PLANNING & DEVELOPMENT
DEVELOPMENT APPLICATION
Proposed Farm Stay Accommodation 1060 Pinnacle Road, Canobolas
Prepared for Simon Rollin
February 2021
Ref: DA1PJB20070
343 Summer St, PO Box 1827, Orange NSW 2800 telephone 02 6361 2955, facsimile 02 6360 4700" mobile 0409 821 016, email [email protected] ob: 91 558 813 035
as nnmzsrrmmnrw: x rzm f» 5
TABLE OF CONTENTS
Section 1.0 1
THE APPLICATION 1
1.1 INTRODUCTION l 1.2 APPLICANT 2 1.3 OWNERSHIP 2 1.4 DOCUMENTATION 3
Section 2.0 4
THE SUBJECT LAND 4
2.1 LOCATION, TITLE AND ZONING .4 2.2 PROPERTY AND SITE DESCRIPTION .4 2.3 ROADS AND ACCESS 6 2.4 SERVICES 6 2.5 SURROUNDING DEVELOPMENT PATTERN 7
Section .0........... 8
THE PROPOSAL 8
3.1 PROPOSED CABINS 8 3.2 SITE WORKS 9 3.3 SERVICES 9
Section +.0 11
TOWN PLANNING CONSIDERATIONS 11
4.1 PROVISIONS OF ENVIRONMENTAL PLANNING INSTRUMENTS 11 4.1.1 Orange Local Environmental Plan 2011.. 11 4.1.2 State Environmental Planning Policy 55 - Remediation of Land 18
4.2 PROVISIONS OF DRAFT ENVIRONMENTAL PLANNING INSTRUMENTS 19 4.3 PROVISIONS OF DEVELOPMENT CONTROL PLANS 19 4.4 MATTERS PRESCRIBED BY THE REGULATIONS 23 4.5 THE LIKELY IMPACTS OF THE DEVELOPMENT 24
4.5.1 Visual Impact 24 4.5.2 Traffic Impacts 25 4.5.3 Air Quality 26 4.5.4 Water Quality 27 4.5.5 Noise 28 4.5.6 Solid Waste Management 29 4.5. 7 Privacy 29 4.5.8 Lighting 29 4.5.9 Potential Land Use Conflict.. 30 4.5.10 Biodiversity 30 4.5.11 Social and Economic lmpacts 32
4.6 THE SUITABILITY OF THE SITE FOR THE DEVELOPMENT 32 4.7 SUBMISSIONS IN ACCORDANCE WITH ACT OR REGULATIONS 32 4.8 THE PUBLIC INTEREST 32
Section 5.0 33
BUSHFIRE ASSESSMENT 33
5.1 VEGETATION AND SLOPE 33 5.2 ASSET PROTECTION ZONE 33 5.3 CONSTRUCTION REQUIREMENTS 34 5.4 BUSHFIRE PROTECTION MEASURES 35
5.4.1 Asset Protection Zone 35 5.4.2 Public Roads 35 5.4.3 Property Access 35 5.4.4 Fire Trails 36 5.4.5 Services 36 5.4.6 Bushfire Management Plan 36
Section 6.0 37
CONCLUSION 37
Annexure A Plans by Peter Basha Planning & Development
Annexure B Architectural Drawings by Cameron Anderson Architects
Annexure C Effluent Disposal Assessment by Envirowest Consulting
Annexure D Preliminary Contamination Investigation by Envirowest Consulting
Annexure E BASIX/NatHERS/ABSA
II
Section 1.0
THE APPLICATION
1.1 INTRODUCTION
This Development Application seeks approval for Farm Stay Accommodation
at 1060 Pinnacle Road, Orange.
The proposal involves the construction of five (5) free-standing cabins, including one that meets the Disability (Access to Premises - Buildings)
Standards 2010}.
INDICATIVE IMAGE
Source: Cameron Anderson Architects
The floor plan of each cabin is arranged as a studio with an open plan
sleeping/sitting/kitchenette zone that opens onto an external deck which
contains an outdoor bathtub. Each cabin includes a separate WC and shower.
Passive design concepts such as natural ventilation, daylight and seasonal solar access have been incorporated into the design to provide users with a high
level of amenity and thermal comfort whilst minimising energy use.
Appropriate rural architectural building materials, finishes and tones are proposed to ensure that the cabins achieve satisfactory visual integration with
the landscape.
The intention is to undertake the development in stages whereby Cabins 1, 3
and 5 would be completed as Stage 1; and Cabins 2 and 4 as Stage 2.
Peter Basha Planning & Development
Proposed Farm Stay Accommodation
1060 Pinnacle Road, Canobolas Page 2
The proposal is located in the heart of a local rural, natural and scenic tourism area where the attractions include Mount Canobolas, Lake Canobolas, The
Pinnacle; vineyards/cellar door premises; restaurants; orchards; road cycling
routes; and mountain bike trails.
The aim of the proposed cabins is to extend the experience for visitors to the
area by providing quality accommodation opportunities within easy reach of
these attractions.
Approval of the proposed development would enhance the diversity of enterprises that are being undertaken within the Orange local government
area and contribute to local rural tourism.
The proposed development has been designed, and can be managed, so that it does not generate an adverse impact on nearby development or the amenity
of the area. It is consistent with the zoning of the land and is considered an appropriate development in the context of the surrounding land use pattern.
This report:
• Describes the subject land and proposed development.
• Provides an assessment of the development pursuant to the relevant matters in Section 4.15 of the Environmental Planning & Assessment Act.
• Concludes that there are no aspects of the development that would
prevent approval of the application.
1.2 APPLICANT
Simon Rollin c/- Peter Basha Planning & Development
PO Box 1827 ORANGE NSW 2800
1.3 OWNERSHIP
Graham Stuart Rollin and Susan Ruth Rollin
1060 Pinnacle Road
CANOBOLAS NSW 2800
Peter Basha Planning & Development
Proposed Farm Stay Accommodation
1060 Pinnacle Road, Canobolas Page 3
1.4 DOCUMENTATION
The development application consists ofthis report; a completed Development Application form; and the attached plans and documentation:
Annexure A - Plans by Peter Basha Planning & Development
Figure 1
Figure 2 Figure 3 Figure 4
Location
Existing Boundaries and Site Detail Surrounding Development Pattern Slope and Vegetation Analysis
Annexure B - Architectural Drawings by Cameron Anderson Architects
Drawing DA00 Drawing DA0l Drawing DA02
Drawing DA03
Drawing DA04 Drawing DA0S
Drawing DA06 Drawing DA07
Drawing DA08
Cover Page
Schedules Location Plan Site Plan
Floor Plan - Typical Floor Plan - DDA
Roof Plans
Elevations Typical Sections
Annexure C
Effluent Disposal Assessment by Envirowest Consulting
Annexure D
Preliminary Contamination Investigation by Envirowest Consulting
Annexure E
BASIX/NatHERS/ABSA
Peter Basha Planning & Development
Section 2.0
THE SUBJECT LAND
2.1 LOCATION, TITLE AND ZONING
The subject land is located between Pinnacle Road and Stairs Road, approximately 6 kilometres to the south west of the Orange urban area (refer
below and Figure 1).
