanes 3:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

1500 0−5%1500 5−15%1500 15−25%1750 0−5%1750 5−15%1750 15−25%2000 0−5%2000 5−15%2000 15−25%2250 0−5%2250 5−15%2250 15−25%2500 0−5%2500 5−15%2500 15−25%

94

Page 96: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 137: Design diagram for weekly profile 2, annual profile 1, speed limit 100 km/h, andnumber of lanes 2:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

1500 0−5%1500 5−15%1500 15−25%1750 0−5%1750 5−15%1750 15−25%2000 0−5%2000 5−15%2000 15−25%2250 0−5%2250 5−15%2250 15−25%2500 0−5%2500 5−15%2500 15−25%

Figure 138: Design diagram for weekly profile 2, annual profile 1, speed limit 100 km/h, andnumber of lanes 3:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

1500 0−5%1500 5−15%1500 15−25%1750 0−5%1750 5−15%1750 15−25%2000 0−5%2000 5−15%2000 15−25%2250 0−5%2250 5−15%2250 15−25%2500 0−5%2500 5−15%2500 15−25%

95

Page 97: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 139: Design diagram for weekly profile 2, annual profile 2, speed limit 100 km/h, andnumber of lanes 2:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

1500 0−5%1500 5−15%1500 15−25%1750 0−5%1750 5−15%1750 15−25%2000 0−5%2000 5−15%2000 15−25%2250 0−5%2250 5−15%2250 15−25%2500 0−5%2500 5−15%2500 15−25%

Figure 140: Design diagram for weekly profile 2, annual profile 2, speed limit 100 km/h, andnumber of lanes 3:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

1500 0−5%1500 5−15%1500 15−25%1750 0−5%1750 5−15%1750 15−25%2000 0−5%2000 5−15%2000 15−25%2250 0−5%2250 5−15%2250 15−25%2500 0−5%2500 5−15%2500 15−25%

96

Page 98: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 141: Design diagram for weekly profile 2, annual profile 3, speed limit 100 km/h, andnumber of lanes 2:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

1500 0−5%1500 5−15%1500 15−25%1750 0−5%1750 5−15%1750 15−25%2000 0−5%2000 5−15%2000 15−25%2250 0−5%2250 5−15%2250 15−25%2500 0−5%2500 5−15%2500 15−25%

Figure 142: Design diagram for weekly profile 2, annual profile 3, speed limit 100 km/h, andnumber of lanes 3:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

1500 0−5%1500 5−15%1500 15−25%1750 0−5%1750 5−15%1750 15−25%2000 0−5%2000 5−15%2000 15−25%2250 0−5%2250 5−15%2250 15−25%2500 0−5%2500 5−15%2500 15−25%

97

Page 99: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 143: Design diagram for weekly profile 2, annual profile 4, speed limit 100 km/h, andnumber of lanes 2:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

1500 0−5%1500 5−15%1500 15−25%1750 0−5%1750 5−15%1750 15−25%2000 0−5%2000 5−15%2000 15−25%2250 0−5%2250 5−15%2250 15−25%2500 0−5%2500 5−15%2500 15−25%

Figure 144: Design diagram for weekly profile 2, annual profile 4, speed limit 100 km/h, andnumber of lanes 3:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

1500 0−5%1500 5−15%1500 15−25%1750 0−5%1750 5−15%1750 15−25%2000 0−5%2000 5−15%2000 15−25%2250 0−5%2250 5−15%2250 15−25%2500 0−5%2500 5−15%2500 15−25%

98

Page 100: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 145: Design diagram for weekly profile 2, annual profile 5, speed limit 100 km/h, andnumber of lanes 2:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

1500 0−5%1500 5−15%1500 15−25%1750 0−5%1750 5−15%1750 15−25%2000 0−5%2000 5−15%2000 15−25%2250 0−5%2250 5−15%2250 15−25%2500 0−5%2500 5−15%2500 15−25%

Figure 146: Design diagram for weekly profile 2, annual profile 5, speed limit 100 km/h, andnumber of lanes 3:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

1500 0−5%1500 5−15%1500 15−25%1750 0−5%1750 5−15%1750 15−25%2000 0−5%2000 5−15%2000 15−25%2250 0−5%2250 5−15%2250 15−25%2500 0−5%2500 5−15%2500 15−25%

99

Page 101: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 147: Design diagram for weekly profile 3, annual profile 1, speed limit 100 km/h, andnumber of lanes 2:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

1500 0−5%1500 5−15%1500 15−25%1750 0−5%1750 5−15%1750 15−25%2000 0−5%2000 5−15%2000 15−25%2250 0−5%2250 5−15%2250 15−25%2500 0−5%2500 5−15%2500 15−25%

Figure 148: Design diagram for weekly profile 3, annual profile 1, speed limit 100 km/h, andnumber of lanes 3:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

1500 0−5%1500 5−15%1500 15−25%1750 0−5%1750 5−15%1750 15−25%2000 0−5%2000 5−15%2000 15−25%2250 0−5%2250 5−15%2250 15−25%2500 0−5%2500 5−15%2500 15−25%

100

Page 102: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 149: Design diagram for weekly profile 3, annual profile 2, speed limit 100 km/h, andnumber of lanes 2:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

1500 0−5%1500 5−15%1500 15−25%1750 0−5%1750 5−15%1750 15−25%2000 0−5%2000 5−15%2000 15−25%2250 0−5%2250 5−15%2250 15−25%2500 0−5%2500 5−15%2500 15−25%

Figure 150: Design diagram for weekly profile 3, annual profile 2, speed limit 100 km/h, andnumber of lanes 3:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

1500 0−5%1500 5−15%1500 15−25%1750 0−5%1750 5−15%1750 15−25%2000 0−5%2000 5−15%2000 15−25%2250 0−5%2250 5−15%2250 15−25%2500 0−5%2500 5−15%2500 15−25%

101

Page 103: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 151: Design diagram for weekly profile 3, annual profile 3, speed limit 100 km/h, andnumber of lanes 2:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

1500 0−5%1500 5−15%1500 15−25%1750 0−5%1750 5−15%1750 15−25%2000 0−5%2000 5−15%2000 15−25%2250 0−5%2250 5−15%2250 15−25%2500 0−5%2500 5−15%2500 15−25%

Figure 152: Design diagram for weekly profile 3, annual profile 3, speed limit 100 km/h, andnumber of lanes 3:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

1500 0−5%1500 5−15%1500 15−25%1750 0−5%1750 5−15%1750 15−25%2000 0−5%2000 5−15%2000 15−25%2250 0−5%2250 5−15%2250 15−25%2500 0−5%2500 5−15%2500 15−25%

102

Page 104: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 153: Design diagram for weekly profile 3, annual profile 4, speed limit 100 km/h, andnumber of lanes 2:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

1500 0−5%1500 5−15%1500 15−25%1750 0−5%1750 5−15%1750 15−25%2000 0−5%2000 5−15%2000 15−25%2250 0−5%2250 5−15%2250 15−25%2500 0−5%2500 5−15%2500 15−25%

Figure 154: Design diagram for weekly profile 3, annual profile 4, speed limit 100 km/h, andnumber of lanes 3:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

1500 0−5%1500 5−15%1500 15−25%1750 0−5%1750 5−15%1750 15−25%2000 0−5%2000 5−15%2000 15−25%2250 0−5%2250 5−15%2250 15−25%2500 0−5%2500 5−15%2500 15−25%

103

Page 105: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 155: Design diagram for weekly profile 3, annual profile 5, speed limit 100 km/h, andnumber of lanes 2:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

1500 0−5%1500 5−15%1500 15−25%1750 0−5%1750 5−15%1750 15−25%2000 0−5%2000 5−15%2000 15−25%2250 0−5%2250 5−15%2250 15−25%2500 0−5%2500 5−15%2500 15−25%

Figure 156: Design diagram for weekly profile 3, annual profile 5, speed limit 100 km/h, andnumber of lanes 3:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

1500 0−5%1500 5−15%1500 15−25%1750 0−5%1750 5−15%1750 15−25%2000 0−5%2000 5−15%2000 15−25%2250 0−5%2250 5−15%2250 15−25%2500 0−5%2500 5−15%2500 15−25%

104

Page 106: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 157: Design diagram for weekly profile 4, annual profile 1, speed limit 100 km/h, andnumber of lanes 2:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

1500 0−5%1500 5−15%1500 15−25%1750 0−5%1750 5−15%1750 15−25%2000 0−5%2000 5−15%2000 15−25%2250 0−5%2250 5−15%2250 15−25%2500 0−5%2500 5−15%2500 15−25%

Figure 158: Design diagram for weekly profile 4, annual profile 1, speed limit 100 km/h, andnumber of lanes 3:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

1500 0−5%1500 5−15%1500 15−25%1750 0−5%1750 5−15%1750 15−25%2000 0−5%2000 5−15%2000 15−25%2250 0−5%2250 5−15%2250 15−25%2500 0−5%2500 5−15%2500 15−25%

105

Page 107: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 159: Design diagram for weekly profile 4, annual profile 2, speed limit 100 km/h, andnumber of lanes 2:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

1500 0−5%1500 5−15%1500 15−25%1750 0−5%1750 5−15%1750 15−25%2000 0−5%2000 5−15%2000 15−25%2250 0−5%2250 5−15%2250 15−25%2500 0−5%2500 5−15%2500 15−25%

Figure 160: Design diagram for weekly profile 4, annual profile 2, speed limit 100 km/h, andnumber of lanes 3:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

1500 0−5%1500 5−15%1500 15−25%1750 0−5%1750 5−15%1750 15−25%2000 0−5%2000 5−15%2000 15−25%2250 0−5%2250 5−15%2250 15−25%2500 0−5%2500 5−15%2500 15−25%

106

Page 108: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 161: Design diagram for weekly profile 4, annual profile 3, speed limit 100 km/h, andnumber of lanes 2:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

1500 0−5%1500 5−15%1500 15−25%1750 0−5%1750 5−15%1750 15−25%2000 0−5%2000 5−15%2000 15−25%2250 0−5%2250 5−15%2250 15−25%2500 0−5%2500 5−15%2500 15−25%

Figure 162: Design diagram for weekly profile 4, annual profile 3, speed limit 100 km/h, andnumber of lanes 3:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

1500 0−5%1500 5−15%1500 15−25%1750 0−5%1750 5−15%1750 15−25%2000 0−5%2000 5−15%2000 15−25%2250 0−5%2250 5−15%2250 15−25%2500 0−5%2500 5−15%2500 15−25%

107

Page 109: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 163: Design diagram for weekly profile 4, annual profile 4, speed limit 100 km/h, andnumber of lanes 2:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

1500 0−5%1500 5−15%1500 15−25%1750 0−5%1750 5−15%1750 15−25%2000 0−5%2000 5−15%2000 15−25%2250 0−5%2250 5−15%2250 15−25%2500 0−5%2500 5−15%2500 15−25%

Figure 164: Design diagram for weekly profile 4, annual profile 4, speed limit 100 km/h, andnumber of lanes 3:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

1500 0−5%1500 5−15%1500 15−25%1750 0−5%1750 5−15%1750 15−25%2000 0−5%2000 5−15%2000 15−25%2250 0−5%2250 5−15%2250 15−25%2500 0−5%2500 5−15%2500 15−25%

108

Page 110: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 165: Design diagram for weekly profile 4, annual profile 5, speed limit 100 km/h, andnumber of lanes 2:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

1500 0−5%1500 5−15%1500 15−25%1750 0−5%1750 5−15%1750 15−25%2000 0−5%2000 5−15%2000 15−25%2250 0−5%2250 5−15%2250 15−25%2500 0−5%2500 5−15%2500 15−25%

Figure 166: Design diagram for weekly profile 4, annual profile 5, speed limit 100 km/h, andnumber of lanes 3:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

1500 0−5%1500 5−15%1500 15−25%1750 0−5%1750 5−15%1750 15−25%2000 0−5%2000 5−15%2000 15−25%2250 0−5%2250 5−15%2250 15−25%2500 0−5%2500 5−15%2500 15−25%

109

Page 111: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 167: Design diagram for weekly profile 5, annual profile 1, speed limit 100 km/h, andnumber of lanes 2:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

1500 0−5%1500 5−15%1500 15−25%1750 0−5%1750 5−15%1750 15−25%2000 0−5%2000 5−15%2000 15−25%2250 0−5%2250 5−15%2250 15−25%2500 0−5%2500 5−15%2500 15−25%

Figure 168: Design diagram for weekly profile 5, annual profile 1, speed limit 100 km/h, andnumber of lanes 3:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

