Director/IS&P ED/ Trichy Visit to MRPL Site on 09.07.2014. GM/IC Receiving Director. GM/MRPL Site Receiving ED/ Trichy. Project Review. Switch Gear building Lift Inauguration. Control Room. STG Hall. STG Hall. STG-1 Seal Ring issue. Entering UB Area. UB Area. UB Area. - PowerPoint PPT Presentation
Citation preview
Director/IS&PED/Trichy
Visit to MRPL Siteon
09.07.2014
GM/IC Receiving Director
GM/MRPL Site Receiving ED/Trichy
Project Review
Switch Gear building Lift Inauguration
Control Room
STG Hall
STG Hall
STG-1 Seal Ring issue
Entering UB Area
UB Area
UB Area
GBC Hall Structure fire proofing
Gas Booster Compressor Hall