D.N.I.TName of Work: CONSTRUCTION OF STREETS, P.C.C AND SOLING AT VILLAGE PANDOWAL TEHSIL & DISTICT MANDI BAHAUDDIN.
(Construction of Drains , Brick on edge pavement, P.C.C, and Sign Board with allied work)Approximate Cost: 6.311 MillionEarnest Money: 0.316 Million Time Limits :( 1.Months)
MRS B-I ANNUAL PERIOD 1st Janurary 2017 to 30th June 2017
Description of Items Qty: UnitSr.No. Chapter No Item No.
CONSTRUCTION 0F SURFACE DRAINS 2768Rft
1 3 10-i
1407.57 P%oCft
2 6 3-d
830.44 P%Cft
3 7 4-i622.88 P%Cft
4 20 1-bii
2214 P%Rft
5 20 3-b
2491.50 P%Sft
6 20 6-a
2768 P/Rft
MRS B-I ANNUAL PERIOD 1st January 2017 to 30th June 2017
Earth work excavation in irrigation channels drain etc to designed section grades and profiles excavated material disposed off and dressed within 50ft (15m) lead ordinery soil.
Cement concrete Brick or stone ballast 1.5" to 2"(40mm to 50mm) gauge, in foundation and plinth:- ratio 1:6:12 etc complete with all respect.
Pacca brick work in foundation and plinth in:-Cement, sand mortar:-Ratio 1:5
Tega formed of pacca bricks on end, laid in and over cement sand mortar projecting to a height of not more than 6" (150 mm) top of drain along the property side where required, laid to lines, grades, slopes and shape according to the Engineer's drawing:- B) 4½" thick (113 mm) ii) ratio 1:5
Pacca brick work on edge laid in reimbursement in Cement sand mortar on sides drains and on other works where required all joints to be completely filled and struck flush ratio 1:5…
Constructing Punjab Standard Drains. of cement concrete 1:2 ½ :5, with cement concrete bedding ratio 1:6:12, complete, laid to lines, grades, slopes and shapes, rendering exposed surface of concrete with 1:1 cement, sand mortar, ¼" (6 mm) thick, as per Engineer's drawing (excluding excavation):-a) Type I
2
1.PP-116 Executive Engineer
Description of Items Qty: UnitSr.No. Chapter No Item No.
MRS B-I ANNUAL PERIOD 1st January 2017 to 30th June 2017
7 6 6 (a-ii) 3
18.64 P/Cft
8 1 1
16.40 P%Cft
9 6 9-b
57.09 P%Kg
Brick Pavement
10 3 1+17 (a+b)
78872.44 P%oCft
11 18 19
24351.60 P%Cft
PLAIN CEMENT CONCRETE
12 4 299230 P%Sft
13 6 3-f4204.1 P%Cft
14 6 5-f
4204.1 P%Cft
Providing and laying reinforced cement concrete (including
prestressed concrete), using coarse sand and screened
graded and washed aggregate, in required shape and
design,including forms, moulds, shuttering, lifting,
compacting,curing, rendering and finishing exposed surface,
complete (but excluding the cost of steel reinforcement, its
fabrication and placing in position, etc.):- (a)(ii) Reinforced
cement concrete in slab of rafts / strip foundation, base slab of
column and retaining walls; etc and other structural members
other than those mentioned in 5(a) (i) above not requiring form
work (i.e. horizental shuttering) complete in all respects:-(3)
type C ( nominal mix 1:2:4)
Carriage of 100 Cft. (2.83 cu.m) of all materials like stone aggregate, spawl, kankar lime (unslaked), surkhi, etc. or 150 means owned by the contractor. Cft. (4.25 cu.m) of timber, by truck or by any other. 0 TO 120 km (Ch.1, It.1)
Fabrication of mild steel reinforcement for cement concrete, including cutting, bending, laying in position, making joints and fastenings, including cost of binding wire and labour charges for binding of steel reinforcement (also includes removal of rust from bars):-(b) Deformed bars (Grade-40)
Earth work excavation undressed lead upto a single
throw of kassi phaorah or shovel in ordinery soil.
Transportation of of earth all types when the total
distance including the lead coverd in the item of work is
more then 1000ft and(a)upto 1/4 mile.(b) for every 330
ft additional lead or part thereof beyond 1/4 mile upto
one mile. (1.6km). Providing and laying dry brick pavement/soling in streets or roads, etc. sand grounted, laid in proper camber, including preparation, watering, compaction of bed to proper camber, and sand cushion.
Dismantling brick or flagged flooring without concrete foundation.Cement concrete brick or stone ballast 1½ " to 2" (40 mm to
50 mm) gauge, in foundation and plinth:- (f) Ratio 1: 7:20
Cement concrete plain including placing, compacting, finishing and curing complete (including screening and washing of stone aggregate): (f) Ratio 1: 2: 4
3
1.PP-116 Executive Engineer
Description of Items Qty: UnitSr.No. Chapter No Item No.
MRS B-I ANNUAL PERIOD 1st January 2017 to 30th June 2017
15 1 1
3699.61 P%Cft SIGN BOARD SIZE 4X3 = 2.No.
16 23 22-I-d56 P.Rft
17 25 10
29.84 P%Kg
18 13 5-d-i+ii
48.64 P%Sft
19 13 11 600 P.Words
20 3 10-i
15.76 P%oCft
21 6 5-f
15.66 P%Cft
22 1 1
13.78 P%CftNON-STANDARDAIZED ITEM'S
Deduction of old Metrial23
N.SOlds Bricks 28222 P%oNos
24 Brick Bats 1343.89 P%Cft
CONDITIONS.1 Conditional tenders / rates will not be entertained
2 Construction schedule towards completion of work should be provided by the contractor within one week of the issuance of acceptance letter.
3Work must be started at site within fortnight from the issuance of acceptance letter, otherwise it will be considered as rescinded automatically.
4Any item of work not included in this bid but during execution actually required to be executed at site will be paid after approval by the competent authority.
5
Carriage of 100 Cft. (2.83 cu.m) of all materials like stone
aggregate, spawl, kankar lime (unslaked), surkhi, etc. or 150
means owned by the contractor. Cft. (4.25 cu.m) of timber, by
truck or by any other. 0 TO 120 km (Ch.1, It.1)
Providing laying cutting jointing G.I pipe using for making of sign board size 1 ½" including welding complete with all respect.
Fabrication of heavy steel working with Tees flat iron round iron and sheet iron for making trusses girder’s etc including cutting drilling reverting handling assembling and fixing but excluding erection in position etc with all respect. Providing and assembling of M.S sheet with size of 4' x 3' with 1/16"SWG.Providing assembling angle iron size 1 ½" x 1 ½"
Preparing of surface of painting guard bars, gates of iron bars gratings railing (including standards braces etc) and in similar open work. Including preming coat. 2coat of paint
Writing letter or figure per letter per inches (25mm) height.Earth work excavation in irrigation channels drain etc to
designed section grades and profiles excavated
material disposed off and dressed within 50ft (15m) lead
ordinery soil.Cement concrete plain including placing, compacting,
finishing and curing complete (including screening and
washing of stone aggregate):(f) Ratio 1: 2: 4Carriage of 100 Cft. (2.83 cu.m) of all materials like
stone aggregate, spawl, kankar lime (unslaked), surkhi,
etc. or 150 means owned by the contractor. Cft. (4.25
cu.m) of timber, by truck or by any other. 0 TO 120 km
(Ch.1, It.1)
The work should be executed in accordance with the availability of funds as required under rule 2.82 of B&R Code, the department will not accept any other reason what so ever related for completion of work.
4
1.PP-116 Executive Engineer
Description of Items Qty: UnitSr.No. Chapter No Item No.
MRS B-I ANNUAL PERIOD 1st January 2017 to 30th June 2017
6
7
8All the conditions of "Contract Agreement” and conditions mentioned in the DNIT will form part of the agreement and binding upon the contractor.
9
10
Rate to be quoted by the contractor on Technically sanctioned
Estimate__________________% above / below.
Contractor: -_______________
Executive EngineerPublic Health Engineering Division
Mandi Bahauddin.
Any omission of the completion / error there in, for interpretation will be referred to standardized rates posted at website by finance department during MRS, BI-ANNUAL PERIOD (1st January 2017, to 30th June 2017 For Distt: M.B.Din and decision of the competent authority will be final and binding upon the contractor.
The execution/completion of work strictly in accordance with the specification, approved design/ drawing and requirements of contract agreement to the entire satisfaction of the engineer-in-charge will be exclusive responsibility of the contractor.
In case of rates quoted less than estimated rates, deposit at call for amount equivalent to a difference of cost between the bid amount and the estimate amount from any scheduled Bank shall be provided by the contractor as additional performance gurantee.
As per Government of the Punjab Finance Department Notification No.RO(Tech)FDI-2/83(VI)(P), dated 06.04.05 and clarification issued vide No. RO(Tech)FDI-2/83(VI)(P), dated 24.01.2006 in case the total tendered amount is less than 5% of the approved estimated (DNIT) amount, the lowest bidder will have to deposit an additional performance security from the scheduled Bank equal to the tendered amount below estimate cost within 15 days of issuance of notice or within expiry period of the bid, which is earlier.
5
1.PP-116 Executive Engineer
D.N.I.TCONSTRUCTION OF STREETS, P.C.C AND SOLING AT VILLAGE PANDOWAL TEHSIL & DISTICT MANDI BAHAUDDIN.
(Construction of Drains , Brick on edge pavement, P.C.C, and Sign Board with allied work)
Time Limits :( 1.Months)MRS B-I ANNUAL PERIOD 1st Janurary 2017 to 30th June 2017
4565.1 6426
10216.85 84845
18301.50 113996
5639.80 124865
8065.80 200959
97.85 270849
Estimated Rates
Rate to be quoted by the
Contractor
6
1.PP-116 Executive Engineer
Estimated Rates
Rate to be quoted by the
Contractor
241.50 4502
2800.00 459
9977.65 5696
5473.6 431716
15566.90 3790789
482.90 44572
8913.30 374724
20668.80 868937
7
1.PP-116 Executive Engineer
Estimated Rates
Rate to be quoted by the
Contractor
2800.00 103589
173.90 9738.0
11949.15 3566.0
729.80 355.0
10.45 6270.0
4565.10 72.0
20668.80 3237.0
2800.00 386
64505484000.00 1128882000.00 26878
6310782
Construction schedule towards completion of work should be provided by the contractor within one week of the issuance of acceptance letter.
Work must be started at site within fortnight from the issuance of acceptance letter, otherwise it will be considered as rescinded automatically.
Any item of work not included in this bid but during execution actually required to be executed at site will be paid after approval by the competent authority.
The work should be executed in accordance with the availability of funds as required under rule 2.82 of B&R Code, the department will not accept any other reason what so
8
1.PP-116 Executive Engineer
Estimated Rates
Rate to be quoted by the
Contractor
All the conditions of "Contract Agreement” and conditions mentioned in the DNIT will form part of the agreement and binding upon the contractor.
Any omission of the completion / error there in, for interpretation will be referred to standardized rates posted at website by finance department during MRS, BI-ANNUAL and decision of the competent authority will be final and binding upon the contractor.
The execution/completion of work strictly in accordance with the specification, approved design/ drawing and requirements of contract agreement to the entire satisfaction of the engineer-in-charge will be exclusive responsibility of the contractor.
In case of rates quoted less than estimated rates, deposit at call for amount equivalent to a difference of cost between the bid amount and the estimate amount from any scheduled Bank shall be provided by the contractor as additional performance gurantee.
As per Government of the Punjab Finance Department Notification No.RO(Tech)FDI-2/83(VI)(P), dated 06.04.05 and clarification issued vide No. RO(Tech)FDI-2/83(VI)(P), dated 24.01.2006 in case the total tendered amount is less than 5% of the approved estimated (DNIT) amount, the lowest bidder will have to deposit an additional performance security from the scheduled Bank equal to the tendered amount below estimate cost within 15 days of issuance of notice or within expiry period of the bid,
9
1.PP-116 Executive Engineer
COMPERATIVE OF SCHEME FOR TENDER RECEIVED ON 22-04-2017 FOR CONSTRUCTION OF STREETS & DRAINS MOHALLAHA SHAFQAT ABAD, KANDANWALA AND KOT FAZAL SHAH.
(Construction of Drains , Sullage Carriers, Brick on edge pavement, P.C.C,Tuff Tiles and R.C.C Sewer in streets with allied work)Approximate Cost: 5.825 Million Earnest Money: 0.117 Million
MRS B-I ANNUAL PERIOD 1st Janurary 2017 to 30th June 2017
Sr.
No.
Ch
ap
ter
No
Item
No.
Discription of ItemsESTIMATED COST
RATES QUOTED BY THE CONTRACTORS
Quantity Unit Rate Amount Rate CONSTRUCTION 0F SURFACE DRAINS 2430Rft
1 3 10-i
1235.65 P%oCft 4565.1 5641 4769.62
2 6 3-d
729.00 P%Cft 10216.85 74481 10674.56
3 7 4-i546.75 P%Cft 18301.50 100063 19121.41
4 20 1-bii
1944 P%Rft 5639.80 109638 5892.46
5 20 3-b
2187.00 P%Sft 8065.80 176399 8427.15
M/S Ch. Zubair Ahmad Tarar Govt: Contractor (4.48% Above on MRS (1st
January 2017 to 30th June 2017)
Earth work excavation in irrigation channels drain etc to designed section grades and profiles excavated material disposed off and dressed within 50ft (15m) lead ordinery soil.
Cement concrete Brick or stone ballast 1.5" to 2"(40mm to 50mm) gauge, in foundation and plinth:- ratio 1:6:12 etc complete with all respect.
Pacca brick work in foundation and plinth in:-Cement, sand mortar:-Ratio 1:5
Tega formed of pacca bricks on end, laid in and over cement sand mortar projecting to a height of not more than 6" (150 mm) top of drain along the property side where required, laid to lines, grades, slopes and shape according to the Engineer's drawing:- B) 4½" thick (113 mm) ii) ratio 1:5
Pacca brick work on edge laid in reimbursement in Cement sand mortar on sides drains and on other works where required all joints to be completely filled and struck flush ratio 1:5…
10
1.PP-116 Executive Engineer
Sr.
No.
Ch
ap
ter
No
Item
No.
Discription of ItemsESTIMATED COST
RATES QUOTED BY THE CONTRACTORS
Quantity Unit Rate Amount Rate
M/S Ch. Zubair Ahmad Tarar Govt: Contractor (4.48% Above on MRS (1st
January 2017 to 30th June 2017)
6 20 6-a
2430 P/Rft 97.85 237776 102.23
7 6
69.90 P/Cft 241.50 16881 252.32
8 1 1
61.51 P%Cft 2800.00 1722 2925.44
Constructing Punjab Standard Drains. of cement concrete 1:2 ½ :5, with cement concrete bedding ratio 1:6:12, complete, laid to lines, grades, slopes and shapes, rendering exposed surface of concrete with 1:1 cement, sand mortar, ¼" (6 mm) thick, as per Engineer's drawing (excluding excavation):-a) Type I
6 (a-ii) 3
Providing and laying reinforced cement concrete (including
prestressed concrete), using coarse sand and screened
graded and washed aggregate, in required shape and
design,including forms, moulds, shuttering, lifting,
compacting,curing, rendering and finishing exposed surface,
complete (but excluding the cost of steel reinforcement, its
fabrication and placing in position, etc.):- (a)(ii) Reinforced
cement concrete in slab of rafts / strip foundation, base slab of
column and retaining walls; etc and other structural members
other than those mentioned in 5(a) (i) above not requiring form
work (i.e. horizental shuttering) complete in all respects:-(3)
type C ( nominal mix 1:2:4)
Carriage of 100 Cft. (2.83 cu.m) of all materials like stone aggregate, spawl, kankar lime (unslaked), surkhi, etc. or 150 means owned by the contractor. Cft. (4.25 cu.m) of timber, by truck or by any other. 0 TO 120 km (Ch.1, It.1)
11
1.PP-116 Executive Engineer
Sr.
No.
Ch
ap
ter
No
Item
No.
Discription of ItemsESTIMATED COST
RATES QUOTED BY THE CONTRACTORS
Quantity Unit Rate Amount Rate
M/S Ch. Zubair Ahmad Tarar Govt: Contractor (4.48% Above on MRS (1st
January 2017 to 30th June 2017)
9 6 9-b
214.08 P%Kg 9977.65 21360 10424.65
CONSTRUCTION OF SULLAGE / STORM WATRER CHANNELS 1.5' X 1.5' = 80 Rft
10 3 10-i
510 P%oCft 4565.1 2328 4769.62
11 6 3-d
112.20 P%Cft 10216.85 11463 10674.56
12 7 4-i270 P%Cft 18301.50 49414 19121.41
13 6 5-F
60.06 P%Cft 20668.80 12414 21594.76
14 11 9-b Cement plaster 1/2" Thick ratio 1:4 200 P%Sft 1706.80 3414 1783.26
Fabrication of mild steel reinforcement for cement concrete, including cutting, bending, laying in position, making joints and fastenings, including cost of binding wire and labour charges for binding of steel reinforcement (also includes removal of rust from bars):-(b) Deformed bars (Grade-40)
Earth work excavation in irrigation channels drain etc to designed section grades and profiles excavated material disposed off and dressed within 50ft (15m) lead ordinery soil.
Cement concrete Brick or stone ballast 1.5" to 2" gauge in foundation and plinth ratio 1:6:12 etc complete with all respect.
Pacca brick work in foundation and plinth in:-Cement, sand mortar:-Ratio 1:5
Cement concrete plain including placing, compacting, finishing and curing complete (including screening and washing of stone aggregate): (f) Ratio 1: 2: 4
12
1.PP-116 Executive Engineer
Sr.
No.
Ch
ap
ter
No
Item
No.
Discription of ItemsESTIMATED COST
RATES QUOTED BY THE CONTRACTORS
Quantity Unit Rate Amount Rate
M/S Ch. Zubair Ahmad Tarar Govt: Contractor (4.48% Above on MRS (1st
January 2017 to 30th June 2017)
15 6
37.50 P/Cft 241.50 9056 252.32
16 1 1
85.85 P%Cft 2800.00 2404 2925.44
17 6 9-b
114.85 P%Kg 9977.65 11459 10424.65
PROVIDING AND LAYING TUFF PAVER 60mm 0.00
18 7 4-i 689.06 P%Cft 18301.50 126108.0 19121.41
6 (a-ii) 3
Providing and laying reinforced cement concrete (including prestressed concrete), using coarse sand and screened graded and washed aggregate, in required shape and design,including forms, moulds, shuttering, lifting, compacting,curing, rendering and finishing exposed surface, complete (but excluding the cost of steel reinforcement, its fabrication and placing in position, etc.):- (a)(ii) Reinforced cement concrete in slab of rafts / strip foundation, base slab of column and retaining walls; etc and other structural members other than those mentioned in 5(a) (i) above not requiring form work (i.e. horizental shuttering) complete in all respects:- (3) type C ( nominal mix 1:2:4)
Carriage of 100 Cft. (2.83 cu.m) of all materials like stone aggregate, spawl, kankar lime (unslaked), surkhi, etc. or 150 means owned by the contractor. Cft. (4.25 cu.m) of timber, by truck or by any other. 0 TO 120 km (Ch.1, It.1)
Fabrication of mild steel reinforcement for cement concrete, including cutting, bending, laying in position, making joints and fastenings, including cost of binding wire and labour charges for binding of steel reinforcement (also includes removal of rust from bars):-(b) Deformed bars (Grade-40)
Pacca brick work in foundation and plinth in:- Cement, sand mortar:- Ratio 1:5
13
1.PP-116 Executive Engineer
Sr.
No.
Ch
ap
ter
No
Item
No.
Discription of ItemsESTIMATED COST
RATES QUOTED BY THE CONTRACTORS
Quantity Unit Rate Amount Rate
M/S Ch. Zubair Ahmad Tarar Govt: Contractor (4.48% Above on MRS (1st
January 2017 to 30th June 2017)
19 10 3
3675.00 P%Cft 3955.00 145346.0 4132.18
20 6 5-f
18.00 P%Cft 20668.80 3720.0 21594.76
21
14700.00 P.Sft 93.95 1381065.0 98.16
Providing, laying, watering and ramming brick ballast 1½" to
2"(40 mm to 50 mm) gauge mixed with 25% sand, for floor
foundation, complete in all respects.Cement concrete plain including placing, compacting, finishing
and curing complete (including screening and washing of
stone aggregate): (f) Ratio 1: 2: 4Providing and laying Tuff pavers, having 7000PSI ,crushing
strength of approved manufacturer, over 2" to 3" sand cushion
i/c grouting with sand in joints i/c finishing to require
slope.complete in all respect.(50% Gray / 50% coloured).60-
mm thick
14
1.PP-116 Executive Engineer
Sr.
No.
Ch
ap
ter
No
Item
No.
Discription of ItemsESTIMATED COST
RATES QUOTED BY THE CONTRACTORS
Quantity Unit Rate Amount Rate
M/S Ch. Zubair Ahmad Tarar Govt: Contractor (4.48% Above on MRS (1st
January 2017 to 30th June 2017)
Brick Pavement
22 4 29250 P%Sft 482.90 1207 504.53
23 3
21696.3 P%oCft 5473.6 118757 5718.82
24 18 19
11924.64 P%Cft 15566.90 1856297 16264.30
PLAIN CEMENT CONCRETE
25 4 291500 P%Sft 482.90 7244 504.53
26 6 3-f1877.37 P%Cft 8913.30 167336 9312.62
27 6 5-f
1877.37 P%Cft 20668.80 388030 21594.76
28 1 1
1652.00 P%Cft 2800.00 46256 2925.44
R.C.C SEWER
Dismantling brick or flagged flooring without concrete foundation.
1+17 (a+b)
Earth work excavation undressed lead upto a single
throw of kassi phaorah or shovel in ordinery soil.
Transportation of of earth all types when the total
distance including the lead coverd in the item of work is
more then 1000ft and(a)upto 1/4 mile.(b) for every 330
ft additional lead or part thereof beyond 1/4 mile upto
one mile. (1.6km). Providing and laying dry brick pavement/soling in streets or roads, etc. sand grounted, laid in proper camber, including preparation, watering, compaction of bed to proper camber, and sand cushion.
Dismantling brick or flagged flooring without concrete foundation.Cement concrete brick or stone ballast 1½ " to 2" (40 mm to
50 mm) gauge, in foundation and plinth:- (f) Ratio 1: 7:20
Cement concrete plain including placing, compacting, finishing and curing complete (including screening and washing of stone aggregate): (f) Ratio 1: 2: 4
Carriage of 100 Cft. (2.83 cu.m) of all materials like stone
aggregate, spawl, kankar lime (unslaked), surkhi, etc. or 150
means owned by the contractor. Cft. (4.25 cu.m) of timber, by
truck or by any other. 0 TO 120 km (Ch.1, It.1)
15
1.PP-116 Executive Engineer
Sr.
No.
Ch
ap
ter
No
Item
No.
Discription of ItemsESTIMATED COST
RATES QUOTED BY THE CONTRACTORS
Quantity Unit Rate Amount Rate
M/S Ch. Zubair Ahmad Tarar Govt: Contractor (4.48% Above on MRS (1st
January 2017 to 30th June 2017)
29 4 45 Dismantling and removing of road metalling. 171.00 P.% Cft 1136.25 1943.0 1187.15
30 3 42 (i)
10958.10 %o Cft 5014.4 54948.0 5239.057.1'-15' ft Depth. 2812.95 %o Cft 8423.75 23696.0 8801.13
31 7 30 Supplying and filling sand under floor: or plugging in wells.777.6 % Cft 1436.70 11172 1501.06
32 21 3
12." i/d = 334 P.Rft 404.65 135153.0 422.78
15." i/d = 242 P.Rft 496.85 120238.0 519.11
33 3 13-b11016.84 %o Cft 1420.30 15647.0 1483.93
34 21 12-c
171 P%Sft 3218.35 5503 3362.53
CONSTRUCTION OF 4' DIA MANHOLE CHAMBER FOR R.C.C SEWER 12" i/d AVERAGE DEPTH 7.0' (4.No.)
Earthwork excavation in open cutting for sewers and manholes
as shown in drawings including shuttering and timbering,
dressing to correct section and dimensions according to
templates and levels, and removing surface water, in all types
of soil except shishingle, gravel and rock:- 0-7
ft Depth.
Providing and laying R.C.C. pipe sewers, moulded with
cement concrete 1:1½:3 conforming to ASTM Specification C-
76-79, Class II. Wall B, including carriage of pipe from factory
to site of work, lowering in trenches to correct alignment and
grade, jointing with rubber ring cutting pipes where necessary,
testing, etc., complete.
Rehandling of earth work excavation lead upto 50 ft taken 80% of excavation.
Black topd road with two coats of surfacing & 10" (250mm) depth of stone metal, for sub base & base.
16
1.PP-116 Executive Engineer
Sr.
No.
Ch
ap
ter
No
Item
No.
Discription of ItemsESTIMATED COST
RATES QUOTED BY THE CONTRACTORS
Quantity Unit Rate Amount Rate
M/S Ch. Zubair Ahmad Tarar Govt: Contractor (4.48% Above on MRS (1st
January 2017 to 30th June 2017)
35 3 42-i-ii
1236.84 P%oCft 5014.40 6202 5239.05
36 6 2176.74 P%Cft 3648.50 6448 3811.95
37 6 3-d88.96 P%Cft 10216.85 9089 10674.56
38 7 7199.64 P%Cft 20105.35 40138 21006.07
39 7 7Extra for pacca brick work in circular massionery.