1500 0−5%1500 5−15%1500 15−25%1750 0−5%1750 5−15%1750 15−25%2000 0−5%2000 5−15%2000 15−25%2250 0−5%2250 5−15%2250 15−25%2500 0−5%2500 5−15%2500 15−25%

110

Page 112: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 169: Design diagram for weekly profile 5, annual profile 2, speed limit 100 km/h, andnumber of lanes 2:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

1500 0−5%1500 5−15%1500 15−25%1750 0−5%1750 5−15%1750 15−25%2000 0−5%2000 5−15%2000 15−25%2250 0−5%2250 5−15%2250 15−25%2500 0−5%2500 5−15%2500 15−25%

Figure 170: Design diagram for weekly profile 5, annual profile 2, speed limit 100 km/h, andnumber of lanes 3:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

1500 0−5%1500 5−15%1500 15−25%1750 0−5%1750 5−15%1750 15−25%2000 0−5%2000 5−15%2000 15−25%2250 0−5%2250 5−15%2250 15−25%2500 0−5%2500 5−15%2500 15−25%

111

Page 113: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 171: Design diagram for weekly profile 5, annual profile 3, speed limit 100 km/h, andnumber of lanes 2:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

1500 0−5%1500 5−15%1500 15−25%1750 0−5%1750 5−15%1750 15−25%2000 0−5%2000 5−15%2000 15−25%2250 0−5%2250 5−15%2250 15−25%2500 0−5%2500 5−15%2500 15−25%

Figure 172: Design diagram for weekly profile 5, annual profile 3, speed limit 100 km/h, andnumber of lanes 3:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

1500 0−5%1500 5−15%1500 15−25%1750 0−5%1750 5−15%1750 15−25%2000 0−5%2000 5−15%2000 15−25%2250 0−5%2250 5−15%2250 15−25%2500 0−5%2500 5−15%2500 15−25%

112

Page 114: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 173: Design diagram for weekly profile 5, annual profile 4, speed limit 100 km/h, andnumber of lanes 2:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

1500 0−5%1500 5−15%1500 15−25%1750 0−5%1750 5−15%1750 15−25%2000 0−5%2000 5−15%2000 15−25%2250 0−5%2250 5−15%2250 15−25%2500 0−5%2500 5−15%2500 15−25%

Figure 174: Design diagram for weekly profile 5, annual profile 4, speed limit 100 km/h, andnumber of lanes 3:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

1500 0−5%1500 5−15%1500 15−25%1750 0−5%1750 5−15%1750 15−25%2000 0−5%2000 5−15%2000 15−25%2250 0−5%2250 5−15%2250 15−25%2500 0−5%2500 5−15%2500 15−25%

113

Page 115: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 175: Design diagram for weekly profile 5, annual profile 5, speed limit 100 km/h, andnumber of lanes 2:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

1500 0−5%1500 5−15%1500 15−25%1750 0−5%1750 5−15%1750 15−25%2000 0−5%2000 5−15%2000 15−25%2250 0−5%2250 5−15%2250 15−25%2500 0−5%2500 5−15%2500 15−25%

Figure 176: Design diagram for weekly profile 5, annual profile 5, speed limit 100 km/h, andnumber of lanes 3:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

1500 0−5%1500 5−15%1500 15−25%1750 0−5%1750 5−15%1750 15−25%2000 0−5%2000 5−15%2000 15−25%2250 0−5%2250 5−15%2250 15−25%2500 0−5%2500 5−15%2500 15−25%

114

Page 116: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 177: Design diagram for weekly profile 6, annual profile 1, speed limit 100 km/h, andnumber of lanes 2:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

1500 0−5%1500 5−15%1500 15−25%1750 0−5%1750 5−15%1750 15−25%2000 0−5%2000 5−15%2000 15−25%2250 0−5%2250 5−15%2250 15−25%2500 0−5%2500 5−15%2500 15−25%

Figure 178: Design diagram for weekly profile 6, annual profile 1, speed limit 100 km/h, andnumber of lanes 3:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

1500 0−5%1500 5−15%1500 15−25%1750 0−5%1750 5−15%1750 15−25%2000 0−5%2000 5−15%2000 15−25%2250 0−5%2250 5−15%2250 15−25%2500 0−5%2500 5−15%2500 15−25%

115

Page 117: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 179: Design diagram for weekly profile 6, annual profile 2, speed limit 100 km/h, andnumber of lanes 2:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

1500 0−5%1500 5−15%1500 15−25%1750 0−5%1750 5−15%1750 15−25%2000 0−5%2000 5−15%2000 15−25%2250 0−5%2250 5−15%2250 15−25%2500 0−5%2500 5−15%2500 15−25%

Figure 180: Design diagram for weekly profile 6, annual profile 2, speed limit 100 km/h, andnumber of lanes 3:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

1500 0−5%1500 5−15%1500 15−25%1750 0−5%1750 5−15%1750 15−25%2000 0−5%2000 5−15%2000 15−25%2250 0−5%2250 5−15%2250 15−25%2500 0−5%2500 5−15%2500 15−25%

116

Page 118: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 181: Design diagram for weekly profile 6, annual profile 3, speed limit 100 km/h, andnumber of lanes 2:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

1500 0−5%1500 5−15%1500 15−25%1750 0−5%1750 5−15%1750 15−25%2000 0−5%2000 5−15%2000 15−25%2250 0−5%2250 5−15%2250 15−25%2500 0−5%2500 5−15%2500 15−25%

Figure 182: Design diagram for weekly profile 6, annual profile 3, speed limit 100 km/h, andnumber of lanes 3:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

1500 0−5%1500 5−15%1500 15−25%1750 0−5%1750 5−15%1750 15−25%2000 0−5%2000 5−15%2000 15−25%2250 0−5%2250 5−15%2250 15−25%2500 0−5%2500 5−15%2500 15−25%

117

Page 119: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 183: Design diagram for weekly profile 6, annual profile 4, speed limit 100 km/h, andnumber of lanes 2:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

1500 0−5%1500 5−15%1500 15−25%1750 0−5%1750 5−15%1750 15−25%2000 0−5%2000 5−15%2000 15−25%2250 0−5%2250 5−15%2250 15−25%2500 0−5%2500 5−15%2500 15−25%

Figure 184: Design diagram for weekly profile 6, annual profile 4, speed limit 100 km/h, andnumber of lanes 3:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

1500 0−5%1500 5−15%1500 15−25%1750 0−5%1750 5−15%1750 15−25%2000 0−5%2000 5−15%2000 15−25%2250 0−5%2250 5−15%2250 15−25%2500 0−5%2500 5−15%2500 15−25%

118

Page 120: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 185: Design diagram for weekly profile 6, annual profile 5, speed limit 100 km/h, andnumber of lanes 2:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

1500 0−5%1500 5−15%1500 15−25%1750 0−5%1750 5−15%1750 15−25%2000 0−5%2000 5−15%2000 15−25%2250 0−5%2250 5−15%2250 15−25%2500 0−5%2500 5−15%2500 15−25%

Figure 186: Design diagram for weekly profile 6, annual profile 5, speed limit 100 km/h, andnumber of lanes 3:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

1500 0−5%1500 5−15%1500 15−25%1750 0−5%1750 5−15%1750 15−25%2000 0−5%2000 5−15%2000 15−25%2250 0−5%2250 5−15%2250 15−25%2500 0−5%2500 5−15%2500 15−25%

119

Page 121: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 187: Design diagram for weekly profile 7, annual profile 1, speed limit 100 km/h, andnumber of lanes 2:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

1500 0−5%1500 5−15%1500 15−25%1750 0−5%1750 5−15%1750 15−25%2000 0−5%2000 5−15%2000 15−25%2250 0−5%2250 5−15%2250 15−25%2500 0−5%2500 5−15%2500 15−25%

Figure 188: Design diagram for weekly profile 7, annual profile 1, speed limit 100 km/h, andnumber of lanes 3:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

1500 0−5%1500 5−15%1500 15−25%1750 0−5%1750 5−15%1750 15−25%2000 0−5%2000 5−15%2000 15−25%2250 0−5%2250 5−15%2250 15−25%2500 0−5%2500 5−15%2500 15−25%

120

Page 122: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 189: Design diagram for weekly profile 7, annual profile 2, speed limit 100 km/h, andnumber of lanes 2:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

1500 0−5%1500 5−15%1500 15−25%1750 0−5%1750 5−15%1750 15−25%2000 0−5%2000 5−15%2000 15−25%2250 0−5%2250 5−15%2250 15−25%2500 0−5%2500 5−15%2500 15−25%

Figure 190: Design diagram for weekly profile 7, annual profile 2, speed limit 100 km/h, andnumber of lanes 3:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

1500 0−5%1500 5−15%1500 15−25%1750 0−5%1750 5−15%1750 15−25%2000 0−5%2000 5−15%2000 15−25%2250 0−5%2250 5−15%2250 15−25%2500 0−5%2500 5−15%2500 15−25%

121

Page 123: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 191: Design diagram for weekly profile 7, annual profile 3, speed limit 100 km/h, andnumber of lanes 2:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

1500 0−5%1500 5−15%1500 15−25%1750 0−5%1750 5−15%1750 15−25%2000 0−5%2000 5−15%2000 15−25%2250 0−5%2250 5−15%2250 15−25%2500 0−5%2500 5−15%2500 15−25%

Figure 192: Design diagram for weekly profile 7, annual profile 3, speed limit 100 km/h, andnumber of lanes 3:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

1500 0−5%1500 5−15%1500 15−25%1750 0−5%1750 5−15%1750 15−25%2000 0−5%2000 5−15%2000 15−25%2250 0−5%2250 5−15%2250 15−25%2500 0−5%2500 5−15%2500 15−25%

122

Page 124: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 193: Design diagram for weekly profile 7, annual profile 4, speed limit 100 km/h, andnumber of lanes 2:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

1500 0−5%1500 5−15%1500 15−25%1750 0−5%1750 5−15%1750 15−25%2000 0−5%2000 5−15%2000 15−25%2250 0−5%2250 5−15%2250 15−25%2500 0−5%2500 5−15%2500 15−25%

Figure 194: Design diagram for weekly profile 7, annual profile 4, speed limit 100 km/h, andnumber of lanes 3:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

1500 0−5%1500 5−15%1500 15−25%1750 0−5%1750 5−15%1750 15−25%2000 0−5%2000 5−15%2000 15−25%2250 0−5%2250 5−15%2250 15−25%2500 0−5%2500 5−15%2500 15−25%

123

Page 125: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 195: Design diagram for weekly profile 7, annual profile 5, speed limit 100 km/h, andnumber of lanes 2:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

1500 0−5%1500 5−15%1500 15−25%1750 0−5%1750 5−15%1750 15−25%2000 0−5%2000 5−15%2000 15−25%2250 0−5%2250 5−15%2250 15−25%2500 0−5%2500 5−15%2500 15−25%

Figure 196: Design diagram for weekly profile 7, annual profile 5, speed limit 100 km/h, andnumber of lanes 3:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

1500 0−5%1500 5−15%1500 15−25%1750 0−5%1750 5−15%1750 15−25%2000 0−5%2000 5−15%2000 15−25%2250 0−5%2250 5−15%2250 15−25%2500 0−5%2500 5−15%2500 15−25%

124

Page 126: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

11 Appendix C: Design diagrams set 2

This section contains the design diagram produced for specified share of heavy goods vehiclesand cross section capacity per lane of the considered motorway. The design diagrams arearranged in 15 subsections. Each subsection represents design diagrams for specific value ofshare of heavy goods vehicles and cross section capacity per lane.

