3
MEMORIA DE CALCULO CASA-HABITACIÓN pág. 23 8. DETALLES A D E B 3.85 1.55 2.45 8.00 5.38 1.00 2.85 4.63 5.38 3.85 1.95 2.68 A C D E 1 2 1 2 3 4 6 4 5 6 K-1 K-1 K-1 K-1 K-1 K-1 C-1 K-4 K-4 K-6 K-6 K-1 K-2 K-2 K-3 K-1 K-1 K-2 K-3 K-5 K-5 K-1 K-1 K-1 CT-1 CT-1 ZA-1 ZC-1 ZC-1 ZC-1 ZC-2 ZC-2 ZC-2 ZC-2 ZC-2 ZC-2 ZC-2 ZC-2 ZC-2 ZC-2 CT-1 K-6 K-6 K-6 K-6 CT-1 B H N.D.= -0.80 A ZC N= ±0.00m ASL ZC AST ASL Plantilla de concreto f'c=50kg/cm2 espesor= 5 cm 5 Dala de desplante (D2) ARMEX 15X15-4 f'c=150.00 kg/cm2 Dala integral (D1) ARMEX 15X20-4 Acero transversal BASE Acero longitudinal H (AST) (ASL) N.D. ZAPATA 40 cm 20cm -0.80m Ø3/8"@25 ZC-1 ACERO (As)Fy=4200kg/cm2 60 cm 20cm -0.80m Ø3/8"@25 ZC-2 (A,B) Ø3/8"@20 Ø3/8"@20 DETALLES DE CIMENTACIÓN PLANTA ESTRUCTURAL DE CIMENTACION DALAS Y CASTILLOS Plantilla de concreto pobre f'c=100.00 kg/cm2 1.40 0.25 #3 @15cm 0.80 Columna C-1 30x30cm DADO 35x35cm Ambos sentidos Est. #3 @10cm C-1 COLUMNA 30.00 30.00 Concreto F´c=200 kg/cm2 8 vs #4 Est. #3 @10cm Secc. 30X30 cm 4 vs #3, e #2 @20 cm K-3 15.00 20.00 Concreto F´c=150 kg/cm2 Secc. 15x20 cm CASTILLO K-4 15.00 20.00 Concreto F´c=150 kg/cm2 CASTILLO 6 vs #3, e #2 @20 cm Secc. 15x20 cm ARMEX 15x20-4 K-2 15.00 20.00 Concreto F´c=150 kg/cm2 Secc. 15x20 cm CASTILLO K-5 15.00 20.00 Concreto F´c=150 kg/cm2 CASTILLO 6 vs #4, e #2 @20 cm Secc. 15x20 cm ARMEX, 15X15-4 15.00 Secc. 15x15 cm CASTILLO K-1 15.00 Concreto F´c=150 kg/cm2 K-6 15.00 30.00 Concreto F´c=150 kg/cm2 CASTILLO 6 vs #3, e #2 @20 cm Secc. 15x30 cm ARMEX, 15X15-4 15.00 Secc. 15x15 cm DALA D2,D3,D5,D6 15.00 Concreto F´c=150 kg/cm2 K-7 15.00 40.00 Concreto F´c=150 kg/cm2 CASTILLO 8 vs #3, e #2 @20 cm o Secc. 15x40 cm 2 Armex 15x20-4 4 vs #4, e #2 @20 cm CT-1 20.00 30.00 Concreto F´c=150 kg/cm2 Secc. 20x30 cm TRABE TIPO 4 vs #3, e #2 @20 cm D-1 15.00 20.00 Concreto F´c=150 kg/cm2 Secc. 15x20 cm DALA INTEGRAL

Detalles Memoria de Calculo Casa-habitacion

Embed Size (px)

DESCRIPTION

Detalles d

Citation preview

  • MEMORIA DE CALCULO CASA-HABITACIN

    pg. 23

    8. DETALLES

    A D EB

    3.85 1.55 2.458.00

    5.38

    1.00

    2.85

    4.63

    5.38

    3.85

    1.95

    2.68

    A C D E

    1

    2

    1

    2

    3

    4

    6

    4

    5

    6

    K-1

    K-1

    K-1 K-1

    K-1

    K-1

    C-1

    K-4

    K-4

    K-6 K-6

    K-1

    K-2

    K-2K-3

    K-1

    K-1

    K-2

    K-3

    K-5

    K-5

    K-1

    K-1

    K-1

    CT-1 CT-1

    ZA-1

    ZC-1

    ZC-1

    ZC-1

    ZC-2 ZC-2

    ZC-2

    ZC-2 ZC-2

    ZC-2

    ZC-2

    ZC-2

    ZC-2ZC-2

    CT-1

    K-6 K-6

    K-6

    K-6

    CT-1

    B

    HN.D.= -0.80

    A

    ZC

    N= 0.00m

    ASL

    ZC

    ASTASL

    Plantilla de concreto f'c=50kg/cm2espesor= 5 cm

    5

    Dala de desplante (D2)ARMEX 15X15-4f'c=150.00 kg/cm2

    Dala integral (D1)ARMEX 15X20-4

    Acero transversalBASE Acero longitudinal H(AST) (ASL)

