Upload
others
View
4
Download
0
Embed Size (px)
Citation preview
Dubai Aviation City Corporation
DESIGN REVISION APPROVAL REQUEST
Version: 2.0 / MAR-2019 / Rev: 0
DACC.IMS.P.RADC.19.DRR.F01
DEVELOPMENT CONTROL FORMS
DATE
Project Name:
Project Owner: Plot No:
Consultant:
Revision Type: Architectural Structural
Revision Details:
REQUIRED INFORMATION AND SUBMITTALS:
Copy of Consultant’s DS Registration (Copy of Consultants Professional License to be enclosed) Copy of Preliminary / Final Design Approval Copy of Building Permit (If Applicable) Project Details Sheet (Updated) NOC from Department of Civil Aviation (If Applicable) DEWA NOC (If Applicable) DCD Final Approval (If Applicable) Structural Calculations Approved & Revised Design Drawings (PDF(with consultant stamp) & DWG format and copy of coversheet signed by the owner) AWQAF Approval for Religious use (If Applicable)
Fee: AED
Knowledge Tariff: AED 10
Innovation Tariff: AED 10 FEE: Total: AED Submission Fee: AED 1 / m2 or minimum AED 2500/- , Cheque payable to Dubai Aviation City Corporation.
Submission Details : Initial Submission Resubmission
CONTRACTOR CONSULTANT
Name Name Contact No. Contact No. Email Email
STAMP STAMP
Signature & Date Signature & Date
FOR OFFICIAL USE ONLY TN- File: DLC RC AC EC GC MP DGC
Received By Signature Date
Remarks:
Approved Approved With Comments Resubmit
Name, Signature & Date
Reviewed By Architect
Reviewed By Snr. Engineer - Civil
Approved By VP – Development Control
Date :