125

Page 127: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

11.1 Cross section capacity: 1500 [veh/lane/h] and share of heavy goodsvehicles: 0 – 5%

Figure 197: Design diagram for weekly profile 1, annual profile 1, share of heavy goods vehi-cles 0%, cross section capacity 1500 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CHF/

km)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 198: Design diagram for weekly profile 1, annual profile 2, share of heavy goods vehi-cles 0%, cross section capacity 1500 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CHF/

km)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

126

Page 128: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 199: Design diagram for weekly profile 1, annual profile 3, share of heavy goods vehi-cles 0%, cross section capacity 1500 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CHF/

km)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 200: Design diagram for weekly profile 1, annual profile 4, share of heavy goods vehi-cles 0%, cross section capacity 1500 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CHF/

km)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

127

Page 129: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 201: Design diagram for weekly profile 1, annual profile 5, share of heavy goods vehi-cles 0%, cross section capacity 1500 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CHF/

km)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 202: Design diagram for weekly profile 2, annual profile 1, share of heavy goods vehi-cles 0%, cross section capacity 1500 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CHF/

km)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

128

Page 130: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 203: Design diagram for weekly profile 2, annual profile 2, share of heavy goods vehi-cles 0%, cross section capacity 1500 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CHF/

km)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 204: Design diagram for weekly profile 2, annual profile 3, share of heavy goods vehi-cles 0%, cross section capacity 1500 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CHF/

km)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

129

Page 131: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 205: Design diagram for weekly profile 2, annual profile 4, share of heavy goods vehi-cles 0%, cross section capacity 1500 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CHF/

km)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 206: Design diagram for weekly profile 2, annual profile 5, share of heavy goods vehi-cles 0%, cross section capacity 1500 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CHF/

km)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

130

Page 132: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 207: Design diagram for weekly profile 3, annual profile 1, share of heavy goods vehi-cles 0%, cross section capacity 1500 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CHF/

km)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 208: Design diagram for weekly profile 3, annual profile 2, share of heavy goods vehi-cles 0%, cross section capacity 1500 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CHF/

km)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

131

Page 133: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 209: Design diagram for weekly profile 3, annual profile 3, share of heavy goods vehi-cles 0%, cross section capacity 1500 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CHF/

km)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 210: Design diagram for weekly profile 3, annual profile 4, share of heavy goods vehi-cles 0%, cross section capacity 1500 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

132

Page 134: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 211: Design diagram for weekly profile 3, annual profile 5, share of heavy goods vehi-cles 0%, cross section capacity 1500 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CHF/

km)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 212: Design diagram for weekly profile 4, annual profile 1, share of heavy goods vehi-cles 0%, cross section capacity 1500 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CHF/

km)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

133

Page 135: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 213: Design diagram for weekly profile 4, annual profile 2, share of heavy goods vehi-cles 0%, cross section capacity 1500 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CHF/

km)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 214: Design diagram for weekly profile 4, annual profile 3, share of heavy goods vehi-cles 0%, cross section capacity 1500 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CHF/

km)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

134

Page 136: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 215: Design diagram for weekly profile 4, annual profile 4, share of heavy goods vehi-cles 0%, cross section capacity 1500 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CHF/

km)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 216: Design diagram for weekly profile 4, annual profile 5, share of heavy goods vehi-cles 0%, cross section capacity 1500 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CHF/

km)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

135

Page 137: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 217: Design diagram for weekly profile 5, annual profile 1, share of heavy goods vehi-cles 0%, cross section capacity 1500 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CHF/

km)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 218: Design diagram for weekly profile 5, annual profile 2, share of heavy goods vehi-cles 0%, cross section capacity 1500 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CHF/

km)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

136

Page 138: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 219: Design diagram for weekly profile 5, annual profile 3, share of heavy goods vehi-cles 0%, cross section capacity 1500 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CHF/

km)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 220: Design diagram for weekly profile 5, annual profile 4, share of heavy goods vehi-cles 0%, cross section capacity 1500 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CHF/

km)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

137

Page 139: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 221: Design diagram for weekly profile 5, annual profile 5, share of heavy goods vehi-cles 0%, cross section capacity 1500 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CHF/

km)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 222: Design diagram for weekly profile 6, annual profile 1, share of heavy goods vehi-cles 0%, cross section capacity 1500 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CHF/

km)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

138

Page 140: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 223: Design diagram for weekly profile 6, annual profile 2, share of heavy goods vehi-cles 0%, cross section capacity 1500 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CHF/

km)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 224: Design diagram for weekly profile 6, annual profile 3, share of heavy goods vehi-cles 0%, cross section capacity 1500 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CHF/

km)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

139

Page 141: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 225: Design diagram for weekly profile 6, annual profile 4, share of heavy goods vehi-cles 0%, cross section capacity 1500 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CHF/

km)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 226: Design diagram for weekly profile 6, annual profile 5, share of heavy goods vehi-cles 0%, cross section capacity 1500 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CHF/

km)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

140

Page 142: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 227: Design diagram for weekly profile 7, annual profile 1, share of heavy goods vehi-cles 0%, cross section capacity 1500 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CHF/

km)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 228: Design diagram for weekly profile 7, annual profile 2, share of heavy goods vehi-cles 0%, cross section capacity 1500 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CHF/

km)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

141

Page 143: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 229: Design diagram for weekly profile 7, annual profile 3, share of heavy goods vehi-cles 0%, cross section capacity 1500 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CHF/

km)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 230: Design diagram for weekly profile 7, annual profile 4, share of heavy goods vehi-cles 0%, cross section capacity 1500 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CHF/

km)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

142

Page 144: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 231: Design diagram for weekly profile 7, annual profile 5, share of heavy goods vehi-cles 0%, cross section capacity 1500 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CHF/

km)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

143

Page 145: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

11.2 Cross section capacity: 1500 [veh/lane/h] and share of heavy goodsvehicles: 5 – 15%

Figure 232: Design diagram for weekly profile 1, annual profile 1, share of heavy goods vehi-cles 5%, cross section capacity 1500 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CHF/

km)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 233: Design diagram for weekly profile 1, annual profile 2, share of heavy goods vehi-cles 5%, cross section capacity 1500 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CHF/

km)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

144

Page 146: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 234: Design diagram for weekly profile 1, annual profile 3, share of heavy goods vehi-cles 5%, cross section capacity 1500 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 235: Design diagram for weekly profile 1, annual profile 4, share of heavy goods vehi-cles 5%, cross section capacity 1500 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

145

Page 147: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 236: Design diagram for weekly profile 1, annual profile 5, share of heavy goods vehi-cles 5%, cross section capacity 1500 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 237: Design diagram for weekly profile 2, annual profile 1, share of heavy goods vehi-cles 5%, cross section capacity 1500 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

146

Page 148: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 238: Design diagram for weekly profile 2, annual profile 2, share of heavy goods vehi-cles 5%, cross section capacity 1500 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 239: Design diagram for weekly profile 2, annual profile 3, share of heavy goods vehi-cles 5%, cross section capacity 1500 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

147

Page 149: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 240: Design diagram for weekly profile 2, annual profile 4, share of heavy goods vehi-cles 5%, cross section capacity 1500 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 241: Design diagram for weekly profile 2, annual profile 5, share of heavy goods vehi-cles 5%, cross section capacity 1500 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

148

Page 150: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 242: Design diagram for weekly profile 3, annual profile 1, share of heavy goods vehi-cles 5%, cross section capacity 1500 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 243: Design diagram for weekly profile 3, annual profile 2, share of heavy goods vehi-cles 5%, cross section capacity 1500 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

149

Page 151: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 244: Design diagram for weekly profile 3, annual profile 3, share of heavy goods vehi-cles 5%, cross section capacity 1500 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 245: Design diagram for weekly profile 3, annual profile 4, share of heavy goods vehi-cles 5%, cross section capacity 1500 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

150

Page 152: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 246: Design diagram for weekly profile 3, annual profile 5, share of heavy goods vehi-cles 5%, cross section capacity 1500 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 247: Design diagram for weekly profile 4, annual profile 1, share of heavy goods vehi-cles 5%, cross section capacity 1500 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

151

Page 153: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 248: Design diagram for weekly profile 4, annual profile 2, share of heavy goods vehi-cles 5%, cross section capacity 1500 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 249: Design diagram for weekly profile 4, annual profile 3, share of heavy goods vehi-cles 5%, cross section capacity 1500 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

152

Page 154: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 250: Design diagram for weekly profile 4, annual profile 4, share of heavy goods vehi-cles 5%, cross section capacity 1500 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 251: Design diagram for weekly profile 4, annual profile 5, share of heavy goods vehi-cles 5%, cross section capacity 1500 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

153

Page 155: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 252: Design diagram for weekly profile 5, annual profile 1, share of heavy goods vehi-cles 5%, cross section capacity 1500 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 253: Design diagram for weekly profile 5, annual profile 2, share of heavy goods vehi-cles 5%, cross section capacity 1500 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

154

Page 156: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 254: Design diagram for weekly profile 5, annual profile 3, share of heavy goods vehi-cles 5%, cross section capacity 1500 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 255: Design diagram for weekly profile 5, annual profile 4, share of heavy goods vehi-cles 5%, cross section capacity 1500 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

155

Page 157: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 256: Design diagram for weekly profile 5, annual profile 5, share of heavy goods vehi-cles 5%, cross section capacity 1500 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 257: Design diagram for weekly profile 6, annual profile 1, share of heavy goods vehi-cles 5%, cross section capacity 1500 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

156

Page 158: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 258: Design diagram for weekly profile 6, annual profile 2, share of heavy goods vehi-cles 5%, cross section capacity 1500 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 259: Design diagram for weekly profile 6, annual profile 3, share of heavy goods vehi-cles 5%, cross section capacity 1500 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

157

Page 159: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 260: Design diagram for weekly profile 6, annual profile 4, share of heavy goods vehi-cles 5%, cross section capacity 1500 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 261: Design diagram for weekly profile 6, annual profile 5, share of heavy goods vehi-cles 5%, cross section capacity 1500 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

158

Page 160: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 262: Design diagram for weekly profile 7, annual profile 1, share of heavy goods vehi-cles 5%, cross section capacity 1500 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 263: Design diagram for weekly profile 7, annual profile 2, share of heavy goods vehi-cles 5%, cross section capacity 1500 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

159

Page 161: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 264: Design diagram for weekly profile 7, annual profile 3, share of heavy goods vehi-cles 5%, cross section capacity 1500 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 265: Design diagram for weekly profile 7, annual profile 4, share of heavy goods vehi-cles 5%, cross section capacity 1500 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

160

Page 162: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 266: Design diagram for weekly profile 7, annual profile 5, share of heavy goods vehi-cles 5%, cross section capacity 1500 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

161

Page 163: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

11.3 Cross section capacity: 1500 [veh/lane/h] and share of heavy goodsvehicles: 15 – 25%

Figure 267: Design diagram for weekly profile 1, annual profile 1, share of heavy goods vehi-cles 15%, cross section capacity 1500 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CHF/

km)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 268: Design diagram for weekly profile 1, annual profile 2, share of heavy goods vehi-cles 15%, cross section capacity 1500 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CHF/

km)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

162

Page 164: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 269: Design diagram for weekly profile 1, annual profile 3, share of heavy goods vehi-cles 15%, cross section capacity 1500 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 270: Design diagram for weekly profile 1, annual profile 4, share of heavy goods vehi-cles 15%, cross section capacity 1500 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

163

Page 165: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 271: Design diagram for weekly profile 1, annual profile 5, share of heavy goods vehi-cles 15%, cross section capacity 1500 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 272: Design diagram for weekly profile 2, annual profile 1, share of heavy goods vehi-cles 15%, cross section capacity 1500 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

164

Page 166: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 273: Design diagram for weekly profile 2, annual profile 2, share of heavy goods vehi-cles 15%, cross section capacity 1500 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 274: Design diagram for weekly profile 2, annual profile 3, share of heavy goods vehi-cles 15%, cross section capacity 1500 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

165

Page 167: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 275: Design diagram for weekly profile 2, annual profile 4, share of heavy goods vehi-cles 15%, cross section capacity 1500 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 276: Design diagram for weekly profile 2, annual profile 5, share of heavy goods vehi-cles 15%, cross section capacity 1500 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

166

Page 168: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 277: Design diagram for weekly profile 3, annual profile 1, share of heavy goods vehi-cles 15%, cross section capacity 1500 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 278: Design diagram for weekly profile 3, annual profile 2, share of heavy goods vehi-cles 15%, cross section capacity 1500 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

167

Page 169: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 279: Design diagram for weekly profile 3, annual profile 3, share of heavy goods vehi-cles 15%, cross section capacity 1500 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 280: Design diagram for weekly profile 3, annual profile 4, share of heavy goods vehi-cles 15%, cross section capacity 1500 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

168

Page 170: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 281: Design diagram for weekly profile 3, annual profile 5, share of heavy goods vehi-cles 15%, cross section capacity 1500 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 282: Design diagram for weekly profile 4, annual profile 1, share of heavy goods vehi-cles 15%, cross section capacity 1500 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

169

Page 171: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 283: Design diagram for weekly profile 4, annual profile 2, share of heavy goods vehi-cles 15%, cross section capacity 1500 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 284: Design diagram for weekly profile 4, annual profile 3, share of heavy goods vehi-cles 15%, cross section capacity 1500 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

170

Page 172: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 285: Design diagram for weekly profile 4, annual profile 4, share of heavy goods vehi-cles 15%, cross section capacity 1500 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 286: Design diagram for weekly profile 4, annual profile 5, share of heavy goods vehi-cles 15%, cross section capacity 1500 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