199.64 P%Cft 1520.90 3036 1589.04
40 6 5-f
64.72 P%Cft 20668.80 13377 21594.76
41 1 1
56.96 P%Cft 2800.00 1595 2925.44
42 11 4-b316.40 P%Cft 1929.80 6106 2016.26
43 21 950.28 P%Cft 1534.10 771 1602.83
Earthwork excavation in open cutting for sewers and manholes as shown in drawings including shuttering and timbering, dressing to correct section and dimensions according to templates and levels, and removing surface water, in all types of soil except shishingle, gravel and rock:- 0-7' Depth
Dry rammed brick or stone ballast, 1½" to 2"( 40 mm to 50 mm) gauge.Brick or stone ballast 1.5" to 2" gauge in foundation and
plinth ratio 1:6:12 etc complete with all respect.Pacca brick work other than building upto 10ft. (3 m)
height in cement sand mortar ratio 1:3.
Cement concrete plain i/c compacting finishing and
curing complete i/c screening & washing of stone
aggregate. (1:2:4). For benching of manhole.Carriage of 100 Cft. (2.83 cu.m) of all materials like
stone aggregate, spawl, kankar lime (unslaked), surkhi,
etc. or 150 means owned by the contractor. Cft. (4.25
cu.m) of timber, by truck or by any other. 0 TO 120 km
(Ch.1, It.1)Cement neru plaster 1/2" thick upto 20' height 1:2 ratio
of cement mortar.Extra for making finishing benching floor work in manhole.
17
1.PP-116 Executive Engineer
Sr.
No.
Ch
ap
ter
No
Item
No.
Discription of ItemsESTIMATED COST
RATES QUOTED BY THE CONTRACTORS
Quantity Unit Rate Amount Rate
M/S Ch. Zubair Ahmad Tarar Govt: Contractor (4.48% Above on MRS (1st
January 2017 to 30th June 2017)
44 21 17
4.00 Each 6931.45 27726 7241.98
45 21 13
8.00 Each 226.90 1815 237.07
Providing and fixing, 6" (150 mm) thick R.C.C. manhole
cover with 3"x3"x¼" (75x75x6mm) angle iron frame, 22"
(550 mm) i/d as per standard drawing STD/PD No. 7 of
1977, complete in all respects.Providing and fixing 1¼"x1¼"x3/16" (31x31x5 mm) angle iron step, in manhole chambers, including carriage and setting the same in work to correct lines and levels.
18
1.PP-116 Executive Engineer
Sr.
No.
Ch
ap
ter
No
Item
No.
Discription of ItemsESTIMATED COST
RATES QUOTED BY THE CONTRACTORS
Quantity Unit Rate Amount Rate
M/S Ch. Zubair Ahmad Tarar Govt: Contractor (4.48% Above on MRS (1st
January 2017 to 30th June 2017)
CONSTRUCTION OF 4' DIA MANHOLE CHAMBER FOR R.C.C SEWER 15" i/d AVERAGE DEPTH 8.67' (2.No.)
463 42-i-ii
618.42 P%oCft 5014.40 3101 5239.05
7'-15' Depth 457.08 P%oCft 8423.75 3850 8801.13
47 6 288.37 P%Cft 3648.50 3224 3811.95
48 6 3-d44.48 P%Cft 10216.85 4544 10674.56
49 7 7232.84 P%Cft 20105.35 46813 21006.07
50 7 7Extra for pacca brick work in circular massionery.
232.84 P%Cft 1520.90 3541 1589.04
51 6 5-f
34.64 P%Cft 20668.80 7160 21594.76
52 1 1
30.48 P%Cft 2800.00 853 2925.44
53 11 4-b323.00 P%Cft 1929.80 6233 2016.26
Earthwork excavation in open cutting for sewers and manholes as shown in drawings including shuttering and timbering, dressing to correct section and dimensions according to templates and levels, and removing surface water, in all types of soil except shishingle, gravel and rock:- 0-7' Depth
Dry rammed brick or stone ballast, 1½" to 2"( 40 mm to 50 mm) gauge.Brick or stone ballast 1.5" to 2" gauge in foundation and
plinth ratio 1:6:12 etc complete with all respect.Pacca brick work other than building upto 10ft. (3 m)
height in cement sand mortar ratio 1:3.
Cement concrete plain i/c compacting finishing and
curing complete i/c screening & washing of stone
aggregate. (1:2:4). For benching of manhole.Carriage of 100 Cft. (2.83 cu.m) of all materials like
stone aggregate, spawl, kankar lime (unslaked), surkhi,
etc. or 150 means owned by the contractor. Cft. (4.25
cu.m) of timber, by truck or by any other. 0 TO 120 km
(Ch.1, It.1)Cement neru plaster 1/2" thick upto 20' height 1:2 ratio
of cement mortar.
19
1.PP-116 Executive Engineer
Sr.
No.
Ch
ap
ter
No
Item
No.
Discription of ItemsESTIMATED COST
RATES QUOTED BY THE CONTRACTORS
Quantity Unit Rate Amount Rate
M/S Ch. Zubair Ahmad Tarar Govt: Contractor (4.48% Above on MRS (1st
January 2017 to 30th June 2017)
54 21 925.14 P%Cft 1534.10 386 1602.83
55 21 17
2.00 Each 6931.45 13863 7241.98
56 21 13
14.00 Each 226.90 3177 237.07CONSTRUCTION OF GULY GRATTING 12"X12" (8.No.)
57 3 42
1257.44 P%oCft 5014.40 6305 5239.05
58 7 30 Supply and filling sand under floor etc. 209.96 P%Cft 1436.70 3016 1501.06
59 21 1-iiiProviding and laying R.C.C sewer pipe for 9" i/d
128 P.Rft 336.75 43104 351.84
60 3 13-a1005.95 P%oCft 1420.30 1429 1483.93
61 21 7-b
8.00 Each 2846.40 22771 2973.92 SIGN BOARD SIZE 4X3 = 3.No.
62 23 22-I-d84 P.Rft 173.90 14608.0 181.69
Extra for making finishing benching floor work in manhole.Providing and fixing, 6" (150 mm) thick R.C.C. manhole
cover with 3"x3"x¼" (75x75x6mm) angle iron frame, 22"
(550 mm) i/d as per standard drawing STD/PD No. 7 of
1977, complete in all respects.Providing and fixing 1¼"x1¼"x3/16" (31x31x5 mm) angle iron step, in manhole chambers, including carriage and setting the same in work to correct lines and levels.
Earthwork excavation in open cutting for sewers and manholes as shown in drawings including shuttering and timbering, dressing to correct section and dimensions according to templates and levels, and removing surface water, in all types of soil except shavel.
Rehandling of earth work excavation lead upto 50ft taken 80% of excavation.Construction of Standard gully gratting chamber 12" x 12" with china wire trap as per PHED drawing standard P/D No.3 complete in all respect.
Providing laying cutting jointing G.I pipe using for making of sign board size 1 ½" including welding complete with all respect.
20
1.PP-116 Executive Engineer
Sr.
No.
Ch
ap
ter
No
Item
No.
Discription of ItemsESTIMATED COST
RATES QUOTED BY THE CONTRACTORS
Quantity Unit Rate Amount Rate
M/S Ch. Zubair Ahmad Tarar Govt: Contractor (4.48% Above on MRS (1st
January 2017 to 30th June 2017)
63 25 10
44.76 P%Kg 11949.15 5348.0 12484.47
64 13
72.96 P%Sft 729.80 532.0 762.50
65 13 11 900 P.Words 10.45 9405.0 10.92
66 3 10-i
23.64 P%oCft 4565.10 108.0 4769.62
67 6 5-f
23.49 P%Cft 20668.80 4855.0 21594.76
68 1 1
20.67 P%Cft 2800.00 579 2925.44
Fabrication of heavy steel working with Tees flat iron round iron and sheet iron for making trusses girder’s etc including cutting drilling reverting handling assembling and fixing but excluding erection in position etc with all respect. Providing and assembling of M.S sheet with size of 4' x 3' with 1/16"SWG.Providing assembling angle iron size 1 ½" x 1 ½"
5-d-i+ii
Preparing of surface of painting guard bars, gates of iron bars gratings railing (including standards braces etc) and in similar open work. Including preming coat. 2coat of paint
Writing letter or figure per letter per inches (25mm) height.Earth work excavation in irrigation channels drain etc to
designed section grades and profiles excavated
material disposed off and dressed within 50ft (15m) lead
ordinery soil.Cement concrete plain including placing, compacting,
finishing and curing complete (including screening and
washing of stone aggregate):(f) Ratio 1: 2: 4Carriage of 100 Cft. (2.83 cu.m) of all materials like
stone aggregate, spawl, kankar lime (unslaked), surkhi,
etc. or 150 means owned by the contractor. Cft. (4.25
cu.m) of timber, by truck or by any other. 0 TO 120 km
(Ch.1, It.1)
21
1.PP-116 Executive Engineer
Sr.
No.
Ch
ap
ter
No
Item
No.
Discription of ItemsESTIMATED COST
RATES QUOTED BY THE CONTRACTORS
Quantity Unit Rate Amount Rate
M/S Ch. Zubair Ahmad Tarar Govt: Contractor (4.48% Above on MRS (1st
January 2017 to 30th June 2017)
NON-STANDARDAIZED ITEM'SR.C.C SEWER
69 N.S 735.55 P.Cft 85.77 63088.0 89.61
Deduction of old Metrial Total 584377570
N.SOlds Bricks 5350.8 P%oNos 4000.00 21403 4179.20
71 Brick Bats 254.8 P%Cft 2000.00 5096 2089.60
G.Total:- 5817276
Executive EngineerPublic Health Engineering Division
Mandi Bahauddin.
Providing placing crush stone size 1/4" to 1" in trenches
i/c local carriage leveling and dressing in proper section
complete in all respect.
As per comparative statement the bid value of lowest bidder M/S Muhammad Manzar Iqbal Government Contractor come to Rs.6075566/-against T.S estimate provision Rs.5817276/-excess/ has come to Rs.258290-or 4.44 % which is within permissible limit i/e 4.50% hence the tender of lowest bidder M/S Muhammad Manzar Iqbal Government Contractor recommended for approval please.
22
1.PP-116 Executive Engineer
COMPERATIVE OF SCHEME FOR TENDER RECEIVED ON 22-04-2017 FOR CONSTRUCTION OF STREETS & DRAINS MOHALLAHA SHAFQAT ABAD, KANDANWALA AND KOT FAZAL SHAH.
(Construction of Drains , Sullage Carriers, Brick on edge pavement, P.C.C,Tuff Tiles and R.C.C Sewer in streets with allied work)Time Limits :( 2.Months)
MRS B-I ANNUAL PERIOD 1st Janurary 2017 to 30th June 2017RATES QUOTED BY THE CONTRACTORS
Amount Rate Amount
5894 4767.79 5891
77818 10670.48 77788
104546 19114.09 104506
114550 5890.21 114506
184302 8423.92 184231
M/S Ch. Zubair Ahmad Tarar Govt: Contractor (4.48% Above on MRS (1st
January 2017 to 30th June 2017)
M/S Muhammad Manzar Iqbal Govt: Contractor (4.44% Above on MRS (1st
January 2017 to 30th June 2017)
23
1.PP-116 Executive Engineer
RATES QUOTED BY THE CONTRACTORS
Amount Rate Amount
M/S Ch. Zubair Ahmad Tarar Govt: Contractor (4.48% Above on MRS (1st
January 2017 to 30th June 2017)
M/S Muhammad Manzar Iqbal Govt: Contractor (4.44% Above on MRS (1st
January 2017 to 30th June 2017)
248428 102.19 248333
17637 252.22 17631
1799 2924.32 1798
24
1.PP-116 Executive Engineer
RATES QUOTED BY THE CONTRACTORS
Amount Rate Amount
M/S Ch. Zubair Ahmad Tarar Govt: Contractor (4.48% Above on MRS (1st
January 2017 to 30th June 2017)
M/S Muhammad Manzar Iqbal Govt: Contractor (4.44% Above on MRS (1st
January 2017 to 30th June 2017)
22317 10420.66 22308
2432 4767.79 2431
11977 10670.48 11972
51628 19114.09 51608
12970 21586.49 12965
3567 1782.58 3566
25
1.PP-116 Executive Engineer
RATES QUOTED BY THE CONTRACTORS
Amount Rate Amount
M/S Ch. Zubair Ahmad Tarar Govt: Contractor (4.48% Above on MRS (1st
January 2017 to 30th June 2017)
M/S Muhammad Manzar Iqbal Govt: Contractor (4.44% Above on MRS (1st
January 2017 to 30th June 2017)
9462 252.22 9458
2512 2924.32 2511
11972 10420.66 11968
0 0.00 0
131758 19114.09 131707
26
1.PP-116 Executive Engineer
RATES QUOTED BY THE CONTRACTORS
Amount Rate Amount
M/S Ch. Zubair Ahmad Tarar Govt: Contractor (4.48% Above on MRS (1st
January 2017 to 30th June 2017)
M/S Muhammad Manzar Iqbal Govt: Contractor (4.44% Above on MRS (1st
January 2017 to 30th June 2017)
151858 4130.60 151799
3887 21586.49 3885
1442937 98.12 1442384
27
1.PP-116 Executive Engineer
RATES QUOTED BY THE CONTRACTORS
Amount Rate Amount
M/S Ch. Zubair Ahmad Tarar Govt: Contractor (4.48% Above on MRS (1st
January 2017 to 30th June 2017)
M/S Muhammad Manzar Iqbal Govt: Contractor (4.44% Above on MRS (1st
January 2017 to 30th June 2017)
1261 504.34 1261
124077 5716.63 124030
1939459 16258.07 1938717
7569 504.34 7566
174833 9309.05 174766
405414 21586.49 405259
48328 2924.32 48310
28
1.PP-116 Executive Engineer
RATES QUOTED BY THE CONTRACTORS
Amount Rate Amount
M/S Ch. Zubair Ahmad Tarar Govt: Contractor (4.48% Above on MRS (1st
January 2017 to 30th June 2017)
M/S Muhammad Manzar Iqbal Govt: Contractor (4.44% Above on MRS (1st
January 2017 to 30th June 2017)
2030 1186.70 2029
57410 5237.04 5738824758 8797.76 24748
11673 1500.49 11668
0 0
141208 422.62 141154
125625 518.91 125577
16348 1483.36 16342
5750 3361.24 5747
29
1.PP-116 Executive Engineer
RATES QUOTED BY THE CONTRACTORS
Amount Rate Amount
M/S Ch. Zubair Ahmad Tarar Govt: Contractor (4.48% Above on MRS (1st
January 2017 to 30th June 2017)
M/S Muhammad Manzar Iqbal Govt: Contractor (4.44% Above on MRS (1st
January 2017 to 30th June 2017)
6480 5237.04 6477
6737 3810.49 6734
9496 10670.48 9493
41936 20998.03 41920
3172 1588.43 3171
13976 21586.49 13971
1666 2924.32 1666
6380 2015.48 6377
806 1602.21 805
30
1.PP-116 Executive Engineer
RATES QUOTED BY THE CONTRACTORS
Amount Rate Amount
M/S Ch. Zubair Ahmad Tarar Govt: Contractor (4.48% Above on MRS (1st
January 2017 to 30th June 2017)
M/S Muhammad Manzar Iqbal Govt: Contractor (4.44% Above on MRS (1st
January 2017 to 30th June 2017)
28968 7239.21 28957
1896 236.97 1896
31
1.PP-116 Executive Engineer
RATES QUOTED BY THE CONTRACTORS
Amount Rate Amount
M/S Ch. Zubair Ahmad Tarar Govt: Contractor (4.48% Above on MRS (1st
January 2017 to 30th June 2017)
M/S Muhammad Manzar Iqbal Govt: Contractor (4.44% Above on MRS (1st
January 2017 to 30th June 2017)
3240 5237.04 3239
4022 8797.76 4021
3368 3810.49 3367
4748 10670.48 4746
48910 20998.03 48891
3700 1588.43 3698
7481 21586.49 7478
891 2924.32 891
6512 2015.48 6510
32
1.PP-116 Executive Engineer
RATES QUOTED BY THE CONTRACTORS
Amount Rate Amount
M/S Ch. Zubair Ahmad Tarar Govt: Contractor (4.48% Above on MRS (1st
January 2017 to 30th June 2017)
M/S Muhammad Manzar Iqbal Govt: Contractor (4.44% Above on MRS (1st
January 2017 to 30th June 2017)
403 1602.21 403
14484 7239.21 14479
3319 236.97 3318
6587 5237.04 6585
3151 1500.49 3150
45035 351.70 45018
1493 1483.36 1492
23791 2972.78 23782
15262 181.62 15257
33
1.PP-116 Executive Engineer
RATES QUOTED BY THE CONTRACTORS
Amount Rate Amount
M/S Ch. Zubair Ahmad Tarar Govt: Contractor (4.48% Above on MRS (1st
January 2017 to 30th June 2017)
M/S Muhammad Manzar Iqbal Govt: Contractor (4.44% Above on MRS (1st
January 2017 to 30th June 2017)
5588 12479.69 5585
556 762.20 556
9826 10.91 9823
113 4767.79 113
5073 21586.49 5071
605 2924.32 605
34
1.PP-116 Executive Engineer
RATES QUOTED BY THE CONTRACTORS
Amount Rate Amount
M/S Ch. Zubair Ahmad Tarar Govt: Contractor (4.48% Above on MRS (1st
January 2017 to 30th June 2017)
M/S Muhammad Manzar Iqbal Govt: Contractor (4.44% Above on MRS (1st
January 2017 to 30th June 2017)
65914 89.58 65889
6105579 6103242
22362 4177.60 22354
5324 2088.80 5322
6077893 6075566
M/S Muhammad Manzar Iqbal Government Contractor come to Rs.6075566/-against T.S estimate provision Rs.5817276/-excess/ has come to Rs.258290-or 4.44 % which is within permissible limit i/e 4.50% hence the tender of lowest bidder M/S Muhammad Manzar Iqbal Government Contractor recommended for approval please.
35
Executive Engineer Superteintending Engineer
(Construction of Drains , Sullage Carriers, Brick on edge pavement, P.C.C in streets and R.C.C Sewer, with allied work)
Approximate Cost: 96.597 Million Earnest Money: 1.932 Million Time Limits :( 12.Months)
MRS B-I ANNUAL PERIOD 1st August 2014 to 31 January 2015
Sr.
No.
Ch
ap
ter
No
Item
No.
Discription of ItemsESTIMATED COST
RATES QUOTED BY THE CONTRACTORS
Quantity Unit Rate Amount Rate Amount
PART- A PROVISION OF SEWERAGE / DRAINAGE / PAVEMENT IN HAILAN AND GHANIAN, TEHSIL PHALIA
CONSTRUCTION 0F SURFACE DRAINS 19565Rft
1 3 10-i
9948.80 P%oCft 2919.85 29049 3124.24 31082
2 6 3-d5869.50 P%Cft 8420.55 494244 9009.99 528841
3 7 4-i4402.13 P%Cft 16142.65 710620 17272.64 760363
4 20 1-bii
15652 P%Rft 4817.30 754004 5154.51 806784
COMPERATIVE OF SCHEME FOR TENDER RECEIVED ON 25-03-2015 FOR PROVISION OF SEWERAGE / DRAINAGE / PAVEMENT IN HAILAN AND GHANIAN, TEHSIL PHALIA AND PROVISION OF SEWERAGE / DRAINAGE / PAVEMENT IN SARLAY, LASOORI KALAN, DUGGAL, PHALIA BOOTA (INCL. THQ HOSPITAL), TEHSIL PHALIA.
M/S Babar Zaheer & Co Govt: Contractor (7.0% Above on MRS (1st August 2014 to 31st January
2015)
Earth work excavation in irrigation channels drain etc to designed section grades and profiles excavated material disposed off and dressed within 50ft (15m) lead ordinery soil.
Cement concrete Brick or stone ballast 1.5" to 2"(40mm to 50mm) gauge, in foundation and plinth:- ratio 1:6:12 etc complete with all respect.
Pacca brick work in foundation and plinth in:-Cement, sand mortar:-Ratio 1:5
Tega formed of pacca bricks on end, laid in and over cement sand mortar projecting to a height of not more than 6" (150 mm) top of drain along the property side where required, laid to lines, grades, slopes and shape according to the Engineer's drawing:- B) 4½" thick (113 mm) ii) ratio 1:5
36
Executive Engineer Superteintending Engineer
5 20 3-b
17608.50 P%Sft 6914.80 1217593 7398.84 1302825
Pacca brick work on edge laid in reimbursement in Cement sand mortar on sides drains and on other works where required all joints to be completely filled and struck flush ratio 1:5…
37
Executive Engineer Superteintending Engineer
6 20 6-a
19565 P/Rft 86.10 1684547 92.13 1802465
7 6 6 (a-ii) 3
1795.05 P/Cft 220.95 396616 236.42 424379
8 6 9-b
5498.00 P%Kg 11402.05 626885 12200.19 670767
CONSTRUCTION OF SULLAGE / STORM WATRER CHANNELS 1.0' X 1.0' = 2700 Rft. 0.00 0
9 3 10-i
10125 P%oCft 2919.85 29563 3124.24 31632
10 6 3-d
2531.25 P%Cft 8420.55 213145 9009.99 228065
Constructing Punjab Standard Drains. of cement concrete 1:2 ½ :5, with cement concrete bedding ratio 1:6:12, complete, laid to lines, grades, slopes and shapes, rendering exposed surface of concrete with 1:1 cement, sand mortar, ¼" (6 mm) thick, as per Engineer's drawing (excluding excavation):-a) Type I
Providing and laying reinforced cement concrete (including prestressed concrete), using coarse sand and screened graded and washed aggregate, in required shape and design,including forms, moulds, shuttering, lifting, compacting,curing, rendering and finishing exposed surface, complete (but excluding the cost of steel reinforcement, its fabrication and placing in position, etc.):- (a)(ii) Reinforced cement concrete in slab of rafts / strip foundation, base slab of column and retaining walls; etc and other structural members other than those mentioned in 5(a) (i) above not requiring form work (i.e. horizental shuttering) complete in all respects:- (3) type C ( nominal mix 1:2:4)
Fabrication of mild steel reinforcement for cement concrete, including cutting, bending, laying in position, making joints and fastenings, including cost of binding wire and labour charges for binding of steel reinforcement (also includesremoval of rust from bars):- (b) Deformed bars (Grade-40)
Earth work excavation in irrigation channels drain etc to designed section grades and profiles excavated material disposed off and dressed within 50ft (15m) lead ordinery soil.
Cement concrete Brick or stone ballast 1.5" to 2" gauge in foundation and plinth ratio 1:6:12 etc complete with all respect.
38
Executive Engineer Superteintending Engineer
11 7 4-i6075 P%Cft 16142.65 980666 17272.64 1049313
Pacca brick work in foundation and plinth in:-Cement, sand mortar:-Ratio 1:5
39
Executive Engineer Superteintending Engineer
12 6 5-F
1465.43 P%Cft 19236.35 281895 20582.89 301628
13 11 9-b4050 P%Sft 1290.85 52279 1381.21 55939
CONSTRUCTION OF SULLAGE / STORM WATRER CHANNELS 1.5' X 1.5' = 1950 Rft 0.00 0
14 3 10-i
12431.25 P%oCft 2919.85 36297 3124.24 38838
15 6 3-d
2734.88 P%Cft 8420.55 230292 9009.99 246412
16 7 4-i6581.25 P%Cft 16142.65 1062388 17272.64 1136755
17 6 5-F
1463.96 P%Cft 19236.35 281612 20582.89 301325
18 11 9-b4875 P%Sft 1290.85 62929 1381.21 67334
Brick Pavement 0.00 0
19 4 293600 P%Sft 309.65 11147 331.33 11927
20 3 1+17 (a+b)
17613.37 P%oCft 4191.95 73834 4485.39 79002
Cement concrete plain including placing, compacting, finishing and curing complete (including screening and washing of stone aggregate): (f) Ratio 1: 2: 4
Cement plaster 1:4 upto 20' (6m) height:- 1/2" (13mm) thick.
Earth work excavation in irrigation channels drain etc to designed section grades and profiles excavated material disposed off and dressed within 50ft (15m) lead ordinery soil.
Brick or stone ballast 1.5" to 2" gauge in foundation and plinth ratio 1:6:12 etc complete with all respect.Pacca brick work in foundation and plinth in:-Cement, sand mortar:-Ratio 1:5
Cement concrete plain including placing, compacting, finishing and curing complete (including screening and washing of stone aggregate): (f) Ratio 1: 2: 4
Cement plaster 1:4 upto 20' (6m) height:- 1/2" (13mm) thick.
Dismantling brick or flagged flooring without concrete foundation.
Earth work excavation undressed lead upto a single throw of kassi phaorah or shovel in ordinery soil. Transportation of of earth all types when the total distance including the lead coverd in the item of work is more then 1000ft and (a)upto 1/4 mile.(b) for every 330 ft additional lead or part thereof beyond 1/4 mile upto one mile. (1.6km).
40
Executive Engineer Superteintending Engineer
21 18 19
17096.35 P%Cft 13538.30 2314555 14485.98 2476574
Providing and laying dry brick pavement/soling in streets or roads, etc. sand grounted, laid in proper camber, including preparation, watering, compaction of bed to proper camber, and sand cushion.
41
Executive Engineer Superteintending Engineer
PLAIN CEMENT CONCRETE 0.00 0
22 4 2965280 P%Sft 309.65 202140 331.33 216290
23 6 3-f
26122 P%Cft 7191.70 1878616 7695.12 2010119
24 6 5-f
26122 P%Cft 19236.35 5024919 20582.89 5376663R.C.C SEWER 0.00 0
25 4 4539974.25 P.% Cft 728.65 291272 779.66 311661
26 4 2922945.55 P%Sft 309.65 71051 331.33 76025
27 4 19-d1907.81 P.% Cft 1092.95 20851 1169.46 22311
28 4 19-c Dismantling cement concrete plain 1:2:4 1907.81 P.% Cft 4007.50 76455 4288.03 81807
29 3 42 (i)
463520.64 %o Cft 3337.85 1547162 3571.50 165546330 3 42-ii 7-15Ft 160440.26 %o Cft 5588.05 896548 5979.21 959306
31 7 3020658.48 % Cft 1231.80 254471 1318.03 272284
32 21 1
1900 P.Rft 298.70 567530 319.61 607257
Dismantling brick or flagged flooring without concrete foundation.Cement concrete brick or stone ballast 1½ " to 2" (40 mm to 50 mm) gauge, in foundation and plinth:- (f) Ratio 1: 7:20
Cement concrete plain including placing, compacting, finishing and curing complete (including screening and washing of stone aggregate): (f) Ratio 1: 2: 4
Dismantling and removing road metaling i/c separating and screening of agregate.