- I ORA.t'J9E
,r
SUBJECT LAND c. e
The address of the subject land is 1060 Pinnacle Road. The Real Property
description is Lot 1 DP 173254, Parish of Beneree and County of Bathurst.
The land is zoned E3 Environmental Management under the provisions of
Orange Local Environmental Plan 2011.
2.2 PROPERTY AND SITE DESCRIPTION
The subject land is a rural property with an area of 12.92 hectares. It is bounded by Stairs Road to the north, Pinnacle Road to the south west; and it adjoins
other rural properties to the south west and west.
The property has been cleared due to orcharding and grazing land uses. It comprises established orchard and pasture as depicted in the submitted aerial plan (refer Figure 2 and below). It is virtually devoid of native timber. Larger
trees extend along the south western and south eastern boundaries. Peter Basha
Planning & Development
Proposed Farm Stay Accommodation
1060 Pinnacle Road, Canobolas Pa e 5
The land falls from west to the east and southeast. The slopes to the east are
generally long and gradual and become slightly steeper falling south. Elevation ranges from 1116m AHD at the western boundary down to 1074m at the
eastern down to 1066m along the south eastern boundary.
Drainage of the land is via the natural surface. It is not affected by any
watercourses.
The land comprises an existing dwelling which is located in the eastern corner
near the intersection of Stairs Road and Pinnacle Road.
The property operates predominantly as an orcharding enterprise supported by well-established orchard; packing shed; machinery shed; and irrigation
system. The non-orchard areas are under pasture.
The site for the proposed cabins is located on the elevated western section of
the property. It has been selected for the following reasons:
• It is elevated with a north easterly aspect. It offers expansive views to the north and east to maximise amenity and outlook for guests.
• The site is well drained and not affected by native timber or watercourses. The terrain is relatively gentle and will not require significant earthworks
to establish the cabins.
• It is well separated from surrounding dwellings. In particular, the well established trees along the southern boundary provides an effective screen
between the development site and the nearest residential neighbour. Peter Basha
Planning & Development
Proposed Farm Stay Accommodation
1060 Pinnacle Road, Canobolas Page 6
• The site is on land that is no longer used for orchard. As such, it will not conflict with the day to day operation of the orchard and nor will it reduce
agricultural production.
• The site can be reasonably accessed from a new entrance that is to be constructed on the Pinnacle Road frontage of the site. In this regard,
Council has already granted a Road Opening Permit (ref. 230-2020) to
construct a new access at the location depicted in the submitted site plan. The internal route between the new access and the development site is not
unreasonably constrained by the topography.
2.3 ROADS AND ACCESS
Pinnacle Road is bitumen sealed roadway which allows one traffic lane in each
direction. It is identified in Orange LEP 2011 as a Classified Road.
Stairs Road is a gravel surface roadway and provides vehicle access to the
subject land at three locations to serve the orchard and sheds.
The existing dwelling obtains separate access at the intersection of Stairs Road
and Pinnacle Road.
Presently, the subject land does not have direct vehicle access onto Pinnacle
Road. However, as mentioned above Road Opening Permit (ref. 230-2020) grants approval to construct a new access at the location depicted in the submitted site plan. As part of the application for this permit, Council staff
were made aware and acknowledged that the new access was intended to
serve the proposed cabins.
2.4 SERVICES
Water supply for the subject land and other properties in the area is provided
via on site means (tanks, dams and bores).
Effluent disposal is undertaken via on site means.
There is no piped stormwater system that services the area. Stormwater generally is either captured on site for water supply or returned to the rural
catchment via natural channels and roadside drainage lines and culverts.
Telephone and electricity services are connected to the subject land. Peter Basha
Planning & Development
Proposed Farm Stay Accommodation 1060 Pinnacle Road, Canobolas age
2.5 SURROUNDING DEVELOPMENT PATTERN
The surrounding land use pattern is depicted in Figure 3 and below.
Land use on properties adjacent to the subject land includes:
• Timbered land to the north west; grazing land to the north; and orchards to the north east; all on the opposite side of Stairs Road. There is one dwelling to the north west within the timbered property. Another dwelling
is north within a concessional/rural residential lot.
• Orchards and a dwelling exist to the south east on the opposite side of
Pinnacle Road.
• A dwelling exists on a lifestyle lot that adjoins the south western boundary of the subject land. There is a dense row of established trees that lie
between this dwelling and the proposed cabins.
• An olive grove is on the adjoining property to the west of the subject land. The dwelling associated with that property is further west.
On a broader scope, the land use pattern comprises a mix of small to moderate
size rural properties with rural dwellings. Some of the properties are used for orchard purposes, while others for small scale grazing.
Peter Basha Planning & Development
Section 3.0
THE PROPOSAL
3.1 PROPOSED CABINS
The proposal involves the construction of five (5) free-standing cabins, including one that meets the Disability {Access to Premises - Buildings)
Standards 2010).
The proposed cabins are to be located within the subject land as depicted in the submitted site plan.
The siting of the cabins has been influenced by the following considerations:
• Enhance the visitor experience by optimising the outlook from each cabin to the rural landscape to the north east; whilst at the same time,
orientating each cabin to achieve effective solar access and seasonal protection.
• Maintain privacy, not only between the cabins but also in relation to surrounding development.
• Ensure the cabins sit below the ridge to assist with visual integration.
The cabins have been designed with a modest footprint and low profile roof roofline. The proposed external finishes are as follows:
• Walls - masonry in a light grey and sand colour/finish plus sheet metal cladding in Colorbond Monument (dark grey) colour.
• Roof- metal sheet in Colorbond Monument (dark grey) colour.
• Doors and windows -timber framing.
• Timber decking.
The floor plan of each cabin is arranged as a studio with an open plan sleeping/sitting/kitchenette zone that opens onto an external deck which contains an outdoor bathtub. Each cabin includes a separate WC and shower.
Peter Basha Planning & Development
Proposed Farm Stay Accommodation
1060 Pinnacle Road, Canobolas Page 9
Passive design concepts such as natural ventilation, daylight and seasonal solar
access have been incorporated into the design to provide users with a high level of amenity and thermal comfort whilst minimising energy use.
Each cabin offers self-contained; self-catered farm stay accommodation. Typical use involves short stays by guests who can experience the rural setting
and observe a working orchard enterprise.