171

Page 173: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 287: Design diagram for weekly profile 5, annual profile 1, share of heavy goods vehi-cles 15%, cross section capacity 1500 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 288: Design diagram for weekly profile 5, annual profile 2, share of heavy goods vehi-cles 15%, cross section capacity 1500 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

172

Page 174: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 289: Design diagram for weekly profile 5, annual profile 3, share of heavy goods vehi-cles 15%, cross section capacity 1500 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 290: Design diagram for weekly profile 5, annual profile 4, share of heavy goods vehi-cles 15%, cross section capacity 1500 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

173

Page 175: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 291: Design diagram for weekly profile 5, annual profile 5, share of heavy goods vehi-cles 15%, cross section capacity 1500 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 292: Design diagram for weekly profile 6, annual profile 1, share of heavy goods vehi-cles 15%, cross section capacity 1500 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

174

Page 176: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 293: Design diagram for weekly profile 6, annual profile 2, share of heavy goods vehi-cles 15%, cross section capacity 1500 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 294: Design diagram for weekly profile 6, annual profile 3, share of heavy goods vehi-cles 15%, cross section capacity 1500 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

175

Page 177: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 295: Design diagram for weekly profile 6, annual profile 4, share of heavy goods vehi-cles 15%, cross section capacity 1500 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 296: Design diagram for weekly profile 6, annual profile 5, share of heavy goods vehi-cles 15%, cross section capacity 1500 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

176

Page 178: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 297: Design diagram for weekly profile 7, annual profile 1, share of heavy goods vehi-cles 15%, cross section capacity 1500 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 298: Design diagram for weekly profile 7, annual profile 2, share of heavy goods vehi-cles 15%, cross section capacity 1500 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

177

Page 179: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 299: Design diagram for weekly profile 7, annual profile 3, share of heavy goods vehi-cles 15%, cross section capacity 1500 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 300: Design diagram for weekly profile 7, annual profile 4, share of heavy goods vehi-cles 15%, cross section capacity 1500 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

178

Page 180: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 301: Design diagram for weekly profile 7, annual profile 5, share of heavy goods vehi-cles 15%, cross section capacity 1500 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

179

Page 181: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

11.4 Cross section capacity: 1750 [veh/lane/h] and share of heavy goodsvehicles: 0 – 5%

Figure 302: Design diagram for weekly profile 1, annual profile 1, share of heavy goods vehi-cles 0%, cross section capacity 1750 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CHF/

km)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 303: Design diagram for weekly profile 1, annual profile 2, share of heavy goods vehi-cles 0%, cross section capacity 1750 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CHF/

km)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

180

Page 182: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 304: Design diagram for weekly profile 1, annual profile 3, share of heavy goods vehi-cles 0%, cross section capacity 1750 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 305: Design diagram for weekly profile 1, annual profile 4, share of heavy goods vehi-cles 0%, cross section capacity 1750 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

181

Page 183: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 306: Design diagram for weekly profile 1, annual profile 5, share of heavy goods vehi-cles 0%, cross section capacity 1750 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 307: Design diagram for weekly profile 2, annual profile 1, share of heavy goods vehi-cles 0%, cross section capacity 1750 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

182

Page 184: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 308: Design diagram for weekly profile 2, annual profile 2, share of heavy goods vehi-cles 0%, cross section capacity 1750 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 309: Design diagram for weekly profile 2, annual profile 3, share of heavy goods vehi-cles 0%, cross section capacity 1750 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

183

Page 185: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 310: Design diagram for weekly profile 2, annual profile 4, share of heavy goods vehi-cles 0%, cross section capacity 1750 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 311: Design diagram for weekly profile 2, annual profile 5, share of heavy goods vehi-cles 0%, cross section capacity 1750 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

184

Page 186: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 312: Design diagram for weekly profile 3, annual profile 1, share of heavy goods vehi-cles 0%, cross section capacity 1750 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 313: Design diagram for weekly profile 3, annual profile 2, share of heavy goods vehi-cles 0%, cross section capacity 1750 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

185

Page 187: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 314: Design diagram for weekly profile 3, annual profile 3, share of heavy goods vehi-cles 0%, cross section capacity 1750 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 315: Design diagram for weekly profile 3, annual profile 4, share of heavy goods vehi-cles 0%, cross section capacity 1750 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

186

Page 188: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 316: Design diagram for weekly profile 3, annual profile 5, share of heavy goods vehi-cles 0%, cross section capacity 1750 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 317: Design diagram for weekly profile 4, annual profile 1, share of heavy goods vehi-cles 0%, cross section capacity 1750 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

187

Page 189: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 318: Design diagram for weekly profile 4, annual profile 2, share of heavy goods vehi-cles 0%, cross section capacity 1750 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 319: Design diagram for weekly profile 4, annual profile 3, share of heavy goods vehi-cles 0%, cross section capacity 1750 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

188

Page 190: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 320: Design diagram for weekly profile 4, annual profile 4, share of heavy goods vehi-cles 0%, cross section capacity 1750 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 321: Design diagram for weekly profile 4, annual profile 5, share of heavy goods vehi-cles 0%, cross section capacity 1750 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

189

Page 191: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 322: Design diagram for weekly profile 5, annual profile 1, share of heavy goods vehi-cles 0%, cross section capacity 1750 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 323: Design diagram for weekly profile 5, annual profile 2, share of heavy goods vehi-cles 0%, cross section capacity 1750 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

190

Page 192: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 324: Design diagram for weekly profile 5, annual profile 3, share of heavy goods vehi-cles 0%, cross section capacity 1750 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 325: Design diagram for weekly profile 5, annual profile 4, share of heavy goods vehi-cles 0%, cross section capacity 1750 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

191

Page 193: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 326: Design diagram for weekly profile 5, annual profile 5, share of heavy goods vehi-cles 0%, cross section capacity 1750 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 327: Design diagram for weekly profile 6, annual profile 1, share of heavy goods vehi-cles 0%, cross section capacity 1750 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

192

Page 194: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 328: Design diagram for weekly profile 6, annual profile 2, share of heavy goods vehi-cles 0%, cross section capacity 1750 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 329: Design diagram for weekly profile 6, annual profile 3, share of heavy goods vehi-cles 0%, cross section capacity 1750 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

193

Page 195: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 330: Design diagram for weekly profile 6, annual profile 4, share of heavy goods vehi-cles 0%, cross section capacity 1750 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 331: Design diagram for weekly profile 6, annual profile 5, share of heavy goods vehi-cles 0%, cross section capacity 1750 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

194

Page 196: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 332: Design diagram for weekly profile 7, annual profile 1, share of heavy goods vehi-cles 0%, cross section capacity 1750 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 333: Design diagram for weekly profile 7, annual profile 2, share of heavy goods vehi-cles 0%, cross section capacity 1750 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

195

Page 197: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 334: Design diagram for weekly profile 7, annual profile 3, share of heavy goods vehi-cles 0%, cross section capacity 1750 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 335: Design diagram for weekly profile 7, annual profile 4, share of heavy goods vehi-cles 0%, cross section capacity 1750 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

196

Page 198: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 336: Design diagram for weekly profile 7, annual profile 5, share of heavy goods vehi-cles 0%, cross section capacity 1750 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

197

Page 199: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

11.5 Cross section capacity: 1750 [veh/lane/h] and share of heavy goodsvehicles: 5 – 15%

Figure 337: Design diagram for weekly profile 1, annual profile 1, share of heavy goods vehi-cles 5%, cross section capacity 1750 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CHF/

km)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 338: Design diagram for weekly profile 1, annual profile 2, share of heavy goods vehi-cles 5%, cross section capacity 1750 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CHF/

km)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

198

Page 200: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 339: Design diagram for weekly profile 1, annual profile 3, share of heavy goods vehi-cles 5%, cross section capacity 1750 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 340: Design diagram for weekly profile 1, annual profile 4, share of heavy goods vehi-cles 5%, cross section capacity 1750 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

199

Page 201: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 341: Design diagram for weekly profile 1, annual profile 5, share of heavy goods vehi-cles 5%, cross section capacity 1750 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 342: Design diagram for weekly profile 2, annual profile 1, share of heavy goods vehi-cles 5%, cross section capacity 1750 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

200

Page 202: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 343: Design diagram for weekly profile 2, annual profile 2, share of heavy goods vehi-cles 5%, cross section capacity 1750 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 344: Design diagram for weekly profile 2, annual profile 3, share of heavy goods vehi-cles 5%, cross section capacity 1750 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

201

Page 203: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 345: Design diagram for weekly profile 2, annual profile 4, share of heavy goods vehi-cles 5%, cross section capacity 1750 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 346: Design diagram for weekly profile 2, annual profile 5, share of heavy goods vehi-cles 5%, cross section capacity 1750 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

202

Page 204: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 347: Design diagram for weekly profile 3, annual profile 1, share of heavy goods vehi-cles 5%, cross section capacity 1750 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 348: Design diagram for weekly profile 3, annual profile 2, share of heavy goods vehi-cles 5%, cross section capacity 1750 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

203

Page 205: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 349: Design diagram for weekly profile 3, annual profile 3, share of heavy goods vehi-cles 5%, cross section capacity 1750 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 350: Design diagram for weekly profile 3, annual profile 4, share of heavy goods vehi-cles 5%, cross section capacity 1750 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

204

Page 206: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 351: Design diagram for weekly profile 3, annual profile 5, share of heavy goods vehi-cles 5%, cross section capacity 1750 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 352: Design diagram for weekly profile 4, annual profile 1, share of heavy goods vehi-cles 5%, cross section capacity 1750 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

205

Page 207: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 353: Design diagram for weekly profile 4, annual profile 2, share of heavy goods vehi-cles 5%, cross section capacity 1750 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 354: Design diagram for weekly profile 4, annual profile 3, share of heavy goods vehi-cles 5%, cross section capacity 1750 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

206

Page 208: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 355: Design diagram for weekly profile 4, annual profile 4, share of heavy goods vehi-cles 5%, cross section capacity 1750 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 356: Design diagram for weekly profile 4, annual profile 5, share of heavy goods vehi-cles 5%, cross section capacity 1750 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

207

Page 209: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 357: Design diagram for weekly profile 5, annual profile 1, share of heavy goods vehi-cles 5%, cross section capacity 1750 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 358: Design diagram for weekly profile 5, annual profile 2, share of heavy goods vehi-cles 5%, cross section capacity 1750 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

208

Page 210: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 359: Design diagram for weekly profile 5, annual profile 3, share of heavy goods vehi-cles 5%, cross section capacity 1750 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 360: Design diagram for weekly profile 5, annual profile 4, share of heavy goods vehi-cles 5%, cross section capacity 1750 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

209

Page 211: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 361: Design diagram for weekly profile 5, annual profile 5, share of heavy goods vehi-cles 5%, cross section capacity 1750 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 362: Design diagram for weekly profile 6, annual profile 1, share of heavy goods vehi-cles 5%, cross section capacity 1750 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

210

Page 212: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 363: Design diagram for weekly profile 6, annual profile 2, share of heavy goods vehi-cles 5%, cross section capacity 1750 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 364: Design diagram for weekly profile 6, annual profile 3, share of heavy goods vehi-cles 5%, cross section capacity 1750 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

211

Page 213: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 365: Design diagram for weekly profile 6, annual profile 4, share of heavy goods vehi-cles 5%, cross section capacity 1750 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 366: Design diagram for weekly profile 6, annual profile 5, share of heavy goods vehi-cles 5%, cross section capacity 1750 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

212

Page 214: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 367: Design diagram for weekly profile 7, annual profile 1, share of heavy goods vehi-cles 5%, cross section capacity 1750 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 368: Design diagram for weekly profile 7, annual profile 2, share of heavy goods vehi-cles 5%, cross section capacity 1750 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

213

Page 215: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 369: Design diagram for weekly profile 7, annual profile 3, share of heavy goods vehi-cles 5%, cross section capacity 1750 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 370: Design diagram for weekly profile 7, annual profile 4, share of heavy goods vehi-cles 5%, cross section capacity 1750 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

214

Page 216: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 371: Design diagram for weekly profile 7, annual profile 5, share of heavy goods vehi-cles 5%, cross section capacity 1750 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

215

Page 217: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

11.6 Cross section capacity: 1750 [veh/lane/h] and share of heavy goodsvehicles: 15 – 25%

Figure 372: Design diagram for weekly profile 1, annual profile 1, share of heavy goods vehi-cles 15%, cross section capacity 1750 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CHF/

km)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 373: Design diagram for weekly profile 1, annual profile 2, share of heavy goods vehi-cles 15%, cross section capacity 1750 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CHF/

km)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

216

Page 218: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 374: Design diagram for weekly profile 1, annual profile 3, share of heavy goods vehi-cles 15%, cross section capacity 1750 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 375: Design diagram for weekly profile 1, annual profile 4, share of heavy goods vehi-cles 15%, cross section capacity 1750 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

