National Energy Foundation Centre for Knowledge Exchange C K E BRIGHT Management Consulting June, 2007 Development of the Theoretical Training Curricula for Energy Managers and Training Providers in ASEAN (EMTC) & Development of the Energy Management Simulation Test for the Practical Training of Energy Managers in ASEAN (EMST)

Development of the Energy Management Simulation Test for

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Development of the Energy Management Simulation Test for

NationalEnergyFoundation Centre for Knowledge Exchange

C K E

BRIGHT Management Consulting

June, 2007

Development of the Theoretical TrainingCurricula for Energy Managers and Training

Providers in ASEAN(EMTC)

&

Development of the Energy ManagementSimulation Test for the Practical Training of

Energy Managers in ASEAN(EMST)

Page 2: Development of the Energy Management Simulation Test for

NationalEnergyFoundation Centre for Knowledge Exchange

C K E

BRIGHT Management Consulting

“Background of the project”

Page 3: Development of the Energy Management Simulation Test for

NationalEnergyFoundation Centre for Knowledge Exchange

C K E

BRIGHT Management Consulting

AEMAS

• Y2004/2005

European commission and ASEAN Energy Facility funded the

design and feasibility study for the establishment of ASEAN

Energy Manager Accreditation Scheme (AEMAS)

The project was completed in May 2005 and the outcomes was

approved during the ASEAN Meeting of Energy Ministers

(AMEM) in Phnom Penh in June 2005

Page 4: Development of the Energy Management Simulation Test for

NationalEnergyFoundation Centre for Knowledge Exchange

C K E

BRIGHT Management Consulting

Outcomes of AEMAS• The project outcomes were

1. Recommended Code of Practice for Energy Manager

2. Recommended Accreditation Procedures for Energy

Managers (CEM-PEM-EEM)

3. Recommended Certification Procedures for

Organization (Entry-Showcase Level)

4. Recommended Training Course Outline

5. Recommended Outline of the Energy Management

Simulation Test (EMST)

6. Implementation Strategy towards the Establishment of an

ASEAN Energy Manager Accreditation Scheme

7. 5-Years Budgetary Estimate for the operation of AEMAS

Page 5: Development of the Energy Management Simulation Test for

NationalEnergyFoundation Centre for Knowledge Exchange

C K E

BRIGHT Management Consulting

New candidateswith:

Pre-QualificationExperience

- Certification asenergy professionalby countries’scheme

Proposed ASEAN Energy ManagerAccreditation Process

New candidateswith minimum

qualification

App

licat

ion

&

Qu

alif

icat

ion

Ass

essm

ent

Trai

nin

g an

d Te

st(C

ompu

lsor

y)

Certified EnergyManager – CEM –

AEMAS BlueLicense

ProfessionalEnergy Manager– PEM – AEMAS

Gold License

3 years

Executive EnergyManager – EEM –AEMAS Platinum

License

7 years

Page 6: Development of the Energy Management Simulation Test for

NationalEnergyFoundation Centre for Knowledge Exchange

C K E

BRIGHT Management Consulting

Compulsory Training Requirements

• Training on the Recommended Code ofPractice for Energy Managers

• Training on Sustainable Energy Management

• Test at the end of the training- Professional Assessment(Theoretical + Practical Test-EMST)

Any candidate who qualifies for accreditation mustattend and complete minimum training requirements asdefined below:

Page 7: Development of the Energy Management Simulation Test for

NationalEnergyFoundation Centre for Knowledge Exchange

C K E

BRIGHT Management Consulting

Consulting Initiative - BRIGHT Management Consulting (former EEC Energetics)

has taken the initiative to apply for the grant from EAEF round 4, to

develop the theoretical training curriculum under the project namely;

“ Development of the Theoretical Training Curricula for Energy

Managers and Training Providers in ASEAN” - EMTC.

- Multimedia Asia applied to develop the practical simulation test

under the project namely;

“ Development of the Energy Management Simulation Test for the

Practical Training of Energy Managers in ASEAN” – EMST.

