Developing a Project Management Best Practice Gina WestcottAbudi, MBA VP, Strategic Initiatives May 2, 2009 1 866 709 8863 1-866-709-8863 www.CorpEdGroup.com Copyright © 2008 Corporate Education Group

Developing a PM Best Practice Presentation · What You Will Learn ¾Benefits of a project management best practice ¾How to prepare the organization ¾A step‐by‐step approach

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Developing a PM Best Practice Presentation · What You Will Learn ¾Benefits of a project management best practice ¾How to prepare the organization ¾A step‐by‐step approach

Developing a Project Management Best Practice

Gina Westcott‐Abudi, MBAVP, Strategic Initiatives

May 2, 2009

1 866 709 88631-866-709-8863www.CorpEdGroup.comCopyright © 2008 Corporate Education Group

Page 2: Developing a PM Best Practice Presentation · What You Will Learn ¾Benefits of a project management best practice ¾How to prepare the organization ¾A step‐by‐step approach

What You Will Learn

Benefits of a project management best practice

How to prepare the organization

A step‐by‐step approach

How to incorporate project management processes into the organization

Best practices for introducing a PMO concept

- 2 -

Page 3: Developing a PM Best Practice Presentation · What You Will Learn ¾Benefits of a project management best practice ¾How to prepare the organization ¾A step‐by‐step approach

What is a Project Management Best PracticeBest Practice

A best practice is an idea that asserts that there is a technique, method or process – through research and application – that is more effective at deli ering a partic lar o tcome than anat delivering a particular outcome than any other technique, method or process. ‐Wikipedia definition; businessdictionary.com 

A best practice is an optimal way currently recognized by industry to achieve a stated goal or objective. – OMP3® Overview, PMI®, Page 9

- 3 -

Page 4: Developing a PM Best Practice Presentation · What You Will Learn ¾Benefits of a project management best practice ¾How to prepare the organization ¾A step‐by‐step approach

Why Establish a Project Management Best PracticeBest Practice

Consistent practices enable organizations to• Effectively manage project resources

l h• Align projects to the strategic goals of the organization

• Better track and report onBetter track and report on the projects’ progress

Overall…reduce the time and money spent on ensuring projects are a success

- 4 -

Page 5: Developing a PM Best Practice Presentation · What You Will Learn ¾Benefits of a project management best practice ¾How to prepare the organization ¾A step‐by‐step approach

Prepare the Organization

Communicate the value add to the organization for establishing a project management best practice

i i• Executive overviews

• “Lunch and learn” sessions

• Informal water cooler conversations• Informal, water cooler conversations

• Create a “buzz” in the office

• Internal newsletter

Develop a team of champions to help in the promotion of the initiativep

- 5 -

Page 6: Developing a PM Best Practice Presentation · What You Will Learn ¾Benefits of a project management best practice ¾How to prepare the organization ¾A step‐by‐step approach

A Five‐Step Approach

And from theAnd from the beginning and throughout.....g

Communicate…Communicate... Communicate

- 6 -

Page 7: Developing a PM Best Practice Presentation · What You Will Learn ¾Benefits of a project management best practice ¾How to prepare the organization ¾A step‐by‐step approach

- 7 -

Page 8: Developing a PM Best Practice Presentation · What You Will Learn ¾Benefits of a project management best practice ¾How to prepare the organization ¾A step‐by‐step approach

Developing Roles and Competenciesp g p

What levels of project management roles exist within the organization?

Are the roles formal or informal?

What competencies are required in each of those roles, and what level of competency is 

i d?required?

- 8 -

Page 9: Developing a PM Best Practice Presentation · What You Will Learn ¾Benefits of a project management best practice ¾How to prepare the organization ¾A step‐by‐step approach

Assess Project Management Staff

Assess against those competencies• Technical project managementTechnical project management 

competencies

• Business and leadership competencies

• Personal competences• Personal competences

Subjective and objective assessments

Group and one‐on‐one interviews

Surveys of managers and other k h ldstakeholders

Data from internal resources on projectsprojects

- 9 -

Page 10: Developing a PM Best Practice Presentation · What You Will Learn ¾Benefits of a project management best practice ¾How to prepare the organization ¾A step‐by‐step approach

Develop Strategic Plans

Training programs• To reach short and long‐term goals

• To help project management staff progress against thcareer paths

CAPM®, PMP® , PgMP® certifications

Other credentials: Scheduling, Risk

Mentoring and coaching programs

Job shadowing options

- 10 -

Page 11: Developing a PM Best Practice Presentation · What You Will Learn ¾Benefits of a project management best practice ¾How to prepare the organization ¾A step‐by‐step approach