    N.D.ZAPATA40 cm 20cm -0.80m3/8"@25ZC-1

    ACERO (As)Fy=4200kg/cm2

    60 cm 20cm -0.80m3/8"@25ZC-2

    (A,B)

    3/8"@20

    3/8"@20

    DETALLES DE CIMENTACIN

    PLANTA ESTRUCTURAL DE CIMENTACION

    DALAS Y CASTILLOS

    Plantilla de concreto pobref'c=100.00 kg/cm2 1.40

    0.25

    #3 @15cm

    0.80

    Columna C-130x30cm

    DADO35x35cm

    Ambos sentidos

    Est. #3 @10cmC-1COLUMNA

    30.00

    30.00

    Concreto Fc=200 kg/cm28 vs #4 Est. #3 @10cmSecc. 30X30 cm

    4 vs #3, e #2 @20 cm

    K-3

    15.00

    20.00Concreto Fc=150 kg/cm2

    Secc. 15x20 cm

    CASTILLO

    K-4

    15.00

    20.00Concreto Fc=150 kg/cm2

    CASTILLO

    6 vs #3, e #2 @20 cmSecc. 15x20 cm

    ARMEX 15x20-4

    K-2

    15.00

    20.00Concreto Fc=150 kg/cm2

    Secc. 15x20 cm

    CASTILLO

    K-5

    15.00

    20.00Concreto Fc=150 kg/cm2

    CASTILLO

    6 vs #4, e #2 @20 cmSecc. 15x20 cm

    ARMEX, 15X15-415.00

    Secc. 15x15 cm

    CASTILLOK-1

    15.00

    Concreto Fc=150 kg/cm2

    K-6

    15.00

    30.00Concreto Fc=150 kg/cm2

    CASTILLO

    6 vs #3, e #2 @20 cmSecc. 15x30 cm

    ARMEX, 15X15-415.00

    Secc. 15x15 cm

    DALAD2,D3,D5,D6

    15.00

    Concreto Fc=150 kg/cm2

    K-7

    15.00

    40.00 Concreto Fc=150 kg/cm2

    CASTILLO

    8 vs #3, e #2 @20 cm oSecc. 15x40 cm

    2 Armex 15x20-4

    4 vs #4, e #2 @20 cm

    CT-1

    20.00

    30.00Concreto Fc=150 kg/cm2

    Secc. 20x30 cm

    TRABE TIPO

    4 vs #3, e #2 @20 cm

    D-1

    15.00

    20.00Concreto Fc=150 kg/cm2

    Secc. 15x20 cm

    DALA INTEGRAL

  • MEMORIA DE CALCULO CASA-HABITACIN

    pg. 24

    COCHERA

    RECAMARA 1

    BAO

    SALACOMEDOR

    3.85 1.55 2.458.00

    5.38

    1.00

    2.85

    4.63

    2.85 2.558.00

    JARDIN

    5.38

    3.85

    1.95

    2.68

    A

    A

    C

    2.53

    D

    D

    E

    E

    1

    2

    1

    2

    3

    4

    6

    4

    5

    6

    B

    K-1

    K-1 C-1

    K-6 K-6

    K-3

    K-1 K-1

    K-6

    K-6K-4

    K-3

    K-2

    K-3

    K-1

    K-1

    K-1

    T4

    T1

    T2T3

    Baston 3/8" @ 40 cm

    Baston 3/8" @ 40 cm

    Baston 3/8" @ 40 cm

    Varilla 3/8" @ 20 cm

    Varilla 3/8" @ 20 cm

    Varilla 3/8" @ 20 cm

    Varilla 3/8" @ 20 cm

    Varilla 3/8" @ 20 cmVarilla 3/8" @ 20 cm

    Baston 3/8" @ 40 cm

    Baston 3/8" @ 40 cm

    Varilla 3/8" @ 20 cm Varilla 3/8" @ 20 cm

    Varilla 3/8" @ 20 cm

    Baston 3/8" @ 40 cm

    2.68

    1.95

    RM-1

    RM-1 RM-1

    K-6

    K-6

    K-6 K-6

    PLANTA ESTRUCTURAL BAJA

    LOSA MACIZA 10CMS

    50 cms

    Muro

    L/4 L/4

    MuroVarilla corrida

    Baston 50 cms

    L = Longitud del claro

    Baston L/4 (Ambos lados)