Page 8: Development of the Energy Management Simulation Test for

NationalEnergyFoundation Centre for Knowledge Exchange

C K E

BRIGHT Management Consulting

Development of the Theoretical Training

Curricula for Energy Managers and Training

Providers in ASEAN

(EMTC)

Page 9: Development of the Energy Management Simulation Test for

NationalEnergyFoundation Centre for Knowledge Exchange

C K E

BRIGHT Management Consulting

Project BriefingProject Briefing (EMTC)(EMTC)

Title Development of the Theoretical Training Curricula for theEnergy Managers and Training Providers in ASEAN

Contract # 131-2005

Acronym "EMTC"

Leader Bright Management Consulting Co.,Ltd.

Partners National Energy Foundation, U.K.Centre for Knowledge Exchange (CKE), Nagueles Co., Ltd.,Ireland

Sponsor EC-ASEAN Energy Facility

Project Duration 28 November 2005 - 27 November 2006

Page 10: Development of the Energy Management Simulation Test for

NationalEnergyFoundation Centre for Knowledge Exchange

C K E

BRIGHT Management Consulting

Project BriefingProject Briefing (EMTC)(EMTC)

Objective - To equip ASEAN member with the tools

necessary to the future capacity building of

energy managers

- To build capacity of training providers for the

delivery of the energy manager training course

Page 11: Development of the Energy Management Simulation Test for

NationalEnergyFoundation Centre for Knowledge Exchange

C K E

BRIGHT Management Consulting

Project BriefingProject Briefing (EMTC)(EMTC)Main activities

1. Develop Energy Managers’ Complete Training Package

1.1 Detailed training program

1.2 Training workbook

1.3 Test questions for the theoretical test

2. Develop Trainers’ Complete Training Package

2.1 Detailed training program

2.2 Trainer’s guidebook

2.3 Training material (MS PowerPoint slides)

3. Organize reviewing of training packages by External

Training Experts and presentation to EE&C SSN

4. Train 15 Local Trainers from ASEAN

5. Train 25 Energy Managers from ASEAN

Page 12: Development of the Energy Management Simulation Test for

NationalEnergyFoundation Centre for Knowledge Exchange

C K E

BRIGHT Management Consulting

Project Planning (EMTC)Project Planning (EMTC)

Page 13: Development of the Energy Management Simulation Test for

NationalEnergyFoundation Centre for Knowledge Exchange

C K E

BRIGHT Management Consulting

External Experts (EMTC & EMST)External Experts (EMTC & EMST)• Dr.Alice B.Herrera

Energy Management Association of The Philipines• Dr.Sanjayan Velautham

Universiti Teknologi Malaysia• Mr.Manaswee Hageme

Training Division, DEDE, Minister of Energy, Thailand• Dr.Somchai Dechapanichkul

Managing Director, UEE Technology (Thailand) Co.,Ltd.• Dr.Sasithorn Suwannathep

King Mongkut University of Technology, Thonburi• Ms.Nisa Attanandana

Director of Training, The Peninsula Bangkok Hotel• Assoc.Prof.Dr.Krismant Whattananarong

King Mongkut’s Institute of Technology, North Bangkok

Page 14: Development of the Energy Management Simulation Test for

NationalEnergyFoundation Centre for Knowledge Exchange

C K E

BRIGHT Management Consulting

Development of the Energy Management

Simulation Test for the Practical Training

of Energy Managers in ASEAN

(EMST)

Page 15: Development of the Energy Management Simulation Test for

NationalEnergyFoundation Centre for Knowledge Exchange

C K E

BRIGHT Management Consulting

Project BriefingProject Briefing (EMST)(EMST)Title Development of EMST for Practical Training of

Energy Manager in ASEAN

Contract # 133-2005

Acronym "EMST"

Leader Multimedia Asia

Partners National Energy Foundation, U.K.Centre for Knowledge Exchange (CKE), Nagueles Co., Ltd.,Ireland

Sponsor EC-ASEAN Energy Facility

Project Duration 9 November 2005 - 8 November 2006

Page 16: Development of the Energy Management Simulation Test for

NationalEnergyFoundation Centre for Knowledge Exchange

C K E

BRIGHT Management Consulting

Project BriefingProject Briefing (EMST)(EMST)

Objective Develop the practical testing package for performance

evaluation of candidate applying for AEMAS accreditation.

