Upload
others
View
2
Download
0
Embed Size (px)
Citation preview
In this Issue
Mapping the transitwayConstruction Update
BenefitsPartnerships
summer 2014 | vol 7 | mississauga transitway news
Etobicoke Creek Station
Road view of Cawthra Station
Discover Your Station – Transitway Open House
Visit our new stations at Central Parkway, Cawthra, Tomken and Dixie.
Saturday, November 15, 2014 10 am to 3 pm
Take a tour and learn more about transit in Mississauga. Services start Monday, November 17, 2014. Visit miway.ca/transitway
Transitway Travel – The Benefits • Efficient and cost-effective solution to addressing congestion in Mississauga • Convenient east-west transit travel across Mississauga • Reduced passenger travel time • Bypass traffic congestion for a more reliable commute • MiExpress and MiLocal buses will provide a safe mode of east-west service as well
as north-south connections at transitway stations • Easier connections to surrounding municipalities • Real-time next bus displays at each station
Partnerships – Making it HappenThe Mississauga Transitway is funded through a joint partnership between the Government of Canada (Canada Strategic Infrastructure Fund), the Province of Ontario, GO Transit (a division of Metrolinx) and the City of Mississauga. The Mississauga Transitway is an example of Metrolinx’s Big Move in action.
How do I get more information?
Follow the transitway blog for construction photo updates!thetransitwayblog.ca
City of Mississauga – MiWay Customer Service905-615-INFO (4636) miway.ca/transitway
GO Transit416-869-3200 (Toronto local calling area) 1-888-GET ON GO (438-6646) gotransit.com/mississaugatransitway
Construction UpdateEast segment – City Centre to Renforth
Construction on the east segment of the transitway is well underway and includes nine new stations starting at City Centre Transit Terminal and ending at Renforth Drive, east of Commerce Boulevard. The City of Mississauga is constructing four new stations at Central Parkway, Cawthra, Tomken and Dixie and the connecting transitway. They are expected to open in November 2014. New stations at Tahoe, Etobicoke Creek, Spectrum, and Orbitor are also being constructed by the City and are scheduled to be completed in 2016.
The east segment of the transitway corridor runs approximately 12 kilometres from the City Centre Transit Terminal to Renforth Gateway.
The Renforth Gateway station is being designed and constructed by GO Transit and is scheduled to be completed in 2017. The station will help make travel to Toronto Pearson International Airport and the Bloor-Danforth subway line easier via Highway 427.
West segment – Erin Mills to Winston Churchill
GO Transit is constructing the west segment, which includes new stations at Winston Churchill and Erin Mills. The stations
will include Park N’ Ride lots for more than 300 vehicles at each station, Kiss N’ Ride drop-off lanes and bicycle shelters. The transitway west corridor is a two-lane, bus-only, 1.5 kilometre roadway on the north side of Highway 403.
Construction of the west segment is expected to be completed in 2016.
Mississauga Transitway
When complete, the 18 kilometre transitway will have 12 stations beginning at Winston Churchill Boulevard in the west and ending at Renforth Drive in the east.
Making it faster and easier for you to travel across the city
(Square One)City Centre Transit Terminal
6 87 9 19A1021
19361A 65
19B
26 28 34 5320 61107 109 11068 76 9166 BT
ZÜM502
LIN
KTr
ainToronto
PearsonInternational
Airport
Hur
onta
rio S
tH
uron
tario
St
To Westwood MallTransit TerminalTo Westwood MallTransit Terminal
To Bloor-DanforthSubway LineTo Bloor-DanforthSubway Line
To Meadowvale Town CentreTo Meadowvale Town Centre
To Clarkson GO StationTo Clarkson GO Station
Dixie Rd
Dixie Rd
Commerce B
lvd
Commerce B
lvd
Orbitor D
r
Orbitor D
r
Eastgate
Pky /
Tahoe B
lvd
Eastgate
Pky /
Tahoe B
lvdEglinton Ave /Tahoe BlvdEglinton Ave /Tahoe Blvd
Renforth DrRenforth Dr
Win
ston
Chu
rchi
llB
lvd
Win
ston
Chu
rchi
llB
lvd
Hwy 403Hwy 403
Bus Bypass Lanes Now OpenBus Bypass Lanes Now OpenCentreview DrCentreview Dr
Hwy 427
Hwy 427
Dundas StDundas St
Erin
Mill
sEr
in M
ills
Pky
Pky
Central Parkway65 107 1095321
Rathburn RdRathburn RdEEE
Dixie21 107 1095
RdRdRd
Tomken107 1095121
DDDCawthra
107 10921
ky/
ky/
ky/y
rrrErin MillsErin Mills
WinstonChurchillWinstonChurchill Renforth
GatewayRenforthGateway
OrbitorOrbitor
SpectrumSpectrumEtobicoke CreekEtobicoke Creek
TahoeTahoe
PP
110
109 110
109
109
109 107
107
S.B.
N.B.
109
Mississauga TransitwayService Starts November 17
*Map not to scale
Phase 1 Transitway Station
Future Transitway Station
Phase 1 Mississauga Transitway
P Parking
Future Mississauga Transitway
MiLocal Route
MiExpress Route
21
Rendering of Renforth Gateway