1
2440 2440 2440 2440 2440 2440 2440 2440 2440 2440 2440 2440 2440 2440 2440 2440 2440 2440 2440 800 1270 2440 2440 2440 2440 2440 2440 2440 2440 2440 2440 2440 2440 2440 2440 800 2440 2440 2440 2440 2440 1270 1270 VARIES 2700 1980 1980 2700 1980 1980 1980 1980 1980 1980 1980 1980 1980 1980 2700 1980 1980 1980 1980 1980 2440 1270 1270 2700 1980 1980 1980 1270 800 1270 800 2440 2440 2440 1980 2440 2440 2440 800 THE SCAFFOLD STRUCTURE DETAILED ON THIS DRAWING HAS BEEN DESIGNED TO BE ERECTED USING ONLY MATERIALS SUPPLIED OR APPROVED BY SAFE ACCESS (HIGHLAND) LTD (Highland) Ltd PLAN VIEW NOTES: - DUE TO UNFORESEEN SITE CIRCUMSTANCES, THE SCAFFOLD ERECTED MAY DIFFER FROM THAT NOTED. IF IN ANY DOUBT CONTACT SAFE ACCESS (HIGHLAND) LTD TO DISCUSS. - ALL ALLOWABLE LOADS AND DETAILS ARE BASED ON THE USE OF EQUIPMENT WITH SWL RATINGS IN ACCORDANCE WITH GENUINE KWIKSTAGE COMPONENTS. - CLIENT TO ENSURE FIRM & LEVEL BASES CAPABLE OF SAFELY SUPPORTING LOAD FROM SCAFFOLDING WITHOUT UNDUE SETTLEMENT OR DEFLECTION. - BUTTRESS & LOADING BAY TO BE ERECTED IN ACCORDANCE WITH EQUIPMENT USER MANUAL. - ALL SCAFFOLD MATERIALS TO COMPLY WITH BS 1139. WORKING DRAWING FRONT ELEVATION SIDE ELEVATION REAR ELEVATION A: 22b Longman Drive Inverness IV1 1SU T: 01463 (711750) M: 07527 135487 E: [email protected] W: www.safe-access.co.uk CLIENT TO ENSURE GROUND BEARING PRESSURES ADEQUATE TO SUPPORT AXIAL LOADS IMPOSED BY UPRIGHTS ADEQUATE SOLE BOARDS MUST BE USED TO TRANSER AXIAL LEG LOAD TO THE GROUND GENERAL NOTES: A) This drawing is confidential and the exclusive property of Safe Access (Highland) Ltd. No unauthorised use, copy or disclosure is to be made and it is to be returned upon request. B) Construct in full compliance with BS EN 12811-1 (TG20:08) unless noted otherwise. C) Scaffold built from tubular materials and fittings conforming to BS 1139 : 1982 or type 4 tube to BS EN 39. All tube must be in 'as new' condition. D) Scaffold built with load bearing fittings, except intermediate bearers below platform level and boards fixed with non-load bearing fittings. E) This drawing has been prepared from details supplied to us by the enquirer/client, who should check that we have correctly interpreted his/her requirements and that all loadings, dimensions, details, erection and striking sequences are correct and practicable. No alteration in the loading may be made without prior reference. F) The client is to prepare and ensure that any foundations/supports are suitable for supporting the loads imposed upon it by our scaffold including its working load. G) No sheeting whatsoever, unless already shown, should be added to the scaffold without prior reference. H) It is the responsibillity of the client/enquirer to ensure that adequate facilities or tying the scaffold are made available and that the building or structure is capable of withstanding the loads applied to it by the scaffold and its working load. I) No ties or braces re to be removed