Dismantling brick or flagged flooring without concrete foundation.Dismantling of cement concrete with brick aggrigate.
Earth work excavation open cutting for sewers and manholes showing in drawing etc. complete 0-7 ft Depth.
Supplying and filling sand under floor: or plugging in wells.
Providing and laying R.C.C. pipe, moulded with cement concrete 1:1 1/2:3, with spigot socket or collar joint, etc including cost of reinforcement, conforming to B.S. 5911 PART I: 1981, Class ''L'' including carriage of pipe from factory to site of work, 9" i/d
42
Executive Engineer Superteintending Engineer
33 21 3
0.00 #VALUE!12" i/d = 6980 P.Rft 369.35 2578063 395.20 275852718" i/d = 3995 P.Rft 491.60 1963942 526.01 2101418
Providing and laying R.C.C. pipe sewers, moulded with cement concrete 1:1½:3 conforming to ASTM Specification C-76-79, Class II. Wall B, including carriage of pipe from factory to site of work, lowering in trenches to correct alignment and grade, jointing with rubber ring cutting pipes where necessary, testing, etc., complete.
43
Executive Engineer Superteintending Engineer
33 21 3
24" i/d = 1920 P.Rft 755.70 1450944 808.60 155251030" i/d = 4100 P.Rft 1120.30 4593230 1198.72 4914756
34 3 13-b499168.72 %o Cft 910.80 454643 974.56 486468
35 21 12-c
39974.25 %Sft 4390.25 1754970 4697.57 1877818
36 21 1022945.55 %Sft 2596.40 595758 2778.15 637461
37 6 3-d
1907.81 P%Cft 7191.70 137204 7695.12 146808
38 6 5-f
1907.81 P%Cft 19236.35 366993 20582.89 392683OUT FALL STRICTURE 2.NOS 0.00 0
39 3 21-b
526.5 P%oCft 3833.30 2018 4101.63 2159
40 6 3-b84.50 P%Cft 10263.80 8673 10982.27 9280
41 7 4-i439.67 P%Cft 17328.85 76190 18541.87 81523
42 11 18-b210 P%Sft 1382.85 2904 1479.65 3107
43 6 5-f
11.88 P%Cft 19236.35 2285 20582.89 2445
Rehandling of earth work excavation lead upto 50 ft taken 80% of excavation.
Restoration of metalled road, on laid service line, including compaction:- c) Black Topped Road with two coats of surfacing & 10" (250 mm) depth of stone metal, for sub base & base.
Restoration of brick pavement on edge, over laid service line, with 2" (50 mm) sand cushion under soling.
Cement concrete brick or stone ballast 1½ " to 2" (40 mm to 50 mm) gauge, in foundation and plinth ratio 1:7:20Cement concrete plain including placing, compacting, finishing and curing complete (including screening and washing of stone aggregate): (f) Ratio 1: 2: 4.
Excavation in foundation of building, bridges and other structure with excavated earth, watering and ramming lead upto one chain (30 m) and lift upto 5 ft. (1.5 m). b) in ordinary soil.
Cement concrete brick or stone ballast 1½ " to 2" (40 mm to 50 mm) gauge, in foundation and plinth:- (f) Ratio 1: 4:8
Pacca brick work in foundation and plinth in:- i) Cement, sand mortar:- Ratio 1:3
Cement pointing struck joints, on walls, upto a) ratio 1:2.
Cement concrete plain including placing, compacting, finishing and curing complete (including screening and washing of stone aggregate): (f) Ratio 1: 2: 4
44
Executive Engineer Superteintending Engineer
44 6 6-ii-c
78.23 P/Cft 220.95 17285 236.42 18495
45 6 9-b
177.47 P%Kg 11402.05 20235 12200.19 21651
46 6 2135.45 P%Cft 2818.20 3817 3015.47 4084
CONSTRUCTION OF 4' DIA MANHOLE CHAMBER FOR R.C.C SEWER 9" i/d AVERAGE DEPTH 7.0' (25.No.)0.00 0
47 3 42
7732.28 P%oCft 3337.85 25809 3571.50 27616
48 6 21104.61 P%Cft 2818.20 31130 3015.47 33309
Providing and laying reinforced cement concrete (including prestressed concrete), using coarse sand and screened graded and washed aggregate, in required shape and design,including forms, moulds, shuttering, lifting, compacting,curing, rendering and finishing exposed surface, complete (but excluding the cost of steel reinforcement, its fabrication and placing in position, etc.):- (a)(ii) Reinforced cement concrete in slab of rafts / strip foundation, base slab of column and retaining walls; etc and other structural members other than those mentioned in 5(a) (i) above not requiring form work (i.e. horizental shuttering) complete in all respects:-(Chapter 6 Item No. 6 (a) (3)
Fabrication of mild steel reinforcement for cement concrete, including cutting, bending, laying in position, making joints and fastenings, including cost of binding wire and labour charges for binding of steel reinforcement (also includes removal of rust from bars):- (b) Deformed bars (Grade-40)Dry rammed brick or stone ballast, 1½" to 2"( 40 mm to 50 mm) gauge.
Earthwork excavation in open cutting for sewers and manholes as shown in drawings including shuttering and timbering, dressing to correct section and dimensions according to templates and levels, and removing surface water, in all types of soil except shishingle, gravel and rock:-
Dry rammed brick or stone ballast, 1½" to 2"( 40 mm to 50 mm) gauge.
45
Executive Engineer Superteintending Engineer
49 6 3-d555.89 P%Cft 8420.55 46809 9009.99 50086
50 7 71290.44 P%Cft 17715.30 228605 18955.37 244607
51 7 7Extra for pacca brick work in circular massionery. 1290.44 P%Cft 1256.50 16214 1344.46 17349
Brick or stone ballast 1.5" to 2" gauge in foundation and plinth ratio 1:6:12 etc complete with all respect.
Pacca brick work other than building upto 10ft. (3 m) height in cement sand mortar ratio 1:3.
46
Executive Engineer Superteintending Engineer
52 6 5-f
314.85 P%Cft 19236.35 60565 20582.89 64805
53 11 4-b2044.60 P%Cft 1504.95 30770 1610.30 32924
54 21 9314.20 P%Cft 1189.20 3736 1272.44 3998
55 21 17
25.00 Each 4194.65 104866 4488.28 112207
56 21 13
75.00 Each 235.40 17655 251.88 18891
CONSTRUCTION OF 4' DIA MANHOLE CHAMBER FOR R.C.C SEWER 12" i/d AVERAGE DEPTH 6'.53' (75.No.)0.00 0
57 3 42
17139.00 P%oCft 3337.85 57207 3571.50 61211
58 6 23313.83 P%Cft 2818.20 93390 3015.47 99927
59 6 3-d2074.72 P%Cft 8420.55 174703 9009.99 186932
60 7 73160.16 P%Cft 17715.30 559832 18955.37 599020
61 7 7Extra for pacca brick work in circular massionery. 3160.16 P%Cft 1256.50 39707 1344.46 42486
Cement concrete plain i/c compacting finishing and curing complete i/c screening & washing of stone aggregate. (1:2:4). For benching of manhole.
Cement neru plaster 1/2" thick upto 20' height 1:2 ratio of cement mortar.
Extra for making finishing benching floor work in manhole.
Providing and fixing, 6" (150 mm) thick R.C.C. manhole cover with 3"x3"x¼" (75x75x6mm) angle iron frame, 22" (550 mm) i/d as per standard drawing STD/PD No. 7 of 1977, complete in all respects.
Providing and fixing 1¼"x1¼"x3/16" (31x31x5 mm) angle iron step, in manhole chambers, including carriage and setting the same in work to correct lines and levels.
Earthwork excavation in open cutting for sewers and manholes as shown in drawings including shuttering and timbering, dressing to correct section and dimensions according to templates and levels, and removing surface water, in all types of soil except shishingle, gravel and rock:-
Dry rammed brick or stone ballast, 1½" to 2"( 40 mm to 50 mm) gauge.
Brick or stone ballast 1.5" to 2" gauge in foundation and plinth ratio 1:6:12 etc complete with all respect.
Pacca brick work other than building upto 10ft. (3 m) height in cement sand mortar ratio 1:3.
47
Executive Engineer Superteintending Engineer
62 6 5-f
1213.82 P%Cft 19236.35 233495 20582.89 249840
63 11 4-b5053.06 P%Cft 1504.95 76046 1610.30 81369
Cement concrete plain i/c compacting finishing and curing complete i/c screening & washing of stone aggregate. (1:2:4). For benching of manhole.
Cement neru plaster 1/2" thick upto 20' height 1:2 ratio of cement mortar.
48
Executive Engineer Superteintending Engineer
64 21 9942.60 P%Cft 1189.20 11209 1272.44 11994
65 21 1775.00 Each 4194.65 314599 4488.28 336621
66 21 13
225.00 Each 235.40 52965 251.88 56673
CONSTRUCTION OF 4' DIA MANHOLE CHAMBER FOR R.C.C SEWER 18" i/d AVERAGE DEPTH 6.98' (40.No.)0.00 0
67 3 42-i-ii
12371.60 P%oCft 3337.85 41295 3571.50 44186
68 6 21767.20 P%Cft 2818.20 49803 3015.47 53289
69 6 3-d889.60 P%Cft 8420.55 74909 9009.99 80153
70 7 71620.00 P%Cft 17715.30 286988 18955.37 307077
71 7 7Extra for pacca brick work in circular massionery. 1620.00 P%Cft 1256.50 20355 1344.46 21780
72 6 5-f
720.00 P%Cft 19236.35 138502 20582.89 148197
73 11 4-b2837.60 P%Cft 1504.95 42704 1610.30 45693
74 21 9502.80 P%Cft 1189.20 5979 1272.44 6398
Extra for making finishing benching floor work in manhole.Providing and fixing, 6" (150 mm) thick R.C.C. manhole cover with 3"x3"x¼" (75x75x6mm) angle iron frame, 22" (550 mm) i/d as per standard drawing STD/PD No. 7 of 1977, complete in all respects.
Providing and fixing 1¼"x1¼"x3/16" (31x31x5 mm) angle iron step, in manhole chambers, including carriage and setting the same in work to correct lines and levels.
Earthwork excavation in open cutting for sewers and manholes as shown in drawings including shuttering and timbering, dressing to correct section and dimensions according to templates and levels, and removing surface water, in all types of soil except shavel. 0'-7' depth
Dry rammed brick or stone ballast, 1½" to 2"( 40 mm to 50 mm) gauge.
Brick or stone ballast 1.5" to 2" gauge in foundation and plinth ratio 1:6:12 etc complete with all respect.
Pacca brick work other than building upto 10ft. (3 m) height in cement sand mortar ratio 1:3.
Cement concrete plain i/c compacting finishing and curing complete i/c screening & washing of stone aggregate. (1:2:4). For benching of manhole.
Cement neru plaster 1/2" thick upto 20' height 1:2 ratio of cement mortar.
Extra for making finishing benching floor work in manhole.
49
Executive Engineer Superteintending Engineer
75 21 17
40.00 Each 4194.65 167786 4488.28 179531
Providing and fixing, 6" (150 mm) thick R.C.C. manhole cover with 3"x3"x¼" (75x75x6mm) angle iron frame, 22" (550 mm) i/d as per standard drawing STD/PD No. 7 of 1977, complete in all respects.
50
Executive Engineer Superteintending Engineer
76 21 13
120.00 Each 235.40 28248 251.88 30225
CONSTRUCTION OF 5' DIA MANHOLE CHAMBER FOR R.C.C SEWER 24" to 30" i/d AVERAGE DEPTH 14' (36.No.)0.00 0
77 3 42-i-ii-iii
16936.92 P%oCft 3337.85 56533 3571.50 604907'-15' ft depth 16936.92 P%oCft 5588.05 94644 5979.21 101269
78 6 22419.56 P%Cft 2818.20 68188 3015.47 72961
79
6 3-d1289.52 P%Cft 8420.55 108585 9009.99 116186
7 7-i+85943.24 P%Cft 18197.30 1081509 19471.11 1157215
80 7 7Extra for pacca brick work in circular massionery. 6074.28 P%Cft 1256.50 76323 1344.46 81666
81 6 5-f
872.64 P%Cft 19236.35 167864 20582.89 179614
82 11 4-b8043.12 P%Cft 1504.95 121045 1610.30 129518
83 21 9707.04 P%Cft 1189.20 8408 1272.44 8997
84 21 17
36.00 Each 4194.65 151007 4488.28 161577
Providing and fixing 1¼"x1¼"x3/16" (31x31x5 mm) angle iron step, in manhole chambers, including carriage and setting the same in work to correct lines and levels.
Earthwork excavation in open cutting for sewers and manholes as shown in drawings including shuttering and timbering, dressing to correct section and dimensions according to templates and levels, and removing surface water, in all types of soil except shavel. 0'-7' depth
Dry rammed brick or stone ballast, 1½" to 2"( 40 mm to 50 mm) gauge.
Brick or stone ballast 1.5" to 2" gauge in foundation and plinth ratio 1:6:12 etc complete with all respect.
Pacca brick work other than building upto 10ft. (3 m) height in cement sand mortar ratio 1:3.
Cement concrete plain i/c compacting finishing and curing complete i/c screening & washing of stone aggregate. (1:2:4). For benching of manhole.
Cement neru plaster 1/2" thick upto 20' height 1:2 ratio of cement mortar.
Extra for making finishing benching floor work in manhole.
Providing and fixing, 6" (150 mm) thick R.C.C. manhole cover with 3"x3"x¼" (75x75x6mm) angle iron frame, 22" (550 mm) i/d as per standard drawing STD/PD No. 7 of 1977, complete in all respects.
51
Executive Engineer Superteintending Engineer
85 21 13
324.00 Each 235.40 76270 251.88 81609
Providing and fixing 1¼"x1¼"x3/16" (31x31x5 mm) angle iron step, in manhole chambers, including carriage and setting the same in work to correct lines and levels.
52
Executive Engineer Superteintending Engineer
CONSTRUCTION OF GULY GRATTING 12"X12" (238.No.) 0.00 0
86 3 42
37408.84 P%oCft 3337.85 124865 3571.50 13360687 7 30 supply and filling sand under floor etc. 6246.31 P%Cft 1231.80 76942 1318.03 82328
88 21 1-iiiProviding and laying R.C.C sewer pipe for 9" i/d 3808 P.Rft 298.70 1137450 319.61 1217072
89 3 13-a29927.07 P%oCft 910.80 27258 974.56 29166
90 21 7-b
238.00 Each 2485.80 591620 2659.81 633033
0.00 0
91 CONSTRUCTION 0F SURFACE DRAINS =9182Rft 0.00 0
92 3 10-i
4669.05 P%oCft 2919.85 13633 3124.24 14587
93 6 3-d
2754.60 P%Cft 8420.55 231952 9009.99 248189
94 7 4-i2065.95 P%Cft 16142.65 333499 17272.64 356844
95 20 1-bii
7345.6 P%Rft 4817.30 353860 5154.51 378630
Earthwork excavation in open cutting for sewers and manholes as shown in drawings including shuttering and timbering, dressing to correct section and dimensions according to templates and levels, and removing surface water, in all types of soil except shavel.
Rehandling of earth work excavation lead upto 50ft taken 80% of excavation.
Construction of Standard gully gratting chamber 12" x 12" with china wire trap as per PHED drawing standard P/D No.3 complete in all respect.
PART- B PROVISION OF SEWERAGE / DRAINAGE / PAVEMENT IN SARLY, LASOORI KALAN, DUGGAL, PHALIA BOOTA ( INCL. THQ HOSPITAL),TEHSIL PHALIA
Earth work excavation in irrigation channels drain etc to designed section grades and profiles excavated material disposed off and dressed within 50ft (15m) lead ordinery soil.
Cement concrete Brick or stone ballast 1.5" to 2" gauge in foundation and plinth ratio 1:6:12 etc complete with all respect.
Pacca brick work in foundation and plinth in:-Cement, sand mortar:-Ratio 1:5
Tega formed of pacca bricks on end, laid in and over cement sand mortar projecting to a height of not more than 6" (150 mm) top of drain along the property side where required, laid to lines, grades, slopes and shape according to the Engineer's drawing:- B) 4½" thick (113 mm) ii) ratio 1:5
53
Executive Engineer Superteintending Engineer
96 20 3-b
8263.8 P%Sft 6914.80 571425 7398.84 611425
97 20 6-a
9182 P/Rft 86.10 790570 92.13 845910
98 6 6 (a-ii) 3
1047.14 P/Cft 220.95 231366 236.42 247562
99 6 9-b
3207.00 P%Kg 11402.05 365664 12200.19 391260CONSTRUCTION OF SULLAGE / STORM WATRER CHANNELS 1.0' X 1.0' = 5375 Rft. 0.00 0
Pacca brick work on edge laid in reimbursement in Cement sand mortar on side drains and on other works where required all joints to be completely filled and struck flush ratio 1:5…
Constructing Punjab Standard Drains. of cement concrete 1:2 ½ :5, with cement concrete bedding ratio 1:6:12, complete, laid to lines, grades, slopes and shapes, rendering exposed surface of concrete with 1:1 cement, sand mortar, ¼" (6 mm) thick, as per Engineer's drawing (excluding excavation):-a) Type I
Providing and laying reinforced cement concrete (including prestressed concrete), using coarse sand and screened graded and washed aggregate, in required shape and design,including forms, moulds, shuttering, lifting, compacting,curing, rendering and finishing exposed surface, complete (but excluding the cost of steel reinforcement, its fabrication and placing in position, etc.):- (a)(ii) Reinforced cement concrete in slab of rafts / strip foundation, base slab of column and retaining walls; etc and other structural members other than those mentioned in 5(a) (i) above not requiring form work (i.e. horizental shuttering) complete in all respects:-(3) type C ( nominal mix 1:2:4)
Fabrication of mild steel reinforcement for cement concrete, including cutting, bending, laying in position, making joints and fastenings, including cost of binding wire and labour charges for binding of steel reinforcement (also includesremoval of rust from bars):- (b) Deformed bars (Grade-40)
54
Executive Engineer Superteintending Engineer
100 3 10-i
20156.25 P%oCft 2919.85 58853 3124.24 62973
101 6 3-d
5039.06 P%Cft 8420.55 424317 9009.99 454019
102 7 4-i12093.75 P%Cft 16142.65 1952252 17272.64 2088910
Earth work excavation in irrigation channels drain etc to designed section grades and profiles excavated material disposed off and dressed within 50ft (15m) lead ordinery soil.
Cement concrete Brick or stone ballast 1.5" to 2" gauge in foundation and plinth ratio 1:6:12 etc complete with all respect.
Pacca brick work in foundation and plinth in:-Cement, sand mortar:-Ratio 1:5
55
Executive Engineer Superteintending Engineer
104 6 5-F
2917.275 P%Cft 19236.35 561177 20582.89 600459
105 11 9-b8063.00 P%Sft 1290.85 104081 1381.21 111367
CONSTRUCTION OF SULLAGE / STORM WATRER CHANNELS 1.25' X 1.25' = 2705 Rft 0.00 0
106 3 10-i
13525 P%oCft 2919.85 39491 3124.24 42255
107 6 3-d
2705.00 P%Cft 8420.55 227776 9009.99 243720
108 7 4-i7607.81 P%Cft 16142.65 1228102 17272.64 1314069
109 6 5-F
1861.710 P%Cft 19236.35 358125 20582.89 383194
110 11 9-b5410.0 P%Sft 1290.85 69835 1381.21 74723
CONSTRUCTION OF SULLAGE / STORM WATRER CHANNELS 1.5' X 1.5' = 660 Rft 0.00 0
111 3 10-i
14726.25 P%oCft 2919.85 42998 3124.24 46008
112 6 3-d
3239.78 P%Cft 8420.55 272807 9009.99 291903
113 7 4-i7796.25 P%Cft 16142.65 1258521 17272.64 1346617
Cement concrete plain including placing, compacting, finishing and curing complete (including screening and washing of stone aggregate): (f) Ratio 1: 2: 4
Cement plaster 1:4 upto 20' (6m) height:- 1/2" (13mm) thick.
Earth work excavation in irrigation channels drain etc to designed section grades and profiles excavated material disposed off and dressed within 50ft (15m) lead ordinery soil.
Brick or stone ballast 1.5" to 2" gauge in foundation and plinth ratio 1:6:12 etc complete with all respect.
Pacca brick work in foundation and plinth in:-Cement, sand mortar:-Ratio 1:5
Cement concrete plain including placing, compacting, finishing and curing complete (including screening and washing of stone aggregate): (f) Ratio 1: 2: 4
Cement plaster 1:4 upto 20' (6m) height:- 1/2" (13mm) thick.
Earth work excavation in irrigation channels drain etc to designed section grades and profiles excavated material disposed off and dressed within 50ft (15m) lead ordinery soil.
Brick or stone ballast 1.5" to 2" gauge in foundation and plinth ratio 1:6:12 etc complete with all respect.
Pacca brick work in foundation and plinth in:-Cement, sand mortar:-Ratio 1:5
56
Executive Engineer Superteintending Engineer
114 6 5-F
1734.23 P%Cft 19236.35 333603 20582.89 356955
115 11 9-b5775 P%Sft 1290.85 74547 1381.21 79765
CONSTRUCTION OF SULLAGE / STORM WATRER CHANNELS 2.0' X 2.0' =3360 Rft 0.00 0
Cement concrete plain including placing, compacting, finishing and curing complete (including screening and washing of stone aggregate): (f) Ratio 1: 2: 4
Cement plaster 1:4 upto 20' (6m) height:- 1/2" (13mm) thick.
57
Executive Engineer Superteintending Engineer
116 3 10-i
31920 P%oCft 2919.85 93202 3124.24 99726
117 6 3-d
5266.80 P%Cft 8420.55 443494 9009.99 474539
118 7 4-i15120 P%Cft 16142.65 2440769 17272.64 2611623
119 6 5-F
2942.52 P%Cft 19236.35 566033 20582.89 605655
120 11 9-b11760 P%Sft 1290.85 151804 1381.21 162430
Brick Pavement 0.00 0
121 4 295400 P%Sft 309.65 16721 331.33 17891
122 3 1+17 (a+b)
25819.74 P%oCft 4191.95 108235 4485.39 115811
123 18 19
43730.96 P%Cft 13538.30 5920429 14485.98 6334859PLAIN CEMENT CONCRETE 0.00 0
124 4 2929403 P%Sft 309.65 91046 331.33 97419
Earth work excavation in irrigation channels drain etc to designed section grades and profiles excavated material disposed off and dressed within 50ft (15m) lead ordinery soil.
Brick or stone ballast 1.5" to 2" gauge in foundation and plinth ratio 1:6:12 etc complete with all respect.
Pacca brick work in foundation and plinth in:-Cement, sand mortar:-Ratio 1:5
Cement concrete plain including placing, compacting, finishing and curing complete (including screening and washing of stone aggregate): (f) Ratio 1: 2: 4
Cement plaster 1:4 upto 20' (6m) height:- 1/2" (13mm) thick.
Dismantling brick or flagged flooring without concrete foundation.
Earth work excavation undressed lead upto a single throw of kassi phaorah or shovel in ordinery soil. Transportation of of earth all types when the total distance including the lead coverd in the item of work is more then 1000ft and (a)upto 1/4 mile. (b) for every 330 ft additional lead or part thereof beyond 1/4 mile upto one mile. (1.6km).
Providing and laying dry brick pavement/soling in streets or roads, etc. sand grounted, laid in proper camber, including preparation, watering, compaction of bed to proper camber, and sand cushion.
Dismantling brick or flagged flooring without concrete foundation.
58
Executive Engineer Superteintending Engineer
125 6 3-f
15203 P%Cft 7191.70 1093354 7695.12 1169889
Cement concrete brick or stone ballast 1½ " to 2" (40 mm to 50 mm) gauge, in foundation and plinth:- (f) Ratio 1: 7:20
59
Executive Engineer Superteintending Engineer
126 6 5-f
15203 P%Cft 19236.35 2924502 20582.89 3129217R.C.C SEWER 0.00 0
127 4 4517024.5 P.% Cft 728.65 124049 779.66 132732
128 4 2913088.75 P%Sft 309.65 40529 331.33 43366
129 4 19-d835.31 P.% Cft 1092.95 9130 1169.46 9769
130 4 19-c Dismantling cement concrete plain 1:2:4 835.31 P.% Cft 4007.50 33475 4288.03 35818
131 3 42 (i)
484525.68 %o Cft 3337.85 1617274 3571.50 17304833 42-ii 7-15Ft 20900.78 %o Cft 5588.05 116795 5979.21 124971
132 7 3016533.86 % Cft 1231.80 203664 1318.03 217920
133 21 1
3815 P.Rft 298.70 1139541 319.61 1219309
Cement concrete plain including placing, compacting, finishing and curing complete (including screening and washing of stone aggregate): (f) Ratio 1: 2: 4
Dismantling and removing road metaling i/c separating and screening of agregate.
Dismantling brick or flagged flooring without concrete foundation.Dismantling of cement concrete with brick aggrigate.
Earthwork excavation in open cutting for sewers and manholes as shown in drawings including shuttering and timbering, dressing to correct section and dimensions according to templates and levels, and removing surface water, in all types of soil except shishingle, gravel and rock:-0-7ft depth
Supplying and filling sand under floor: or plugging in wells.
Providing and laying R.C.C. pipe, moulded with cement concrete 1:1 1/2:3, with spigot socket or collar joint, etc including cost of reinforcement, conforming to B.S. 5911 PART I: 1981, Class ''L'' including carriage of pipe from factory to site of work, 9" i/d
60
Executive Engineer Superteintending Engineer
134 21 3 0.00 #VALUE!