Main activities

1. Review the outlines of the EMST structure developed

during feasibility study of AEMAS

2. Develop functional specification of EMST

3. Develop EMST program, user manual & guidebook

4. Organize reviewing of training packages by External

Training Experts and presentation to EE&C SSN

5. Train 15 Local Trainers from ASEAN

6. Train 25 Energy Managers from ASEAN

Page 17: Development of the Energy Management Simulation Test for

NationalEnergyFoundation Centre for Knowledge Exchange

C K E

BRIGHT Management Consulting

Project Planning (EMST)Project Planning (EMST)

Page 18: Development of the Energy Management Simulation Test for

NationalEnergyFoundation Centre for Knowledge Exchange

C K E

BRIGHT Management Consulting

Review TrainingCourse Structure

(AEMAS)

Prepare structure ofEMTC

EMTC

2.Workshop 23-24 Feb 06

Review structure - externalexperts

EMSTJoint ActivitiesReview EMST

Structure (AEMAS)1.Kick Off Meeting

8 - 9 Dec 2005

Prepare structure ofEMST

Develop detailcontent of EMTC

(Jan-Apr’06)

Develop FunctionalSpec. of EMST

Dec’05-Feb’06

Dec’05-Feb’06

3.Workshop-26-27 Jun 06

Review detail content &structure of TTT & Test EMST by

external experts

Programming &Testing of EMST

Prepare structure ofTrain the Trainer (TTT)

Develop detail contentof TTT (Jun-Jul’06)

Present to EE&C SSNPresent to EE&C SSN

4.Workshop-30-31 Aug 06

Review by EE&C SSN in BKK

Train 15 Trainers

Train 25 EMs

Joint development duringFeb-Jun’06

5.Pilot training (TTT)-11-15 Sep 06

6.Pilot training (EM)-24-27 Oct 06

Train 15 Trainers

Train 25 EMs

Project MethodologyProject Methodology

Page 19: Development of the Energy Management Simulation Test for

NationalEnergyFoundation Centre for Knowledge Exchange

C K E

BRIGHT Management Consulting

ProjectProjectss OutcomesOutcomesEMTC

• Two training packages have been successfully developed :

• Training package for energy manager, including

• Training program for energy manager training course

• Training workbook for energy manager

• Theoretical test questions and answers (120 questions)

• Training package for training providers, including

• Training program for training of trainers course

• Trainers’ manual

• Training material including power point presentation and

classroom exercises

Page 20: Development of the Energy Management Simulation Test for

NationalEnergyFoundation Centre for Knowledge Exchange

C K E

BRIGHT Management Consulting

ProjectProjectss OutcomesOutcomes

EMTC• 15 Regional Trainers have been trained. (from Thailand, Malaysia,

The Philippines, Vietnam, Indonesia, Cambodia and Laos)

• 25 Potential ASEAN Energy Manager from ASEAN have been trained.

Page 21: Development of the Energy Management Simulation Test for

NationalEnergyFoundation Centre for Knowledge Exchange

C K E

BRIGHT Management Consulting

ProjectProjectss OutcomesOutcomesTraining Procedures

EM Training 3 days

Theoretical & PracticalTest (1 day)

Train the TrainersWorkshop (1 day)

Training of Trainers

EM Training 3 days

Theoretical & PracticalTest (1 day)

Training of Energy Managers

• 15 Trainers are trained

5 Trainersdelivered thesessions asCo- Trainers

Panel of Master Trainers

• 25 Energy Managers aretrained

Performance Evaluation

Page 22: Development of the Energy Management Simulation Test for

NationalEnergyFoundation Centre for Knowledge Exchange

C K E

BRIGHT Management Consulting

ProjectProjectss OutcomesOutcomes

EMST

• Energy Management Simulation Test (EMST) package has been

successfully developed including the simulation test software,

trainer guidebook and user manual

• The training course to train 15 regional trainers was co-organized with

EMTC project.