The development provides the opportunity for visitors to tour the Orange urban area and the nearby tourist attractions.
The management of the cabins will be as follows:
• On-line booking.
• Cleaning/maintenance by the operator or their contractor.
• General monitoring by the property owner.
3.2 SITE WORKS
The proposal involves the following site works:
• Construction of a new internal driveway that will extend from the new access onto Pinnacle Road (already approved pursuant to Road Opening
Permit 230-2020) to the proposed cabins. The driveway will be constructed to an all-weather gravel surface and will lead to a parking space in the vicinity of each cabin.
• Construction of an accessible path of travel to service the proposed accessible cabin.
• Installation of the on-site effluent disposal system which will comprise a submerged secondary wastewater treatment system and subsurface irrigation lines in the nominated drain field.
3.3 SERVICES
Effluent disposal will be undertaken on-site. An effluent disposal assessment is
included in Annexure C of this report.
Peter Basha Planning & Development
Proposed Farm Stay Accommodation
1060 Pinnacle Road, Canobolas Page 10
The proposed water supply system will comprise at least a 20,000 litre
rainwater tank attached to each cabin (of which 10,000 litres will be reserved
for firefighting purposes. Each tank will collect rainwater from the respective cabin roof. The tanks will be topped up as needed from an existing 50,000
water tank within the property.
Telephone and electricity services are available for connection.
Stormwater not captured on site for water supply purposes will be returned to
the rural catchment in a non-erosive manner.
Peter Basha Planning & Development
Section +.0
TOWN PLANNING CONSIDERATIONS
In determining the application, Council must take into consideration the relevant matters under section 4.15 of the Environmental Planning and Assessment Act, 1979.
These are assessed below.
4.1 PROVISIONS OF ENVIRONMENTAL PLANNING INSTRUMENTS
4.1.1 Orange Local Environmental Plan 2011
Orange Local Environmental Plan 2011 (the LEP) applies. The relevant
provisions are considered below.
LEPMapping
The subject land is identified on Orange Local Environmental Plan 2011 mapping on sheets numbered 004. Consideration of the LEP mapping matters
is provided in the table below.
LEP Matter Comment
Land Zoning Map E3 Environmental Management
Lot Size Map 100 hectares (not relevant to this proposal)
Heritage Map Not within a Conservation Area.
No heritage items in vicinity.
Height of Buildings Map No building height limit
Floor Space Ratio Map No floor space limit
Terrestrial Biodiversity Map No mapped biodiversity sensitivity on site
Peter Basha Planning & Development
Proposed Farm Stay Accommodation
1060 Pinnacle Road, Canobolas Page 12
LEP Matter Comment
Groundwater Vulnerability Map Groundwater vulnerable
Drinking Water Catchment Map Within a drinking water catchment
Watercourse Map No sensitive waterway in vicinity
Urban Release Area Map Not within an urban release area
Obstacle Limitation Surface Map Not applicable
Additional Permitted Uses Map Not applicable
Flood Planning Map Not a flood planning area
Zoning
The land is zoned E3 Environmental Management. The objectives of the E3 zone are:
• To protect, manage and restore areas with special ecological, scientific, cultural or aesthetic values.
• To provide for a limited range of development that does not have an adverse effect on those values.
• To manage development within water supply catchment lands to conserve and enhance the city and district's water resources.
• To maintain the rural function and primary production values of the area.
• To ensure development along the Southern Link Road has alternative access.
Peter Basha Planning & Development
Proposed Farm Stay Accommodation
1060 Pinnacle Road, Canobolas Pa e 13
There are no aspects of the proposed development that are adverse to the
zone objectives. In particular:
• The proposal is consistent with the first and second stated objectives in that it does not adversely affect any area of special ecological, scientific,
cultural or aesthetic value.
• In consideration of the third stated objective, the proposal will adopt the measures outlined in Section 4.5.4 of this report to maintain water quality
within the City's drinking water catchment.
• In consideration of the fourth stated objective, the rural and primary
production function of the area will be maintained. In this regard the proposed cabins are sited so as to not intrude on existing rural activities
within or around the subject land.
• The fifth stated objective pertaining to the Southern Link Road is not
relevant to this proposal.
Permissibility
The proposal is defined as farm stay accommodation which according to the
LEP Dictionary means a building or place that provides temporary or short-term accommodation to paying guests on a working farm as a secondary business to primary production.
According to the Land Use Table in the LEP farm stay accommodation is
permissible in the E3 Zone subject to receiving to the development consent of
Council.
The proposal is consistent with the LEP definition due to the following:
• By their very design, the proposed cabins are solely for temporary or short
term accommodation for paying guests.
• The primary use of the subject land is as a working farm. The subject land operates as an orchard enterprise as evidenced by the well-established
orchard trees over much of the property along with substantial agricultural
infrastructure, including the packing shed; cool rooms; and irrigation
system.
Peter Basha Planning & Development
Proposed Farm Stay Accommodation 1060 Pinnacle Road, Canobolas Page 14
• The proposed farm stay accommodation is secondary to the primary
production business due to the following:
- The proposed cabins do not unreasonably encroach upon or limit the
continued agricultural use of the subject land.
- The fruit production enterprise requires greater management, activity
and input than the proposed farm stay accommodation.
- Considerable infrastructure has been invested to support the fruit
production enterprise, including the orchard areas themselves; the buildings; plant and equipment; water supply system; and other
relevant infrastructure.
Clause 1.2 Aims of Plan
The aims of the LEP are as follows:
a) to encourage development that complements and enhances the unique
character of Orange as a major regional centre boasting a diverse economy and offering an attractive regional lifestyle,
b) to provide for a range of development opportunities that contribute to the social, economic and environmental resources of Orange in a way that
allows the needs of present and future generations to be met by implementing the principles of ecologically sustainable development,
c) to conserve and enhance the water resources on which Orange depends, particularly water supply catchments,
d) to manage rural land as an environmental resource that provides economic
and social benefits for Orange,
e) to provide a range of housing choices in planned urban and rural locations
to meet population growth,
f) to recognise and manage valued environmental heritage, landscape and scenic features of Orange.
In consideration of the LEP aims, the following comments are provided in
support of the development:
Peter Basha Planning & Development
Proposed Farm Stay Accommodation
1060 Pinnacle Road, Canobolas Page15
• General Aim (a) - There are no aspects of the proposal that detract from the character of Orange as a major regional centre
• General Aim (b) - The proposal would have a neutral to positive effect in terms of the social, economic and environmental resources of the City.
There are no aspects ofthe proposal that would compromise the principles
of ecologically sustainable development.
• General Aim (c) - There are no aspects of the proposal that would represent a direct threat to the City's water resources.