217

Page 219: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 376: Design diagram for weekly profile 1, annual profile 5, share of heavy goods vehi-cles 15%, cross section capacity 1750 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 377: Design diagram for weekly profile 2, annual profile 1, share of heavy goods vehi-cles 15%, cross section capacity 1750 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

218

Page 220: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 378: Design diagram for weekly profile 2, annual profile 2, share of heavy goods vehi-cles 15%, cross section capacity 1750 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 379: Design diagram for weekly profile 2, annual profile 3, share of heavy goods vehi-cles 15%, cross section capacity 1750 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

219

Page 221: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 380: Design diagram for weekly profile 2, annual profile 4, share of heavy goods vehi-cles 15%, cross section capacity 1750 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 381: Design diagram for weekly profile 2, annual profile 5, share of heavy goods vehi-cles 15%, cross section capacity 1750 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

220

Page 222: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 382: Design diagram for weekly profile 3, annual profile 1, share of heavy goods vehi-cles 5%, cross section capacity 1750 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 383: Design diagram for weekly profile 3, annual profile 2, share of heavy goods vehi-cles 15%, cross section capacity 1750 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

221

Page 223: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 384: Design diagram for weekly profile 3, annual profile 3, share of heavy goods vehi-cles 15%, cross section capacity 1750 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 385: Design diagram for weekly profile 3, annual profile 4, share of heavy goods vehi-cles 15%, cross section capacity 1750 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

222

Page 224: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 386: Design diagram for weekly profile 3, annual profile 5, share of heavy goods vehi-cles 15%, cross section capacity 1750 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 387: Design diagram for weekly profile 4, annual profile 1, share of heavy goods vehi-cles 15%, cross section capacity 1750 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

223

Page 225: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 388: Design diagram for weekly profile 4, annual profile 2, share of heavy goods vehi-cles 5%, cross section capacity 1750 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 389: Design diagram for weekly profile 4, annual profile 3, share of heavy goods vehi-cles 15%, cross section capacity 1750 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

224

Page 226: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 390: Design diagram for weekly profile 4, annual profile 4, share of heavy goods vehi-cles 15%, cross section capacity 1750 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 391: Design diagram for weekly profile 4, annual profile 5, share of heavy goods vehi-cles 15%, cross section capacity 1750 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

225

Page 227: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 392: Design diagram for weekly profile 5, annual profile 1, share of heavy goods vehi-cles 15%, cross section capacity 1750 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 393: Design diagram for weekly profile 5, annual profile 2, share of heavy goods vehi-cles 15%, cross section capacity 1750 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

226

Page 228: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 394: Design diagram for weekly profile 5, annual profile 3, share of heavy goods vehi-cles 15%, cross section capacity 1750 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 395: Design diagram for weekly profile 5, annual profile 4, share of heavy goods vehi-cles 15%, cross section capacity 1750 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

227

Page 229: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 396: Design diagram for weekly profile 5, annual profile 5, share of heavy goods vehi-cles 15%, cross section capacity 1750 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 397: Design diagram for weekly profile 6, annual profile 1, share of heavy goods vehi-cles 15%, cross section capacity 1750 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

228

Page 230: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 398: Design diagram for weekly profile 6, annual profile 2, share of heavy goods vehi-cles 15%, cross section capacity 1750 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 399: Design diagram for weekly profile 6, annual profile 3, share of heavy goods vehi-cles 15%, cross section capacity 1750 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

229

Page 231: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 400: Design diagram for weekly profile 6, annual profile 4, share of heavy goods vehi-cles 15%, cross section capacity 1750 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 401: Design diagram for weekly profile 6, annual profile 5, share of heavy goods vehi-cles 15%, cross section capacity 1750 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

230

Page 232: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 402: Design diagram for weekly profile 7, annual profile 1, share of heavy goods vehi-cles 15%, cross section capacity 1750 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 403: Design diagram for weekly profile 7, annual profile 2, share of heavy goods vehi-cles 15%, cross section capacity 1750 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

231

Page 233: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 404: Design diagram for weekly profile 7, annual profile 3, share of heavy goods vehi-cles 15%, cross section capacity 1750 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 405: Design diagram for weekly profile 7, annual profile 4, share of heavy goods vehi-cles 15%, cross section capacity 1750 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

232

Page 234: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 406: Design diagram for weekly profile 7, annual profile 5, share of heavy goods vehi-cles 15%, cross section capacity 1750 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

233

Page 235: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

11.7 Cross section capacity: 2000 [veh/lane/h] and share of heavy goodsvehicles: 0 – 5%

Figure 407: Design diagram for weekly profile 1, annual profile 1, share of heavy goods vehi-cles 0%, cross section capacity 2000 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CHF/

km)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 408: Design diagram for weekly profile 1, annual profile 2, share of heavy goods vehi-cles 0%, cross section capacity 2000 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CHF/

km)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

234

Page 236: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 409: Design diagram for weekly profile 1, annual profile 3, share of heavy goods vehi-cles 0%, cross section capacity 2000 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 410: Design diagram for weekly profile 1, annual profile 4, share of heavy goods vehi-cles 0%, cross section capacity 2000 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

235

Page 237: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 411: Design diagram for weekly profile 1, annual profile 5, share of heavy goods vehi-cles 0%, cross section capacity 2000 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 412: Design diagram for weekly profile 2, annual profile 1, share of heavy goods vehi-cles 0%, cross section capacity 2000 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

236

Page 238: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 413: Design diagram for weekly profile 2, annual profile 2, share of heavy goods vehi-cles 0%, cross section capacity 2000 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 414: Design diagram for weekly profile 2, annual profile 3, share of heavy goods vehi-cles 0%, cross section capacity 2000 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

237

Page 239: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 415: Design diagram for weekly profile 2, annual profile 4, share of heavy goods vehi-cles 0%, cross section capacity 2000 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 416: Design diagram for weekly profile 2, annual profile 5, share of heavy goods vehi-cles 0%, cross section capacity 2000 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

238

Page 240: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 417: Design diagram for weekly profile 3, annual profile 1, share of heavy goods vehi-cles 0%, cross section capacity 2000 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 418: Design diagram for weekly profile 3, annual profile 2, share of heavy goods vehi-cles 0%, cross section capacity 2000 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

239

Page 241: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 419: Design diagram for weekly profile 3, annual profile 3, share of heavy goods vehi-cles 0%, cross section capacity 2000 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 420: Design diagram for weekly profile 3, annual profile 4, share of heavy goods vehi-cles 0%, cross section capacity 2000 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

240

Page 242: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 421: Design diagram for weekly profile 3, annual profile 5, share of heavy goods vehi-cles 0%, cross section capacity 2000 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 422: Design diagram for weekly profile 4, annual profile 1, share of heavy goods vehi-cles 0%, cross section capacity 2000 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

241

Page 243: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 423: Design diagram for weekly profile 4, annual profile 2, share of heavy goods vehi-cles 0%, cross section capacity 2000 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 424: Design diagram for weekly profile 4, annual profile 3, share of heavy goods vehi-cles 0%, cross section capacity 2000 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

242

Page 244: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 425: Design diagram for weekly profile 4, annual profile 4, share of heavy goods vehi-cles 0%, cross section capacity 2000 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 426: Design diagram for weekly profile 4, annual profile 5, share of heavy goods vehi-cles 0%, cross section capacity 2000 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

243

Page 245: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 427: Design diagram for weekly profile 5, annual profile 1, share of heavy goods vehi-cles 0%, cross section capacity 2000 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 428: Design diagram for weekly profile 5, annual profile 2, share of heavy goods vehi-cles 0%, cross section capacity 2000 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

244

Page 246: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 429: Design diagram for weekly profile 5, annual profile 3, share of heavy goods vehi-cles 0%, cross section capacity 2000 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 430: Design diagram for weekly profile 5, annual profile 4, share of heavy goods vehi-cles 0%, cross section capacity 2000 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

245

Page 247: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 431: Design diagram for weekly profile 5, annual profile 5, share of heavy goods vehi-cles 0%, cross section capacity 2000 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 432: Design diagram for weekly profile 6, annual profile 1, share of heavy goods vehi-cles 0%, cross section capacity 2000 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

246

Page 248: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 433: Design diagram for weekly profile 6, annual profile 2, share of heavy goods vehi-cles 0%, cross section capacity 2000 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 434: Design diagram for weekly profile 6, annual profile 3, share of heavy goods vehi-cles 0%, cross section capacity 2000 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

247

Page 249: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 435: Design diagram for weekly profile 6, annual profile 4, share of heavy goods vehi-cles 0%, cross section capacity 2000 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 436: Design diagram for weekly profile 6, annual profile 5, share of heavy goods vehi-cles 0%, cross section capacity 2000 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

248

Page 250: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 437: Design diagram for weekly profile 7, annual profile 1, share of heavy goods vehi-cles 0%, cross section capacity 2000 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 438: Design diagram for weekly profile 7, annual profile 2, share of heavy goods vehi-cles 0%, cross section capacity 2000 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

249

Page 251: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 439: Design diagram for weekly profile 7, annual profile 3, share of heavy goods vehi-cles 0%, cross section capacity 2000 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 440: Design diagram for weekly profile 7, annual profile 4, share of heavy goods vehi-cles 0%, cross section capacity 2000 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

250

Page 252: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 441: Design diagram for weekly profile 7, annual profile 5, share of heavy goods vehi-cles 0%, cross section capacity 2000 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

251

Page 253: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

11.8 Cross section capacity: 2000 [veh/lane/h] and share of heavy goodsvehicles: 5 – 15%

Figure 442: Design diagram for weekly profile 1, annual profile 1, share of heavy goods vehi-cles 5%, cross section capacity 2000 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CHF/

km)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 443: Design diagram for weekly profile 1, annual profile 2, share of heavy goods vehi-cles 5%, cross section capacity 2000 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CHF/

km)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

252

Page 254: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 444: Design diagram for weekly profile 1, annual profile 3, share of heavy goods vehi-cles 5%, cross section capacity 2000 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 445: Design diagram for weekly profile 1, annual profile 4, share of heavy goods vehi-cles 5%, cross section capacity 2000 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

253

Page 255: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 446: Design diagram for weekly profile 1, annual profile 5, share of heavy goods vehi-cles 5%, cross section capacity 2000 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 447: Design diagram for weekly profile 2, annual profile 1, share of heavy goods vehi-cles 5%, cross section capacity 2000 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

254

Page 256: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 448: Design diagram for weekly profile 2, annual profile 2, share of heavy goods vehi-cles 5%, cross section capacity 2000 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 449: Design diagram for weekly profile 2, annual profile 3, share of heavy goods vehi-cles 5%, cross section capacity 2000 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

255

Page 257: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 450: Design diagram for weekly profile 2, annual profile 4, share of heavy goods vehi-cles 5%, cross section capacity 2000 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 451: Design diagram for weekly profile 2, annual profile 5, share of heavy goods vehi-cles 5%, cross section capacity 2000 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

256

Page 258: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 452: Design diagram for weekly profile 3, annual profile 1, share of heavy goods vehi-cles 5%, cross section capacity 2000 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 453: Design diagram for weekly profile 3, annual profile 2, share of heavy goods vehi-cles 5%, cross section capacity 2000 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

257

Page 259: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 454: Design diagram for weekly profile 3, annual profile 3, share of heavy goods vehi-cles 5%, cross section capacity 2000 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 455: Design diagram for weekly profile 3, annual profile 4, share of heavy goods vehi-cles 5%, cross section capacity 2000 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

258

Page 260: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 456: Design diagram for weekly profile 3, annual profile 5, share of heavy goods vehi-cles 5%, cross section capacity 2000 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 457: Design diagram for weekly profile 4, annual profile 1, share of heavy goods vehi-cles 5%, cross section capacity 2000 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

259

Page 261: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 458: Design diagram for weekly profile 4, annual profile 2, share of heavy goods vehi-cles 5%, cross section capacity 2000 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 459: Design diagram for weekly profile 4, annual profile 3, share of heavy goods vehi-cles 5%, cross section capacity 2000 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

260

Page 262: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 460: Design diagram for weekly profile 4, annual profile 4, share of heavy goods vehi-cles 5%, cross section capacity 2000 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 461: Design diagram for weekly profile 4, annual profile 5, share of heavy goods vehi-cles 5%, cross section capacity 2000 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