• The training course for the first group of potential energy managers

(25 persons) was co-organized with EMTC project.

Page 23: Development of the Energy Management Simulation Test for

NationalEnergyFoundation Centre for Knowledge Exchange

C K E

BRIGHT Management Consulting

Training Programme

for

“Energy Manager”

Training Course

Page 24: Development of the Energy Management Simulation Test for

NationalEnergyFoundation Centre for Knowledge Exchange

C K E

BRIGHT Management Consulting

“Training Programme for Energy Manager Training Course”

Day - 1Time Duration

(Minutes)Session Subject

0900 – 1200 TC-1 Introduction0900 – 0930 30 Session 1 Welcome – Workshop Introduction0930 – 1030 60 Session 2 1.1 Introduction to Sustainable Energy Management1030 – 1045 15 Coffee Break1045 – 1200 75 Session 3 1.2 Definition and role of Energy Manager

1.3 Responsibilities of Energy Manager1.4 Recommended Code of Practice for Energy Manager

1200 – 1300 60 Lunch1300 – 1600 TC-2 Setting up a Sustainable Energy Management System

1300 – 1430 90 Session 4 2.1 Effective Tool for Appraising Energy Management Performanceof Organization

2.2 Methodology for Preparation of Energy Management System2.2.1 Energy Policy2.2.2 Effective Energy Management Committee

1430 – 1445 15 Coffee Break1445 – 1600 75 Session 5 2.2.3 Energy Accounting Centres

2.2.4 Energy Efficiency Index

Page 25: Development of the Energy Management Simulation Test for

NationalEnergyFoundation Centre for Knowledge Exchange

C K E

BRIGHT Management Consulting

“Training Programme for Energy Manager Training Course”

Day 2Time Duration

(Minutes)Session Subject

0900 – 1600 TC-2 Setting up a Sustainable Energy Management System(Cont…)

0900 – 1030 90 Session 1 2.2.5 Working Manual and Tools for Energy Management2.2.6 Energy Management Working Procedures

1030 – 1045 15 Coffee Break1045 – 1200 75 Session 2 2.2.7 Investment Appraisal for Energy Efficiency Project

2.2.8 Human Resource Development in Energy Management2.2.9 Documentation in Energy Management System

1200 – 1300 60 Lunch1300 – 1430 90 Session 3 2.3 Setting of Energy Target & Plan

2.3.1 Organizing Energy Audit & Analysis2.3.2 How to set Energy Target & Plan (ET&P)2.3.3 Measurement & Verification

1430 – 1445 15 Coffee Break1445 – 1600 75 Session 4 2.4 Integration of the Energy Management System into Business

Practice2.4.1 Monitoring System2.4.2 Reporting System2.4.3 Integration of Energy Management System with other

quality or standard system

Page 26: Development of the Energy Management Simulation Test for

NationalEnergyFoundation Centre for Knowledge Exchange

C K E

BRIGHT Management Consulting

“Training Programme for Energy Manager Training Course”

Day 3Time Duration

(Minutes)Session Subject

0900 – 1600 TC-3 Managing Activities in Sustainable Energy ManagementSystem

0900 – 1030 90 Session 1 3.1 Project Management & Controlling3.1.1 Project Management & Controlling Techniques3.1.2 Budget & Resource Management

1030 – 1045 15 Coffee Break1045 – 1200 75 Session 2 3.2 Energy Management Performance Review

3.2.1 Performance Review – Strategy & Approaches3.2.2 Conducting Performance Review

1200 – 1300 60 Lunch1300 – 1600 Introduction to the Energy Management Simulation Test