• General Aim (d) -- The management of rural land as an environmental
resource is not relevant to this proposal.
• General Aim (e) -- The proposal has no impact on the City's range and supply
of housing choices.
• General Aim (f) -- There are no aspects of the proposal that would adversely
affect the value of heritage, landscape and scenic features of the City.
Clause 5.4 Controls Relating to Miscellaneous Permissible Uses
Pursuant to Clause 5.4(5) development for the purposes of farm stay accommodation must consist of no more than 5 bedrooms.
The proposed development complies with this requirement.
Clause 7.6 Groundwater vulnerability
The subject land is defined on the Orange Local Environmental Plan 2011
Water Map as having groundwater vulnerability. Clause 7.6 of the LEP provides
as follows:
1) The objectives of this clause are to maintain the hydrological functions of key groundwater systems and to protect vulnerable groundwater resources from depletion and contamination as a result of inappropriate
development.
2) This clause applies to land identified as "Groundwater Vulnerability" on the
Groundwater Vulnerability Map.
Peter Basha Planning & Development
Proposed Farm Stay Accommodation
1060 Pinnacle Road, Canobolas Page 16
3) Before determining a development application for development on land to
which this clause applies, the consent authority must consider:
a) whether or not the development (including any on-site storage or disposal of solid or liquid waste and chemicals) is likely to cause any
groundwater contamination or have any adverse effect on
groundwater dependent ecosystems, and
b) the cumulative impact (including the impact on nearby groundwater extraction for potable water supply or stock water supply) of the
development and any other existing development on groundwater.
4) Development consent must not be granted to development on land to which this clause applies unless the consent authority is satisfied that:
a) the development is designed, sited and will be managed to avoid any significant adverse environmental impact, or
b) if that impact cannot be reasonably avoided-the development is
designed, sited and will be managed to minimise that impact,
c) if that impact cannot be minimised-the development will be managed to mitigate that impact.
The potential impacts on groundwater resources are addressed as follows:
• An on-site effluent disposal assessment has been prepared in accordance with Australian Standard 1547, On-site domestic wastewater management, and the Environment and Health Protection Guidelines, On
site sewage management for single households (1998), Department of Urban Affairs and Planning. The assessment is included as Annexure C and
recommends a system to ensure that the application, treatment and
disposal of effluent is undertaken in a satisfactory manner.
• The proposed use does not involve the production, storage or disposal of large quantities of other liquid wastes or chemicals, and none that would easily find their way to groundwater resources.
Clause 7. 7 - Drinking water catchments
According to the Orange Local Environmental Plan 2011 --Drinking Water
Catchment Map the subject land is within the City's drinking water catchment.
Peter Basha Planning & Development
Proposed Farm Stay Accommodation
1060 Pinnacle Road, Canobolas Page 17
Clause 7.7 of the LEP provides as follows:
1) The objective of this clause is to protect drinking water catchments by
minimising the adverse impacts of development on the quality and quantity of water entering drinking water storages.
2) This clause applies to land identified as "Drinking water" on the Drinking
Water Catchment Map.
3) Before determining a development application for development on land to which this clause applies, the consent authority must consider whether or
not the development is likely to have any adverse impact on the quality and quantity of water entering the drinking water storage, having regard to:
a) the distance between the development and any waterway that feeds into the drinking water storage, and
b) the on-site use, storage and disposal of any chemicals on the land, and
c) the treatment, storage and disposal of waste water and solid waste generated or used by the development.
4) Development consent must not be granted to development on land to which this clause applies unless the consent authority is satisfied that:
a) the development is designed, sited and will be managed to avoid any significant adverse impact on water quality and flows, or
b) if that impact cannot be reasonably avoided-the development is
designed, sited and will be managed to minimise that impact, or
c) if that impact cannot be minimised-the development will be managed to mitigate that impact.
Measures to protect water quality are provided in Section 4.5.5 of this report.
Clause 7.11- Essential services
Clause 7.11 states that development consent must not be granted to
development unless the consent authority is satisfied that any of the following services that are essential for the proposed development are available or that
adequate arrangements have been made to make them available when required:
Peter Basha Planning & Development
Proposed Farm Stay Accommodation
1060 Pinnacle Road, Canobolas Page 18
a) the supply of water,
b) the supply of electricity,
c) the disposal and management of sewage,
d) storm water drainage or on-site conservation,
e) suitable road access.
The proposed development will satisfy the requirements of this clause and
Council's normal requirements pertaining to the servicing of development and the provision of road access.
4.1.2 State Environmental Planning Policy 55 - Remediation of Land
Clause 7(1) of SEPP 55 Remediation of Land provides that a consent authority
must not consent to the carrying out of any development on land unless:
a) It has considered whether the land is contaminated, and
b) If the land is contaminated, it is satisfied that the land is suitable in its
contaminated state (or will be suitable, after remediation) for the purpose for which the development is proposed to be carried out, and
c) If the land requires remediation to be made suitable for the purpose for which the development is proposed to be carried out, it is satisfied that the
land will be remediated before the land is used for that purpose.
A preliminary contamination investigation of the development site has been undertaken (refer Annexure D). The objective was to identify past potentially
contaminating activities, identify potential types of contamination, discuss the site condition, provide a preliminary assessment of site contamination and assess the need for further investigation to determine suitability for the proposed land use.
Soil samples were collected from across the development area for analysis of metals and organochlorine pesticides.
The investigation found as follows:
The site has a land-use history of orcharding. No sheds, pesticide mixing or filling areas were located within the site.
Peter Basha Planning & Development
Proposed Farm Stay Accommodation
1060 Pinnacle Road, Canobolas Page 19
Vegetation cover on the site was dominated by pasture grasses, capeweed, rye grass, phalaris and clover. Orchards comprising cherries and olives were identified to the north, east and west with large pine trees to the south. Vegetation cover within the investigation area was 100%.
No evidence of mines, sheep dips, mixing sheds or contaminating industrial activities were identified on the site from the review of site history and site walkover. The use of agricultural pesticides over the area in the past is expected to be low.
Levels of copper and zinc exceeded the Ell for residential land-use. Potential ecological receptors identified in the conceptual site model was vegetation. Vegetation on the site did not show signs of stress or impact from copper and zinc levels in the soil. Levels of copper and zinc in the soil are not expected to impact on vegetation.
The investigation made the following conclusions:
The levels of all other assessed potential contaminants in the soil samples were below the residential land-use thresholds (NEPC 1999).
No further investigations are required.
The investigation area is suitable for the proposed land-use.
4.2 PROVISIONS OF DRAFT ENVIRONMENTAL PLANNING INSTRUMENTS
There are no known draft regional, state or local planning instruments that are likely to affect the subject land or development.