261

Page 263: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 462: Design diagram for weekly profile 5, annual profile 1, share of heavy goods vehi-cles 5%, cross section capacity 2000 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 463: Design diagram for weekly profile 5, annual profile 2, share of heavy goods vehi-cles 5%, cross section capacity 2000 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

262

Page 264: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 464: Design diagram for weekly profile 5, annual profile 3, share of heavy goods vehi-cles 5%, cross section capacity 2000 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 465: Design diagram for weekly profile 5, annual profile 4, share of heavy goods vehi-cles 5%, cross section capacity 2000 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

263

Page 265: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 466: Design diagram for weekly profile 5, annual profile 5, share of heavy goods vehi-cles 5%, cross section capacity 2000 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 467: Design diagram for weekly profile 6, annual profile 1, share of heavy goods vehi-cles 5%, cross section capacity 2000 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

264

Page 266: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 468: Design diagram for weekly profile 6, annual profile 2, share of heavy goods vehi-cles 5%, cross section capacity 2000 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 469: Design diagram for weekly profile 6, annual profile 3, share of heavy goods vehi-cles 5%, cross section capacity 2000 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

265

Page 267: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 470: Design diagram for weekly profile 6, annual profile 4, share of heavy goods vehi-cles 5%, cross section capacity 2000 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 471: Design diagram for weekly profile 6, annual profile 5, share of heavy goods vehi-cles 5%, cross section capacity 2000 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

266

Page 268: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 472: Design diagram for weekly profile 7, annual profile 1, share of heavy goods vehi-cles 5%, cross section capacity 2000 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 473: Design diagram for weekly profile 7, annual profile 2, share of heavy goods vehi-cles 5%, cross section capacity 2000 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

267

Page 269: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 474: Design diagram for weekly profile 7, annual profile 3, share of heavy goods vehi-cles 5%, cross section capacity 2000 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 475: Design diagram for weekly profile 7, annual profile 4, share of heavy goods vehi-cles 5%, cross section capacity 2000 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

268

Page 270: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 476: Design diagram for weekly profile 7, annual profile 5, share of heavy goods vehi-cles 5%, cross section capacity 2000 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

269

Page 271: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

11.9 Cross section capacity: 2000 [veh/lane/h] and share of heavy goodsvehicles: 15 – 25%

Figure 477: Design diagram for weekly profile 1, annual profile 1, share of heavy goods vehi-cles 15%, cross section capacity 2000 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CHF/

km)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 478: Design diagram for weekly profile 1, annual profile 2, share of heavy goods vehi-cles 15%, cross section capacity 2000 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CHF/

km)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

270

Page 272: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 479: Design diagram for weekly profile 1, annual profile 3, share of heavy goods vehi-cles 15%, cross section capacity 2000 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 480: Design diagram for weekly profile 1, annual profile 4, share of heavy goods vehi-cles 15%, cross section capacity 2000 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

271

Page 273: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 481: Design diagram for weekly profile 1, annual profile 5, share of heavy goods vehi-cles 15%, cross section capacity 2000 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 482: Design diagram for weekly profile 2, annual profile 1, share of heavy goods vehi-cles 15%, cross section capacity 2000 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

272

Page 274: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 483: Design diagram for weekly profile 2, annual profile 2, share of heavy goods vehi-cles 15%, cross section capacity 2000 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 484: Design diagram for weekly profile 2, annual profile 3, share of heavy goods vehi-cles 15%, cross section capacity 2000 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

273

Page 275: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 485: Design diagram for weekly profile 2, annual profile 4, share of heavy goods vehi-cles 15%, cross section capacity 2000 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 486: Design diagram for weekly profile 2, annual profile 5, share of heavy goods vehi-cles 15%, cross section capacity 2000 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

274

Page 276: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 487: Design diagram for weekly profile 3, annual profile 1, share of heavy goods vehi-cles 15%, cross section capacity 2000 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 488: Design diagram for weekly profile 3, annual profile 2, share of heavy goods vehi-cles 15%, cross section capacity 2000 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

275

Page 277: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 489: Design diagram for weekly profile 3, annual profile 3, share of heavy goods vehi-cles 15%, cross section capacity 2000 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 490: Design diagram for weekly profile 3, annual profile 4, share of heavy goods vehi-cles 15%, cross section capacity 2000 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

276

Page 278: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 491: Design diagram for weekly profile 3, annual profile 5, share of heavy goods vehi-cles 15%, cross section capacity 2000 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 492: Design diagram for weekly profile 4, annual profile 1, share of heavy goods vehi-cles 15%, cross section capacity 2000 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

277

Page 279: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 493: Design diagram for weekly profile 4, annual profile 2, share of heavy goods vehi-cles 15%, cross section capacity 2000 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 494: Design diagram for weekly profile 4, annual profile 3, share of heavy goods vehi-cles 15%, cross section capacity 2000 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

278

Page 280: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 495: Design diagram for weekly profile 4, annual profile 4, share of heavy goods vehi-cles 15%, cross section capacity 2000 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 496: Design diagram for weekly profile 4, annual profile 5, share of heavy goods vehi-cles 15%, cross section capacity 2000 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

279

Page 281: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 497: Design diagram for weekly profile 5, annual profile 1, share of heavy goods vehi-cles 15%, cross section capacity 2000 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 498: Design diagram for weekly profile 5, annual profile 2, share of heavy goods vehi-cles 15%, cross section capacity 2000 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

280

Page 282: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 499: Design diagram for weekly profile 5, annual profile 3, share of heavy goods vehi-cles 15%, cross section capacity 2000 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 500: Design diagram for weekly profile 5, annual profile 4, share of heavy goods vehi-cles 15%, cross section capacity 2000 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

281

Page 283: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 501: Design diagram for weekly profile 5, annual profile 5, share of heavy goods vehi-cles 15%, cross section capacity 2000 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 502: Design diagram for weekly profile 6, annual profile 1, share of heavy goods vehi-cles 15%, cross section capacity 2000 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

282

Page 284: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 503: Design diagram for weekly profile 6, annual profile 2, share of heavy goods vehi-cles 15%, cross section capacity 2000 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 504: Design diagram for weekly profile 6, annual profile 3, share of heavy goods vehi-cles 15%, cross section capacity 2000 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

283

Page 285: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 505: Design diagram for weekly profile 6, annual profile 4, share of heavy goods vehi-cles 15%, cross section capacity 2000 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 506: Design diagram for weekly profile 6, annual profile 5, share of heavy goods vehi-cles 15%, cross section capacity 2000 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

284

Page 286: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 507: Design diagram for weekly profile 7, annual profile 1, share of heavy goods vehi-cles 15%, cross section capacity 2000 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 508: Design diagram for weekly profile 7, annual profile 2, share of heavy goods vehi-cles 15%, cross section capacity 2000 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

285

Page 287: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 509: Design diagram for weekly profile 7, annual profile 3, share of heavy goods vehi-cles 15%, cross section capacity 2000 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 510: Design diagram for weekly profile 7, annual profile 4, share of heavy goods vehi-cles 15%, cross section capacity 2000 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

286

Page 288: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 511: Design diagram for weekly profile 7, annual profile 5, share of heavy goods vehi-cles 15%, cross section capacity 2000 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

287

Page 289: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

11.10 Cross section capacity: 2250 [veh/lane/h] and share of heavy goodsvehicles: 0 – 5%

Figure 512: Design diagram for weekly profile 1, annual profile 1, share of heavy goods vehi-cles 0%, cross section capacity 2250 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CHF/

km)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 513: Design diagram for weekly profile 1, annual profile 2, share of heavy goods vehi-cles 0%, cross section capacity 2250 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CHF/

km)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

288

Page 290: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 514: Design diagram for weekly profile 1, annual profile 3, share of heavy goods vehi-cles 0%, cross section capacity 2250 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 515: Design diagram for weekly profile 1, annual profile 4, share of heavy goods vehi-cles 0%, cross section capacity 2250 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

289

Page 291: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 516: Design diagram for weekly profile 1, annual profile 5, share of heavy goods vehi-cles 0%, cross section capacity 2250 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 517: Design diagram for weekly profile 2, annual profile 1, share of heavy goods vehi-cles 0%, cross section capacity 2250 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

290

Page 292: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 518: Design diagram for weekly profile 2, annual profile 2, share of heavy goods vehi-cles 0%, cross section capacity 2250 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 519: Design diagram for weekly profile 2, annual profile 3, share of heavy goods vehi-cles 0%, cross section capacity 2250 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

291

Page 293: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 520: Design diagram for weekly profile 2, annual profile 4, share of heavy goods vehi-cles 0%, cross section capacity 2250 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 521: Design diagram for weekly profile 2, annual profile 5, share of heavy goods vehi-cles 0%, cross section capacity 2250 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

292

Page 294: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 522: Design diagram for weekly profile 3, annual profile 1, share of heavy goods vehi-cles 0%, cross section capacity 2250 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 523: Design diagram for weekly profile 3, annual profile 2, share of heavy goods vehi-cles 0%, cross section capacity 2250 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

293

Page 295: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 524: Design diagram for weekly profile 3, annual profile 3, share of heavy goods vehi-cles 0%, cross section capacity 2250 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 525: Design diagram for weekly profile 3, annual profile 4, share of heavy goods vehi-cles 0%, cross section capacity 2250 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

294

Page 296: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 526: Design diagram for weekly profile 3, annual profile 5, share of heavy goods vehi-cles 0%, cross section capacity 2250 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 527: Design diagram for weekly profile 4, annual profile 1, share of heavy goods vehi-cles 0%, cross section capacity 2250 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

295

Page 297: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 528: Design diagram for weekly profile 4, annual profile 2, share of heavy goods vehi-cles 0%, cross section capacity 2250 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 529: Design diagram for weekly profile 4, annual profile 3, share of heavy goods vehi-cles 0%, cross section capacity 2250 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

296

Page 298: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 530: Design diagram for weekly profile 4, annual profile 4, share of heavy goods vehi-cles 0%, cross section capacity 2250 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 531: Design diagram for weekly profile 4, annual profile 5, share of heavy goods vehi-cles 0%, cross section capacity 2250 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

297

Page 299: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 532: Design diagram for weekly profile 5, annual profile 1, share of heavy goods vehi-cles 0%, cross section capacity 2250 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 533: Design diagram for weekly profile 5, annual profile 2, share of heavy goods vehi-cles 0%, cross section capacity 2250 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

298

Page 300: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 534: Design diagram for weekly profile 5, annual profile 3, share of heavy goods vehi-cles 0%, cross section capacity 2250 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 535: Design diagram for weekly profile 5, annual profile 4, share of heavy goods vehi-cles 0%, cross section capacity 2250 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

299

Page 301: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 536: Design diagram for weekly profile 5, annual profile 5, share of heavy goods vehi-cles 0%, cross section capacity 2250 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 537: Design diagram for weekly profile 6, annual profile 1, share of heavy goods vehi-cles 0%, cross section capacity 2250 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

300

Page 302: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 538: Design diagram for weekly profile 6, annual profile 2, share of heavy goods vehi-cles 0%, cross section capacity 2250 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 539: Design diagram for weekly profile 6, annual profile 3, share of heavy goods vehi-cles 0%, cross section capacity 2250 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

301

Page 303: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 540: Design diagram for weekly profile 6, annual profile 4, share of heavy goods vehi-cles 0%, cross section capacity 2250 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 541: Design diagram for weekly profile 6, annual profile 5, share of heavy goods vehi-cles 0%, cross section capacity 2250 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

302

Page 304: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 542: Design diagram for weekly profile 7, annual profile 1, share of heavy goods vehi-cles 0%, cross section capacity 2250 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 543: Design diagram for weekly profile 7, annual profile 2, share of heavy goods vehi-cles 0%, cross section capacity 2250 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

303

Page 305: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 544: Design diagram for weekly profile 7, annual profile 3, share of heavy goods vehi-cles 0%, cross section capacity 2250 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 545: Design diagram for weekly profile 7, annual profile 4, share of heavy goods vehi-cles 0%, cross section capacity 2250 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

304

Page 306: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 546: Design diagram for weekly profile 7, annual profile 5, share of heavy goods vehi-cles 0%, cross section capacity 2250 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

305

Page 307: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

11.11 Cross section capacity: 2250 [veh/lane/h] and share of heavy goodsvehicles: 5 – 15%

Figure 547: Design diagram for weekly profile 1, annual profile 1, share of heavy goods vehi-cles 5%, cross section capacity 2250 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CHF/

km)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 548: Design diagram for weekly profile 1, annual profile 2, share of heavy goods vehi-cles 5%, cross section capacity 2250 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CHF/

km)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

306

Page 308: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 549: Design diagram for weekly profile 1, annual profile 3, share of heavy goods vehi-cles 5%, cross section capacity 2250 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 550: Design diagram for weekly profile 1, annual profile 4, share of heavy goods vehi-cles 5%, cross section capacity 2250 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