12" i/d = 7124 P.Rft 369.35 2631249 395.20 281543615" i/d = 4672 P.Rft 452.85 2115715 484.55 2263815
Providing and laying R.C.C. pipe sewers, moulded with cement concrete 1:1½:3 conforming to ASTM Specification C-76-79, Class II. Wall B, including carriage of pipe from factory to site of work, lowering in trenches to correct alignment and grade, jointing with rubber ring cutting pipes where necessary, testing, etc., complete.
61
Executive Engineer Superteintending Engineer
134 21 3
18" i/d = 4950 P.Rft 491.60 2433420 526.01 260375921" i/d = 2056 P.Rft 630.95 1297233 675.12 138803924" i/d = 585 P.Rft 755.70 442085 808.60 473031
135 3 13-b404341.17 %o Cft 910.80 368274 974.56 394053
136 21 12-c
17024.50 %Sft 4390.25 747418 4697.57 799737
137 21 1013088.75 %Sft 2596.40 339836 2778.15 363625
138 6 3-d
835.31 P%Cft 7191.70 60073 7695.12 64278
139 6 5-f
835.31 P%Cft 19236.35 160683 20582.89 171931OUT FALL STRUCTURE= 5.No 0.00 0
140 3 21-b
1316.25 P%oCft 3833.30 5046 4101.63 5399
141 6 3-b211.25 P%Cft 10263.80 21682 10982.27 23200
142 7 4-i1115.03 P%Cft 17328.85 193222 18541.87 206748
143 11 18-b525 P%Sft 1382.85 7260 1479.65 7768
144 6 5-f
29.70 P%Cft 19236.35 5713 20582.89 6113
Rehandling of earth work excavation lead upto 50 ft taken 80% of excavation.
Restoration of metalled road, on laid service line, including compaction:- c) Black Topped Road with two coats of surfacing & 10" (250 mm) depth of stone metal, for sub base & base.
Restoration of brick pavement on edge, over laid service line, with 2" (50 mm) sand cushion under soling.
Cement concrete brick or stone ballast 1½ " to 2" (40 mm to 50 mm) gauge, in foundation and plinth ratio 1:7:20Cement concrete plain including placing, compacting, finishing and curing complete (including screening and washing of stone aggregate):(f) Ratio 1: 2: 4.
Excavation in foundation of building, bridges and other structure with excavated earth, watering and ramming lead upto one chain (30 m) and lift upto 5 ft. (1.5 m). b) in ordinary soil.
Cement concrete brick or stone ballast 1½ " to 2" (40 mm to 50 mm) gauge, in foundation and plinth:- (f) Ratio 1: 4:8
Pacca brick work in foundation and plinth in:- i) Cement, sand mortar:- Ratio 1:3
Cement pointing struck joints, on walls, upto a) ratio 1:2.
Cement concrete plain including placing, compacting, finishing and curing complete (including screening and washing of stone aggregate): (f) Ratio 1: 2: 4
62
Executive Engineer Superteintending Engineer
145 6 6-a-ii-3
195.57 P/Cft 220.95 43211 236.42 46236
146 6 9-b
443.67 P%Kg 11402.05 50587 12200.19 54128
147 6 2338.625 P%Cft 2818.20 9543 3015.47 10211
CONSTRUCTION OF 4' DIA MANHOLE CHAMBER FOR R.C.C SEWER 9" i/d AVERAGE DEPTH 7..41' (90.No.)0.00 0
148 3 42
27836.190 P%oCft 3337.85 92913 3571.50 994177'-15' ft depth 1630.80 P%oCft 5588.05 9113 5979.21 9751
Providing and laying reinforced cement concrete (including prestressed concrete), using coarse sand and screened graded and washed aggregate, in required shape and design,including forms, moulds, shuttering, lifting, compacting,curing, rendering and finishing exposed surface, complete (but excluding the cost of steel reinforcement, its fabrication and placing in position, etc.):- (a)(ii) Reinforced cement concrete in slab of rafts / strip foundation, base slab of column and retaining walls; etc and other structural members other than those mentioned in 5(a) (i) above not requiring form work (i.e. horizental shuttering) complete in all respects:-
Fabrication of mild steel reinforcement for cement concrete, including cutting, bending, laying in position, making joints and fastenings, including cost of binding wire and labour charges for binding of steel reinforcement (also includes removal of rust from bars):- (b) Deformed bars (Grade-40)Dry rammed brick or stone ballast, 1½" to 2"( 40 mm to 50 mm) gauge.
Earthwork excavation in open cutting for sewers and manholes as shown in drawings including shuttering and timbering, dressing to correct section and dimensions according to templates and levels, and removing surface water, in all types of soil except shishingle, gravel and rock:-
63
Executive Engineer Superteintending Engineer
149 6 23976.60 P%Cft 2818.20 112068 3015.47 119913
150 6 3-d2001.195 P%Cft 8420.55 168512 9009.99 180308
Dry rammed brick or stone ballast, 1½" to 2"( 40 mm to 50 mm) gauge.
Brick or stone ballast 1.5" to 2" gauge in foundation and plinth ratio 1:6:12 etc complete with all respect.
64
Executive Engineer Superteintending Engineer
151 7 74897.42 P%Cft 17715.30 867593 18955.37 928325
152 7 7Extra for pacca brick work in circular massionery. 4897.42 P%Cft 1256.50 61536 1344.46 65844
153 6 5-f
1133.44 P%Cft 19236.35 218032 20582.89 233294
154 11 4-b7749.39 P%Cft 1504.95 116624 1610.30 124788
155 21 91131.12 P%Cft 1189.20 13451 1272.44 14393
156 21 17
90.00 Each 4194.65 377519 4488.28 403945
157 21 13
270.00 Each 235.40 63558 251.88 68007
158 CONSTRUCTION OF 4' DIA MANHOLE CHAMBER FOR R.C.C SEWER 12" i/d AVERAGE DEPTH 7.0' (74.No.)0.00 0
159 3 42-i
25830.440 P%oCft 3337.85 86218 3571.50 92253
160 6 23269.646 P%Cft 2818.20 92145 3015.47 98595
161 6 3-d2047.055 P%Cft 8420.55 172373 9009.99 184439
Pacca brick work other than building upto 10ft. (3 m) height in cement sand mortar ratio 1:3.
Cement concrete plain i/c compacting finishing and curing complete i/c screening & washing of stone aggregate. (1:2:4). For benching of manhole.
Cement neru plaster 1/2" thick upto 20' height 1:2 ratio of cement mortar.
Extra for making finishing benching floor work in manhole.
Providing and fixing, 6" (150 mm) thick R.C.C. manhole cover with 3"x3"x¼" (75x75x6mm) angle iron frame, 22" (550 mm) i/d as per standard drawing STD/PD No. 7 of 1977, complete in all respects.
Providing and fixing 1¼"x1¼"x3/16" (31x31x5 mm) angle iron step, in manhole chambers, including carriage and setting the same in work to correct lines and levels.
Earthwork excavation in open cutting for sewers and manholes as shown in drawings including shuttering and timbering, dressing to correct section and dimensions according to templates and levels, and removing surface water, in all types of soil except shingle, gravel and rock:- 0-7' ft depth
Dry rammed brick or stone ballast, 1½" to 2"( 40 mm to 50 mm) gauge.
Brick or stone ballast 1.5" to 2" gauge in foundation and plinth ratio 1:6:12 etc complete with all respect.
65
Executive Engineer Superteintending Engineer
162 7 74343.926 P%Cft 17715.30 769540 18955.37 823408
Pacca brick work other than building upto 10ft. (3 m) height in cement sand mortar ratio 1:3.
66
Executive Engineer Superteintending Engineer
163 7 7Extra for pacca brick work in circular massionery. 4343.926 P%Cft 1256.50 54581 1344.46 58402
164 6 5-f
1197.638 P%Cft 19236.35 230382 20582.89 246509
165 11 4-b5087.981 P%Sft 1504.95 76572 1610.30 81932
166 21 9930.032 P%Cft 1189.20 11060 1272.44 11834
167 21 17
74.00 Each 4194.65 310404 4488.28 332132
168 21 13
222.00 Each 235.40 52259 251.88 55917
0.00 0
169 3 42-i
15857.400 P%oCft 3337.85 52930 3571.50 56635
170 6 22518.511 P%Cft 2818.20 70977 3015.47 75945
171 6 3-d1267.424 P%Cft 8420.55 106724 9009.99 114195
172 7 72308.500 P%Cft 17715.30 408958 18955.37 437585
Cement concrete plain i/c compacting finishing and curing complete i/c screening & washing of stone aggregate. (1:2:4). For benching of manhole.
Cement neru plaster 1/2" thick upto 20' height 1:2 ratio of cement mortar.
Extra for making finishing benching floor work in manhole.
Providing and fixing, 6" (150 mm) thick R.C.C. manhole cover with 3"x3"x¼" (75x75x6mm) angle iron frame, 22" (550 mm) i/d as per standard drawing STD/PD No. 7 of 1977, complete in all respects.
Providing and fixing 1¼"x1¼"x3/16" (31x31x5 mm) angle iron step, in manhole chambers, including carriage and setting the same in work to correct lines and levels.
CONSTRUCTION OF 4' DIA MANHOLE CHAMBER FOR R.C.C SEWER 15" i/d and 18" i/d AVERAGE DEPTH 6.50' (57.No.)
Earthwork excavation in open cutting for sewers and manholes as shown in drawings including shuttering and timbering, dressing to correct section and dimensions according to templates and levels, and removing surface water, in all types of soil except shingle, gravel and rock:- 0-7' ft depth
Dry rammed brick or stone ballast, 1½" to 2"( 40 mm to 50 mm) gauge.
Brick or stone ballast 1.5" to 2" gauge in foundation and plinth ratio 1:6:12 etc complete with all respect.
Pacca brick work other than building upto 10ft. (3 m) height in cement sand mortar ratio 1:3.
67
Executive Engineer Superteintending Engineer
173 7 7Extra for pacca brick work in circular massionery. 2308.500 P%Cft 1256.50 29006 1344.46 31036
174 6 5-f
1026.000 P%Cft 19236.35 197365 20582.89 211181
175 11 4-b4043.490 P%Sft 1504.95 60853 1610.30 65113
176 21 9716.376 P%Cft 1189.20 8519 1272.44 9115
177 21 17
57.00 Each 4194.65 239095 4488.28 255832
178 21 13
171.00 Each 235.40 40253 251.88 43071
CONSTRUCTION OF 4' DIA MANHOLE CHAMBER FOR R.C.C SEWER 21" i/d AVERAGE DEPTH 7.41' (11.No.)0.00 0
179 3 42-i
3402.190 P%oCft 3337.85 11356 3571.50 121517'-15' ft depth 199.32 P%oCft 5588.05 1114 5979.21 1192
180 6 2485.980 P%Cft 2818.20 13696 3015.47 14655
181 6 3-d244.640 P%Cft 8420.55 20600 9009.99 22042
182 7 7213.730 P%Cft 17715.30 37863 18955.37 40513
Cement concrete plain i/c compacting finishing and curing complete i/c screening & washing of stone aggregate. (1:2:4). For benching of manhole.
Cement neru plaster 1/2" thick upto 20' height 1:2 ratio of cement mortar.
Extra for making finishing benching floor work in manhole.
Providing and fixing, 6" (150 mm) thick R.C.C. manhole cover with 3"x3"x¼" (75x75x6mm) angle iron frame, 22" (550 mm) i/d as per standard drawing STD/PD No. 7 of 1977, complete in all respects.
Providing and fixing 1¼"x1¼"x3/16" (31x31x5 mm) angle iron step, in manhole chambers, including carriage and setting the same in work to correct lines and levels.
Earthwork excavation in open cutting for sewers and manholes as shown in drawings including shuttering and timbering, dressing to correct section and dimensions according to templates and levels, and removing surface water, in all types of soil except shingle, gravel and rock:- 0-7' ft depth
Dry rammed brick or stone ballast, 1½" to 2"( 40 mm to 50 mm) gauge.
Brick or stone ballast 1.5" to 2" gauge in foundation and plinth ratio 1:6:12 etc complete with all respect.
Pacca brick work other than building upto 10ft. (3 m) height in cement sand mortar ratio 1:3.
68
Executive Engineer Superteintending Engineer
183 7 7Extra for pacca brick work in circular massionery. 213.730 P%Cft 1256.50 2686 1344.46 2874
184 6 5-f
183.810 P%Cft 19236.35 35358 20582.89 37833
Cement concrete plain i/c compacting finishing and curing complete i/c screening & washing of stone aggregate. (1:2:4). For benching of manhole.
69
Executive Engineer Superteintending Engineer
185 11 4-b877.360 P%Sft 1504.95 13204 1610.30 14128
186 21 9138.270 P%Cft 1189.20 1644 1272.44 1759
187 21 17
11.00 Each 4194.65 46141 4488.28 49371
188 21 13
44.00 Each 235.40 10358 251.88 11083
CONSTRUCTION OF 5' DIA MANHOLE CHAMBER FOR R.C.C SEWER 24" i/d AVERAGE DEPTH 5.0' (3.No.)0.00 0
189 3 42-i-ii
851.28 P%oCft 3337.85 2841 3571.50 3040
190 6 2170.25 P%Cft 2818.20 4798 3015.47 5134
191 6 3-d88.80 P%Cft 8420.55 7477 9009.99 8000
192 7 7-i149.892 P%Cft 17715.30 26554 18955.37 28413
193 7 7Extra for pacca brick work in circular massionery. 149.89 P%Cft 1256.50 1883 1344.46 2015
194 6 5-f
47.01 P%Cft 19236.35 9043 20582.89 9676
Cement neru plaster 1/2" thick upto 20' height 1:2 ratio of cement mortar.
Extra for making finishing benching floor work in manhole.
Providing and fixing, 6" (150 mm) thick R.C.C. manhole cover with 3"x3"x¼" (75x75x6mm) angle iron frame, 22" (550 mm) i/d as per standard drawing STD/PD No. 7 of 1977, complete in all respects.
Providing and fixing 1¼"x1¼"x3/16" (31x31x5 mm) angle iron step, in manhole chambers, including carriage and setting the same in work to correct lines and levels.
Earthwork excavation in open cutting for sewers and manholes as shown in drawings including shuttering and timbering, dressing to correct section and dimensions according to templates and levels, and removing surface water, in all types of soil except shingle, gravel and rock:- 0-7' ft depth
Dry rammed brick or stone ballast, 1½" to 2"( 40 mm to 50 mm) gauge.
Brick or stone ballast 1.5" to 2" gauge in foundation and plinth ratio 1:6:12 etc complete with all respect.
Pacca brick work other than building upto 10ft. (3 m) height in cement sand mortar ratio 1:3.
Cement concrete plain i/c compacting finishing and curing complete i/c screening & washing of stone aggregate. (1:2:4). For benching of manhole.
70
Executive Engineer Superteintending Engineer
195 11 4-b245.16 P%Cft 1504.95 3690 1610.30 3948
196 21 958.92 P%Cft 1189.20 701 1272.44 750
Cement neru plaster 1/2" thick upto 20' height 1:2 ratio of cement mortar.
Extra for making finishing benching floor work in manhole.
71
Executive Engineer Superteintending Engineer
197 21 17
3.00 Each 4194.65 12584 4488.28 13465
199 21 13
6.00 Each 235.40 1412 251.88 1511CONSTRUCTION OF GULY GRATTING 12"X12" (250.No.) 0.00 0
200 3 42
39295.00 P%oCft 3337.85 131161 3571.50 140342201 7 30 supply and filling sand under floor etc. 6561.250 P%Cft 1231.80 80821 1318.03 86478
202 21 1-iiiProviding and laying R.C.C sewer pipe for 9" i/d 4000 P.Rft 298.70 1194800 319.61 1278436
203 3 13-a31436.00 P%oCft 910.80 28632 974.56 30636
204 21 7-b
250.00 Each 2485.80 621450 2659.81 664952NON-STANDARDAIZED ITEM'S 0.00 0
PART- A PROVISION OF SEWERAGE / DRAINAGE / PAVEMENT IN HAILAN AND GHANIAN, TEHSIL PHALIA 0.00 0
0.00 0
Providing and fixing, 6" (150 mm) thick R.C.C. manhole cover with 3"x3"x¼" (75x75x6mm) angle iron frame, 22" (550 mm) i/d as per standard drawing STD/PD No. 7 of 1977, complete in all respects.
Providing and fixing 1¼"x1¼"x3/16" (31x31x5 mm) angle iron step, in manhole chambers, including carriage and setting the same in work to correct lines and levels.
Earthwork excavation in open cutting for sewers and manholes as shown in drawings including shuttering and timbering, dressing to correct section and dimensions according to templates and levels, and removing surface water, in all types of soil except shingle, gravel and rock:- 0-7' ft depth
Rehandling of earth work excavation lead upto 50ft taken 80% of excavation.
Construction of Standard gully gratting chamber 12" x 12" with china wire trap as per PHED drawing standard P/D No.3 complete in all respect.
CONSTRUCTION OF DISTRIBOTERY CROSSING FOR 47" I/D 3/8" THICK M.S CASING PIPE, FOR 30" I/D FOR PHALIA DISTRIBOUTERY CROSSING AT HAILAAN
72
Executive Engineer Superteintending Engineer
205 N.S
100 Rft 13980.0 1398000 14958.60 1495860
Irrigation Distriboutery Crossing with 47" i/d 3/8" thick M.S cassing pipe to be lowerd in horizontal position under neath the Irrigation Distriboutery at required depth through jack push method of horizontal boring i/c removal of excavated material from pipe. Rate also includies cost of all arrangement of jacking method labour charges, hire charges of T&P welding plant. Welding material and hire charges of reqired capacity heavy duty 2 No. jack, chain pully block with tripot. Rate further includes the providing and injecting cement sand slurry ratio 1:2 between M.S. pipe on 30" RCC Sewer pipe including lowring of R.C.C Sewer Pipe (Cost of RCC pipe not included) by mechnically means through injecting pump including all safety measures, site clearance complete in all repect to the entire satisfaction of Engineer In charge.
73
Executive Engineer Superteintending Engineer
STONE CRUSHED FOR BEDDING OF R.C.C SEWER 90264471 0.00 96582984
206 N.S
55801.91 P.Cft 63.00 3515520 67.41 3761607Deduction of old Metrial 93779991 0.00 100344591
207N.S Olds Bricks(11007+199600=210607) 210607 P%oNos 3500.00 737125 3745.00 788723
Brick Bats(524+9505=10029) 10029 P%Cft 1800.00 180522 1926.00 193159208 NON-STANDARDAIZED ITEM'S 92862345 99362709
STONE CRUSHED FOR BEDDING OF R.C.C SEWER
209 N.S
45918.58 P.Cft 63.00 2892871 67.41 3095371Deduction of old Metrial 95755215 102458080
210N.S
Olds Bricks(16511+89903=106414) 106414 P%oNos 3500.00 372449 3745.00 398520211 Brick Bats(786+4281=5067) 5067 P%Cft 1800.00 91206 1926.00 97590
95291560 101961970
Executive Engineer Superintending EngineerPublic Health Engineering Division Public Health Engineering Circle
Mandi Bahauddin. Gujranwala
Providing placing stone crush size 1/4" to 1" in trenches i/c local carriage leveling and dressing in proper section complete in all respect.
PART- B PROVISION OF SEWERAGE / DRAINAGE / PAVEMENT IN SARLY, LASOORI KALAN, DUGGAL, PHALIA BOOTA ( INCL. THQ HOSPITAL),TEHSIL PHALIA
Providing placing stone crush size 1/4" to 1" in trenches i/c local carriage leveling and dressing in proper section complete in all respect.
As per comparative statement the bid value of lowest bidder M/S Ghazali Construction Company Government Contractor come to Rs.9,95,70,151/-against T.S estimate provision Rs.9,52,91,560/-excess/ has come to Rs.42,78,591/-or 4.49 % which is within permissible limit i/e 4.50% hence the tender of lowest bidder M/S Ghazali Construction Company Government Contractor recommended for approval please.
74
Executive Engineer Superteintending Engineer
(Construction of Drains , Sullage Carriers, Brick on edge pavement, P.C.C in streets and R.C.C Sewer, with allied work)
Time Limits :( 12.Months)
MRS B-I ANNUAL PERIOD 1st August 2014 to 31 January 2015RATES QUOTED BY THE CONTRACTORS
Rate Amount Rate Amount
3050.95 30353 3109.64 30937
8798.63 516436 8967.89 526370
16867.45 742527 17191.92 756810
5033.60 787859 5130.42 803014
COMPERATIVE OF SCHEME FOR TENDER RECEIVED ON 25-03-2015 FOR PROVISION OF SEWERAGE / DRAINAGE / PAVEMENT IN HAILAN AND GHANIAN, TEHSIL PHALIA AND PROVISION OF SEWERAGE / DRAINAGE / PAVEMENT IN SARLAY, LASOORI KALAN, DUGGAL, PHALIA BOOTA (INCL. THQ HOSPITAL), TEHSIL PHALIA.
M/S Ghazali Constt: Company Govt: Contractor (4.49% Above on MRS (1st
August 2014 to 31st January 2015)
M/S Mian Abdul Razzaq Govt: Contractor (6.50% Above on MRS (1st August 2014 to 31st
January 2015)
75
Executive Engineer Superteintending Engineer
7225.27 1272263 7364.26 1296737
76
Executive Engineer Superteintending Engineer
89.97 1760183 91.70 1794043
230.87 414424 235.31 422396
11914.00 655032 12143.18 667633
0.00 0 0.00 0
3050.95 30890 3109.64 31485
8798.63 222715 8967.89 226999
77
Executive Engineer Superteintending Engineer
16867.45 1024698 17191.92 1044409
78
Executive Engineer Superteintending Engineer
20100.06 294552 20486.71 300218
1348.81 54626 1374.76 55677
0.00 0 0.00 0
3050.95 37927 3109.64 38656
8798.63 240632 8967.89 245261
16867.45 1110089 17191.92 1131443
20100.06 294256 20486.71 299917
1348.81 65755 1374.76 670190.00 0 0.00 0
323.55 11648 329.78 11872
4380.17 77149 4464.43 78633
79
Executive Engineer Superteintending Engineer
14146.17 2418479 14418.29 2465001
80
Executive Engineer Superteintending Engineer
0.00 0 0.00 0
323.55 211216 329.78 215279
7514.61 1962966 7659.16 2000726
20100.06 5250538 20486.71 53515390.00 0 0.00 0
761.37 304350 776.01 310205
323.55 74241 329.78 75669
1142.02 21787 1163.99 22206
4187.44 79888 4267.99 81425
3487.72 1616630 3554.81 16477285838.95 936803 5951.27 954824
1287.11 265897 1311.87 271012
312.11 593012 318.12 604419
81
Executive Engineer Superteintending Engineer
0.00 #VALUE! 0.00 #VALUE!