4.3 PROVISIONS OF DEVELOPMENT CONTROL PLANS
Orange Development Control Plan 2004 (the DCP) sets certain Planning Outcomes to cover a range of development types and issues.
There are certain DCP matters that are relevant to this proposal. These are considered below:
Peter Basha Planning & Development
Proposed Farm Stay Accommodation
1060 Pinnacle Road, Canobolas Page 20
PO 12.1-1 PLANNING OUTCOMES - GENERAL CONTROLS IN WATER SUPPLY CATCHMENTS
1. Development proposals clearly demonstrate measures that are to be instituted to minimise impacts on the quality and availability of water resources for public water-supply use.
The above Planning Outcome is addressed in Section 4.5.4 of this report.
PO 15.6-1 PLANNING OUTCOMES - OFF-STREET CAR PARKING
1. Adequate off-street car parking is provided in accordance with the Table or, alternatively, according to an assessment that demonstrates peak-parking demand based on recognised research.
2. Car-parking areas are designed according to Australian Standard.
3. Car-park areas include adequate lighting and landscaping (preferably deciduous shade trees), which provides for the personal security of users.
4. Bicycle-parking facilities are provided according to the relevant Australian Standard.
5. Facilities for loading and unloading of commercial vehicles are provided according to the relevant Australian Standard.
In consideration of the above Planning Outcomes:
• Planning Outcome 1 - The DCP Table requires parking for tourist
accommodation to be provided at the rate of 1 space per unit or bedroom. As such, the proposed 5 x 1 bedroom cabins generate a parking requirement of 5 spaces. As indicated in the attached site plan, a total of 5
spaces will be provided, including 1 accessible space.
• Planning Outcome 2 - The car parking spaces will be provided in
accordance with Australian Standard.
• Planning Outcome 3-Car parking spaces can be adequately illuminated by low level lighting associated with each cabin. Site landscaping can be
provided so as to maintain passive surveillance/security. Peter Basha
Planning & Development
Proposed Farm Stay Accommodation
1060 Pinnacle Road, Canobolas
• Planning Outcome 4- Given the nature of the proposed development, formal bicycle parking is not warranted. Notwithstanding, there is ample opportunity for bicycles to be parked within the site.
• Planning Outcome 5- Only light service vehicles and cars are likely to be associated with the cabins. These vehicles can be accommodated in the
proposed driveway and parking areas.
PO 0.4-11 INTERIM PLANNING OUTCOMES - TRANSPORT ROUTES
1. The development provides a high standard of visual appeal to motorists, cyclists and pedestrians as well as adjoining property owners.
2. The visual appearance of the development, including any signage, lighting or other ancillary element, must not generate a distraction to motorists.
3. Any signage must not be animated whether by movement or flashing lights.
4. Where land has more than one street frontage the street with the lower volume of traffic is to provide the principal access to the development, subject to safety considerations.
5. Where access is provided onto an arterial road, distributor road or major collector road, the access point must have appropriate safe sight distances for the prevailing speed limit and clear and unimpeded entrance/exit signage must be displayed.
6. Where on-site customer parking is provided that is not immediately visible from a public road clear and unimpeded directional signage must be displayed.
7. Where the proposal is residential, or another noise sensitive form, appropriate noise mitigation measures to limit the development from traffic noise must be demonstrated.
Pinnacle Road is identified in Orange LEP 2011 as a Classified Road. As such the proposal represents development along a transport route which is subject to the above Planning Outcomes. The proposal is considered satisfactory as
follows:
• Planning Outcome 1-The proposed development has a high standard of visual appeal with buildings that are designed to integrate with the
landform and rural setting.
Peter Basha Planning & Development
Proposed Farm Stay Accommodation
1060 Pinnacle Road, Canobolas Pa e 22
• Planning Outcome 2- There are no visual aspects of the development that would pose a distraction to motorists, cyclists or adjoining property
owners.
• Planning Outcome 3- There is no signage proposed by this development
application.
• Planning Outcome 4-Although Stairs Road would experience lower traffic
volumes compared to Pinnacle Road, it is not suitable to provide safe access to and from the development. This is largely due to the poor driver
sightlines at its intersection with Pinnacle Road.
• Planning Outcome 5 - The proposed access point on Pinnacle Road has been approved by Council pursuant to Road Opening Permit (ref. 230
2020).
• Planning Outcome 6 -Appropriate signage can be provided to direct visitors to the cabins and parking areas.
• Planning Outcome 7--The proposed cabins are not expected to be affected by traffic noise due to the generous setback from Pinnacle Road and the
relatively modest traffic volumes associated with that road.
PO 10.3-1 PLANNING OUTCOMES - DEVELOPMENT NEAR MAJOR ROADS
1. Development on land fronting and visible from a major road or distributor road provides for quality design on the highway and/or distributor road through landscaping, building setbacks fa~ade design, external colours and materials and siting.
2. Residential buildings address potential noise impacts in design from adjacent main roads.
3. Direct access to major roads is limited and is constructed to the requirements of the relevant roads authority.
4. Residential lots are set back from planned distributor roads to provide a reasonable separation between future roads and residential land.
5. Where direct access to a main or arterial road is denied by the Roads Authority and comprises residential subdivision, any rear or side fences are set back and screened with dense landscaping.
Peter Basha Planning & Development
Proposed Farm Stay Accommodation
1060 Pinnacle Road, Canobolas Page 23
6. Commercial buildings adjoining a distributor road are setback from the property boundary by at least 10m.
7. Lighting and signage visible from a distributor road is not animated and is designed so as not to distract motorists beyond glance recognition.
Pinnacle Road is identified in Orange LEP 2011 as a Classified Road. As such the proposal represents development along a major road which is subject to the
above Planning Outcomes. The proposal is considered satisfactory as follows:
• Planning Outcome 1- The proposed development has a high standard of
visual appeal with buildings that are designed to integrate with the landform and rural setting. Existing and future landscaping will assist further in this regard.
• Planning Outcome 2-The proposed cabins are not expected to be affected by traffic noise due to the generous setback from Pinnacle Road and the
relatively modest traffic volumes associated with that road.
• Planning Outcome 3- The proposed access point on Pinnacle Road has
been approved by Council pursuant to Road Opening Permit (ref. 230- 2020).
• Planning Outcome 4-Not relevant.
• Planning Outcome 5-Not relevant.
• Planning Outcome 6- Not relevant.
• Planning Outcome 7 - There is no signage proposed by this development application. External lighting around the cabins will be provided so that it is low level and subdued so as to not pose a distraction to motorists or surrounding development.
4.4 MATTERS PRESCRIBED BY THE REGULATIONS
The Environmental Planning and Assessment Regulation 2000 prescribes certain matters that must be considered by Council in determining a
development application. The following information is provided in respect of the relevant prescribed matters:
Peter Basha Planning & Development
Proposed Farm Stay Accommodation
1060 Pinnacle Road, Canobolas ------~-------------------·---···- Page 24
Demolition of a Building (Clause 92)
Not applicable as the proposal does not involve demolition.