or any modifications to be made to the scaffold without prior reference. J) The enquirer/client is to design, supply and fix all necessary auxiliary equipment including but not limited to, shuttering, timber, bearers, steel joists and to ensure that such auxiliary equipment is capable of safely transmitting the loads to the standards. K) The enquirer/client will be responsible for setting out and final leveling of scaffolding or similar equipment used as a system support. L) All dimensions are as stated or as calculated M) This drawing has been prepared on the assumption that all loads will be applied axially to the tubes unless specifically stated. DESIGN LOADS: THIS SCAFFOLD HAS BEEN DESIGNED FOR THE FOLLOWING:- 12 /,)76 # N1Pð 12 /,)76 # N1Pð THE CLIENT MUST ENSURE THAT NO LOADS IMPOSED ARE GREATER THAN THE ALLOWABLE STATED LOADS R.MAIR RETURN TRANSOMS TO BE USED WITH ALL GAPS FILLED USING LAPPING BOARDS AND TUBE & FITTING ADEQUATE TIMBER SOLE BOARDS TO BE USED TRANSFERRING LEG LOADS TO *5281' 0,1 Pð CLIENT TO CONFIRM SUITABILITY OF BUILDING STRUCTURE TO SUSTAIN LOADS TRANSFERRED FROM THE SCAFFOLD ANCHORS SHOULD BE INSTALLED ONLY BY TRAINED PERSONNEL USING THE CORRECT TOOLS AND STRICTLY IN ACCORDANCE WITH MANUFACTURERS INSTRUCTIONS SIDE ELEVATION RETURN TRANSOM TO BE USED AT ALL ,17(56(&7,216 FIRST LIFT HEIGHT TO BE DETERMINED ON SITE BY CLIENT AGENT ELEVATION TO BE TIED INTO EXISITNG BUILDING AND BUTTED ON BOTH SIDES DUE TO SITE CONDITIONS, ALL ELEVATIONS TO BE TIED INTO EXISTING BUILDING USING M16 ANCHORS. CLIENT TO ENSURE BUILDING IS CAPABLE OF WITHSTANDING LOADS IMPOSED BY SCAFFOLD ALL GAPS TO BE FILLED USING TUBE & FITTING AND LAPPING BOARDS LOADING: 1R :25.,1* /,)7 # N1Pð 1R :25.,1* /,)7 # N1Pð $// ,16,'( %2$5'6 N1Pð ADJACENT UPRIGHTS TIED USING SHORT TUBE $1' &283/(56 LEDGER BRACING REQUIRED FIXED TO UPRIGHTS WITHIN 300mm OF NODE POINT DOUBLE GUARD RAILS AND TOEBOARDS ON ALL WORKING LIFTS FRONT ELEVATION HAS BEEN DESIGNED TO HAVE 3 No. WORKING LIFTS DEBRIS NETTED 2.7m PAVEMENT GANTRY. TO BE TIED AT FIRST LIFT FACE BRACING INSTALLED AS PER KWIKSTAGE USER MANUAL PLAN BRACING REQUIRED IF TIES CANNOT BE INSTALLED TWO WAY TIE USING HILTI M16 ANCHOR WITH TUBE AND COUPLERS TUBE WITH JACK BUTTED AGAINST BUILDING GRANTOWN ON SPEY. MORAY SHIRE ALTITUDE, A = 222 m ABOVE SEA LEVEL WIND FACTOR, S = 29.33 PLAN BRACING SECURED TO UPRIGHTS AS SHOWN Hilti M16 HKD with Scaffold Ring Bolt (58253). Min embedment depth - 65mm Min edge distance - 230mm Min corner distance -230mm Anchor capacity should be determined on site by testing. Concrete SWL : 6.1kN ANCHOR DETAIL PLAN BRACING REQUIRED MAX LEG LOAD: 11.54 kN MAX LEG LOAD: 8.96 kN 1 No. INSIDE GUARD RAIL 1:10 @ A1 PEDESTRIAN WALKWAY. ALL STANDARDS SHOULD BE ENCLOSED TO PREVENT HARM TO PUBLIC PUBLIC ACCESS PUBLIC ACCESS 2 No. 9m APOLLO X-BEAMSLACED AND BRACED IN PAIRS @ 1m INTERVALS 9m APOLLO X-BEAMS. BRACED AT 1m INTERVALS. FIXED TO UPRIGHTS USING RIGHT ANGLE COUPLERS

