Director/IS&P ED/ Trichy Visit to MRPL Site on 09.07.2014. GM/IC Receiving Director. GM/MRPL Site Receiving ED/ Trichy. Project Review. Switch Gear building Lift Inauguration. Control Room. STG Hall. STG Hall. STG-1 Seal Ring issue. Entering UB Area. UB Area. UB Area. - PowerPoint PPT Presentation

Citation preview

Page 1: Director/IS&P ED/ Trichy Visit  to MRPL  Site on 09.07.2014

Director/IS&PED/Trichy

Visit to MRPL Siteon

09.07.2014

Page 2: Director/IS&P ED/ Trichy Visit  to MRPL  Site on 09.07.2014

GM/IC Receiving Director

Page 3: Director/IS&P ED/ Trichy Visit  to MRPL  Site on 09.07.2014

GM/MRPL Site Receiving ED/Trichy

Page 4: Director/IS&P ED/ Trichy Visit  to MRPL  Site on 09.07.2014

Project Review

Page 5: Director/IS&P ED/ Trichy Visit  to MRPL  Site on 09.07.2014

Switch Gear building Lift Inauguration

Page 6: Director/IS&P ED/ Trichy Visit  to MRPL  Site on 09.07.2014

Control Room

Page 7: Director/IS&P ED/ Trichy Visit  to MRPL  Site on 09.07.2014

STG Hall

Page 8: Director/IS&P ED/ Trichy Visit  to MRPL  Site on 09.07.2014

STG Hall

Page 9: Director/IS&P ED/ Trichy Visit  to MRPL  Site on 09.07.2014

STG-1 Seal Ring issue

Page 10: Director/IS&P ED/ Trichy Visit  to MRPL  Site on 09.07.2014

Entering UB Area

Page 11: Director/IS&P ED/ Trichy Visit  to MRPL  Site on 09.07.2014

UB Area

Page 12: Director/IS&P ED/ Trichy Visit  to MRPL  Site on 09.07.2014

UB Area

Page 13: Director/IS&P ED/ Trichy Visit  to MRPL  Site on 09.07.2014

GBC Hall Structure fire proofing

Page 14: Director/IS&P ED/ Trichy Visit  to MRPL  Site on 09.07.2014

Gas Booster Compressor Hall

Page 15: Director/IS&P ED/ Trichy Visit  to MRPL  Site on 09.07.2014

Thank You