Upload
others
View
2
Download
0
Embed Size (px)
Citation preview
GENERATION ATLANTAAtlanta, Georgia
Prescient was founded to leverage technology to
improve the approach to multifamily construction. Our
system is a combination of software and hardware that
are all linked together to make the development and
construction process much faster, more collaborative,
less expensive and with a lot less risk.
Revolutionizing Multi-unit Housing Development
INTEGRATED APPROACH
DIGITAL DESIGN
Drawings up to 65% faster than traditional approaches
ADVANCED MANUFACTURING
Pre-fabricated light gauge steel manufactured to 1/32” tolerances
ON SITE ASSEMBLY
Can install at rates up to 20,000 sq ft/wk with only 36 installers
CERTIFICATIONS
DIGITAL DESIGN BUILD FOR AFFORDABILITY
MARKETS WE SERVE
MANUFACTURING CAPABILITIES
10 M SQFT of capacity in Mebane, NC
and Denver, CO facilities
Revolutionize the Building Environment
Student Housing
Senior Living Hotels
Apartments
Revolutionize the Building Environment
UC Davis West VillageDavis, CA1,258,536 SF
Industry ApartmentsDenver, CO274,885 SF
Northgate at College StationCollege Station, TX183,180 SF
The Corner AustinAustin, TX93,108 SF
Morning Star at RidgegateLone Tree, CO249,682 SF
CCU 1st Residential BuildingLakewood, CO90,752 SF
Hyatt HouseLakewoo, CO79,100 SF
Uncommon Fort CollinsFort Collins, CO113,060 SF
Alexan Cherry CreekDenver, CO173,443 SF
OU Cross VillageNorman, OK393,048 SF
Arterra 21Kansas City, MO120,000 SF
Completed 38 buildings and 6 M sq. ft.OUR TECHNOLOGY IS PROVEN
CUSTOMER COMMENTS
“We have converted multiple projects from other structural systems to Prescient for the simple reason
that we would not have been able to finish the projects on time and on budget without Prescient on the team.”
Chris HirstSVP for CBG Building Company
Buildings are resilient to natural disasters and other issues
Approved for seismic zones High wind velocity resilience
Non-combustibleMold resistant
Termite resistant
WWW.PRESCIENTCO.COM
“The Prescient solution not only allowed us to meet aggres-sive deadlines by trimming weeks off the schedule required
for other building materials, it was cost-effective and allowed us to deliver a truly showcase student housing project.”
JJ SmithPresident of CA Living speaking about USF Dorms
Revolutionize the Building Environment