Design Drawing

Embed Size (px)

Citation preview

Page 1: Design Drawing

24402440244024402440

2440

2440

2440

2440

2440

2440 2440 2440 2440 2440 2440

2440

2440

2440

800

1270

244024402440

2440

2440 2440 2440 2440 2440 2440

2440 2440 2440 2440

800

244024402440 244024401270 1270

VARI

ES27

0019

8019

80

2700

1980

1980

1980

1980

1980

1980

1980

1980

1980

1980

2700

1980

1980

1980

1980

1980

2440

1270

1270

2700

1980

1980

1980

1270

800

1270

800

2440

2440

2440

1980

2440 2440 2440 800

THE SCAFFOLD STRUCTURE DETAILED ON THIS DRAWINGHAS BEEN DESIGNED TO BE ERECTED USING ONLY MATERIALSSUPPLIED OR APPROVED BY SAFE ACCESS (HIGHLAND) LTD

(Highland) Ltd

PLAN VIEW

NOTES:

- DUE TO UNFORESEEN SITE CIRCUMSTANCES, THE SCAFFOLD ERECTED MAY DIFFER FROM THAT NOTED. IF IN ANY DOUBT CONTACT SAFE ACCESS(HIGHLAND) LTD TO DISCUSS.- ALL ALLOWABLE LOADS AND DETAILS ARE BASED ON THE USE OF EQUIPMENT WITH SWL RATINGS IN ACCORDANCE WITH GENUINE KWIKSTAGECOMPONENTS.- CLIENT TO ENSURE FIRM & LEVEL BASES CAPABLE OF SAFELY SUPPORTING LOAD FROM SCAFFOLDING WITHOUT UNDUE SETTLEMENT OR DEFLECTION.- BUTTRESS & LOADING BAY TO BE ERECTED IN ACCORDANCE WITH EQUIPMENT USER MANUAL.- ALL SCAFFOLD MATERIALS TO COMPLY WITH BS 1139.

WORKING DRAWING

FRONT ELEVATION

SIDE ELEVATION

REAR ELEVATION

A: 22b Longman Drive Inverness IV1 1SUT: 01463 (711750)M: 07527 135487E: [email protected]: www.safe-access.co.uk

CLIENT TO ENSURE GROUND BEARINGPRESSURES ADEQUATE TO SUPPORTAXIAL LOADS IMPOSED BY UPRIGHTS

ADEQUATE SOLEBOARDS MUST BE USEDTO TRANSER AXIAL LEGLOAD TO THE GROUND

GENERAL NOTES:

A) This drawing is confidential and the exclusive property of Safe Access (Highland) Ltd.No unauthorised use, copy or disclosure is to be made and it is to be returned upon request.

B) Construct in full compliance with BS EN 12811-1 (TG20:08) unless noted otherwise.

C) Scaffold built from tubular materials and fittings conforming to BS 1139 : 1982 or type 4tube to BS EN 39. All tube must be in 'as new' condition.

D) Scaffold built with load bearing fittings, except intermediate bearers below platform leveland boards fixed with non-load bearing fittings.

E) This drawing has been prepared from details supplied to us by the enquirer/client, whoshould check that we have correctly interpreted his/her requirements and that all loadings,dimensions, details, erection and striking sequences are correct and practicable. Noalteration in the loading may be made without prior reference.

F) The client is to prepare and ensure that any foundations/supports are suitable forsupporting the loads imposed upon it by our scaffold including its working load.

G) No sheeting whatsoever, unless already shown, should be added to the scaffold withoutprior reference.

H) It is the responsibillity of the client/enquirer to ensure that adequate facilities or tying thescaffold are made available and that the building or structure is capable of withstanding theloads applied to it by the scaffold and its working load.

I) No ties or braces re to be removed or any modifications to be made to the scaffold withoutprior reference.

J) The enquirer/client is to design, supply and fix all necessary auxiliary equipment includingbut not limited to, shuttering, timber, bearers, steel joists and to ensure that such auxiliaryequipment is capable of safely transmitting the loads to the standards.

K) The enquirer/client will be responsible for setting out and final leveling of scaffolding orsimilar equipment used as a system support.

L) All dimensions are as stated or as calculated

M) This drawing has been prepared on the assumption that all loads will be applied axially tothe tubes unless specifically stated.