    10 cms

    Lado discontinuo

    de 10 vecesgancho minimo

    el diametro

    VAR #3 @ 20cm AMBOS LADOS

    2.90

    A E

    0.35

    4.90

    B

    2#32#42#3

    1#3 2#5

    1.100.50

    1.40

    2#41#3

    0.50 2.80

    2#52#3

    2#4 4#5

    2#4+2#3

    2.85

    A B

    0.35

    2#34#4

    4.00

    C E

    1.00 3.00 1.00E#2@10 E#2@10E#2@20

    0.20

    2#3

    E#2@10

    1.95

    A B

    0.40

    2.65

    2#3

    2#3

    2#4

    2#42#3

    h=20b=40

    T-2

    0.20f'c=200.00 kg/cm2

    h=20b=35

    T-1

    0.20f'c=200.00 kg/cm2

    h=15b=35

    T-3

    0.15f'c=200.00 kg/cm2

    2#3

    2#43#4

    h=15b=20

    T-4

    0.15

    f'c=200.00 kg/cm2

    2#3

    4#4

    TRABES

    COLUMNA

    30.00

    30.00

    Concreto Fc=200 kg/cm28 vs #4Secc. 30X30 cm

    Est. 3" @ 15cm7 @ 10cm

    7 @ 10cm

  • MEMORIA DE CALCULO CASA-HABITACIN

    pg. 25

    PLANTA ESTRUCTURAL AZOTEA

    2#3

    2.70

    5 6

    E#2@20

    0.25

    2#3

    TRABES

    2#5+1#3

    4.90

    B E

    1.20 2.50 1.20E#2@10 E#2@10E#2@20

    0.35

    2#3

    h=15b=25

    T-5

    0.15

    f'c=200.00 kg/cm2

    2#3

    2#3h=15b=25

    T-5

    0.15

    f'c=200.00 kg/cm2

    2#3

    2#3

    terminado escobillado.

    e = Espesor del muro existente (0.15m)

    integrando el armado a dalas y castillos del muro.

    y vertical, contra la estructura existente y de preferencia

    minimo deberan rematarse en su extremo superior horizontal

    3) Las dos capas de mortero Cemento-Arena f'c=100Kg/cm

    2) Malla electrosoldada ( 6x6-10/10 ) fijada con clavos o grapas

    1) Capa de mortero cemento-arena 1:4 (TIPO I) f'c=100 Kg/cm

    RECUBRIMIENTO ARMADO PARA REFUERZO DE MAMPOSTERIA

    lanzada contra el muro de mamposteria de 3.0 cm de espesor

    (9pzas/m ) de 2".

    REFORZAMIENTO DE MUROS CON MALLA MR-1

    RM-1

    C O R T ESUELO COMPACTADO

    90 % PROCTOR

    0.10Anclar malla

    0.03

    1

    e

    2

    E

    1

    2

    4

    5

    6

    2

    2

    4

    6

    K-1

    K-1

    K-6 K-6

    K-1

    RECAMARAPRINCIPAL VESTIDOR

    RECAMARA 3

    TERRAZA

    BAO

    K-1

    K-2

    K-1 K-1

    K-1 K-1

    K-1

    K-1

    K-1

    K-1

    K-2 K-1 K-4

    K-1

    K-1

    K-4

    K-3

    K-1

    Baston 3/8" @ 40 cm

    Baston 3/8" @ 40 cm

    Baston 3/8" @ 40 cm

    Baston 3/8" @ 40 cm

    Baston 3/8" @ 40 cm

    Varilla 3/8" @ 20 cm

    Varilla 3/8" @ 20 cm Varilla 3/8" @ 20 cm

    Varilla 3/8" @ 20 cm

    Varilla 3/8" @ 20 cm

    Varilla 3/8" @ 20 cm

    D6 D6

    D6

    D6D6

    T5

    D6

    K-7

    Baston 3/8" @ 40 cm Baston 3/8" @ 40 cm

    Varilla 3/8" @ 20 cmVarilla 3/8" @ 20 cm

    T6

    B1.00

    3.85 4.008.00

    2.85 4.008.00

    5.38

    3.85

    1.95

    2.70

    5.38

    3.85

    4.65

    A C E

    A C