Fire Safety Considerations (Clause 93)
Not applicable. This clause applies to a development application that involves a change of building use for an existing building, where the applicant does not seek the rebuilding, alteration, enlargement or extension of a building.
Buildings to be Upgraded {Clause 94)
Not applicable. This clause only applies to a development application for development comprising the rebuilding, alteration, enlargement or extension
of an existing building.
BASIX Commitments {Clause 97A)
BASIX/NatHERS/ABSA documentation is provided in Annexure E.
4.5 THE LIKELY IMPACTS OF THE DEVELOPMENT
The proposal is unlikely to generate any impacts that would adversely affect
the quality of the environment of the locality. The potential impacts of the development are considered below.
4.5.1 Visual Impact
The visual quality of the area is attractive due to the rural setting; the variable
topography; existing vegetation; and the level of visual integration that has generally been achieved for existing development. The proposed development
is considered satisfactory in terms of visual impact due to the following.
• The cabins are modest in bulk and scale and are to be positioned below the ridgeline and partially buried into the slope. With the skillion roof line, the overall appearance will be low-profiled buildings that are sympathetically
tied into the landform.
• The proposed masonry walls in a neutral tone; the darker roof and wall
sheeting; and the timber framing represent an appropriate selection of
Peter Basha Planning & Development
Proposed Farm Stay Accommodation
1060 Pinnacle Road, Canobolas Page 25
external materials and finishes that complement the rural landscape and
assist with visual integration.
• The established vegetation to the south of the cabin site and also along the Pinnacle Road frontage of the property provide reasonable screening of the
development, particularly in views along the Pinnacle Road view corridor.
4.5.2 Traffic Impacts
The potential for traffic impacts relates mainly to:
• The capacity of the local road network to accommodate vehicles associated with the proposed use; and
• The ability for vehicles to enter, exit and use the site without disruption to traffic flow along Pinnacle Road.
Traffic Generation
Traffic increases attributed to the development are expected to be modest. The proposal represents short stay tourist accommodation. As such, key
activity is expected to occur predominantly around weekends and generally outside the normal peak hour traffic conditions of Monday to Friday.
By its very nature, traffic associated with the development would typically involve light vehicles (cars).
Adequacy of Road Network
The primary route to the development is via Pinnacle Road which is a sealed
classified road with one traffic lane in each direction. It serves local properties and also forms part of a tourist loop from Orange to local attractions including Lake Canobolas; Mount Canobolas; the Pinnacle Lookout; and various
vineyards; cellar door premises; and food and drink premises.
The proposed development is expected to represent a modest proportion of the traffic that this road is subject to. In the context of its current standard and
current level of use, Pinnacle Road is considered suitable to accommodate the
additional traffic generated by the proposed development. It is expected that traffic from the development would achieve reasonable integration with existing traffic volumes without adverse impact upon the capacity of this road.
Peter Basha Planning & Development
Proposed Farm Stay Accommodation
1060 Pinnacle Road, Canobolas Page 26
Access, Internal Layout and Servicing
The proposed development is considered satisfactory in terms of access, internal layout and servicing. In this regard:
• Access to the subject land is to be provided via a new entrance onto Pinnacle Road. This access has already been approved by Council pursuant
to Road Opening Permit 203-2020.
• The new access will have an open gate so that vehicles can move directly to the site without having to stop and obstruct passing vehicles along Pinnacle Road.
• An internal all-weather driveway will be constructed from the new access to the proposed cabins and adjacent parking areas.
• Vehicles entering and exiting the property via the Pinnacle Road access are able to do so in a forward direction at all times.
• Only light service vehicles are likely to be associated with the cabins. These vehicles can be accommodated in the proposed driveway and parking areas.
Parking Provision
As stated earlier in this report (Section 4.3) the proposed development
provides off-street parking in accordance with Orange DCP 2004 - 15 Car Parking.
4.5.3 Air Quality
Due to the existing land use pattern and the lack of noxious atmospheric discharges it is assumed that air quality in the locality is good. The potential
impacts on air quality are proposed to be addressed as follows:
• The proposed development does not involve any processes or activities that would affect the area in terms of dust, odour or other atmospheric discharges in the long term.
• Within the site, vehicle movements over the compacted gravel driveway will be encouraged to adopt slow speeds and responsible driving practices to minimise the potential for raised dust.
Peter Basha Planning & Development
Proposed Farm Stay Accommodation
1060 Pinnacle Road, Canobolas Page 27
• Reasonable separation exists between the vehicle areas of the proposed development and surrounding dwellings.
4.5.4 Water Quality
The proposed development can be managed so as to avoid adverse impacts upon water quality. Measures to maintain water quality are outlined below.
Effluent Disposal
The treatment of wastewater from the cabins has been considered in the On site Effluent Management Study by Envirowest Consulting (refer Annexure C).
The Study recommends a secondary wastewater treatment system with disposal to be undertaken via surface or subsurface irrigation within a
minimum area of 807m2.
The Study has assessed an area of some 2,000m2 within the subject land as being suitable to accommodate the required irrigation area of 807m2 and states the following:
• Construction of the treatment and application systems is to be in accordance with AS1547.
• Gypsum should be applied to the application area during construction and
every two years to maintain permeability and reduce topsoil dispersion.
• Secondary treatment systems require regular maintenance to ensure effective operation. Maintenance scheduling should be undertaken in
accordance with manufacturers and NSW Health guidelines.
• Fencing should be erected around the application/irrigation area to prevent access. Signage should be displayed indicating the area of treated effluent.
Provided the wastewater management system is provided in accordance with the recommendations of the Study, it is expected that this aspect of the development would not impact upon water quality.
Storm water
Stormwater that is not captured for drinking water and firefighting purposes
will be returned to the rural catchment in a non-erosive manner.
Peter Basha Planning & Development
Proposed Farm Stay Accommodation
1060 Pinnacle Road, Canobolas Page 28
In this regard the following measures may mitigate potential impacts:
• Implement appropriate erosion and sediment control devices.
• Tank overflows to be discharged via a dissipater or spreader to prevent
scouring.
• Provide appropriate drains from driveway and hard stand areas with
adequate scour protection measures as required.
Groundwater
The on-site disposal of treated wastewater is not constrained by groundwater
resources. In this regard, the Study by Envirowest Consulting states:
No groundwater bores are known to be located within 100m of the investigation area. Five registered groundwater bores were identified within 500m of the site on the NSW Government Water NSW website {2020}. Bores in the locality are licensed for irrigation, domestic and stock use. Water-bearing zones {WBZs} were from 10.4m to 170.5m and standing water levels (SWL) from 32m. No impact on groundwater is expected from the application of effluent on the site.