385.93 2693818 393.36 2745637513.67 2052123 523.55 2091598
82
Executive Engineer Superteintending Engineer
789.63 1516091 804.82 15452551170.60 4799466 1193.12 4891790
951.69 475056 970.00 484195
4587.37 1833768 4675.62 1869043
2712.98 622508 2765.17 634482
7514.61 143364 7659.16 146122
20100.06 383471 20486.71 3908480.00 0 0.00 0
4005.42 2109 4082.46 2149
10724.64 9062 10930.95 9237
18106.92 79611 18455.23 81142
1444.94 3034 1472.74 3093
20100.06 2388 20486.71 2434
83
Executive Engineer Superteintending Engineer
230.87 18061 235.31 18409
11914.00 21144 12143.18 21550
2944.74 3988 3001.38 4065
0.00 0 0.00 0
3487.72 26968 3554.81 27487
2944.74 32528 3001.38 33153
84
Executive Engineer Superteintending Engineer
8798.63 48911 8967.89 49852
18510.72 238869 18866.79 243464
1312.92 16942 1338.17 17268
85
Executive Engineer Superteintending Engineer
20100.06 63284 20486.71 64502
1572.52 32152 1602.77 32770
1242.60 3904 1266.50 3979
4382.99 109574 4467.30 111682
245.97 18448 250.70 18803
0.00 0 0.00 0
3487.72 59776 3554.81 60925
2944.74 97583 3001.38 99460
8798.63 182547 8967.89 186059
18510.72 584968 18866.79 596221
1312.92 41490 1338.17 42288
86
Executive Engineer Superteintending Engineer
20100.06 243979 20486.71 248672
1572.52 79460 1602.77 80989
87
Executive Engineer Superteintending Engineer
1242.60 11712 1266.50 11938
4382.99 328724 4467.30 335048
245.97 55343 250.70 56408
0.00 0 0.00 0
3487.72 43149 3554.81 43979
2944.74 52039 3001.38 53040
8798.63 78272 8967.89 79778
18510.72 299874 18866.79 305642
1312.92 21269 1338.17 21678
20100.06 144721 20486.71 147505
1572.52 44621 1602.77 45480
1242.60 6247 1266.50 6368
88
Executive Engineer Superteintending Engineer
4382.99 175320 4467.30 178692
89
Executive Engineer Superteintending Engineer
245.97 29516 250.70 30084
0.00 0 0.00 0
3487.72 59071 3554.81 602085838.95 98894 5951.27 100796
2944.74 71250 3001.38 72620
8798.63 113460 8967.89 115643
19014.36 1130069 19380.12 1151807
1312.92 79750 1338.17 81284
20100.06 175401 20486.71 178775
1572.52 126480 1602.77 128913
1242.60 8786 1266.50 8955
4382.99 157787 4467.30 160822
90
Executive Engineer Superteintending Engineer
245.97 79695 250.70 81228
91
Executive Engineer Superteintending Engineer
0.00 0 0.00 0
3487.72 130471 3554.81 1329811287.11 80397 1311.87 81943
312.11 1188522 318.12 1211384
951.69 28482 970.00 29030
2597.41 618184 2647.38 630075
0.00 0 0.00 0
0.00 0 0.00 0
3050.95 14245 3109.64 14519
8798.63 242367 8967.89 247029
16867.45 348473 17191.92 355176
5033.60 369748 5130.42 376861
92
Executive Engineer Superteintending Engineer
7225.27 597082 7364.26 608568
89.97 826067 91.70 841957
230.87 241754 235.31 246405
11914.00 382082 12143.18 3894320.00 0 0.00 0
93
Executive Engineer Superteintending Engineer
3050.95 61495 3109.64 62678
8798.63 443369 8967.89 451898
16867.45 2039908 17191.92 2079148
94
Executive Engineer Superteintending Engineer
20100.06 586374 20486.71 597654
1348.81 108754 1374.76 1108460.00 0 0.00 0
3050.95 41264 3109.64 42058
8798.63 238003 8967.89 242581
16867.45 1283244 17191.92 1307929
20100.06 374205 20486.71 381403
1348.81 72971 1374.76 743740.00 0 0.00 0
3050.95 44929 3109.64 45793
8798.63 285056 8967.89 290539
16867.45 1315029 17191.92 1340325
95
Executive Engineer Superteintending Engineer
20100.06 348582 20486.71 355287
1348.81 77894 1374.76 793930.00 0 0.00 0
96
Executive Engineer Superteintending Engineer
3050.95 97387 3109.64 99260
8798.63 463407 8967.89 472321
16867.45 2550360 17191.92 2599419
20100.06 591448 20486.71 602825
1348.81 158620 1374.76 1616710.00 0 0.00 0
323.55 17472 329.78 17808
4380.17 113095 4464.43 115270
14146.17 6186256 14418.29 63052570.00 0 0.00 0
323.55 95134 329.78 96964
97
Executive Engineer Superteintending Engineer
7514.61 1142446 7659.16 1164422
98
Executive Engineer Superteintending Engineer
20100.06 3055812 20486.71 31145950.00 0 0.00 0
761.37 129619 776.01 132112
323.55 42349 329.78 43163
1142.02 9540 1163.99 9723
4187.44 34978 4267.99 35651
3487.72 1689890 3554.81 17223975838.95 122039 5951.27 124387
1287.11 212809 1311.87 216902
312.11 1190706 318.12 1213611
99
Executive Engineer Superteintending Engineer
0.00 #VALUE! 0.00 #VALUE!385.93 2749392 393.36 2802280473.18 2210711 482.29 2253236
100
Executive Engineer Superteintending Engineer
513.67 2542681 523.55 2591592659.28 1355479 671.96 1381553789.63 461935 804.82 470821
951.69 384810 970.00 392212
4587.37 780977 4675.62 796000
2712.98 355095 2765.17 361925
7514.61 62770 7659.16 63978
20100.06 167898 20486.71 1711270.00 0 0.00 0
4005.42 5273 4082.46 5374
10724.64 22656 10930.95 23091
18106.92 201898 18455.23 205781
1444.94 7586 1472.74 7732
20100.06 5970 20486.71 6084
101
Executive Engineer Superteintending Engineer
230.87 45151 235.31 46020
11914.00 52858 12143.18 53875
2944.74 9971 3001.38 10163
0.00 0 0.00 0
3487.72 97085 3554.81 989525838.95 9522 5951.27 9705
102
Executive Engineer Superteintending Engineer
2944.74 117100 3001.38 119352
8798.63 176078 8967.89 179465
103
Executive Engineer Superteintending Engineer
18510.72 906548 18866.79 923987
1312.92 64299 1338.17 65536
20100.06 227822 20486.71 232204
1572.52 121860 1602.77 124205
1242.60 14055 1266.50 14325
4382.99 394470 4467.30 402058
245.97 66412 250.70 67689
0.00 0 0.00 0
3487.72 90089 3554.81 91822
2944.74 96282 3001.38 98134
8798.63 180113 8967.89 183577
104
Executive Engineer Superteintending Engineer
18510.72 804092 18866.79 819560
105
Executive Engineer Superteintending Engineer
1312.92 57032 1338.17 58129
20100.06 240726 20486.71 245357
1572.52 80010 1602.77 81549
1242.60 11557 1266.50 11779
4382.99 324341 4467.30 330580
245.97 54605 250.70 55656
0.00 0 0.00 0
3487.72 55307 3554.81 56370
2944.74 74164 3001.38 75591
8798.63 111516 8967.89 113661
18510.72 427320 18866.79 435540
106
Executive Engineer Superteintending Engineer
1312.92 30308 1338.17 30891
20100.06 206227 20486.71 210194
1572.52 63585 1602.77 64808
1242.60 8902 1266.50 9073
4382.99 249830 4467.30 254636
245.97 42060 250.70 42869
0.00 0 0.00 0
3487.72 11866 3554.81 120945838.95 1164 5951.27 1186
2944.74 14311 3001.38 14586
8798.63 21525 8967.89 21939
18510.72 39563 18866.79 40324
107
Executive Engineer Superteintending Engineer
1312.92 2807 1338.17 2861
20100.06 36946 20486.71 37656
108
Executive Engineer Superteintending Engineer
1572.52 13797 1602.77 14062
1242.60 1718 1266.50 1751
4382.99 48213 4467.30 49140
245.97 10823 250.70 11031
0.00 0 0.00 0
3487.72 2969 3554.81 3026
2944.74 5013 3001.38 5110
8798.63 7813 8967.89 7963
18510.72 27746 18866.79 28280
1312.92 1968 1338.17 2005
20100.06 9449 20486.71 9631
109
Executive Engineer Superteintending Engineer
1572.52 3856 1602.77 3930
1242.60 732 1266.50 747
110
Executive Engineer Superteintending Engineer
4382.99 13149 4467.30 13402
245.97 1475 250.70 15040.00 0 0.00 0
3487.72 137050 3554.81 1396861287.11 84450 1311.87 86074
312.11 1248447 318.12 1272462
951.69 29918 970.00 30493
2597.41 649353 2647.38 6618440.00 0 0.00 0
0.00 0 0.00 0
0.00 0 0.00 0
111
Executive Engineer Superteintending Engineer
14607.70 1460770 14888.70 1488870
112
Executive Engineer Superteintending Engineer
0.00 94317346 0.00 96131662
65.83 3673367 67.10 37440290.00 97990713 0.00 99875691
3657.15 770221 3727.50 7850381880.82 188627 1917.00 192256
97031864 98898397
65.83 3022760 67.10 3080907100054625 101979304
3657.15 389172 3727.50 3966581880.82 95301 1917.00 97134
99570151 101485512
As per comparative statement the bid value of lowest bidder M/S Ghazali Construction Company Government Contractor come to Rs.9,95,70,151/-against T.S estimate provision Rs.9,52,91,560/-excess/ has come to Rs.42,78,591/-or 4.49 % which is within permissible limit i/e 4.50% hence the tender of lowest bidder M/S Ghazali Construction Company Government Contractor recommended for approval please.
1
1.PP-116 Executive Engineer
D.N.I.TName of Work: CONSTRUCTION OF STREETS / DRAINS IN U.C KADHAR
(Construction of Drains , Brick on edge pavement, P.C.C, and Sign Board with allied work)Approximate Cost: 5.049 MillionEarnest Money: 0.252 Million Time Limits :( 1.Months)
MRS B-I ANNUAL PERIOD 1st Janurary 2017 to 30th June 2017
Description of Items Qty: UnitSr.No. Chapter No Item No.
CONSTRUCTION 0F SURFACE DRAINS 4040.Rft
1 3 10-i
2054.34 P%oCft
2 6 3-d
1212.00 P%Cft
3 7 4-i909 P%Cft
4 20 1-bii
3232 P%Rft
5 20 3-b
3636.00 P%Sft
6 20 6-a
4040 P/Rft
MRS B-I ANNUAL PERIOD 1st January 2017 to 30th June 2017
Earth work excavation in irrigation channels drain etc to designed section grades and profiles excavated material disposed off and dressed within 50ft (15m) lead ordinery soil.
Cement concrete Brick or stone ballast 1.5" to 2"(40mm to 50mm) gauge, in foundation and plinth:- ratio 1:6:12 etc complete with all respect.
Pacca brick work in foundation and plinth in:-Cement, sand mortar:-Ratio 1:5
Tega formed of pacca bricks on end, laid in and over cement sand mortar projecting to a height of not more than 6" (150 mm) top of drain along the property side where required, laid to lines, grades, slopes and shape according to the Engineer's drawing:- B) 4½" thick (113 mm) ii) ratio 1:5
Pacca brick work on edge laid in reimbursement in Cement sand mortar on sides drains and on other works where required all joints to be completely filled and struck flush ratio 1:5…
Constructing Punjab Standard Drains. of cement concrete 1:2 ½ :5, with cement concrete bedding ratio 1:6:12, complete, laid to lines, grades, slopes and shapes, rendering exposed surface of concrete with 1:1 cement, sand mortar, ¼" (6 mm) thick, as per Engineer's drawing (excluding excavation):-a) Type I
2
1.PP-116 Executive Engineer
Description of Items Qty: UnitSr.No. Chapter No Item No.
MRS B-I ANNUAL PERIOD 1st January 2017 to 30th June 2017
7 6 6 (a-ii) 3
18.64 P/Cft
8 1 1
16.40 P%Cft
9 6 9-b
57.09 P%Kg
Brick Pavement
10 3 1+17 (a+b)
35145.66 P%oCft
11 18 19
11284.00 P%Cft
PLAIN CEMENT CONCRETE
12 4 299230 P%Sft
13 6 3-f6173.5 P%Cft
14 6 5-f
6173.5 P%Cft
Providing and laying reinforced cement concrete (including
prestressed concrete), using coarse sand and screened
graded and washed aggregate, in required shape and
design,including forms, moulds, shuttering, lifting,
compacting,curing, rendering and finishing exposed surface,
complete (but excluding the cost of steel reinforcement, its
fabrication and placing in position, etc.):- (a)(ii) Reinforced
cement concrete in slab of rafts / strip foundation, base slab of
column and retaining walls; etc and other structural members
other than those mentioned in 5(a) (i) above not requiring form
work (i.e. horizental shuttering) complete in all respects:-(3)
type C ( nominal mix 1:2:4)
Carriage of 100 Cft. (2.83 cu.m) of all materials like stone aggregate, spawl, kankar lime (unslaked), surkhi, etc. or 150 means owned by the contractor. Cft. (4.25 cu.m) of timber, by truck or by any other. 0 TO 120 km (Ch.1, It.1)
Fabrication of mild steel reinforcement for cement concrete, including cutting, bending, laying in position, making joints and fastenings, including cost of binding wire and labour charges for binding of steel reinforcement (also includes removal of rust from bars):-(b) Deformed bars (Grade-40)
Earth work excavation undressed lead upto a single
throw of kassi phaorah or shovel in ordinery soil.
Transportation of of earth all types when the total
distance including the lead coverd in the item of work is
more then 1000ft and(a)upto 1/4 mile.(b) for every 330
ft additional lead or part thereof beyond 1/4 mile upto
one mile. (1.6km). Providing and laying dry brick pavement/soling in streets or roads, etc. sand grounted, laid in proper camber, including preparation, watering, compaction of bed to proper camber, and sand cushion.
Dismantling brick or flagged flooring without concrete foundation.Cement concrete brick or stone ballast 1½ " to 2" (40 mm to
50 mm) gauge, in foundation and plinth:- (f) Ratio 1: 7:20
Cement concrete plain including placing, compacting, finishing and curing complete (including screening and washing of stone aggregate): (f) Ratio 1: 2: 4
3
1.PP-116 Executive Engineer
Description of Items Qty: UnitSr.No. Chapter No Item No.
MRS B-I ANNUAL PERIOD 1st January 2017 to 30th June 2017
15 1 1
5432.68 P%Cft SIGN BOARD SIZE 4X3 = 3.No. 3
16 23 22-I-d84 P.Rft
17 25 10
44.76 P%Kg
18 13 5-d-i+ii
72.96 P%Sft
19 13 11 900 P.Words
20 3 10-i
23.64 P%oCft
21 6 5-f
23.49 P%Cft
22 1 1
20.67 P%CftNON-STANDARDAIZED ITEM'S
Deduction of old Metrial23
N.SOlds Bricks 28222 P%oNos
24 Brick Bats 1343.89 P%Cft
CONDITIONS.1 Conditional tenders / rates will not be entertained
2 Construction schedule towards completion of work should be provided by the contractor within one week of the issuance of acceptance letter.
3Work must be started at site within fortnight from the issuance of acceptance letter, otherwise it will be considered as rescinded automatically.
4Any item of work not included in this bid but during execution actually required to be executed at site will be paid after approval by the competent authority.
5
Carriage of 100 Cft. (2.83 cu.m) of all materials like stone
aggregate, spawl, kankar lime (unslaked), surkhi, etc. or 150
means owned by the contractor. Cft. (4.25 cu.m) of timber, by
truck or by any other. 0 TO 120 km (Ch.1, It.1)
Providing laying cutting jointing G.I pipe using for making of sign board size 1 ½" including welding complete with all respect.
Fabrication of heavy steel working with Tees flat iron round iron and sheet iron for making trusses girder’s etc including cutting drilling reverting handling assembling and fixing but excluding erection in position etc with all respect. Providing and assembling of M.S sheet with size of 4' x 3' with 1/16"SWG.Providing assembling angle iron size 1 ½" x 1 ½"
Preparing of surface of painting guard bars, gates of iron bars gratings railing (including standards braces etc) and in similar open work. Including preming coat. 2coat of paint
Writing letter or figure per letter per inches (25mm) height.Earth work excavation in irrigation channels drain etc to
designed section grades and profiles excavated
material disposed off and dressed within 50ft (15m) lead
ordinery soil.Cement concrete plain including placing, compacting,
finishing and curing complete (including screening and
washing of stone aggregate):(f) Ratio 1: 2: 4Carriage of 100 Cft. (2.83 cu.m) of all materials like
stone aggregate, spawl, kankar lime (unslaked), surkhi,
etc. or 150 means owned by the contractor. Cft. (4.25
cu.m) of timber, by truck or by any other. 0 TO 120 km
(Ch.1, It.1)
The work should be executed in accordance with the availability of funds as required under rule 2.82 of B&R Code, the department will not accept any other reason what so ever related for completion of work.
4
1.PP-116 Executive Engineer
Description of Items Qty: UnitSr.No. Chapter No Item No.
MRS B-I ANNUAL PERIOD 1st January 2017 to 30th June 2017
6
7
8All the conditions of "Contract Agreement” and conditions mentioned in the DNIT will form part of the agreement and binding upon the contractor.
9
10
Rate to be quoted by the contractor on Technically sanctioned
Estimate__________________% above / below.
Contractor: -_______________
Executive EngineerPublic Health Engineering Division
Mandi Bahauddin.
Any omission of the completion / error there in, for interpretation will be referred to standardized rates posted at website by finance department during MRS, BI-ANNUAL PERIOD (1st January 2017, to 30th June 2017 For Distt: M.B.Din and decision of the competent authority will be final and binding upon the contractor.
The execution/completion of work strictly in accordance with the specification, approved design/ drawing and requirements of contract agreement to the entire satisfaction of the engineer-in-charge will be exclusive responsibility of the contractor.
In case of rates quoted less than estimated rates, deposit at call for amount equivalent to a difference of cost between the bid amount and the estimate amount from any scheduled Bank shall be provided by the contractor as additional performance gurantee.
As per Government of the Punjab Finance Department Notification No.RO(Tech)FDI-2/83(VI)(P), dated 06.04.05 and clarification issued vide No. RO(Tech)FDI-2/83(VI)(P), dated 24.01.2006 in case the total tendered amount is less than 5% of the approved estimated (DNIT) amount, the lowest bidder will have to deposit an additional performance security from the scheduled Bank equal to the tendered amount below estimate cost within 15 days of issuance of notice or within expiry period of the bid, which is earlier.
5
1.PP-116 Executive Engineer
D.N.I.TCONSTRUCTION OF STREETS / DRAINS IN U.C KADHAR
(Construction of Drains , Brick on edge pavement, P.C.C, and Sign Board with allied work)
Time Limits :( 1.Months)MRS B-I ANNUAL PERIOD 1st Janurary 2017 to 30th June 2017
4565.1 9378
10216.85 123828
18301.50 166361
5639.80 182278
8065.80 293272
97.85 395314
Estimated Rates
Rate to be quoted by the
Contractor
6
1.PP-116 Executive Engineer
Estimated Rates
Rate to be quoted by the
Contractor
241.50 4502
2800.00 459
9977.65 5696
5473.6 192373
15566.90 1756569
482.90 44572
8913.30 550263
20668.80 1275988
7
1.PP-116 Executive Engineer
Estimated Rates
Rate to be quoted by the
Contractor
2800.00 152115
173.90 14608.0
11949.15 5348.0
729.80 532.0
10.45 9405.0
4565.10 108.0
20668.80 4855.0
2800.00 579
51884034000.00 1128882000.00 26878
5048637
Construction schedule towards completion of work should be provided by the contractor within one week of the issuance of acceptance letter.
Work must be started at site within fortnight from the issuance of acceptance letter, otherwise it will be considered as rescinded automatically.
Any item of work not included in this bid but during execution actually required to be executed at site will be paid after approval by the competent authority.
The work should be executed in accordance with the availability of funds as required under rule 2.82 of B&R Code, the department will not accept any other reason what so
8
1.PP-116 Executive Engineer
Estimated Rates
Rate to be quoted by the
Contractor
All the conditions of "Contract Agreement” and conditions mentioned in the DNIT will form part of the agreement and binding upon the contractor.
Any omission of the completion / error there in, for interpretation will be referred to standardized rates posted at website by finance department during MRS, BI-ANNUAL and decision of the competent authority will be final and binding upon the contractor.
The execution/completion of work strictly in accordance with the specification, approved design/ drawing and requirements of contract agreement to the entire satisfaction of the engineer-in-charge will be exclusive responsibility of the contractor.
In case of rates quoted less than estimated rates, deposit at call for amount equivalent to a difference of cost between the bid amount and the estimate amount from any scheduled Bank shall be provided by the contractor as additional performance gurantee.
As per Government of the Punjab Finance Department Notification No.RO(Tech)FDI-2/83(VI)(P), dated 06.04.05 and clarification issued vide No. RO(Tech)FDI-2/83(VI)(P), dated 24.01.2006 in case the total tendered amount is less than 5% of the approved estimated (DNIT) amount, the lowest bidder will have to deposit an additional performance security from the scheduled Bank equal to the tendered amount below estimate cost within 15 days of issuance of notice or within expiry period of the bid,
9
1.PP-116 Executive Engineer
COMPERATIVE OF SCHEME FOR TENDER RECEIVED ON 22-04-2017 FOR CONSTRUCTION OF STREETS & DRAINS MOHALLAHA SHAFQAT ABAD, KANDANWALA AND KOT FAZAL SHAH.
(Construction of Drains , Sullage Carriers, Brick on edge pavement, P.C.C,Tuff Tiles and R.C.C Sewer in streets with allied work)Approximate Cost: 5.825 Million Earnest Money: 0.117 Million
MRS B-I ANNUAL PERIOD 1st Janurary 2017 to 30th June 2017
Sr.
No.
Ch
ap
ter
No
Item
No.
Discription of ItemsESTIMATED COST
RATES QUOTED BY THE CONTRACTORS
Quantity Unit Rate Amount Rate CONSTRUCTION 0F SURFACE DRAINS 2430Rft
1 3 10-i
1235.65 P%oCft 4565.1 5641 4769.62
2 6 3-d
729.00 P%Cft 10216.85 74481 10674.56
3 7 4-i546.75 P%Cft 18301.50 100063 19121.41
4 20 1-bii
1944 P%Rft 5639.80 109638 5892.46
5 20 3-b
2187.00 P%Sft 8065.80 176399 8427.15
M/S Ch. Zubair Ahmad Tarar Govt: Contractor (4.48% Above on MRS (1st
January 2017 to 30th June 2017)
Earth work excavation in irrigation channels drain etc to designed section grades and profiles excavated material disposed off and dressed within 50ft (15m) lead ordinery soil.
Cement concrete Brick or stone ballast 1.5" to 2"(40mm to 50mm) gauge, in foundation and plinth:- ratio 1:6:12 etc complete with all respect.
Pacca brick work in foundation and plinth in:-Cement, sand mortar:-Ratio 1:5
Tega formed of pacca bricks on end, laid in and over cement sand mortar projecting to a height of not more than 6" (150 mm) top of drain along the property side where required, laid to lines, grades, slopes and shape according to the Engineer's drawing:- B) 4½" thick (113 mm) ii) ratio 1:5
Pacca brick work on edge laid in reimbursement in Cement sand mortar on sides drains and on other works where required all joints to be completely filled and struck flush ratio 1:5…
10
1.PP-116 Executive Engineer
Sr.
No.
Ch
ap
ter
No
Item
No.
Discription of ItemsESTIMATED COST
RATES QUOTED BY THE CONTRACTORS
Quantity Unit Rate Amount Rate
M/S Ch. Zubair Ahmad Tarar Govt: Contractor (4.48% Above on MRS (1st
January 2017 to 30th June 2017)
6 20 6-a
2430 P/Rft 97.85 237776 102.23
7 6
69.90 P/Cft 241.50 16881 252.32
8 1 1
61.51 P%Cft 2800.00 1722 2925.44
Constructing Punjab Standard Drains. of cement concrete 1:2 ½ :5, with cement concrete bedding ratio 1:6:12, complete, laid to lines, grades, slopes and shapes, rendering exposed surface of concrete with 1:1 cement, sand mortar, ¼" (6 mm) thick, as per Engineer's drawing (excluding excavation):-a) Type I
6 (a-ii) 3
Providing and laying reinforced cement concrete (including
prestressed concrete), using coarse sand and screened
graded and washed aggregate, in required shape and
design,including forms, moulds, shuttering, lifting,
compacting,curing, rendering and finishing exposed surface,
complete (but excluding the cost of steel reinforcement, its
fabrication and placing in position, etc.):- (a)(ii) Reinforced
cement concrete in slab of rafts / strip foundation, base slab of
column and retaining walls; etc and other structural members
other than those mentioned in 5(a) (i) above not requiring form
work (i.e. horizental shuttering) complete in all respects:-(3)
type C ( nominal mix 1:2:4)
Carriage of 100 Cft. (2.83 cu.m) of all materials like stone aggregate, spawl, kankar lime (unslaked), surkhi, etc. or 150 means owned by the contractor. Cft. (4.25 cu.m) of timber, by truck or by any other. 0 TO 120 km (Ch.1, It.1)
11
1.PP-116 Executive Engineer
Sr.
No.
Ch
ap
ter
No
Item
No.
Discription of ItemsESTIMATED COST
RATES QUOTED BY THE CONTRACTORS
Quantity Unit Rate Amount Rate
M/S Ch. Zubair Ahmad Tarar Govt: Contractor (4.48% Above on MRS (1st
January 2017 to 30th June 2017)
9 6 9-b
214.08 P%Kg 9977.65 21360 10424.65
CONSTRUCTION OF SULLAGE / STORM WATRER CHANNELS 1.5' X 1.5' = 80 Rft
10 3 10-i
510 P%oCft 4565.1 2328 4769.62
11 6 3-d
112.20 P%Cft 10216.85 11463 10674.56
12 7 4-i270 P%Cft 18301.50 49414 19121.41
13 6 5-F
60.06 P%Cft 20668.80 12414 21594.76
14 11 9-b Cement plaster 1/2" Thick ratio 1:4 200 P%Sft 1706.80 3414 1783.26
Fabrication of mild steel reinforcement for cement concrete, including cutting, bending, laying in position, making joints and fastenings, including cost of binding wire and labour charges for binding of steel reinforcement (also includes removal of rust from bars):-(b) Deformed bars (Grade-40)
Earth work excavation in irrigation channels drain etc to designed section grades and profiles excavated material disposed off and dressed within 50ft (15m) lead ordinery soil.
Cement concrete Brick or stone ballast 1.5" to 2" gauge in foundation and plinth ratio 1:6:12 etc complete with all respect.
Pacca brick work in foundation and plinth in:-Cement, sand mortar:-Ratio 1:5
Cement concrete plain including placing, compacting, finishing and curing complete (including screening and washing of stone aggregate): (f) Ratio 1: 2: 4
12
1.PP-116 Executive Engineer
Sr.
No.
Ch
ap
ter
No
Item
No.
Discription of ItemsESTIMATED COST
RATES QUOTED BY THE CONTRACTORS
Quantity Unit Rate Amount Rate
M/S Ch. Zubair Ahmad Tarar Govt: Contractor (4.48% Above on MRS (1st
January 2017 to 30th June 2017)
15 6
37.50 P/Cft 241.50 9056 252.32
16 1 1
85.85 P%Cft 2800.00 2404 2925.44
17 6 9-b
114.85 P%Kg 9977.65 11459 10424.65
PROVIDING AND LAYING TUFF PAVER 60mm 0.00
18 7 4-i 689.06 P%Cft 18301.50 126108.0 19121.41
6 (a-ii) 3
Providing and laying reinforced cement concrete (including prestressed concrete), using coarse sand and screened graded and washed aggregate, in required shape and design,including forms, moulds, shuttering, lifting, compacting,curing, rendering and finishing exposed surface, complete (but excluding the cost of steel reinforcement, its fabrication and placing in position, etc.):- (a)(ii) Reinforced cement concrete in slab of rafts / strip foundation, base slab of column and retaining walls; etc and other structural members other than those mentioned in 5(a) (i) above not requiring form work (i.e. horizental shuttering) complete in all respects:- (3) type C ( nominal mix 1:2:4)
Carriage of 100 Cft. (2.83 cu.m) of all materials like stone aggregate, spawl, kankar lime (unslaked), surkhi, etc. or 150 means owned by the contractor. Cft. (4.25 cu.m) of timber, by truck or by any other. 0 TO 120 km (Ch.1, It.1)
Fabrication of mild steel reinforcement for cement concrete, including cutting, bending, laying in position, making joints and fastenings, including cost of binding wire and labour charges for binding of steel reinforcement (also includes removal of rust from bars):-(b) Deformed bars (Grade-40)
Pacca brick work in foundation and plinth in:- Cement, sand mortar:- Ratio 1:5
13
1.PP-116 Executive Engineer
Sr.