Support Your Project Management StaffSupport Your Project Management Staff

Internal Support Portal/Knowledge Base• Collaboration/information sharing forums

• Access to tools, templates, job aids, project management software

• Best practices knowledge base

• Resource library

• Listing of all organizational project resourcesListing of all organizational project resources

• Current and past project information – lessons learned

• Track project status 

M i t i j t h d l d b d t• Maintain project schedules and budgets

• Resource allocation

• Just‐in‐time learning components

- 11 -

Page 12: Developing a PM Best Practice Presentation · What You Will Learn ¾Benefits of a project management best practice ¾How to prepare the organization ¾A step‐by‐step approach

Measure the Value

Continuously measure the value that the project management practice brings to the organizationmanagement practice brings to the organization• Business Impact and ROI

Set key performance indicatorsSet key performance indicators• Time to market for products/services

• Use of budgeted moniesUse of budgeted monies

• Allocation of resources

• What else???  Think about what is important to your organization

Set your baseline against those KPIs and monitor• Every 6 months - 12 -

Page 13: Developing a PM Best Practice Presentation · What You Will Learn ¾Benefits of a project management best practice ¾How to prepare the organization ¾A step‐by‐step approach

Annually Re‐Assess and Re‐Evaluate

Re‐assess project management skills sets

Re‐evaluate competencies required for each project management role

R l i i dRe‐evaluate training and mentoring programs

- 13 -

Page 14: Developing a PM Best Practice Presentation · What You Will Learn ¾Benefits of a project management best practice ¾How to prepare the organization ¾A step‐by‐step approach

Incorporating Project Management Processes into the OrganizationProcesses into the Organization

What processes already exist• Fine‐tune and use them

Find your champions• Who supports the use of standardized processes

Start slow • Find project teams willing to use the new processes

• Capture lessons learned, make adjustments

P hPromote the successes• Via intranet

- 14 -

Page 15: Developing a PM Best Practice Presentation · What You Will Learn ¾Benefits of a project management best practice ¾How to prepare the organization ¾A step‐by‐step approach

Starting Your PMO

Start slowly – gain buy‐in

Use as a central resource for:• Processes/templates/tools

• Past project information

• Current project information

S j• Support on current projects

• Communication and problem solving forum for project team membersteam members

- 15 -

Page 16: Developing a PM Best Practice Presentation · What You Will Learn ¾Benefits of a project management best practice ¾How to prepare the organization ¾A step‐by‐step approach

The PMO

Begin to measure the effectiveness of the PMO• Support provided project managers

• Problems solved/conflicts resolved

• Consistency across all projects

• Improved teamwork/knowledge sharing

• Collect project performance data• Collect project performance data

- 16 -

Page 17: Developing a PM Best Practice Presentation · What You Will Learn ¾Benefits of a project management best practice ¾How to prepare the organization ¾A step‐by‐step approach

Example Case Study: Medium‐Sized Law FirmMedium Sized Law Firm

Tasked to doD t i j t t kill i d t• Determine project management skills required to ensure that projects are completed on time and within budgets allocated

• Projects include: IT, financial, process improvement initiatives, trial cases

• Provide skills training focused on the basics of projectProvide skills training focused on the basics of project management

• Provide support to individuals during project work

• Help develop project management processes

These individuals may never be PMPs or even formal project b h h j kill

- 17 -managers.…but they must have project management skills.

Page 18: Developing a PM Best Practice Presentation · What You Will Learn ¾Benefits of a project management best practice ¾How to prepare the organization ¾A step‐by‐step approach

Example Case Study: Objectives

Develop a project management mindset within the firm• Increase the likelihood of successful projects

l l• Implement strategic plans into practice

• Better monitor and control projects

• Proactively monitor risk• Proactively monitor risk

• Ensure a standard approach throughout the firm

• Share information/knowledgeShare information/knowledge

• Efficient utilization and tracking of resources

• Implementation of best practices and standard processes - 18 -

Page 19: Developing a PM Best Practice Presentation · What You Will Learn ¾Benefits of a project management best practice ¾How to prepare the organization ¾A step‐by‐step approach

Example Case Study: What Is Driving This Need?What Is Driving This Need?