Erosion and Sedimentation
Erosion and sediment control devices are to be placed during the earthworks
and construction phase. Retention of existing vegetative cover around the
disturbed areas would reduce mass movement of sediment.
Immediately after works have been completed the exposed areas should be re-sown with appropriate grass species. The erosion and sediment control
devices installed at the construction phase should remain in place until stabilisation and revegetation of the exposed areas has occurred.
4.5.5 Noise
The ambient noise levels of the locality are considered typical of most rural
areas where agricultural production takes place. Noise in this area would be
attributed to:
• Vehicle movement along Pinnacle Road, Stairs Road and property
driveways.
Peter Basha Planning & Development
Proposed Farm Stay Accommodation
1060 Pinnacle Road, Canobolas Page 29
• Operation of equipment and vehicles (tractors, spray carts etc) associated with agricultural activities in the area.
The proposed development would not generate noise that is additional to or uncharacteristic of the area. In this regard:
• By its very nature, farm stay accommodation is not considered to be a noise generating use.
• The cabins are well separated from the external boundaries of the site and sensitive receivers (surrounding dwellings).
4.5.6 Solid Waste Management
It is expected that the proposed use would only generate modest quantities of domestic waste such as paper, plastic and glass containers, bottles, cans and
kitchen/food waste.
Wastes generated by the use will be stored appropriately, ready for
collection/transport to Council's Waste Depot for recycling or disposal.
4.5. 7 Privacy
The proposed development is not likely to generate unreasonable impacts in
terms of visual and acoustic privacy.
In terms of visual privacy, the established vegetation, variable topography and separation from surrounding dwellings prevents direct line of sight between
the proposed cabins and the nearest dwellings.
The generous physical separation that exists between the development and
the nearest dwellings which lie to the south would ameliorate potential impacts in regard to acoustic privacy.
4.5.8 Lighting
The aim is to provide effective illumination of the site and cabins without causing light scatter or disturbance to neighbours. To this end, lighting will be
affixed to each cabin; directed downwards; and will be of low illumination.
Peter Basha Planning & Development
Proposed Farm Stay Accommodation
1060 Pinnacle Road, Canobolas Page 30
4.5.9 Potential Land Use Conflict
The proposed development can be designed and managed so as to not cause unreasonable impact upon surrounding land uses.
The proposed cabins are well separated from surrounding dwellings and therefore will not impact upon their residential amenity, particularly in regard
to noise and privacy.
There is potential for land use conflict to occur between the proposed cabins
and the olive grove to the west (particularly in regard to the use of agricultural sprays). However, the following situation may ameliorate the potential
impacts:
• The nearest cabin is sited some 30 metres away from the edge of the olive
grove. As such there is some physical separation provided.
• It is understood that the olives do not require frequent spraying and there are low toxicity spray options that can be used.
• As has been the case to date, spraying within the olive grove is conducted in a manner that does not cause damage to the existing cherry orchard
within the subject land and vice versa. As a consequence, this mutual approach would also serve to minimise the potential for spray impacts upon the proposed cabins.
• In any case it is the responsibility of a landowner to limit the potential for
spray drift to escape their property boundary by adopting safe spraying practices and not spraying in adverse weather conditions.
4.5.10 Biodiversity
Section 1.7 of the Environmental Planning & Assessment Act, 1979 requires consideration of Part 7 of the Biodiversity Conservation Act, 2016 in relation to terrestrial environments; and Part 7 A of the Fisheries Management Act,
1994 in relation to aquatic environments. The proposal does not involve an aquatic environment. As such, only the Biodiversity Conservation Act, 2016 requires consideration.
There are four matters that may trigger the Biodiversity Offset Scheme to determine whether or not a Biodiversity Assessment Report (BOAR) is required. These are considered below.
Peter Basha Planning & Development
Proposed Farm Stay Accommodation
1060 Pinnacle Road, Canobolas Page 31
Whether the development occurs on land identified on the OEH Biodiversity Values Map
The subject land is not identified on the Biodiversity Values Map published under clause 7.3 of the BC Regulation 2016. The proposal does not involve any action prescribed by clause 6.1 of the BC Regulation 2016.
Whether the amount of native vegetation being cleared exceeds a threshold area based on the minimum lot size associated with the property
The proposal does not involve the clearing of native vegetation. Therefore it will certainly not exceed the threshold area of 1 hectare (based on the 100 hectare minimum lot size which applies to the property).
Whether the development or activity is "likely to significantly affect threatened species"?
The natural state of the site and surrounding area has been highly modified by the rural and agricultural settlement pattern.
The development site is devoid of native timer. The potential for the site to attract less common native species is considered minimal. The habitat value of
the site is low and it does not have realistic potential to re-establish into providing a habitat of value.
As such, the proposal is not likely to have an adverse effect on a threatened species; endangered ecological community; or a critically endangered ecological community or their habitat.
Whether the development or activity development or activity will be carried out in a declared area of outstanding biodiversity value?
No. The subject land is not a declared area of outstanding biodiversity value.
Peter Basha Planning & Development
Proposed Farm Stay Accommodation
1060 Pinnacle Road, Canobolas Page 32
4.5.11 Social and Economic Impacts
The development has the potential to generate positive economic as follows:
• Approval of the development application would contribute to the local rural tourism industry.
• The proposal would enhance the diversity of enterprises that are being undertaken within the Orange local government area.
• The proposal will increase spending in the local area.
• Farm stay accommodation represents appropriate value adding of an existing rural enterprise.
It is reasonable to suggest that any negative economic effects would only be of significance to the proponent.
Negative social effects relate to the potential adverse impacts that may be
generated by the development. However, it is considered that if the development operates in the manner proposed in this report, the potential for adverse social impacts would be minimal.
4.6 THE SUITABILITY OF THE SITE FOR THE DEVELOPMENT
There are no aspects relating to the subject land to suggest that it would not be suitable for the proposed development.
4.7 SUBMISSIONS IN ACCORDANCE WITH ACT OR REGULATIONS
According to Council's Planning & Development Community Participation Plan 2019 (the CPP) the development is identified as a proposal that requires advertised exhibition.
4.8 THE PUBLIC INTEREST
The proposed development is considered to be only of minor interest to the
wider public due to the relatively localised nature of potential impacts.
Peter Basha Planning & Development
Section 5.0
BUSHFIRE ASSESSMENT
An assessment has been undertaken for the proposed development in accordance with the procedures in Planning for Bushfire Protection November 2019 (PBP).