No.
Ch
ap
ter
No
Item
No.
Discription of ItemsESTIMATED COST
RATES QUOTED BY THE CONTRACTORS
Quantity Unit Rate Amount Rate
M/S Ch. Zubair Ahmad Tarar Govt: Contractor (4.48% Above on MRS (1st
January 2017 to 30th June 2017)
19 10 3
3675.00 P%Cft 3955.00 145346.0 4132.18
20 6 5-f
18.00 P%Cft 20668.80 3720.0 21594.76
21
14700.00 P.Sft 93.95 1381065.0 98.16
Providing, laying, watering and ramming brick ballast 1½" to
2"(40 mm to 50 mm) gauge mixed with 25% sand, for floor
foundation, complete in all respects.Cement concrete plain including placing, compacting, finishing
and curing complete (including screening and washing of
stone aggregate): (f) Ratio 1: 2: 4Providing and laying Tuff pavers, having 7000PSI ,crushing
strength of approved manufacturer, over 2" to 3" sand cushion
i/c grouting with sand in joints i/c finishing to require
slope.complete in all respect.(50% Gray / 50% coloured).60-
mm thick
14
1.PP-116 Executive Engineer
Sr.
No.
Ch
ap
ter
No
Item
No.
Discription of ItemsESTIMATED COST
RATES QUOTED BY THE CONTRACTORS
Quantity Unit Rate Amount Rate
M/S Ch. Zubair Ahmad Tarar Govt: Contractor (4.48% Above on MRS (1st
January 2017 to 30th June 2017)
Brick Pavement
22 4 29250 P%Sft 482.90 1207 504.53
23 3
21696.3 P%oCft 5473.6 118757 5718.82
24 18 19
11924.64 P%Cft 15566.90 1856297 16264.30
PLAIN CEMENT CONCRETE
25 4 291500 P%Sft 482.90 7244 504.53
26 6 3-f1877.37 P%Cft 8913.30 167336 9312.62
27 6 5-f
1877.37 P%Cft 20668.80 388030 21594.76
28 1 1
1652.00 P%Cft 2800.00 46256 2925.44
R.C.C SEWER
Dismantling brick or flagged flooring without concrete foundation.
1+17 (a+b)
Earth work excavation undressed lead upto a single
throw of kassi phaorah or shovel in ordinery soil.
Transportation of of earth all types when the total
distance including the lead coverd in the item of work is
more then 1000ft and(a)upto 1/4 mile.(b) for every 330
ft additional lead or part thereof beyond 1/4 mile upto
one mile. (1.6km). Providing and laying dry brick pavement/soling in streets or roads, etc. sand grounted, laid in proper camber, including preparation, watering, compaction of bed to proper camber, and sand cushion.
Dismantling brick or flagged flooring without concrete foundation.Cement concrete brick or stone ballast 1½ " to 2" (40 mm to
50 mm) gauge, in foundation and plinth:- (f) Ratio 1: 7:20
Cement concrete plain including placing, compacting, finishing and curing complete (including screening and washing of stone aggregate): (f) Ratio 1: 2: 4
Carriage of 100 Cft. (2.83 cu.m) of all materials like stone
aggregate, spawl, kankar lime (unslaked), surkhi, etc. or 150
means owned by the contractor. Cft. (4.25 cu.m) of timber, by
truck or by any other. 0 TO 120 km (Ch.1, It.1)
15
1.PP-116 Executive Engineer
Sr.
No.
Ch
ap
ter
No
Item
No.
Discription of ItemsESTIMATED COST
RATES QUOTED BY THE CONTRACTORS
Quantity Unit Rate Amount Rate
M/S Ch. Zubair Ahmad Tarar Govt: Contractor (4.48% Above on MRS (1st
January 2017 to 30th June 2017)
29 4 45 Dismantling and removing of road metalling. 171.00 P.% Cft 1136.25 1943.0 1187.15
30 3 42 (i)
10958.10 %o Cft 5014.4 54948.0 5239.057.1'-15' ft Depth. 2812.95 %o Cft 8423.75 23696.0 8801.13
31 7 30 Supplying and filling sand under floor: or plugging in wells.777.6 % Cft 1436.70 11172 1501.06
32 21 3
12." i/d = 334 P.Rft 404.65 135153.0 422.78
15." i/d = 242 P.Rft 496.85 120238.0 519.11
33 3 13-b11016.84 %o Cft 1420.30 15647.0 1483.93
34 21 12-c
171 P%Sft 3218.35 5503 3362.53
CONSTRUCTION OF 4' DIA MANHOLE CHAMBER FOR R.C.C SEWER 12" i/d AVERAGE DEPTH 7.0' (4.No.)
Earthwork excavation in open cutting for sewers and manholes
as shown in drawings including shuttering and timbering,
dressing to correct section and dimensions according to
templates and levels, and removing surface water, in all types
of soil except shishingle, gravel and rock:- 0-7
ft Depth.
Providing and laying R.C.C. pipe sewers, moulded with
cement concrete 1:1½:3 conforming to ASTM Specification C-
76-79, Class II. Wall B, including carriage of pipe from factory
to site of work, lowering in trenches to correct alignment and
grade, jointing with rubber ring cutting pipes where necessary,
testing, etc., complete.
Rehandling of earth work excavation lead upto 50 ft taken 80% of excavation.
Black topd road with two coats of surfacing & 10" (250mm) depth of stone metal, for sub base & base.
16
1.PP-116 Executive Engineer
Sr.
No.
Ch
ap
ter
No
Item
No.
Discription of ItemsESTIMATED COST
RATES QUOTED BY THE CONTRACTORS
Quantity Unit Rate Amount Rate
M/S Ch. Zubair Ahmad Tarar Govt: Contractor (4.48% Above on MRS (1st
January 2017 to 30th June 2017)
35 3 42-i-ii
1236.84 P%oCft 5014.40 6202 5239.05
36 6 2176.74 P%Cft 3648.50 6448 3811.95
37 6 3-d88.96 P%Cft 10216.85 9089 10674.56
38 7 7199.64 P%Cft 20105.35 40138 21006.07
39 7 7Extra for pacca brick work in circular massionery.
199.64 P%Cft 1520.90 3036 1589.04
40 6 5-f
64.72 P%Cft 20668.80 13377 21594.76
41 1 1
56.96 P%Cft 2800.00 1595 2925.44
42 11 4-b316.40 P%Cft 1929.80 6106 2016.26
43 21 950.28 P%Cft 1534.10 771 1602.83
Earthwork excavation in open cutting for sewers and manholes as shown in drawings including shuttering and timbering, dressing to correct section and dimensions according to templates and levels, and removing surface water, in all types of soil except shishingle, gravel and rock:- 0-7' Depth
Dry rammed brick or stone ballast, 1½" to 2"( 40 mm to 50 mm) gauge.Brick or stone ballast 1.5" to 2" gauge in foundation and
plinth ratio 1:6:12 etc complete with all respect.Pacca brick work other than building upto 10ft. (3 m)
height in cement sand mortar ratio 1:3.
Cement concrete plain i/c compacting finishing and
curing complete i/c screening & washing of stone
aggregate. (1:2:4). For benching of manhole.Carriage of 100 Cft. (2.83 cu.m) of all materials like
stone aggregate, spawl, kankar lime (unslaked), surkhi,
etc. or 150 means owned by the contractor. Cft. (4.25
cu.m) of timber, by truck or by any other. 0 TO 120 km
(Ch.1, It.1)Cement neru plaster 1/2" thick upto 20' height 1:2 ratio
of cement mortar.Extra for making finishing benching floor work in manhole.
17
1.PP-116 Executive Engineer
Sr.
No.
Ch
ap
ter
No
Item
No.
Discription of ItemsESTIMATED COST
RATES QUOTED BY THE CONTRACTORS
Quantity Unit Rate Amount Rate
M/S Ch. Zubair Ahmad Tarar Govt: Contractor (4.48% Above on MRS (1st
January 2017 to 30th June 2017)
44 21 17
4.00 Each 6931.45 27726 7241.98
45 21 13
8.00 Each 226.90 1815 237.07
Providing and fixing, 6" (150 mm) thick R.C.C. manhole
cover with 3"x3"x¼" (75x75x6mm) angle iron frame, 22"
(550 mm) i/d as per standard drawing STD/PD No. 7 of
1977, complete in all respects.Providing and fixing 1¼"x1¼"x3/16" (31x31x5 mm) angle iron step, in manhole chambers, including carriage and setting the same in work to correct lines and levels.
18
1.PP-116 Executive Engineer
Sr.
No.
Ch
ap
ter
No
Item
No.
Discription of ItemsESTIMATED COST
RATES QUOTED BY THE CONTRACTORS
Quantity Unit Rate Amount Rate
M/S Ch. Zubair Ahmad Tarar Govt: Contractor (4.48% Above on MRS (1st
January 2017 to 30th June 2017)
CONSTRUCTION OF 4' DIA MANHOLE CHAMBER FOR R.C.C SEWER 15" i/d AVERAGE DEPTH 8.67' (2.No.)
463 42-i-ii
618.42 P%oCft 5014.40 3101 5239.05
7'-15' Depth 457.08 P%oCft 8423.75 3850 8801.13
47 6 288.37 P%Cft 3648.50 3224 3811.95
48 6 3-d44.48 P%Cft 10216.85 4544 10674.56
49 7 7232.84 P%Cft 20105.35 46813 21006.07
50 7 7Extra for pacca brick work in circular massionery.
232.84 P%Cft 1520.90 3541 1589.04
51 6 5-f
34.64 P%Cft 20668.80 7160 21594.76
52 1 1
30.48 P%Cft 2800.00 853 2925.44
53 11 4-b323.00 P%Cft 1929.80 6233 2016.26
Earthwork excavation in open cutting for sewers and manholes as shown in drawings including shuttering and timbering, dressing to correct section and dimensions according to templates and levels, and removing surface water, in all types of soil except shishingle, gravel and rock:- 0-7' Depth
Dry rammed brick or stone ballast, 1½" to 2"( 40 mm to 50 mm) gauge.Brick or stone ballast 1.5" to 2" gauge in foundation and
plinth ratio 1:6:12 etc complete with all respect.Pacca brick work other than building upto 10ft. (3 m)
height in cement sand mortar ratio 1:3.
Cement concrete plain i/c compacting finishing and
curing complete i/c screening & washing of stone
aggregate. (1:2:4). For benching of manhole.Carriage of 100 Cft. (2.83 cu.m) of all materials like
stone aggregate, spawl, kankar lime (unslaked), surkhi,
etc. or 150 means owned by the contractor. Cft. (4.25
cu.m) of timber, by truck or by any other. 0 TO 120 km
(Ch.1, It.1)Cement neru plaster 1/2" thick upto 20' height 1:2 ratio
of cement mortar.
19
1.PP-116 Executive Engineer
Sr.
No.
Ch
ap
ter
No
Item
No.
Discription of ItemsESTIMATED COST
RATES QUOTED BY THE CONTRACTORS
Quantity Unit Rate Amount Rate
M/S Ch. Zubair Ahmad Tarar Govt: Contractor (4.48% Above on MRS (1st
January 2017 to 30th June 2017)
54 21 925.14 P%Cft 1534.10 386 1602.83
55 21 17
2.00 Each 6931.45 13863 7241.98
56 21 13
14.00 Each 226.90 3177 237.07CONSTRUCTION OF GULY GRATTING 12"X12" (8.No.)
57 3 42
1257.44 P%oCft 5014.40 6305 5239.05
58 7 30 Supply and filling sand under floor etc. 209.96 P%Cft 1436.70 3016 1501.06
59 21 1-iiiProviding and laying R.C.C sewer pipe for 9" i/d
128 P.Rft 336.75 43104 351.84
60 3 13-a1005.95 P%oCft 1420.30 1429 1483.93
61 21 7-b
8.00 Each 2846.40 22771 2973.92 SIGN BOARD SIZE 4X3 = 3.No.
62 23 22-I-d84 P.Rft 173.90 14608.0 181.69
Extra for making finishing benching floor work in manhole.Providing and fixing, 6" (150 mm) thick R.C.C. manhole
cover with 3"x3"x¼" (75x75x6mm) angle iron frame, 22"
(550 mm) i/d as per standard drawing STD/PD No. 7 of
1977, complete in all respects.Providing and fixing 1¼"x1¼"x3/16" (31x31x5 mm) angle iron step, in manhole chambers, including carriage and setting the same in work to correct lines and levels.
Earthwork excavation in open cutting for sewers and manholes as shown in drawings including shuttering and timbering, dressing to correct section and dimensions according to templates and levels, and removing surface water, in all types of soil except shavel.
Rehandling of earth work excavation lead upto 50ft taken 80% of excavation.Construction of Standard gully gratting chamber 12" x 12" with china wire trap as per PHED drawing standard P/D No.3 complete in all respect.
Providing laying cutting jointing G.I pipe using for making of sign board size 1 ½" including welding complete with all respect.
20
1.PP-116 Executive Engineer
Sr.
No.
Ch
ap
ter
No
Item
No.
Discription of ItemsESTIMATED COST
RATES QUOTED BY THE CONTRACTORS
Quantity Unit Rate Amount Rate
M/S Ch. Zubair Ahmad Tarar Govt: Contractor (4.48% Above on MRS (1st
January 2017 to 30th June 2017)
63 25 10
44.76 P%Kg 11949.15 5348.0 12484.47
64 13
72.96 P%Sft 729.80 532.0 762.50
65 13 11 900 P.Words 10.45 9405.0 10.92
66 3 10-i
23.64 P%oCft 4565.10 108.0 4769.62
67 6 5-f
23.49 P%Cft 20668.80 4855.0 21594.76
68 1 1
20.67 P%Cft 2800.00 579 2925.44
Fabrication of heavy steel working with Tees flat iron round iron and sheet iron for making trusses girder’s etc including cutting drilling reverting handling assembling and fixing but excluding erection in position etc with all respect. Providing and assembling of M.S sheet with size of 4' x 3' with 1/16"SWG.Providing assembling angle iron size 1 ½" x 1 ½"
5-d-i+ii
Preparing of surface of painting guard bars, gates of iron bars gratings railing (including standards braces etc) and in similar open work. Including preming coat. 2coat of paint
Writing letter or figure per letter per inches (25mm) height.Earth work excavation in irrigation channels drain etc to
designed section grades and profiles excavated
material disposed off and dressed within 50ft (15m) lead
ordinery soil.Cement concrete plain including placing, compacting,
finishing and curing complete (including screening and
washing of stone aggregate):(f) Ratio 1: 2: 4Carriage of 100 Cft. (2.83 cu.m) of all materials like
stone aggregate, spawl, kankar lime (unslaked), surkhi,
etc. or 150 means owned by the contractor. Cft. (4.25
cu.m) of timber, by truck or by any other. 0 TO 120 km
(Ch.1, It.1)
21
1.PP-116 Executive Engineer
Sr.
No.
Ch
ap
ter
No
Item
No.
Discription of ItemsESTIMATED COST
RATES QUOTED BY THE CONTRACTORS
Quantity Unit Rate Amount Rate
M/S Ch. Zubair Ahmad Tarar Govt: Contractor (4.48% Above on MRS (1st
January 2017 to 30th June 2017)
NON-STANDARDAIZED ITEM'SR.C.C SEWER
69 N.S 735.55 P.Cft 85.77 63088.0 89.61
Deduction of old Metrial Total 584377570
N.SOlds Bricks 5350.8 P%oNos 4000.00 21403 4179.20
71 Brick Bats 254.8 P%Cft 2000.00 5096 2089.60
G.Total:- 5817276
Executive EngineerPublic Health Engineering Division
Mandi Bahauddin.
Providing placing crush stone size 1/4" to 1" in trenches
i/c local carriage leveling and dressing in proper section
complete in all respect.
As per comparative statement the bid value of lowest bidder M/S Muhammad Manzar Iqbal Government Contractor come to Rs.6075566/-against T.S estimate provision Rs.5817276/-excess/ has come to Rs.258290-or 4.44 % which is within permissible limit i/e 4.50% hence the tender of lowest bidder M/S Muhammad Manzar Iqbal Government Contractor recommended for approval please.
22
1.PP-116 Executive Engineer
COMPERATIVE OF SCHEME FOR TENDER RECEIVED ON 22-04-2017 FOR CONSTRUCTION OF STREETS & DRAINS MOHALLAHA SHAFQAT ABAD, KANDANWALA AND KOT FAZAL SHAH.
(Construction of Drains , Sullage Carriers, Brick on edge pavement, P.C.C,Tuff Tiles and R.C.C Sewer in streets with allied work)Time Limits :( 2.Months)
MRS B-I ANNUAL PERIOD 1st Janurary 2017 to 30th June 2017RATES QUOTED BY THE CONTRACTORS
Amount Rate Amount
5894 4767.79 5891
77818 10670.48 77788
104546 19114.09 104506
114550 5890.21 114506
184302 8423.92 184231
M/S Ch. Zubair Ahmad Tarar Govt: Contractor (4.48% Above on MRS (1st
January 2017 to 30th June 2017)
M/S Muhammad Manzar Iqbal Govt: Contractor (4.44% Above on MRS (1st
January 2017 to 30th June 2017)
23
1.PP-116 Executive Engineer
RATES QUOTED BY THE CONTRACTORS
Amount Rate Amount
M/S Ch. Zubair Ahmad Tarar Govt: Contractor (4.48% Above on MRS (1st
January 2017 to 30th June 2017)
M/S Muhammad Manzar Iqbal Govt: Contractor (4.44% Above on MRS (1st
January 2017 to 30th June 2017)
248428 102.19 248333
17637 252.22 17631
1799 2924.32 1798
24
1.PP-116 Executive Engineer
RATES QUOTED BY THE CONTRACTORS
Amount Rate Amount
M/S Ch. Zubair Ahmad Tarar Govt: Contractor (4.48% Above on MRS (1st
January 2017 to 30th June 2017)
M/S Muhammad Manzar Iqbal Govt: Contractor (4.44% Above on MRS (1st
January 2017 to 30th June 2017)
22317 10420.66 22308
2432 4767.79 2431
11977 10670.48 11972
51628 19114.09 51608
12970 21586.49 12965
3567 1782.58 3566
25
1.PP-116 Executive Engineer
RATES QUOTED BY THE CONTRACTORS
Amount Rate Amount
M/S Ch. Zubair Ahmad Tarar Govt: Contractor (4.48% Above on MRS (1st
January 2017 to 30th June 2017)
M/S Muhammad Manzar Iqbal Govt: Contractor (4.44% Above on MRS (1st
January 2017 to 30th June 2017)
9462 252.22 9458
2512 2924.32 2511
11972 10420.66 11968
0 0.00 0
131758 19114.09 131707
26
1.PP-116 Executive Engineer
RATES QUOTED BY THE CONTRACTORS
Amount Rate Amount
M/S Ch. Zubair Ahmad Tarar Govt: Contractor (4.48% Above on MRS (1st
January 2017 to 30th June 2017)
M/S Muhammad Manzar Iqbal Govt: Contractor (4.44% Above on MRS (1st
January 2017 to 30th June 2017)
151858 4130.60 151799
3887 21586.49 3885
1442937 98.12 1442384
27
1.PP-116 Executive Engineer
RATES QUOTED BY THE CONTRACTORS
Amount Rate Amount
M/S Ch. Zubair Ahmad Tarar Govt: Contractor (4.48% Above on MRS (1st
January 2017 to 30th June 2017)
M/S Muhammad Manzar Iqbal Govt: Contractor (4.44% Above on MRS (1st
January 2017 to 30th June 2017)
1261 504.34 1261
124077 5716.63 124030
1939459 16258.07 1938717
7569 504.34 7566
174833 9309.05 174766
405414 21586.49 405259
48328 2924.32 48310
28
1.PP-116 Executive Engineer
RATES QUOTED BY THE CONTRACTORS
Amount Rate Amount
M/S Ch. Zubair Ahmad Tarar Govt: Contractor (4.48% Above on MRS (1st
January 2017 to 30th June 2017)
M/S Muhammad Manzar Iqbal Govt: Contractor (4.44% Above on MRS (1st
January 2017 to 30th June 2017)
2030 1186.70 2029
57410 5237.04 5738824758 8797.76 24748
11673 1500.49 11668
0 0
141208 422.62 141154
125625 518.91 125577
16348 1483.36 16342
5750 3361.24 5747
29
1.PP-116 Executive Engineer
RATES QUOTED BY THE CONTRACTORS
Amount Rate Amount
M/S Ch. Zubair Ahmad Tarar Govt: Contractor (4.48% Above on MRS (1st
January 2017 to 30th June 2017)
M/S Muhammad Manzar Iqbal Govt: Contractor (4.44% Above on MRS (1st
January 2017 to 30th June 2017)
6480 5237.04 6477
6737 3810.49 6734
9496 10670.48 9493
41936 20998.03 41920
3172 1588.43 3171
13976 21586.49 13971
1666 2924.32 1666
6380 2015.48 6377
806 1602.21 805
30
1.PP-116 Executive Engineer
RATES QUOTED BY THE CONTRACTORS
Amount Rate Amount
M/S Ch. Zubair Ahmad Tarar Govt: Contractor (4.48% Above on MRS (1st
January 2017 to 30th June 2017)
M/S Muhammad Manzar Iqbal Govt: Contractor (4.44% Above on MRS (1st
January 2017 to 30th June 2017)
28968 7239.21 28957
1896 236.97 1896
31
1.PP-116 Executive Engineer
RATES QUOTED BY THE CONTRACTORS
Amount Rate Amount
M/S Ch. Zubair Ahmad Tarar Govt: Contractor (4.48% Above on MRS (1st
January 2017 to 30th June 2017)
M/S Muhammad Manzar Iqbal Govt: Contractor (4.44% Above on MRS (1st
January 2017 to 30th June 2017)
3240 5237.04 3239
4022 8797.76 4021
3368 3810.49 3367
4748 10670.48 4746
48910 20998.03 48891
3700 1588.43 3698
7481 21586.49 7478
891 2924.32 891
6512 2015.48 6510
32
1.PP-116 Executive Engineer
RATES QUOTED BY THE CONTRACTORS
Amount Rate Amount
M/S Ch. Zubair Ahmad Tarar Govt: Contractor (4.48% Above on MRS (1st
January 2017 to 30th June 2017)
M/S Muhammad Manzar Iqbal Govt: Contractor (4.44% Above on MRS (1st
January 2017 to 30th June 2017)
403 1602.21 403
14484 7239.21 14479
3319 236.97 3318
6587 5237.04 6585
3151 1500.49 3150
45035 351.70 45018
1493 1483.36 1492
23791 2972.78 23782
15262 181.62 15257
33
1.PP-116 Executive Engineer
RATES QUOTED BY THE CONTRACTORS
Amount Rate Amount
M/S Ch. Zubair Ahmad Tarar Govt: Contractor (4.48% Above on MRS (1st
January 2017 to 30th June 2017)
M/S Muhammad Manzar Iqbal Govt: Contractor (4.44% Above on MRS (1st
January 2017 to 30th June 2017)
5588 12479.69 5585
556 762.20 556
9826 10.91 9823
113 4767.79 113
5073 21586.49 5071
605 2924.32 605
34
1.PP-116 Executive Engineer
RATES QUOTED BY THE CONTRACTORS
Amount Rate Amount
M/S Ch. Zubair Ahmad Tarar Govt: Contractor (4.48% Above on MRS (1st
January 2017 to 30th June 2017)
M/S Muhammad Manzar Iqbal Govt: Contractor (4.44% Above on MRS (1st
January 2017 to 30th June 2017)
65914 89.58 65889
6105579 6103242
22362 4177.60 22354
5324 2088.80 5322
6077893 6075566
M/S Muhammad Manzar Iqbal Government Contractor come to Rs.6075566/-against T.S estimate provision Rs.5817276/-excess/ has come to Rs.258290-or 4.44 % which is within permissible limit i/e 4.50% hence the tender of lowest bidder M/S Muhammad Manzar Iqbal Government Contractor recommended for approval please.
35
Executive Engineer Superteintending Engineer
(Construction of Drains , Sullage Carriers, Brick on edge pavement, P.C.C in streets and R.C.C Sewer, with allied work)
Approximate Cost: 96.597 Million Earnest Money: 1.932 Million Time Limits :( 12.Months)
MRS B-I ANNUAL PERIOD 1st August 2014 to 31 January 2015
Sr.
No.
Ch
ap
ter
No
Item
No.
Discription of ItemsESTIMATED COST
RATES QUOTED BY THE CONTRACTORS
Quantity Unit Rate Amount Rate Amount
PART- A PROVISION OF SEWERAGE / DRAINAGE / PAVEMENT IN HAILAN AND GHANIAN, TEHSIL PHALIA
CONSTRUCTION 0F SURFACE DRAINS 19565Rft
1 3 10-i
9948.80 P%oCft 2919.85 29049 3124.24 31082
2 6 3-d5869.50 P%Cft 8420.55 494244 9009.99 528841
3 7 4-i4402.13 P%Cft 16142.65 710620 17272.64 760363
4 20 1-bii
15652 P%Rft 4817.30 754004 5154.51 806784
COMPERATIVE OF SCHEME FOR TENDER RECEIVED ON 25-03-2015 FOR PROVISION OF SEWERAGE / DRAINAGE / PAVEMENT IN HAILAN AND GHANIAN, TEHSIL PHALIA AND PROVISION OF SEWERAGE / DRAINAGE / PAVEMENT IN SARLAY, LASOORI KALAN, DUGGAL, PHALIA BOOTA (INCL. THQ HOSPITAL), TEHSIL PHALIA.
M/S Babar Zaheer & Co Govt: Contractor (7.0% Above on MRS (1st August 2014 to 31st January
2015)
Earth work excavation in irrigation channels drain etc to designed section grades and profiles excavated material disposed off and dressed within 50ft (15m) lead ordinery soil.
Cement concrete Brick or stone ballast 1.5" to 2"(40mm to 50mm) gauge, in foundation and plinth:- ratio 1:6:12 etc complete with all respect.