Strategic projects to be completed to meet long term Firm objectives

Growth in Firm driving need for more formal processes

Focus on reducing costs and improving release i f k i i i itime of key initiatives

Ensuring success roll‐outs

Desire for a more formalized way of managing variety of projects

- 19 -

Page 20: Developing a PM Best Practice Presentation · What You Will Learn ¾Benefits of a project management best practice ¾How to prepare the organization ¾A step‐by‐step approach

Example Case Study:First StepsFirst Steps

Determine basic competencies needed for individuals responsible for managing projects• Time management

l k l d h d l• Develop a project task list and schedule

• Communicate with/managing stakeholders

• Develop and lead effective project teams• Develop and lead effective project teams

• Allocate resources effectively

• Manage to a budgetManage to a budget

Assess against those competencies• Online questionnaire and interviewsq

- 20 -

Page 21: Developing a PM Best Practice Presentation · What You Will Learn ¾Benefits of a project management best practice ¾How to prepare the organization ¾A step‐by‐step approach

Example Case Study:First Steps (cont.)First Steps (cont.)

Review success of past projects• Not formally tracked but knowledge around release time, roll out processes, budgeting

R i t (i f l) i lReview current (informal) processes in place throughout Firm

- 21 -

Page 22: Developing a PM Best Practice Presentation · What You Will Learn ¾Benefits of a project management best practice ¾How to prepare the organization ¾A step‐by‐step approach

Example Case Study:Executive OverviewExecutive Overview

Developed an executive overview for managing partners• Benefits of investing in project management 

l f d l f l d b• Value to Firm of developing a formalized best practice and processes/standards around project management

• The managing partner’s role in project managementThe managing partner s role in project management

• A “softer approach” to assessing individuals’ skills in project management

• Measuring the business impact and ROI of the best practice

- 22 -

Page 23: Developing a PM Best Practice Presentation · What You Will Learn ¾Benefits of a project management best practice ¾How to prepare the organization ¾A step‐by‐step approach

Example Case Study: Training and SupportTraining and Support

Developed a 5‐day project management training program plus a 3‐day general communication skills training program

d f d j• Increased comfort around project management

• Increased skills needed to manage major projects while performing daily rolewhile performing daily role

• Increased skills in gathering requirements from stakeholders and influencing others

• Included action planning component

- 23 -

Page 24: Developing a PM Best Practice Presentation · What You Will Learn ¾Benefits of a project management best practice ¾How to prepare the organization ¾A step‐by‐step approach

Example Case Study: Training and Support (cont.)Training and Support (cont.)

Developed mentoring program• Active for 3 months after program completed

Developed online support portal• Start of a PMO – central resource for all projects within firm

- 24 -

Page 25: Developing a PM Best Practice Presentation · What You Will Learn ¾Benefits of a project management best practice ¾How to prepare the organization ¾A step‐by‐step approach

Example Case Study: Support PortalSupport Portal

Provided a one‐source location for everything project l dmanagement related

• Collaboration/information sharing forum

• Access to tools/templates/processes

• Best practices knowledge base

• Listing of all project resources within the firm

• Current and past project information• Current and past project information

• Track project status

• Maintain project schedules and budgets

• Track available resources and resource allocation

• Examples of completed project plans and project plan components

- 25 -

Page 26: Developing a PM Best Practice Presentation · What You Will Learn ¾Benefits of a project management best practice ¾How to prepare the organization ¾A step‐by‐step approach

Example Case Study: Re‐assess and FindingsRe assess and Findings

Re‐assessed: 6 months, 9 months, 12 months• Follow up to action plans

• Online survey and interviews

• Reviewed progress of ongoing projectsReviewed progress of ongoing projects

Found• Improved teamwork

• Processes ensuring improved consistency across all projects

• Improved allocation of resources – no one overcommitted

U f t l i t t d i i• Use of portal consistent and increasing

• Project budgets better managed

• End results meets needs of stakeholders- 26 -

Page 27: Developing a PM Best Practice Presentation · What You Will Learn ¾Benefits of a project management best practice ¾How to prepare the organization ¾A step‐by‐step approach

Example: Wrapped up with a Business Impact and ROI StudyBusiness Impact and ROI Study

Collected baseline data on past projects

Data collection plan• Level 1: satisfaction survey

• Level 2: test administered to participants to measure learning from both classes

• Level 3: action plan follow up + questionnaires• Level 3: action plan follow up + questionnaires

• Level 4: collection of data for business impact

• Level 5: ROILevel 5: ROI

- 27 -

Page 28: Developing a PM Best Practice Presentation · What You Will Learn ¾Benefits of a project management best practice ¾How to prepare the organization ¾A step‐by‐step approach

Summary

Find your champion within the organization

Prepare the organization for the change – get the “buzz” going about the benefits and get people excited about the upcoming changes

Remember – constant communication

Take your time…it can’t happen overnight – start slow and build on the small successes

Always return and re‐evaluate – make adjustments/changes as needed