(EMST)

Page 27: Development of the Energy Management Simulation Test for

NationalEnergyFoundation Centre for Knowledge Exchange

C K E

BRIGHT Management Consulting

“Training Programme for Energy Manager Training Course”

Day 4

0900 - 1200 Theoretical Test

1200 - 1330 Lunch

1330 - 1630 Practical Test: Energy Management Simulation Test (EMST)

Page 28: Development of the Energy Management Simulation Test for

NationalEnergyFoundation Centre for Knowledge Exchange

C K E

BRIGHT Management Consulting

Part I : Theoretical test (3 hours)

• Based on understanding and follows an adult learning approach

• Test papers :

• Multiple choices and qualitative questions

• Candidates will get the test questions (120 questions) on the first

day of the training for preparation.

• Candidate will be required to complete and pass only 30 questions

(random selected and distribution)

Page 29: Development of the Energy Management Simulation Test for

NationalEnergyFoundation Centre for Knowledge Exchange

C K E

BRIGHT Management Consulting

Theoretical Test - No. of Questions

Module ContentLevel

Duration(h)

%Weighting

No. of TestQuestions

TC-1 :Introduction

General 3 (20 %) 12 %14

TC-2 :Setting up a SEMS

Details 9 (60 %) 55 %66

TC-3 :Managing SEMS

Details 3 (20 %) 33 %40

Total 10 15 100 %120

Page 30: Development of the Energy Management Simulation Test for

NationalEnergyFoundation Centre for Knowledge Exchange

C K E

BRIGHT Management Consulting

Theoretical Test - No. of Questions

Module MultipleChoices

Qualitative

TC-1 :Introduction

6 8

TC-2 :Setting up a SEMS

37 29

TC-3 :Managing SEMS

23 17

Total 66 54

Total

14

66

40

120

Page 31: Development of the Energy Management Simulation Test for

NationalEnergyFoundation Centre for Knowledge Exchange

C K E

BRIGHT Management Consulting

Part II : Practical test

The practical test requires candidates to work through the EnergyManagement Simulation Test (EMST):

• EMST designed to simulate energy management in a virtualorganization

• Candidates act as Energy Manager in the virtual organization

• Candidates will have to apply their knowledge andunderstanding of sustainable energy management and workthrough EMST to achieve certain points, as required by the test

Page 32: Development of the Energy Management Simulation Test for

NationalEnergyFoundation Centre for Knowledge Exchange

C K E

BRIGHT Management Consulting

Structure of EMST

• EMST test consists of 9 modules.

• Maximum allowed time is 3 hours.

• Test modules are grouped into 4 groups.

• Modules in the same group are interconnected.

• There are multiple scenarios for the test versions.

Page 33: Development of the Energy Management Simulation Test for

NationalEnergyFoundation Centre for Knowledge Exchange

C K E

BRIGHT Management Consulting

Structure of EMSTGroup 1:

ST-1 : Energy Management AssessmentST-2 : Energy Policy

ST-3 : Energy Committee

Group 2:ST-4 : Energy Accounting CentersST-5 : Working Procedures

Group 3:ST-6 : Energy AuditST-7 : Energy Targeting & Planning

ST-8 : Monitoring and Reporting SystemGroup 4:

ST-9 : Performance Review

Page 34: Development of the Energy Management Simulation Test for
Page 35: Development of the Energy Management Simulation Test for

Module 1

Page 36: Development of the Energy Management Simulation Test for

Module 2

Page 37: Development of the Energy Management Simulation Test for

Module 3

Page 38: Development of the Energy Management Simulation Test for

Module 4

Page 39: Development of the Energy Management Simulation Test for

Module 5

Page 40: Development of the Energy Management Simulation Test for

Module 6

Page 41: Development of the Energy Management Simulation Test for

Module 7

Page 42: Development of the Energy Management Simulation Test for

Module 8

Page 43: Development of the Energy Management Simulation Test for

Module 9