Pacca brick work in foundation and plinth in:-Cement, sand mortar:-Ratio 1:5
Tega formed of pacca bricks on end, laid in and over cement sand mortar projecting to a height of not more than 6" (150 mm) top of drain along the property side where required, laid to lines, grades, slopes and shape according to the Engineer's drawing:- B) 4½" thick (113 mm) ii) ratio 1:5
36
Executive Engineer Superteintending Engineer
5 20 3-b
17608.50 P%Sft 6914.80 1217593 7398.84 1302825
Pacca brick work on edge laid in reimbursement in Cement sand mortar on sides drains and on other works where required all joints to be completely filled and struck flush ratio 1:5…
37
Executive Engineer Superteintending Engineer
6 20 6-a
19565 P/Rft 86.10 1684547 92.13 1802465
7 6 6 (a-ii) 3
1795.05 P/Cft 220.95 396616 236.42 424379
8 6 9-b
5498.00 P%Kg 11402.05 626885 12200.19 670767
CONSTRUCTION OF SULLAGE / STORM WATRER CHANNELS 1.0' X 1.0' = 2700 Rft. 0.00 0
9 3 10-i
10125 P%oCft 2919.85 29563 3124.24 31632
10 6 3-d
2531.25 P%Cft 8420.55 213145 9009.99 228065
Constructing Punjab Standard Drains. of cement concrete 1:2 ½ :5, with cement concrete bedding ratio 1:6:12, complete, laid to lines, grades, slopes and shapes, rendering exposed surface of concrete with 1:1 cement, sand mortar, ¼" (6 mm) thick, as per Engineer's drawing (excluding excavation):-a) Type I
Providing and laying reinforced cement concrete (including prestressed concrete), using coarse sand and screened graded and washed aggregate, in required shape and design,including forms, moulds, shuttering, lifting, compacting,curing, rendering and finishing exposed surface, complete (but excluding the cost of steel reinforcement, its fabrication and placing in position, etc.):- (a)(ii) Reinforced cement concrete in slab of rafts / strip foundation, base slab of column and retaining walls; etc and other structural members other than those mentioned in 5(a) (i) above not requiring form work (i.e. horizental shuttering) complete in all respects:- (3) type C ( nominal mix 1:2:4)
Fabrication of mild steel reinforcement for cement concrete, including cutting, bending, laying in position, making joints and fastenings, including cost of binding wire and labour charges for binding of steel reinforcement (also includesremoval of rust from bars):- (b) Deformed bars (Grade-40)
Earth work excavation in irrigation channels drain etc to designed section grades and profiles excavated material disposed off and dressed within 50ft (15m) lead ordinery soil.
Cement concrete Brick or stone ballast 1.5" to 2" gauge in foundation and plinth ratio 1:6:12 etc complete with all respect.
38
Executive Engineer Superteintending Engineer
11 7 4-i6075 P%Cft 16142.65 980666 17272.64 1049313
Pacca brick work in foundation and plinth in:-Cement, sand mortar:-Ratio 1:5
39
Executive Engineer Superteintending Engineer
12 6 5-F
1465.43 P%Cft 19236.35 281895 20582.89 301628
13 11 9-b4050 P%Sft 1290.85 52279 1381.21 55939
CONSTRUCTION OF SULLAGE / STORM WATRER CHANNELS 1.5' X 1.5' = 1950 Rft 0.00 0
14 3 10-i
12431.25 P%oCft 2919.85 36297 3124.24 38838
15 6 3-d
2734.88 P%Cft 8420.55 230292 9009.99 246412
16 7 4-i6581.25 P%Cft 16142.65 1062388 17272.64 1136755
17 6 5-F
1463.96 P%Cft 19236.35 281612 20582.89 301325
18 11 9-b4875 P%Sft 1290.85 62929 1381.21 67334
Brick Pavement 0.00 0
19 4 293600 P%Sft 309.65 11147 331.33 11927
20 3 1+17 (a+b)
17613.37 P%oCft 4191.95 73834 4485.39 79002
Cement concrete plain including placing, compacting, finishing and curing complete (including screening and washing of stone aggregate): (f) Ratio 1: 2: 4
Cement plaster 1:4 upto 20' (6m) height:- 1/2" (13mm) thick.
Earth work excavation in irrigation channels drain etc to designed section grades and profiles excavated material disposed off and dressed within 50ft (15m) lead ordinery soil.
Brick or stone ballast 1.5" to 2" gauge in foundation and plinth ratio 1:6:12 etc complete with all respect.Pacca brick work in foundation and plinth in:-Cement, sand mortar:-Ratio 1:5
Cement concrete plain including placing, compacting, finishing and curing complete (including screening and washing of stone aggregate): (f) Ratio 1: 2: 4
Cement plaster 1:4 upto 20' (6m) height:- 1/2" (13mm) thick.
Dismantling brick or flagged flooring without concrete foundation.
Earth work excavation undressed lead upto a single throw of kassi phaorah or shovel in ordinery soil. Transportation of of earth all types when the total distance including the lead coverd in the item of work is more then 1000ft and (a)upto 1/4 mile.(b) for every 330 ft additional lead or part thereof beyond 1/4 mile upto one mile. (1.6km).
40
Executive Engineer Superteintending Engineer
21 18 19
17096.35 P%Cft 13538.30 2314555 14485.98 2476574
Providing and laying dry brick pavement/soling in streets or roads, etc. sand grounted, laid in proper camber, including preparation, watering, compaction of bed to proper camber, and sand cushion.
41
Executive Engineer Superteintending Engineer
PLAIN CEMENT CONCRETE 0.00 0
22 4 2965280 P%Sft 309.65 202140 331.33 216290
23 6 3-f
26122 P%Cft 7191.70 1878616 7695.12 2010119
24 6 5-f
26122 P%Cft 19236.35 5024919 20582.89 5376663R.C.C SEWER 0.00 0
25 4 4539974.25 P.% Cft 728.65 291272 779.66 311661
26 4 2922945.55 P%Sft 309.65 71051 331.33 76025
27 4 19-d1907.81 P.% Cft 1092.95 20851 1169.46 22311
28 4 19-c Dismantling cement concrete plain 1:2:4 1907.81 P.% Cft 4007.50 76455 4288.03 81807
29 3 42 (i)
463520.64 %o Cft 3337.85 1547162 3571.50 165546330 3 42-ii 7-15Ft 160440.26 %o Cft 5588.05 896548 5979.21 959306
31 7 3020658.48 % Cft 1231.80 254471 1318.03 272284
32 21 1
1900 P.Rft 298.70 567530 319.61 607257
Dismantling brick or flagged flooring without concrete foundation.Cement concrete brick or stone ballast 1½ " to 2" (40 mm to 50 mm) gauge, in foundation and plinth:- (f) Ratio 1: 7:20
Cement concrete plain including placing, compacting, finishing and curing complete (including screening and washing of stone aggregate): (f) Ratio 1: 2: 4
Dismantling and removing road metaling i/c separating and screening of agregate.
Dismantling brick or flagged flooring without concrete foundation.Dismantling of cement concrete with brick aggrigate.
Earth work excavation open cutting for sewers and manholes showing in drawing etc. complete 0-7 ft Depth.
Supplying and filling sand under floor: or plugging in wells.
Providing and laying R.C.C. pipe, moulded with cement concrete 1:1 1/2:3, with spigot socket or collar joint, etc including cost of reinforcement, conforming to B.S. 5911 PART I: 1981, Class ''L'' including carriage of pipe from factory to site of work, 9" i/d
42
Executive Engineer Superteintending Engineer
33 21 3
0.00 #VALUE!12" i/d = 6980 P.Rft 369.35 2578063 395.20 275852718" i/d = 3995 P.Rft 491.60 1963942 526.01 2101418
Providing and laying R.C.C. pipe sewers, moulded with cement concrete 1:1½:3 conforming to ASTM Specification C-76-79, Class II. Wall B, including carriage of pipe from factory to site of work, lowering in trenches to correct alignment and grade, jointing with rubber ring cutting pipes where necessary, testing, etc., complete.
43
Executive Engineer Superteintending Engineer
33 21 3
24" i/d = 1920 P.Rft 755.70 1450944 808.60 155251030" i/d = 4100 P.Rft 1120.30 4593230 1198.72 4914756
34 3 13-b499168.72 %o Cft 910.80 454643 974.56 486468
35 21 12-c
39974.25 %Sft 4390.25 1754970 4697.57 1877818
36 21 1022945.55 %Sft 2596.40 595758 2778.15 637461
37 6 3-d
1907.81 P%Cft 7191.70 137204 7695.12 146808
38 6 5-f
1907.81 P%Cft 19236.35 366993 20582.89 392683OUT FALL STRICTURE 2.NOS 0.00 0
39 3 21-b
526.5 P%oCft 3833.30 2018 4101.63 2159
40 6 3-b84.50 P%Cft 10263.80 8673 10982.27 9280
41 7 4-i439.67 P%Cft 17328.85 76190 18541.87 81523
42 11 18-b210 P%Sft 1382.85 2904 1479.65 3107
43 6 5-f
11.88 P%Cft 19236.35 2285 20582.89 2445
Rehandling of earth work excavation lead upto 50 ft taken 80% of excavation.
Restoration of metalled road, on laid service line, including compaction:- c) Black Topped Road with two coats of surfacing & 10" (250 mm) depth of stone metal, for sub base & base.
Restoration of brick pavement on edge, over laid service line, with 2" (50 mm) sand cushion under soling.
Cement concrete brick or stone ballast 1½ " to 2" (40 mm to 50 mm) gauge, in foundation and plinth ratio 1:7:20Cement concrete plain including placing, compacting, finishing and curing complete (including screening and washing of stone aggregate): (f) Ratio 1: 2: 4.
Excavation in foundation of building, bridges and other structure with excavated earth, watering and ramming lead upto one chain (30 m) and lift upto 5 ft. (1.5 m). b) in ordinary soil.
Cement concrete brick or stone ballast 1½ " to 2" (40 mm to 50 mm) gauge, in foundation and plinth:- (f) Ratio 1: 4:8
Pacca brick work in foundation and plinth in:- i) Cement, sand mortar:- Ratio 1:3
Cement pointing struck joints, on walls, upto a) ratio 1:2.
Cement concrete plain including placing, compacting, finishing and curing complete (including screening and washing of stone aggregate): (f) Ratio 1: 2: 4
44
Executive Engineer Superteintending Engineer
44 6 6-ii-c
78.23 P/Cft 220.95 17285 236.42 18495
45 6 9-b
177.47 P%Kg 11402.05 20235 12200.19 21651
46 6 2135.45 P%Cft 2818.20 3817 3015.47 4084
CONSTRUCTION OF 4' DIA MANHOLE CHAMBER FOR R.C.C SEWER 9" i/d AVERAGE DEPTH 7.0' (25.No.)0.00 0
47 3 42
7732.28 P%oCft 3337.85 25809 3571.50 27616
48 6 21104.61 P%Cft 2818.20 31130 3015.47 33309
Providing and laying reinforced cement concrete (including prestressed concrete), using coarse sand and screened graded and washed aggregate, in required shape and design,including forms, moulds, shuttering, lifting, compacting,curing, rendering and finishing exposed surface, complete (but excluding the cost of steel reinforcement, its fabrication and placing in position, etc.):- (a)(ii) Reinforced cement concrete in slab of rafts / strip foundation, base slab of column and retaining walls; etc and other structural members other than those mentioned in 5(a) (i) above not requiring form work (i.e. horizental shuttering) complete in all respects:-(Chapter 6 Item No. 6 (a) (3)
Fabrication of mild steel reinforcement for cement concrete, including cutting, bending, laying in position, making joints and fastenings, including cost of binding wire and labour charges for binding of steel reinforcement (also includes removal of rust from bars):- (b) Deformed bars (Grade-40)Dry rammed brick or stone ballast, 1½" to 2"( 40 mm to 50 mm) gauge.
Earthwork excavation in open cutting for sewers and manholes as shown in drawings including shuttering and timbering, dressing to correct section and dimensions according to templates and levels, and removing surface water, in all types of soil except shishingle, gravel and rock:-
Dry rammed brick or stone ballast, 1½" to 2"( 40 mm to 50 mm) gauge.
45
Executive Engineer Superteintending Engineer
49 6 3-d555.89 P%Cft 8420.55 46809 9009.99 50086
50 7 71290.44 P%Cft 17715.30 228605 18955.37 244607
51 7 7Extra for pacca brick work in circular massionery. 1290.44 P%Cft 1256.50 16214 1344.46 17349
Brick or stone ballast 1.5" to 2" gauge in foundation and plinth ratio 1:6:12 etc complete with all respect.
Pacca brick work other than building upto 10ft. (3 m) height in cement sand mortar ratio 1:3.
46
Executive Engineer Superteintending Engineer
52 6 5-f
314.85 P%Cft 19236.35 60565 20582.89 64805
53 11 4-b2044.60 P%Cft 1504.95 30770 1610.30 32924
54 21 9314.20 P%Cft 1189.20 3736 1272.44 3998
55 21 17
25.00 Each 4194.65 104866 4488.28 112207
56 21 13
75.00 Each 235.40 17655 251.88 18891
CONSTRUCTION OF 4' DIA MANHOLE CHAMBER FOR R.C.C SEWER 12" i/d AVERAGE DEPTH 6'.53' (75.No.)0.00 0
57 3 42
17139.00 P%oCft 3337.85 57207 3571.50 61211
58 6 23313.83 P%Cft 2818.20 93390 3015.47 99927
59 6 3-d2074.72 P%Cft 8420.55 174703 9009.99 186932
60 7 73160.16 P%Cft 17715.30 559832 18955.37 599020
61 7 7Extra for pacca brick work in circular massionery. 3160.16 P%Cft 1256.50 39707 1344.46 42486
Cement concrete plain i/c compacting finishing and curing complete i/c screening & washing of stone aggregate. (1:2:4). For benching of manhole.
Cement neru plaster 1/2" thick upto 20' height 1:2 ratio of cement mortar.
Extra for making finishing benching floor work in manhole.
Providing and fixing, 6" (150 mm) thick R.C.C. manhole cover with 3"x3"x¼" (75x75x6mm) angle iron frame, 22" (550 mm) i/d as per standard drawing STD/PD No. 7 of 1977, complete in all respects.
Providing and fixing 1¼"x1¼"x3/16" (31x31x5 mm) angle iron step, in manhole chambers, including carriage and setting the same in work to correct lines and levels.
Earthwork excavation in open cutting for sewers and manholes as shown in drawings including shuttering and timbering, dressing to correct section and dimensions according to templates and levels, and removing surface water, in all types of soil except shishingle, gravel and rock:-
Dry rammed brick or stone ballast, 1½" to 2"( 40 mm to 50 mm) gauge.
Brick or stone ballast 1.5" to 2" gauge in foundation and plinth ratio 1:6:12 etc complete with all respect.
Pacca brick work other than building upto 10ft. (3 m) height in cement sand mortar ratio 1:3.
47
Executive Engineer Superteintending Engineer
62 6 5-f
1213.82 P%Cft 19236.35 233495 20582.89 249840
63 11 4-b5053.06 P%Cft 1504.95 76046 1610.30 81369
Cement concrete plain i/c compacting finishing and curing complete i/c screening & washing of stone aggregate. (1:2:4). For benching of manhole.
Cement neru plaster 1/2" thick upto 20' height 1:2 ratio of cement mortar.
48
Executive Engineer Superteintending Engineer
64 21 9942.60 P%Cft 1189.20 11209 1272.44 11994
65 21 1775.00 Each 4194.65 314599 4488.28 336621
66 21 13
225.00 Each 235.40 52965 251.88 56673
CONSTRUCTION OF 4' DIA MANHOLE CHAMBER FOR R.C.C SEWER 18" i/d AVERAGE DEPTH 6.98' (40.No.)0.00 0
67 3 42-i-ii
12371.60 P%oCft 3337.85 41295 3571.50 44186
68 6 21767.20 P%Cft 2818.20 49803 3015.47 53289
69 6 3-d889.60 P%Cft 8420.55 74909 9009.99 80153
70 7 71620.00 P%Cft 17715.30 286988 18955.37 307077
71 7 7Extra for pacca brick work in circular massionery. 1620.00 P%Cft 1256.50 20355 1344.46 21780
72 6 5-f
720.00 P%Cft 19236.35 138502 20582.89 148197
73 11 4-b2837.60 P%Cft 1504.95 42704 1610.30 45693
74 21 9502.80 P%Cft 1189.20 5979 1272.44 6398
Extra for making finishing benching floor work in manhole.Providing and fixing, 6" (150 mm) thick R.C.C. manhole cover with 3"x3"x¼" (75x75x6mm) angle iron frame, 22" (550 mm) i/d as per standard drawing STD/PD No. 7 of 1977, complete in all respects.
Providing and fixing 1¼"x1¼"x3/16" (31x31x5 mm) angle iron step, in manhole chambers, including carriage and setting the same in work to correct lines and levels.
Earthwork excavation in open cutting for sewers and manholes as shown in drawings including shuttering and timbering, dressing to correct section and dimensions according to templates and levels, and removing surface water, in all types of soil except shavel. 0'-7' depth
Dry rammed brick or stone ballast, 1½" to 2"( 40 mm to 50 mm) gauge.
Brick or stone ballast 1.5" to 2" gauge in foundation and plinth ratio 1:6:12 etc complete with all respect.
Pacca brick work other than building upto 10ft. (3 m) height in cement sand mortar ratio 1:3.
Cement concrete plain i/c compacting finishing and curing complete i/c screening & washing of stone aggregate. (1:2:4). For benching of manhole.
Cement neru plaster 1/2" thick upto 20' height 1:2 ratio of cement mortar.
Extra for making finishing benching floor work in manhole.
49
Executive Engineer Superteintending Engineer
75 21 17
40.00 Each 4194.65 167786 4488.28 179531
Providing and fixing, 6" (150 mm) thick R.C.C. manhole cover with 3"x3"x¼" (75x75x6mm) angle iron frame, 22" (550 mm) i/d as per standard drawing STD/PD No. 7 of 1977, complete in all respects.
50
Executive Engineer Superteintending Engineer
76 21 13
120.00 Each 235.40 28248 251.88 30225
CONSTRUCTION OF 5' DIA MANHOLE CHAMBER FOR R.C.C SEWER 24" to 30" i/d AVERAGE DEPTH 14' (36.No.)0.00 0
77 3 42-i-ii-iii
16936.92 P%oCft 3337.85 56533 3571.50 604907'-15' ft depth 16936.92 P%oCft 5588.05 94644 5979.21 101269
78 6 22419.56 P%Cft 2818.20 68188 3015.47 72961
79
6 3-d1289.52 P%Cft 8420.55 108585 9009.99 116186
7 7-i+85943.24 P%Cft 18197.30 1081509 19471.11 1157215
80 7 7Extra for pacca brick work in circular massionery. 6074.28 P%Cft 1256.50 76323 1344.46 81666
81 6 5-f
872.64 P%Cft 19236.35 167864 20582.89 179614
82 11 4-b8043.12 P%Cft 1504.95 121045 1610.30 129518
83 21 9707.04 P%Cft 1189.20 8408 1272.44 8997
84 21 17
36.00 Each 4194.65 151007 4488.28 161577
Providing and fixing 1¼"x1¼"x3/16" (31x31x5 mm) angle iron step, in manhole chambers, including carriage and setting the same in work to correct lines and levels.
Earthwork excavation in open cutting for sewers and manholes as shown in drawings including shuttering and timbering, dressing to correct section and dimensions according to templates and levels, and removing surface water, in all types of soil except shavel. 0'-7' depth
Dry rammed brick or stone ballast, 1½" to 2"( 40 mm to 50 mm) gauge.
Brick or stone ballast 1.5" to 2" gauge in foundation and plinth ratio 1:6:12 etc complete with all respect.
Pacca brick work other than building upto 10ft. (3 m) height in cement sand mortar ratio 1:3.
Cement concrete plain i/c compacting finishing and curing complete i/c screening & washing of stone aggregate. (1:2:4). For benching of manhole.
Cement neru plaster 1/2" thick upto 20' height 1:2 ratio of cement mortar.
Extra for making finishing benching floor work in manhole.
Providing and fixing, 6" (150 mm) thick R.C.C. manhole cover with 3"x3"x¼" (75x75x6mm) angle iron frame, 22" (550 mm) i/d as per standard drawing STD/PD No. 7 of 1977, complete in all respects.
51
Executive Engineer Superteintending Engineer
85 21 13
324.00 Each 235.40 76270 251.88 81609
Providing and fixing 1¼"x1¼"x3/16" (31x31x5 mm) angle iron step, in manhole chambers, including carriage and setting the same in work to correct lines and levels.
52
Executive Engineer Superteintending Engineer
CONSTRUCTION OF GULY GRATTING 12"X12" (238.No.) 0.00 0
86 3 42
37408.84 P%oCft 3337.85 124865 3571.50 13360687 7 30 supply and filling sand under floor etc. 6246.31 P%Cft 1231.80 76942 1318.03 82328
88 21 1-iiiProviding and laying R.C.C sewer pipe for 9" i/d 3808 P.Rft 298.70 1137450 319.61 1217072
89 3 13-a29927.07 P%oCft 910.80 27258 974.56 29166
90 21 7-b
238.00 Each 2485.80 591620 2659.81 633033
0.00 0
91 CONSTRUCTION 0F SURFACE DRAINS =9182Rft 0.00 0
92 3 10-i
4669.05 P%oCft 2919.85 13633 3124.24 14587
93 6 3-d
2754.60 P%Cft 8420.55 231952 9009.99 248189
94 7 4-i2065.95 P%Cft 16142.65 333499 17272.64 356844
95 20 1-bii
7345.6 P%Rft 4817.30 353860 5154.51 378630
Earthwork excavation in open cutting for sewers and manholes as shown in drawings including shuttering and timbering, dressing to correct section and dimensions according to templates and levels, and removing surface water, in all types of soil except shavel.
Rehandling of earth work excavation lead upto 50ft taken 80% of excavation.
Construction of Standard gully gratting chamber 12" x 12" with china wire trap as per PHED drawing standard P/D No.3 complete in all respect.
PART- B PROVISION OF SEWERAGE / DRAINAGE / PAVEMENT IN SARLY, LASOORI KALAN, DUGGAL, PHALIA BOOTA ( INCL. THQ HOSPITAL),TEHSIL PHALIA
Earth work excavation in irrigation channels drain etc to designed section grades and profiles excavated material disposed off and dressed within 50ft (15m) lead ordinery soil.
Cement concrete Brick or stone ballast 1.5" to 2" gauge in foundation and plinth ratio 1:6:12 etc complete with all respect.
Pacca brick work in foundation and plinth in:-Cement, sand mortar:-Ratio 1:5
Tega formed of pacca bricks on end, laid in and over cement sand mortar projecting to a height of not more than 6" (150 mm) top of drain along the property side where required, laid to lines, grades, slopes and shape according to the Engineer's drawing:- B) 4½" thick (113 mm) ii) ratio 1:5
53
Executive Engineer Superteintending Engineer
96 20 3-b
8263.8 P%Sft 6914.80 571425 7398.84 611425
97 20 6-a
9182 P/Rft 86.10 790570 92.13 845910
98 6 6 (a-ii) 3
1047.14 P/Cft 220.95 231366 236.42 247562
99 6 9-b
3207.00 P%Kg 11402.05 365664 12200.19 391260CONSTRUCTION OF SULLAGE / STORM WATRER CHANNELS 1.0' X 1.0' = 5375 Rft. 0.00 0
Pacca brick work on edge laid in reimbursement in Cement sand mortar on side drains and on other works where required all joints to be completely filled and struck flush ratio 1:5…
Constructing Punjab Standard Drains. of cement concrete 1:2 ½ :5, with cement concrete bedding ratio 1:6:12, complete, laid to lines, grades, slopes and shapes, rendering exposed surface of concrete with 1:1 cement, sand mortar, ¼" (6 mm) thick, as per Engineer's drawing (excluding excavation):-a) Type I
Providing and laying reinforced cement concrete (including prestressed concrete), using coarse sand and screened graded and washed aggregate, in required shape and design,including forms, moulds, shuttering, lifting, compacting,curing, rendering and finishing exposed surface, complete (but excluding the cost of steel reinforcement, its fabrication and placing in position, etc.):- (a)(ii) Reinforced cement concrete in slab of rafts / strip foundation, base slab of column and retaining walls; etc and other structural members other than those mentioned in 5(a) (i) above not requiring form work (i.e. horizental shuttering) complete in all respects:-(3) type C ( nominal mix 1:2:4)
Fabrication of mild steel reinforcement for cement concrete, including cutting, bending, laying in position, making joints and fastenings, including cost of binding wire and labour charges for binding of steel reinforcement (also includesremoval of rust from bars):- (b) Deformed bars (Grade-40)
54
Executive Engineer Superteintending Engineer
100 3 10-i
20156.25 P%oCft 2919.85 58853 3124.24 62973
101 6 3-d
5039.06 P%Cft 8420.55 424317 9009.99 454019
102 7 4-i12093.75 P%Cft 16142.65 1952252 17272.64 2088910
Earth work excavation in irrigation channels drain etc to designed section grades and profiles excavated material disposed off and dressed within 50ft (15m) lead ordinery soil.
Cement concrete Brick or stone ballast 1.5" to 2" gauge in foundation and plinth ratio 1:6:12 etc complete with all respect.