5.1 VEGETATION AND SLOPE
With reference to attached Figure 4, the vegetation and slope in all directions
around the site of the proposed cabins is summarised as follows:
Direction Vegetation (140 metre radius) Slope (100m radius)
North Low threat vegetation (Orchard) 5°-10° downslope
East Low threat vegetation (Orchard) 5°-10° downslope
South Grassland to 50m then 5°-10° downslope narrow patch of pine trees
West Low threat vegetation (Orchard) 0°-5° upslope
5.2 ASSET PROTECTION ZONE
As the proposal is for tourist accommodation, it represents a Special Fire
Protection Purpose development (SFPP).
The minimum Asset Protection Zone (APZ) for a SFPP is normally determined by reference to Table Al.12.1 of PBP. However, Table 6.8a of PBP allows a
variation whereby the APZ for farm stay developments may be determined by reference to Table Al.12.3 (FFDI 80) of PBP where the buildings will not be exposed to radiant heat levels exceeding 29kW/m2 (i.e. not exceeding BAL-29).
As identified below in Section 5.3 of this report, the BAL for the proposed buildings does not exceed 12.SkW/m2 (i.e. BAL-12.5). Therefore, Table Al.12.3
of PBP will be used.
Peter Basha Planning & Development
Proposed Farm Stay Accommodation
1060 Pinnacle Road, Canobolas Page 34
With reference to Table Al.12.3 the minimum APZ for the proposed
development is depicted in the table below.
Direction Vegetation/Slope APZ
North Low threat vegetation {Orchard) Exclusion allowed via Al.10 of PBP 5°- 10° downslope but adopt 12 metres for Grassland
East Low threat vegetation {Orchard) Exclusion allowed via A1.10 of PBP 5°-10° downslope but adopt 12 metres for Grassland
South Grassland to 50 metres 5° -10° APZ 12 metres
downslope then narrow patch of
pine trees
West Low threat vegetation {Orchard) Exclusion allowed via Al.10 of PBP 0°-5° upslope but adopt 10 metres for Grassland
5.3 CONSTRUCTION REQUIREMENTS
With reference to Table Al.12.6 of PBP, the Bushfire Attack Level (BAL) in
relation to the proposed development is summarised as follows.
Direction Distance to predominant vegetation class BAL
North 5° -10° downslope- Low threat vegetation {Orchard) but BAL 12.5 adopt Grassland in range of 26 to 50 metres
East 5°-10° downslope - Low threat vegetation (Orchard) but BAL 12.5 adopt Grassland in range of 26 to 50 metres
South 5°-10° downslope - Grassland for 50 metres BAL 12.5
West 0° -5° upslope -Low threat vegetation {Orchard) but BAL 12.5 adopt Grassland in range of 20 to 50 metres
Peter Basha Planning & Development
Proposed Farm Stay Accommodation
1060 Pinnacle Road, Canobolas Page 35
Section Al.10 of PBP identifies orchard as Low Threat Vegetation and is
therefore an exclusion in regard to AS 3959 for the purpose of PBP. However a BAL of 12.5 has been adopted in any case.
According to PBP, a BAL of 12.5 warrants specific construction requirements for ember protection and accumulation of debris.
5.4 BUSHFIRE PROTECTION MEASURES
5.4.1 Asset Protection Zone
The APZ for the proposed cabins can be contained entirely within the boundaries of the subject land. The APZ is on a slope of less than 18°.
Ongoing maintenance and fuel management is required within the APZ in accordance with Planning for Bushfire Protection.
5.4.2 Public Roads
Pinnacle Road and Stairs Road are considered sufficient to accommodate increased traffic volumes in the event of a bushfire emergency and allows vehicles to pass in a two-way traffic situation.
5.4.3 Property Access
The entrance to the property from Pinnacle Road is to be clearly identified with a property numbering plate in accordance with Council requirements.
The internal driveway to serve the proposed cabins is to be to an all-weather
standard. The driveway route avoids low lying or poorly drained areas and can readily meet the relevant performance criteria, namely:
• Minimum width of 4 metres with widening to 6 metres on curves;
• Minimum overhead clearance of 4 metres;
• The proposed driveway will allow multi-point turns generally in accordance with Types B, C or D in Figure A3.3 of PBP. Further, the relatively even terrain and open land adjacent to the driveway would allow rural
firefighting vehicles to turn as required;
Peter Basha Planning & Development
Proposed Farm Stay Accommodation
1060 Pinnacle Road, Canobolas Pa e 36
• Curves to have a minimum inner radius of 6 metres;
• Road cross fall maximum of 10; and
• Maximum grade to be 10° (unsealed road).
An alternative route to evacuate the subject land site leads away from the
bushfire hazard Stairs Road over open country. A formed alternate route is not warranted.
5.4.4 Fire Trails
Not required.
5.4.5 Services
Table 6.8c requires a minimum of 10,000 litres of static water supply for each
cabin (in non-reticulated areas).
Given that a future electricity line extension will be over existing orchard or grassland, the potential for electricity new services to ignite bushland would be minimised.
Subject to imposition of a condition of consent, bottled gas supply (if desired)
can be provided so as to comply with the relevant performance criteria in Table 6.8c.
5.4.6 Bushfire Management Plan
A Bushfire Emergency Management and Evacuation Plan is to be prepared in accordance with Table 6.8d.
Peter Basha Planning & Development
Section 6.0
CONCLUSION
This development application can be approved on the following grounds:
• The proposal can be demonstrated to comply with the relevant provisions of Orange LEP 2011.
• The proposal satisfies the relevant Planning Outcomes contained in Orange DCP 2004.
• The proposal is considered satisfactory in terms of Section 4.15 of the Environmental Planning and Assessment Act, 1979. The potential impacts are considered to be satisfactory as follows:
- In the context of the surrounding land use pattern, the potential for adverse rural interface issues can be adequately addressed.
- Visual impacts are satisfactory due to the siting and the high quality design and finish of the proposed cabins.
- On site effluent disposal will be undertaken in accordance with On-Site Sewage Management for Single Households and AS/NZS 1547:2000 On-site Domestic Wastewater Management.
- The proposal will not generate unacceptable traffic impacts. The standard of the existing road network and the proposed access arrangements would adequately accommodate the modest traffic associated with the development.
- The proposal will not impact upon biodiversity values, or air or water quality.
• Council has the ability to impose relevant conditions of consent to ensure that the development is completed in accordance with its normal requirements.
• There are no aspects of the development that warrant refusal.
Peter Basha Planning & Development
Proposed Farm Stay Accommodation
1060 Pinnacle Road, Canobolas Page 38
We trust that this application will be considered favourably by Council. Should you
wish to discuss any matter further please do not hesitate to contact Mr Peter Basha on 6361 2955.
Yours faithfully
Peter Basha Planning & Development
Per:
PETER BASHA
Peter Basha Planning & Development