307

Page 309: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 551: Design diagram for weekly profile 1, annual profile 5, share of heavy goods vehi-cles 5%, cross section capacity 2250 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 552: Design diagram for weekly profile 2, annual profile 1, share of heavy goods vehi-cles 5%, cross section capacity 2250 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

308

Page 310: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 553: Design diagram for weekly profile 2, annual profile 2, share of heavy goods vehi-cles 5%, cross section capacity 2250 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 554: Design diagram for weekly profile 2, annual profile 3, share of heavy goods vehi-cles 5%, cross section capacity 2250 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

309

Page 311: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 555: Design diagram for weekly profile 2, annual profile 4, share of heavy goods vehi-cles 5%, cross section capacity 2250 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 556: Design diagram for weekly profile 2, annual profile 5, share of heavy goods vehi-cles 5%, cross section capacity 2250 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

310

Page 312: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 557: Design diagram for weekly profile 3, annual profile 1, share of heavy goods vehi-cles 5%, cross section capacity 2250 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 558: Design diagram for weekly profile 3, annual profile 2, share of heavy goods vehi-cles 5%, cross section capacity 2250 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

311

Page 313: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 559: Design diagram for weekly profile 3, annual profile 3, share of heavy goods vehi-cles 5%, cross section capacity 2250 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 560: Design diagram for weekly profile 3, annual profile 4, share of heavy goods vehi-cles 5%, cross section capacity 2250 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

312

Page 314: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 561: Design diagram for weekly profile 3, annual profile 5, share of heavy goods vehi-cles 5%, cross section capacity 2250 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 562: Design diagram for weekly profile 4, annual profile 1, share of heavy goods vehi-cles 5%, cross section capacity 2250 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

313

Page 315: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 563: Design diagram for weekly profile 4, annual profile 2, share of heavy goods vehi-cles 5%, cross section capacity 2250 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 564: Design diagram for weekly profile 4, annual profile 3, share of heavy goods vehi-cles 5%, cross section capacity 2250 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

314

Page 316: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 565: Design diagram for weekly profile 4, annual profile 4, share of heavy goods vehi-cles 5%, cross section capacity 2250 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 566: Design diagram for weekly profile 4, annual profile 5, share of heavy goods vehi-cles 5%, cross section capacity 2250 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

315

Page 317: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 567: Design diagram for weekly profile 5, annual profile 1, share of heavy goods vehi-cles 5%, cross section capacity 2250 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 568: Design diagram for weekly profile 5, annual profile 2, share of heavy goods vehi-cles 5%, cross section capacity 2250 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

316

Page 318: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 569: Design diagram for weekly profile 5, annual profile 3, share of heavy goods vehi-cles 5%, cross section capacity 2250 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 570: Design diagram for weekly profile 5, annual profile 4, share of heavy goods vehi-cles 5%, cross section capacity 2250 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

317

Page 319: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 571: Design diagram for weekly profile 5, annual profile 5, share of heavy goods vehi-cles 5%, cross section capacity 2250 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 572: Design diagram for weekly profile 6, annual profile 1, share of heavy goods vehi-cles 5%, cross section capacity 2250 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

318

Page 320: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 573: Design diagram for weekly profile 6, annual profile 2, share of heavy goods vehi-cles 5%, cross section capacity 2250 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 574: Design diagram for weekly profile 6, annual profile 3, share of heavy goods vehi-cles 5%, cross section capacity 2250 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

319

Page 321: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 575: Design diagram for weekly profile 6, annual profile 4, share of heavy goods vehi-cles 5%, cross section capacity 2250 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 576: Design diagram for weekly profile 6, annual profile 5, share of heavy goods vehi-cles 5%, cross section capacity 2250 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

320

Page 322: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 577: Design diagram for weekly profile 7, annual profile 1, share of heavy goods vehi-cles 5%, cross section capacity 2250 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 578: Design diagram for weekly profile 7, annual profile 2, share of heavy goods vehi-cles 5%, cross section capacity 2250 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

321

Page 323: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 579: Design diagram for weekly profile 7, annual profile 3, share of heavy goods vehi-cles 5%, cross section capacity 2250 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 580: Design diagram for weekly profile 7, annual profile 4, share of heavy goods vehi-cles 5%, cross section capacity 2250 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

322

Page 324: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 581: Design diagram for weekly profile 7, annual profile 5, share of heavy goods vehi-cles 5%, cross section capacity 2250 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

323

Page 325: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

11.12 Cross section capacity: 2250 [veh/lane/h] and share of heavy goodsvehicles: 15 – 25%

Figure 582: Design diagram for weekly profile 1, annual profile 1, share of heavy goods vehi-cles 15%, cross section capacity 2250 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CHF/

km)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 583: Design diagram for weekly profile 1, annual profile 2, share of heavy goods vehi-cles 15%, cross section capacity 2250 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CHF/

km)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

324

Page 326: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 584: Design diagram for weekly profile 1, annual profile 3, share of heavy goods vehi-cles 15%, cross section capacity 2250 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 585: Design diagram for weekly profile 1, annual profile 4, share of heavy goods vehi-cles 15%, cross section capacity 2250 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

325

Page 327: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 586: Design diagram for weekly profile 1, annual profile 5, share of heavy goods vehi-cles 15%, cross section capacity 2250 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 587: Design diagram for weekly profile 2, annual profile 1, share of heavy goods vehi-cles 15%, cross section capacity 2250 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

326

Page 328: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 588: Design diagram for weekly profile 2, annual profile 2, share of heavy goods vehi-cles 15%, cross section capacity 2250 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 589: Design diagram for weekly profile 2, annual profile 3, share of heavy goods vehi-cles 15%, cross section capacity 2250 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

327

Page 329: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 590: Design diagram for weekly profile 2, annual profile 4, share of heavy goods vehi-cles 15%, cross section capacity 2250 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 591: Design diagram for weekly profile 2, annual profile 5, share of heavy goods vehi-cles 15%, cross section capacity 2250 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

328

Page 330: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 592: Design diagram for weekly profile 3, annual profile 1, share of heavy goods vehi-cles 15%, cross section capacity 2250 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 593: Design diagram for weekly profile 3, annual profile 2, share of heavy goods vehi-cles 15%, cross section capacity 2250 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

329

Page 331: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 594: Design diagram for weekly profile 3, annual profile 3, share of heavy goods vehi-cles 15%, cross section capacity 2250 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 595: Design diagram for weekly profile 3, annual profile 4, share of heavy goods vehi-cles 15%, cross section capacity 2250 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

330

Page 332: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 596: Design diagram for weekly profile 3, annual profile 5, share of heavy goods vehi-cles 15%, cross section capacity 2250 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 597: Design diagram for weekly profile 4, annual profile 1, share of heavy goods vehi-cles 15%, cross section capacity 2250 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

331

Page 333: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 598: Design diagram for weekly profile 4, annual profile 2, share of heavy goods vehi-cles 15%, cross section capacity 2250 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 599: Design diagram for weekly profile 4, annual profile 3, share of heavy goods vehi-cles 15%, cross section capacity 2250 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

332

Page 334: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 600: Design diagram for weekly profile 4, annual profile 4, share of heavy goods vehi-cles 15%, cross section capacity 2250 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 601: Design diagram for weekly profile 4, annual profile 5, share of heavy goods vehi-cles 15%, cross section capacity 2250 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

333

Page 335: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 602: Design diagram for weekly profile 5, annual profile 1, share of heavy goods vehi-cles 15%, cross section capacity 2250 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 603: Design diagram for weekly profile 5, annual profile 2, share of heavy goods vehi-cles 15%, cross section capacity 2250 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

334

Page 336: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 604: Design diagram for weekly profile 5, annual profile 3, share of heavy goods vehi-cles 15%, cross section capacity 2250 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 605: Design diagram for weekly profile 5, annual profile 4, share of heavy goods vehi-cles 15%, cross section capacity 2250 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

335

Page 337: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 606: Design diagram for weekly profile 5, annual profile 5, share of heavy goods vehi-cles 15%, cross section capacity 2250 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 607: Design diagram for weekly profile 6, annual profile 1, share of heavy goods vehi-cles 15%, cross section capacity 2250 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

336

Page 338: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 608: Design diagram for weekly profile 6, annual profile 2, share of heavy goods vehi-cles 15%, cross section capacity 2250 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 609: Design diagram for weekly profile 6, annual profile 3, share of heavy goods vehi-cles 15%, cross section capacity 2250 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

337

Page 339: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 610: Design diagram for weekly profile 6, annual profile 4, share of heavy goods vehi-cles 15%, cross section capacity 2250 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 611: Design diagram for weekly profile 6, annual profile 5, share of heavy goods vehi-cles 15%, cross section capacity 2250 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

338

Page 340: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 612: Design diagram for weekly profile 7, annual profile 1, share of heavy goods vehi-cles 15%, cross section capacity 2250 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 613: Design diagram for weekly profile 7, annual profile 2, share of heavy goods vehi-cles 15%, cross section capacity 2250 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

339

Page 341: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 614: Design diagram for weekly profile 7, annual profile 3, share of heavy goods vehi-cles 15%, cross section capacity 2250 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 615: Design diagram for weekly profile 7, annual profile 4, share of heavy goods vehi-cles 15%, cross section capacity 2250 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

340

Page 342: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 616: Design diagram for weekly profile 7, annual profile 5, share of heavy goods vehi-cles 15%, cross section capacity 2250 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

341

Page 343: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

11.13 Cross section capacity: 2500 [veh/lane/h] and share of heavy goodsvehicles: 0 – 5%

Figure 617: Design diagram for weekly profile 1, annual profile 1, share of heavy goods vehi-cles 0%, cross section capacity 2500 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CHF/

km)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 618: Design diagram for weekly profile 1, annual profile 2, share of heavy goods vehi-cles 0%, cross section capacity 2500 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CHF/

km)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

342

Page 344: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 619: Design diagram for weekly profile 1, annual profile 3, share of heavy goods vehi-cles 0%, cross section capacity 2500 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 620: Design diagram for weekly profile 1, annual profile 4, share of heavy goods vehi-cles 0%, cross section capacity 2500 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

343

Page 345: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 621: Design diagram for weekly profile 1, annual profile 5, share of heavy goods vehi-cles 0%, cross section capacity 2500 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 622: Design diagram for weekly profile 2, annual profile 1, share of heavy goods vehi-cles 0%, cross section capacity 2500 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

344

Page 346: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 623: Design diagram for weekly profile 2, annual profile 2, share of heavy goods vehi-cles 0%, cross section capacity 2500 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 624: Design diagram for weekly profile 2, annual profile 3, share of heavy goods vehi-cles 0%, cross section capacity 2500 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

345

Page 347: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 625: Design diagram for weekly profile 2, annual profile 4, share of heavy goods vehi-cles 0%, cross section capacity 2500 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 626: Design diagram for weekly profile 2, annual profile 5, share of heavy goods vehi-cles 0%, cross section capacity 2500 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

346

Page 348: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 627: Design diagram for weekly profile 3, annual profile 1, share of heavy goods vehi-cles 0%, cross section capacity 2500 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 628: Design diagram for weekly profile 3, annual profile 2, share of heavy goods vehi-cles 0%, cross section capacity 2500 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

347

Page 349: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 629: Design diagram for weekly profile 3, annual profile 3, share of heavy goods vehi-cles 0%, cross section capacity 2500 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 630: Design diagram for weekly profile 3, annual profile 4, share of heavy goods vehi-cles 0%, cross section capacity 2500 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

348

Page 350: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 631: Design diagram for weekly profile 3, annual profile 5, share of heavy goods vehi-cles 0%, cross section capacity 2500 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 632: Design diagram for weekly profile 4, annual profile 1, share of heavy goods vehi-cles 0%, cross section capacity 2500 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

349

Page 351: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 633: Design diagram for weekly profile 4, annual profile 2, share of heavy goods vehi-cles 0%, cross section capacity 2500 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 634: Design diagram for weekly profile 4, annual profile 3, share of heavy goods vehi-cles 0%, cross section capacity 2500 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

350

Page 352: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 635: Design diagram for weekly profile 4, annual profile 4, share of heavy goods vehi-cles 0%, cross section capacity 2500 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 636: Design diagram for weekly profile 4, annual profile 5, share of heavy goods vehi-cles 0%, cross section capacity 2500 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