DESIGN LOADS:

THIS SCAFFOLD HAS BEEN DESIGNED FOR THE FOLLOWING:-1 NO. LIFTS @ 2.0 kN/m²1 NO. LIFTS @ 1.0 kN/m²

THE CLIENT MUST ENSURE THAT NO LOADS IMPOSED ARE GREATERTHAN THE ALLOWABLE STATED LOADS

R.MAIR

RETURN TRANSOMSTO BE USED WITH ALLGAPS FILLED USINGLAPPING BOARDSAND TUBE & FITTING

ADEQUATE TIMBER SOLE BOARDS TO BEUSED TRANSFERRING LEG LOADS TOGROUND. MIN 0.1m²

CLIENT TO CONFIRM SUITABILITY OFBUILDING STRUCTURE TO SUSTAINLOADS TRANSFERRED FROM THESCAFFOLD

ANCHORS SHOULD BE INSTALLEDONLY BY TRAINED PERSONNELUSING THE CORRECT TOOLS ANDSTRICTLY IN ACCORDANCE WITHMANUFACTURERS INSTRUCTIONS

SIDE ELEVATION

RETURN TRANSOMTO BE USED AT ALL90° INTERSECTIONS

FIRST LIFT HEIGHT TOBE DETERMINED ONSITE BY CLIENT AGENT

ELEVATION TO BE TIEDINTO EXISITNGBUILDING AND BUTTEDON BOTH SIDES

DUE TO SITE CONDITIONS, ALL ELEVATIONS TO BETIED INTO EXISTING BUILDING USING M16 ANCHORS.CLIENT TO ENSURE BUILDING IS CAPABLE OFWITHSTANDING LOADS IMPOSED BY SCAFFOLD

ALL GAPS TO BE FILLEDUSING TUBE & FITTINGAND LAPPING BOARDS

LOADING:1 No. WORKING LIFT @ 2.00 kN/m²+ 1 No. WORKING LIFT @ 1.00 kN/m²ALL INSIDE BOARDS 0.75 kN/m²

ADJACENTUPRIGHTS TIEDUSING SHORT TUBEAND 90° COUPLERS

LEDGER BRACINGREQUIRED FIXED TOUPRIGHTS WITHIN 300mmOF NODE POINT

DOUBLE GUARD RAILSAND TOEBOARDS ON ALLWORKING LIFTS

FRONT ELEVATION HASBEEN DESIGNED TOHAVE 3 No. WORKINGLIFTS DEBRIS NETTED

2.7m PAVEMENTGANTRY. TO BE TIEDAT FIRST LIFT

FACE BRACINGINSTALLED AS PERKWIKSTAGE USERMANUAL

PLAN BRACINGREQUIRED IF TIESCANNOT BE INSTALLED

TWO WAY TIE USING HILTIM16 ANCHOR WITH TUBE ANDCOUPLERS

TUBE WITH JACK BUTTEDAGAINST BUILDING

GRANTOWN ON SPEY. MORAY SHIREALTITUDE, A = 222 m ABOVE SEA LEVEL

WIND FACTOR, S = 29.33

PLAN BRACINGSECURED TOUPRIGHTS AS SHOWN

Hilti M16 HKD with Scaffold Ring Bolt (58253).Min embedment depth - 65mmMin edge distance - 230mmMin corner distance -230mmAnchor capacity should be determined on siteby testing. Concrete SWL : 6.1kN

ANCHOR DETAILPLAN BRACINGREQUIRED

MAX LEG LOAD:11.54 kN

MAX LEGLOAD: 8.96 kN

1 No. INSIDEGUARD RAIL

1:10 @ A1

PEDESTRIAN WALKWAY.ALL STANDARDS SHOULDBE ENCLOSED TO PREVENTHARM TO PUBLIC

PUBLICACCESS

PUBLICACCESS

2 No. 9m APOLLOX-BEAMSLACED ANDBRACED IN PAIRS @1m INTERVALS

9m APOLLO X-BEAMS.BRACED AT 1m INTERVALS.FIXED TO UPRIGHTS USINGRIGHT ANGLE COUPLERS