351

Page 353: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 637: Design diagram for weekly profile 5, annual profile 1, share of heavy goods vehi-cles 0%, cross section capacity 2500 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 638: Design diagram for weekly profile 5, annual profile 2, share of heavy goods vehi-cles 0%, cross section capacity 2500 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

352

Page 354: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 639: Design diagram for weekly profile 5, annual profile 3, share of heavy goods vehi-cles 0%, cross section capacity 2500 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 640: Design diagram for weekly profile 5, annual profile 4, share of heavy goods vehi-cles 0%, cross section capacity 2500 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

353

Page 355: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 641: Design diagram for weekly profile 5, annual profile 5, share of heavy goods vehi-cles 0%, cross section capacity 2500 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 642: Design diagram for weekly profile 6, annual profile 1, share of heavy goods vehi-cles 0%, cross section capacity 2500 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

354

Page 356: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 643: Design diagram for weekly profile 6, annual profile 2, share of heavy goods vehi-cles 0%, cross section capacity 2500 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 644: Design diagram for weekly profile 6, annual profile 3, share of heavy goods vehi-cles 0%, cross section capacity 2500 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

355

Page 357: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 645: Design diagram for weekly profile 6, annual profile 4, share of heavy goods vehi-cles 0%, cross section capacity 2500 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 646: Design diagram for weekly profile 6, annual profile 5, share of heavy goods vehi-cles 0%, cross section capacity 2500 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

356

Page 358: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 647: Design diagram for weekly profile 7, annual profile 1, share of heavy goods vehi-cles 0%, cross section capacity 2500 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 648: Design diagram for weekly profile 7, annual profile 2, share of heavy goods vehi-cles 0%, cross section capacity 2500 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

357

Page 359: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 649: Design diagram for weekly profile 7, annual profile 3, share of heavy goods vehi-cles 0%, cross section capacity 2500 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 650: Design diagram for weekly profile 7, annual profile 4, share of heavy goods vehi-cles 0%, cross section capacity 2500 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

358

Page 360: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 651: Design diagram for weekly profile 7, annual profile 5, share of heavy goods vehi-cles 0%, cross section capacity 2500 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

359

Page 361: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

11.14 Cross section capacity: 2500 [veh/lane/h] and share of heavy goodsvehicles: 5 – 15%

Figure 652: Design diagram for weekly profile 1, annual profile 1, share of heavy goods vehi-cles 5%, cross section capacity 2500 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CHF/

km)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 653: Design diagram for weekly profile 1, annual profile 2, share of heavy goods vehi-cles 5%, cross section capacity 2500 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CHF/

km)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

360

Page 362: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 654: Design diagram for weekly profile 1, annual profile 3, share of heavy goods vehi-cles 5%, cross section capacity 2500 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 655: Design diagram for weekly profile 1, annual profile 4, share of heavy goods vehi-cles 5%, cross section capacity 2500 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

361

Page 363: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 656: Design diagram for weekly profile 1, annual profile 5, share of heavy goods vehi-cles 5%, cross section capacity 2500 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 657: Design diagram for weekly profile 2, annual profile 1, share of heavy goods vehi-cles 5%, cross section capacity 2500 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

362

Page 364: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 658: Design diagram for weekly profile 2, annual profile 2, share of heavy goods vehi-cles 5%, cross section capacity 2500 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 659: Design diagram for weekly profile 2, annual profile 3, share of heavy goods vehi-cles 5%, cross section capacity 2500 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

363

Page 365: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 660: Design diagram for weekly profile 2, annual profile 4, share of heavy goods vehi-cles 5%, cross section capacity 2500 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 661: Design diagram for weekly profile 2, annual profile 5, share of heavy goods vehi-cles 5%, cross section capacity 2500 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

364

Page 366: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 662: Design diagram for weekly profile 3, annual profile 1, share of heavy goods vehi-cles 5%, cross section capacity 2500 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 663: Design diagram for weekly profile 3, annual profile 2, share of heavy goods vehi-cles 5%, cross section capacity 2500 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

365

Page 367: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 664: Design diagram for weekly profile 3, annual profile 3, share of heavy goods vehi-cles 5%, cross section capacity 2500 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 665: Design diagram for weekly profile 3, annual profile 4, share of heavy goods vehi-cles 5%, cross section capacity 2500 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

366

Page 368: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 666: Design diagram for weekly profile 3, annual profile 5, share of heavy goods vehi-cles 5%, cross section capacity 2500 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 667: Design diagram for weekly profile 4, annual profile 1, share of heavy goods vehi-cles 5%, cross section capacity 2500 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

367

Page 369: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 668: Design diagram for weekly profile 4, annual profile 2, share of heavy goods vehi-cles 5%, cross section capacity 2500 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 669: Design diagram for weekly profile 4, annual profile 3, share of heavy goods vehi-cles 5%, cross section capacity 2500 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

368

Page 370: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 670: Design diagram for weekly profile 4, annual profile 4, share of heavy goods vehi-cles 5%, cross section capacity 2500 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 671: Design diagram for weekly profile 4, annual profile 5, share of heavy goods vehi-cles 5%, cross section capacity 2500 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

369

Page 371: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 672: Design diagram for weekly profile 5, annual profile 1, share of heavy goods vehi-cles 5%, cross section capacity 2500 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 673: Design diagram for weekly profile 5, annual profile 2, share of heavy goods vehi-cles 5%, cross section capacity 2500 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

370

Page 372: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 674: Design diagram for weekly profile 5, annual profile 3, share of heavy goods vehi-cles 5%, cross section capacity 2500 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 675: Design diagram for weekly profile 5, annual profile 4, share of heavy goods vehi-cles 5%, cross section capacity 2500 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

371

Page 373: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 676: Design diagram for weekly profile 5, annual profile 5, share of heavy goods vehi-cles 5%, cross section capacity 2500 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 677: Design diagram for weekly profile 6, annual profile 1, share of heavy goods vehi-cles 5%, cross section capacity 2500 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

372

Page 374: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 678: Design diagram for weekly profile 6, annual profile 2, share of heavy goods vehi-cles 5%, cross section capacity 2500 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 679: Design diagram for weekly profile 6, annual profile 3, share of heavy goods vehi-cles 5%, cross section capacity 2500 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

373

Page 375: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 680: Design diagram for weekly profile 6, annual profile 4, share of heavy goods vehi-cles 5%, cross section capacity 2500 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 681: Design diagram for weekly profile 6, annual profile 5, share of heavy goods vehi-cles 5%, cross section capacity 2500 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

374

Page 376: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 682: Design diagram for weekly profile 7, annual profile 1, share of heavy goods vehi-cles 5%, cross section capacity 2500 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 683: Design diagram for weekly profile 7, annual profile 2, share of heavy goods vehi-cles 5%, cross section capacity 2500 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

375

Page 377: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 684: Design diagram for weekly profile 7, annual profile 3, share of heavy goods vehi-cles 5%, cross section capacity 2500 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 685: Design diagram for weekly profile 7, annual profile 4, share of heavy goods vehi-cles 5%, cross section capacity 2500 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

376

Page 378: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 686: Design diagram for weekly profile 7, annual profile 5, share of heavy goods vehi-cles 5%, cross section capacity 2500 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

377

Page 379: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

11.15 Cross section capacity: 2500 [veh/lane/h] and share of heavy goodsvehicles: 15 – 25%

Figure 687: Design diagram for weekly profile 1, annual profile 1, share of heavy goods vehi-cles 15%, cross section capacity 2500 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CHF/

km)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 688: Design diagram for weekly profile 1, annual profile 2, share of heavy goods vehi-cles 15%, cross section capacity 2500 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CHF/

km)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

378

Page 380: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 689: Design diagram for weekly profile 1, annual profile 3, share of heavy goods vehi-cles 15%, cross section capacity 2500 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 690: Design diagram for weekly profile 1, annual profile 4, share of heavy goods vehi-cles 15%, cross section capacity 2500 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

379

Page 381: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 691: Design diagram for weekly profile 1, annual profile 5, share of heavy goods vehi-cles 15%, cross section capacity 2500 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 692: Design diagram for weekly profile 2, annual profile 1, share of heavy goods vehi-cles 15%, cross section capacity 2500 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

380

Page 382: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 693: Design diagram for weekly profile 2, annual profile 2, share of heavy goods vehi-cles 15%, cross section capacity 2500 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 694: Design diagram for weekly profile 2, annual profile 3, share of heavy goods vehi-cles 15%, cross section capacity 2500 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

381

Page 383: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 695: Design diagram for weekly profile 2, annual profile 4, share of heavy goods vehi-cles 15%, cross section capacity 2500 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 696: Design diagram for weekly profile 2, annual profile 5, share of heavy goods vehi-cles 15%, cross section capacity 2500 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

382

Page 384: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 697: Design diagram for weekly profile 3, annual profile 1, share of heavy goods vehi-cles 15%, cross section capacity 2500 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 698: Design diagram for weekly profile 3, annual profile 2, share of heavy goods vehi-cles 15%, cross section capacity 2500 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

383

Page 385: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 699: Design diagram for weekly profile 3, annual profile 3, share of heavy goods vehi-cles 15%, cross section capacity 2500 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 700: Design diagram for weekly profile 3, annual profile 4, share of heavy goods vehi-cles 15%, cross section capacity 2500 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

384

Page 386: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 701: Design diagram for weekly profile 3, annual profile 5, share of heavy goods vehi-cles 15%, cross section capacity 2500 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 702: Design diagram for weekly profile 4, annual profile 1, share of heavy goods vehi-cles 15%, cross section capacity 2500 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

385

Page 387: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 703: Design diagram for weekly profile 4, annual profile 2, share of heavy goods vehi-cles 15%, cross section capacity 2500 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 704: Design diagram for weekly profile 4, annual profile 3, share of heavy goods vehi-cles 15%, cross section capacity 2500 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

386

Page 388: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 705: Design diagram for weekly profile 4, annual profile 4, share of heavy goods vehi-cles 15%, cross section capacity 2500 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 706: Design diagram for weekly profile 4, annual profile 5, share of heavy goods vehi-cles 15%, cross section capacity 2500 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

387

Page 389: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 707: Design diagram for weekly profile 5, annual profile 1, share of heavy goods vehi-cles 15%, cross section capacity 2500 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 708: Design diagram for weekly profile 5, annual profile 2, share of heavy goods vehi-cles 15%, cross section capacity 2500 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

388

Page 390: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 709: Design diagram for weekly profile 5, annual profile 3, share of heavy goods vehi-cles 15%, cross section capacity 2500 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 710: Design diagram for weekly profile 5, annual profile 4, share of heavy goods vehi-cles 15%, cross section capacity 2500 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

389

Page 391: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 711: Design diagram for weekly profile 5, annual profile 5, share of heavy goods vehi-cles 15%, cross section capacity 2500 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 712: Design diagram for weekly profile 6, annual profile 1, share of heavy goods vehi-cles 15%, cross section capacity 2500 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

390

Page 392: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 713: Design diagram for weekly profile 6, annual profile 2, share of heavy goods vehi-cles 15%, cross section capacity 2500 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 714: Design diagram for weekly profile 6, annual profile 3, share of heavy goods vehi-cles 15%, cross section capacity 2500 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

391

Page 393: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 715: Design diagram for weekly profile 6, annual profile 4, share of heavy goods vehi-cles 15%, cross section capacity 2500 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 716: Design diagram for weekly profile 6, annual profile 5, share of heavy goods vehi-cles 15%, cross section capacity 2500 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

392

Page 394: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 717: Design diagram for weekly profile 7, annual profile 1, share of heavy goods vehi-cles 15%, cross section capacity 2500 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 718: Design diagram for weekly profile 7, annual profile 2, share of heavy goods vehi-cles 15%, cross section capacity 2500 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

393

Page 395: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 719: Design diagram for weekly profile 7, annual profile 3, share of heavy goods vehi-cles 15%, cross section capacity 2500 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

Figure 720: Design diagram for weekly profile 7, annual profile 4, share of heavy goods vehi-cles 15%, cross section capacity 2500 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

394

Page 396: Design diagrams for road infrastructure elements: High ...€¦ · Design diagrams for road infrastructure elements: High capacity roads July 2009 where, „R = Mean of the reserve

Design diagrams for road infrastructure elements: High capacity roads July 2009

Figure 721: Design diagram for weekly profile 7, annual profile 5, share of heavy goods vehi-cles 15%, cross section capacity 2500 [veh/lane/h]:

0 1 2 3 4 5 6 7

x 104

105

106

107

Average Weekday Traffic (AWT)

Annu

al C

ost (

CH

F/km

)

2Lane 100kmph3Lane 100kmph2Lane 120kmph3Lane 120kmph

395