Pacca brick work in foundation and plinth in:-Cement, sand mortar:-Ratio 1:5
55
Executive Engineer Superteintending Engineer
104 6 5-F
2917.275 P%Cft 19236.35 561177 20582.89 600459
105 11 9-b8063.00 P%Sft 1290.85 104081 1381.21 111367
CONSTRUCTION OF SULLAGE / STORM WATRER CHANNELS 1.25' X 1.25' = 2705 Rft 0.00 0
106 3 10-i
13525 P%oCft 2919.85 39491 3124.24 42255
107 6 3-d
2705.00 P%Cft 8420.55 227776 9009.99 243720
108 7 4-i7607.81 P%Cft 16142.65 1228102 17272.64 1314069
109 6 5-F
1861.710 P%Cft 19236.35 358125 20582.89 383194
110 11 9-b5410.0 P%Sft 1290.85 69835 1381.21 74723
CONSTRUCTION OF SULLAGE / STORM WATRER CHANNELS 1.5' X 1.5' = 660 Rft 0.00 0
111 3 10-i
14726.25 P%oCft 2919.85 42998 3124.24 46008
112 6 3-d
3239.78 P%Cft 8420.55 272807 9009.99 291903
113 7 4-i7796.25 P%Cft 16142.65 1258521 17272.64 1346617
Cement concrete plain including placing, compacting, finishing and curing complete (including screening and washing of stone aggregate): (f) Ratio 1: 2: 4
Cement plaster 1:4 upto 20' (6m) height:- 1/2" (13mm) thick.
Earth work excavation in irrigation channels drain etc to designed section grades and profiles excavated material disposed off and dressed within 50ft (15m) lead ordinery soil.
Brick or stone ballast 1.5" to 2" gauge in foundation and plinth ratio 1:6:12 etc complete with all respect.
Pacca brick work in foundation and plinth in:-Cement, sand mortar:-Ratio 1:5
Cement concrete plain including placing, compacting, finishing and curing complete (including screening and washing of stone aggregate): (f) Ratio 1: 2: 4
Cement plaster 1:4 upto 20' (6m) height:- 1/2" (13mm) thick.
Earth work excavation in irrigation channels drain etc to designed section grades and profiles excavated material disposed off and dressed within 50ft (15m) lead ordinery soil.
Brick or stone ballast 1.5" to 2" gauge in foundation and plinth ratio 1:6:12 etc complete with all respect.
Pacca brick work in foundation and plinth in:-Cement, sand mortar:-Ratio 1:5
56
Executive Engineer Superteintending Engineer
114 6 5-F
1734.23 P%Cft 19236.35 333603 20582.89 356955
115 11 9-b5775 P%Sft 1290.85 74547 1381.21 79765
CONSTRUCTION OF SULLAGE / STORM WATRER CHANNELS 2.0' X 2.0' =3360 Rft 0.00 0
Cement concrete plain including placing, compacting, finishing and curing complete (including screening and washing of stone aggregate): (f) Ratio 1: 2: 4
Cement plaster 1:4 upto 20' (6m) height:- 1/2" (13mm) thick.
57
Executive Engineer Superteintending Engineer
116 3 10-i
31920 P%oCft 2919.85 93202 3124.24 99726
117 6 3-d
5266.80 P%Cft 8420.55 443494 9009.99 474539
118 7 4-i15120 P%Cft 16142.65 2440769 17272.64 2611623
119 6 5-F
2942.52 P%Cft 19236.35 566033 20582.89 605655
120 11 9-b11760 P%Sft 1290.85 151804 1381.21 162430
Brick Pavement 0.00 0
121 4 295400 P%Sft 309.65 16721 331.33 17891
122 3 1+17 (a+b)
25819.74 P%oCft 4191.95 108235 4485.39 115811
123 18 19
43730.96 P%Cft 13538.30 5920429 14485.98 6334859PLAIN CEMENT CONCRETE 0.00 0
124 4 2929403 P%Sft 309.65 91046 331.33 97419
Earth work excavation in irrigation channels drain etc to designed section grades and profiles excavated material disposed off and dressed within 50ft (15m) lead ordinery soil.
Brick or stone ballast 1.5" to 2" gauge in foundation and plinth ratio 1:6:12 etc complete with all respect.
Pacca brick work in foundation and plinth in:-Cement, sand mortar:-Ratio 1:5
Cement concrete plain including placing, compacting, finishing and curing complete (including screening and washing of stone aggregate): (f) Ratio 1: 2: 4
Cement plaster 1:4 upto 20' (6m) height:- 1/2" (13mm) thick.
Dismantling brick or flagged flooring without concrete foundation.
Earth work excavation undressed lead upto a single throw of kassi phaorah or shovel in ordinery soil. Transportation of of earth all types when the total distance including the lead coverd in the item of work is more then 1000ft and (a)upto 1/4 mile. (b) for every 330 ft additional lead or part thereof beyond 1/4 mile upto one mile. (1.6km).
Providing and laying dry brick pavement/soling in streets or roads, etc. sand grounted, laid in proper camber, including preparation, watering, compaction of bed to proper camber, and sand cushion.
Dismantling brick or flagged flooring without concrete foundation.
58
Executive Engineer Superteintending Engineer
125 6 3-f
15203 P%Cft 7191.70 1093354 7695.12 1169889
Cement concrete brick or stone ballast 1½ " to 2" (40 mm to 50 mm) gauge, in foundation and plinth:- (f) Ratio 1: 7:20
59
Executive Engineer Superteintending Engineer
126 6 5-f
15203 P%Cft 19236.35 2924502 20582.89 3129217R.C.C SEWER 0.00 0
127 4 4517024.5 P.% Cft 728.65 124049 779.66 132732
128 4 2913088.75 P%Sft 309.65 40529 331.33 43366
129 4 19-d835.31 P.% Cft 1092.95 9130 1169.46 9769
130 4 19-c Dismantling cement concrete plain 1:2:4 835.31 P.% Cft 4007.50 33475 4288.03 35818
131 3 42 (i)
484525.68 %o Cft 3337.85 1617274 3571.50 17304833 42-ii 7-15Ft 20900.78 %o Cft 5588.05 116795 5979.21 124971
132 7 3016533.86 % Cft 1231.80 203664 1318.03 217920
133 21 1
3815 P.Rft 298.70 1139541 319.61 1219309
Cement concrete plain including placing, compacting, finishing and curing complete (including screening and washing of stone aggregate): (f) Ratio 1: 2: 4
Dismantling and removing road metaling i/c separating and screening of agregate.
Dismantling brick or flagged flooring without concrete foundation.Dismantling of cement concrete with brick aggrigate.
Earthwork excavation in open cutting for sewers and manholes as shown in drawings including shuttering and timbering, dressing to correct section and dimensions according to templates and levels, and removing surface water, in all types of soil except shishingle, gravel and rock:-0-7ft depth
Supplying and filling sand under floor: or plugging in wells.
Providing and laying R.C.C. pipe, moulded with cement concrete 1:1 1/2:3, with spigot socket or collar joint, etc including cost of reinforcement, conforming to B.S. 5911 PART I: 1981, Class ''L'' including carriage of pipe from factory to site of work, 9" i/d
60
Executive Engineer Superteintending Engineer
134 21 3 0.00 #VALUE!
12" i/d = 7124 P.Rft 369.35 2631249 395.20 281543615" i/d = 4672 P.Rft 452.85 2115715 484.55 2263815
Providing and laying R.C.C. pipe sewers, moulded with cement concrete 1:1½:3 conforming to ASTM Specification C-76-79, Class II. Wall B, including carriage of pipe from factory to site of work, lowering in trenches to correct alignment and grade, jointing with rubber ring cutting pipes where necessary, testing, etc., complete.
61
Executive Engineer Superteintending Engineer
134 21 3
18" i/d = 4950 P.Rft 491.60 2433420 526.01 260375921" i/d = 2056 P.Rft 630.95 1297233 675.12 138803924" i/d = 585 P.Rft 755.70 442085 808.60 473031
135 3 13-b404341.17 %o Cft 910.80 368274 974.56 394053
136 21 12-c
17024.50 %Sft 4390.25 747418 4697.57 799737
137 21 1013088.75 %Sft 2596.40 339836 2778.15 363625
138 6 3-d
835.31 P%Cft 7191.70 60073 7695.12 64278
139 6 5-f
835.31 P%Cft 19236.35 160683 20582.89 171931OUT FALL STRUCTURE= 5.No 0.00 0
140 3 21-b
1316.25 P%oCft 3833.30 5046 4101.63 5399
141 6 3-b211.25 P%Cft 10263.80 21682 10982.27 23200
142 7 4-i1115.03 P%Cft 17328.85 193222 18541.87 206748
143 11 18-b525 P%Sft 1382.85 7260 1479.65 7768
144 6 5-f
29.70 P%Cft 19236.35 5713 20582.89 6113
Rehandling of earth work excavation lead upto 50 ft taken 80% of excavation.
Restoration of metalled road, on laid service line, including compaction:- c) Black Topped Road with two coats of surfacing & 10" (250 mm) depth of stone metal, for sub base & base.
Restoration of brick pavement on edge, over laid service line, with 2" (50 mm) sand cushion under soling.
Cement concrete brick or stone ballast 1½ " to 2" (40 mm to 50 mm) gauge, in foundation and plinth ratio 1:7:20Cement concrete plain including placing, compacting, finishing and curing complete (including screening and washing of stone aggregate):(f) Ratio 1: 2: 4.
Excavation in foundation of building, bridges and other structure with excavated earth, watering and ramming lead upto one chain (30 m) and lift upto 5 ft. (1.5 m). b) in ordinary soil.
Cement concrete brick or stone ballast 1½ " to 2" (40 mm to 50 mm) gauge, in foundation and plinth:- (f) Ratio 1: 4:8
Pacca brick work in foundation and plinth in:- i) Cement, sand mortar:- Ratio 1:3
Cement pointing struck joints, on walls, upto a) ratio 1:2.
Cement concrete plain including placing, compacting, finishing and curing complete (including screening and washing of stone aggregate): (f) Ratio 1: 2: 4
62
Executive Engineer Superteintending Engineer
145 6 6-a-ii-3
195.57 P/Cft 220.95 43211 236.42 46236
146 6 9-b
443.67 P%Kg 11402.05 50587 12200.19 54128
147 6 2338.625 P%Cft 2818.20 9543 3015.47 10211
CONSTRUCTION OF 4' DIA MANHOLE CHAMBER FOR R.C.C SEWER 9" i/d AVERAGE DEPTH 7..41' (90.No.)0.00 0
148 3 42
27836.190 P%oCft 3337.85 92913 3571.50 994177'-15' ft depth 1630.80 P%oCft 5588.05 9113 5979.21 9751
Providing and laying reinforced cement concrete (including prestressed concrete), using coarse sand and screened graded and washed aggregate, in required shape and design,including forms, moulds, shuttering, lifting, compacting,curing, rendering and finishing exposed surface, complete (but excluding the cost of steel reinforcement, its fabrication and placing in position, etc.):- (a)(ii) Reinforced cement concrete in slab of rafts / strip foundation, base slab of column and retaining walls; etc and other structural members other than those mentioned in 5(a) (i) above not requiring form work (i.e. horizental shuttering) complete in all respects:-
Fabrication of mild steel reinforcement for cement concrete, including cutting, bending, laying in position, making joints and fastenings, including cost of binding wire and labour charges for binding of steel reinforcement (also includes removal of rust from bars):- (b) Deformed bars (Grade-40)Dry rammed brick or stone ballast, 1½" to 2"( 40 mm to 50 mm) gauge.
Earthwork excavation in open cutting for sewers and manholes as shown in drawings including shuttering and timbering, dressing to correct section and dimensions according to templates and levels, and removing surface water, in all types of soil except shishingle, gravel and rock:-
63
Executive Engineer Superteintending Engineer
149 6 23976.60 P%Cft 2818.20 112068 3015.47 119913
150 6 3-d2001.195 P%Cft 8420.55 168512 9009.99 180308
Dry rammed brick or stone ballast, 1½" to 2"( 40 mm to 50 mm) gauge.
Brick or stone ballast 1.5" to 2" gauge in foundation and plinth ratio 1:6:12 etc complete with all respect.
64
Executive Engineer Superteintending Engineer
151 7 74897.42 P%Cft 17715.30 867593 18955.37 928325
152 7 7Extra for pacca brick work in circular massionery. 4897.42 P%Cft 1256.50 61536 1344.46 65844
153 6 5-f
1133.44 P%Cft 19236.35 218032 20582.89 233294
154 11 4-b7749.39 P%Cft 1504.95 116624 1610.30 124788
155 21 91131.12 P%Cft 1189.20 13451 1272.44 14393
156 21 17
90.00 Each 4194.65 377519 4488.28 403945
157 21 13
270.00 Each 235.40 63558 251.88 68007
158 CONSTRUCTION OF 4' DIA MANHOLE CHAMBER FOR R.C.C SEWER 12" i/d AVERAGE DEPTH 7.0' (74.No.)0.00 0
159 3 42-i
25830.440 P%oCft 3337.85 86218 3571.50 92253
160 6 23269.646 P%Cft 2818.20 92145 3015.47 98595
161 6 3-d2047.055 P%Cft 8420.55 172373 9009.99 184439
Pacca brick work other than building upto 10ft. (3 m) height in cement sand mortar ratio 1:3.
Cement concrete plain i/c compacting finishing and curing complete i/c screening & washing of stone aggregate. (1:2:4). For benching of manhole.
Cement neru plaster 1/2" thick upto 20' height 1:2 ratio of cement mortar.
Extra for making finishing benching floor work in manhole.
Providing and fixing, 6" (150 mm) thick R.C.C. manhole cover with 3"x3"x¼" (75x75x6mm) angle iron frame, 22" (550 mm) i/d as per standard drawing STD/PD No. 7 of 1977, complete in all respects.
Providing and fixing 1¼"x1¼"x3/16" (31x31x5 mm) angle iron step, in manhole chambers, including carriage and setting the same in work to correct lines and levels.
Earthwork excavation in open cutting for sewers and manholes as shown in drawings including shuttering and timbering, dressing to correct section and dimensions according to templates and levels, and removing surface water, in all types of soil except shingle, gravel and rock:- 0-7' ft depth
Dry rammed brick or stone ballast, 1½" to 2"( 40 mm to 50 mm) gauge.
Brick or stone ballast 1.5" to 2" gauge in foundation and plinth ratio 1:6:12 etc complete with all respect.
65
Executive Engineer Superteintending Engineer
162 7 74343.926 P%Cft 17715.30 769540 18955.37 823408
Pacca brick work other than building upto 10ft. (3 m) height in cement sand mortar ratio 1:3.
66
Executive Engineer Superteintending Engineer
163 7 7Extra for pacca brick work in circular massionery. 4343.926 P%Cft 1256.50 54581 1344.46 58402
164 6 5-f
1197.638 P%Cft 19236.35 230382 20582.89 246509
165 11 4-b5087.981 P%Sft 1504.95 76572 1610.30 81932
166 21 9930.032 P%Cft 1189.20 11060 1272.44 11834
167 21 17
74.00 Each 4194.65 310404 4488.28 332132
168 21 13
222.00 Each 235.40 52259 251.88 55917
0.00 0
169 3 42-i
15857.400 P%oCft 3337.85 52930 3571.50 56635
170 6 22518.511 P%Cft 2818.20 70977 3015.47 75945
171 6 3-d1267.424 P%Cft 8420.55 106724 9009.99 114195
172 7 72308.500 P%Cft 17715.30 408958 18955.37 437585
Cement concrete plain i/c compacting finishing and curing complete i/c screening & washing of stone aggregate. (1:2:4). For benching of manhole.
Cement neru plaster 1/2" thick upto 20' height 1:2 ratio of cement mortar.
Extra for making finishing benching floor work in manhole.
Providing and fixing, 6" (150 mm) thick R.C.C. manhole cover with 3"x3"x¼" (75x75x6mm) angle iron frame, 22" (550 mm) i/d as per standard drawing STD/PD No. 7 of 1977, complete in all respects.
Providing and fixing 1¼"x1¼"x3/16" (31x31x5 mm) angle iron step, in manhole chambers, including carriage and setting the same in work to correct lines and levels.
CONSTRUCTION OF 4' DIA MANHOLE CHAMBER FOR R.C.C SEWER 15" i/d and 18" i/d AVERAGE DEPTH 6.50' (57.No.)
Earthwork excavation in open cutting for sewers and manholes as shown in drawings including shuttering and timbering, dressing to correct section and dimensions according to templates and levels, and removing surface water, in all types of soil except shingle, gravel and rock:- 0-7' ft depth
Dry rammed brick or stone ballast, 1½" to 2"( 40 mm to 50 mm) gauge.
Brick or stone ballast 1.5" to 2" gauge in foundation and plinth ratio 1:6:12 etc complete with all respect.
Pacca brick work other than building upto 10ft. (3 m) height in cement sand mortar ratio 1:3.
67
Executive Engineer Superteintending Engineer
173 7 7Extra for pacca brick work in circular massionery. 2308.500 P%Cft 1256.50 29006 1344.46 31036
174 6 5-f
1026.000 P%Cft 19236.35 197365 20582.89 211181
175 11 4-b4043.490 P%Sft 1504.95 60853 1610.30 65113
176 21 9716.376 P%Cft 1189.20 8519 1272.44 9115
177 21 17
57.00 Each 4194.65 239095 4488.28 255832
178 21 13
171.00 Each 235.40 40253 251.88 43071
CONSTRUCTION OF 4' DIA MANHOLE CHAMBER FOR R.C.C SEWER 21" i/d AVERAGE DEPTH 7.41' (11.No.)0.00 0
179 3 42-i
3402.190 P%oCft 3337.85 11356 3571.50 121517'-15' ft depth 199.32 P%oCft 5588.05 1114 5979.21 1192
180 6 2485.980 P%Cft 2818.20 13696 3015.47 14655
181 6 3-d244.640 P%Cft 8420.55 20600 9009.99 22042
182 7 7213.730 P%Cft 17715.30 37863 18955.37 40513
Cement concrete plain i/c compacting finishing and curing complete i/c screening & washing of stone aggregate. (1:2:4). For benching of manhole.
Cement neru plaster 1/2" thick upto 20' height 1:2 ratio of cement mortar.
Extra for making finishing benching floor work in manhole.
Providing and fixing, 6" (150 mm) thick R.C.C. manhole cover with 3"x3"x¼" (75x75x6mm) angle iron frame, 22" (550 mm) i/d as per standard drawing STD/PD No. 7 of 1977, complete in all respects.
Providing and fixing 1¼"x1¼"x3/16" (31x31x5 mm) angle iron step, in manhole chambers, including carriage and setting the same in work to correct lines and levels.
Earthwork excavation in open cutting for sewers and manholes as shown in drawings including shuttering and timbering, dressing to correct section and dimensions according to templates and levels, and removing surface water, in all types of soil except shingle, gravel and rock:- 0-7' ft depth
Dry rammed brick or stone ballast, 1½" to 2"( 40 mm to 50 mm) gauge.
Brick or stone ballast 1.5" to 2" gauge in foundation and plinth ratio 1:6:12 etc complete with all respect.
Pacca brick work other than building upto 10ft. (3 m) height in cement sand mortar ratio 1:3.
68
Executive Engineer Superteintending Engineer
183 7 7Extra for pacca brick work in circular massionery. 213.730 P%Cft 1256.50 2686 1344.46 2874
184 6 5-f
183.810 P%Cft 19236.35 35358 20582.89 37833
Cement concrete plain i/c compacting finishing and curing complete i/c screening & washing of stone aggregate. (1:2:4). For benching of manhole.
69
Executive Engineer Superteintending Engineer
185 11 4-b877.360 P%Sft 1504.95 13204 1610.30 14128
186 21 9138.270 P%Cft 1189.20 1644 1272.44 1759
187 21 17
11.00 Each 4194.65 46141 4488.28 49371
188 21 13
44.00 Each 235.40 10358 251.88 11083
CONSTRUCTION OF 5' DIA MANHOLE CHAMBER FOR R.C.C SEWER 24" i/d AVERAGE DEPTH 5.0' (3.No.)0.00 0
189 3 42-i-ii
851.28 P%oCft 3337.85 2841 3571.50 3040
190 6 2170.25 P%Cft 2818.20 4798 3015.47 5134
191 6 3-d88.80 P%Cft 8420.55 7477 9009.99 8000
192 7 7-i149.892 P%Cft 17715.30 26554 18955.37 28413
193 7 7Extra for pacca brick work in circular massionery. 149.89 P%Cft 1256.50 1883 1344.46 2015
194 6 5-f
47.01 P%Cft 19236.35 9043 20582.89 9676
Cement neru plaster 1/2" thick upto 20' height 1:2 ratio of cement mortar.
Extra for making finishing benching floor work in manhole.
Providing and fixing, 6" (150 mm) thick R.C.C. manhole cover with 3"x3"x¼" (75x75x6mm) angle iron frame, 22" (550 mm) i/d as per standard drawing STD/PD No. 7 of 1977, complete in all respects.
Providing and fixing 1¼"x1¼"x3/16" (31x31x5 mm) angle iron step, in manhole chambers, including carriage and setting the same in work to correct lines and levels.
Earthwork excavation in open cutting for sewers and manholes as shown in drawings including shuttering and timbering, dressing to correct section and dimensions according to templates and levels, and removing surface water, in all types of soil except shingle, gravel and rock:- 0-7' ft depth
Dry rammed brick or stone ballast, 1½" to 2"( 40 mm to 50 mm) gauge.
Brick or stone ballast 1.5" to 2" gauge in foundation and plinth ratio 1:6:12 etc complete with all respect.
Pacca brick work other than building upto 10ft. (3 m) height in cement sand mortar ratio 1:3.
Cement concrete plain i/c compacting finishing and curing complete i/c screening & washing of stone aggregate. (1:2:4). For benching of manhole.
70
Executive Engineer Superteintending Engineer
195 11 4-b245.16 P%Cft 1504.95 3690 1610.30 3948
196 21 958.92 P%Cft 1189.20 701 1272.44 750
Cement neru plaster 1/2" thick upto 20' height 1:2 ratio of cement mortar.
Extra for making finishing benching floor work in manhole.
71
Executive Engineer Superteintending Engineer
197 21 17
3.00 Each 4194.65 12584 4488.28 13465
199 21 13
6.00 Each 235.40 1412 251.88 1511CONSTRUCTION OF GULY GRATTING 12"X12" (250.No.) 0.00 0
200 3 42
39295.00 P%oCft 3337.85 131161 3571.50 140342201 7 30 supply and filling sand under floor etc. 6561.250 P%Cft 1231.80 80821 1318.03 86478
202 21 1-iiiProviding and laying R.C.C sewer pipe for 9" i/d 4000 P.Rft 298.70 1194800 319.61 1278436
203 3 13-a31436.00 P%oCft 910.80 28632 974.56 30636
204 21 7-b
250.00 Each 2485.80 621450 2659.81 664952NON-STANDARDAIZED ITEM'S 0.00 0
PART- A PROVISION OF SEWERAGE / DRAINAGE / PAVEMENT IN HAILAN AND GHANIAN, TEHSIL PHALIA 0.00 0
0.00 0
Providing and fixing, 6" (150 mm) thick R.C.C. manhole cover with 3"x3"x¼" (75x75x6mm) angle iron frame, 22" (550 mm) i/d as per standard drawing STD/PD No. 7 of 1977, complete in all respects.
Providing and fixing 1¼"x1¼"x3/16" (31x31x5 mm) angle iron step, in manhole chambers, including carriage and setting the same in work to correct lines and levels.
Earthwork excavation in open cutting for sewers and manholes as shown in drawings including shuttering and timbering, dressing to correct section and dimensions according to templates and levels, and removing surface water, in all types of soil except shingle, gravel and rock:- 0-7' ft depth
Rehandling of earth work excavation lead upto 50ft taken 80% of excavation.
Construction of Standard gully gratting chamber 12" x 12" with china wire trap as per PHED drawing standard P/D No.3 complete in all respect.
CONSTRUCTION OF DISTRIBOTERY CROSSING FOR 47" I/D 3/8" THICK M.S CASING PIPE, FOR 30" I/D FOR PHALIA DISTRIBOUTERY CROSSING AT HAILAAN
72
Executive Engineer Superteintending Engineer
205 N.S
100 Rft 13980.0 1398000 14958.60 1495860
Irrigation Distriboutery Crossing with 47" i/d 3/8" thick M.S cassing pipe to be lowerd in horizontal position under neath the Irrigation Distriboutery at required depth through jack push method of horizontal boring i/c removal of excavated material from pipe. Rate also includies cost of all arrangement of jacking method labour charges, hire charges of T&P welding plant. Welding material and hire charges of reqired capacity heavy duty 2 No. jack, chain pully block with tripot. Rate further includes the providing and injecting cement sand slurry ratio 1:2 between M.S. pipe on 30" RCC Sewer pipe including lowring of R.C.C Sewer Pipe (Cost of RCC pipe not included) by mechnically means through injecting pump including all safety measures, site clearance complete in all repect to the entire satisfaction of Engineer In charge.
73
Executive Engineer Superteintending Engineer
STONE CRUSHED FOR BEDDING OF R.C.C SEWER 90264471 0.00 96582984
206 N.S
55801.91 P.Cft 63.00 3515520 67.41 3761607Deduction of old Metrial 93779991 0.00 100344591
207N.S Olds Bricks(11007+199600=210607) 210607 P%oNos 3500.00 737125 3745.00 788723
Brick Bats(524+9505=10029) 10029 P%Cft 1800.00 180522 1926.00 193159208 NON-STANDARDAIZED ITEM'S 92862345 99362709
STONE CRUSHED FOR BEDDING OF R.C.C SEWER
209 N.S
45918.58 P.Cft 63.00 2892871 67.41 3095371Deduction of old Metrial 95755215 102458080
210N.S
Olds Bricks(16511+89903=106414) 106414 P%oNos 3500.00 372449 3745.00 398520211 Brick Bats(786+4281=5067) 5067 P%Cft 1800.00 91206 1926.00 97590
95291560 101961970
Executive Engineer Superintending EngineerPublic Health Engineering Division Public Health Engineering Circle
Mandi Bahauddin. Gujranwala
Providing placing stone crush size 1/4" to 1" in trenches i/c local carriage leveling and dressing in proper section complete in all respect.
PART- B PROVISION OF SEWERAGE / DRAINAGE / PAVEMENT IN SARLY, LASOORI KALAN, DUGGAL, PHALIA BOOTA ( INCL. THQ HOSPITAL),TEHSIL PHALIA
Providing placing stone crush size 1/4" to 1" in trenches i/c local carriage leveling and dressing in proper section complete in all respect.
As per comparative statement the bid value of lowest bidder M/S Ghazali Construction Company Government Contractor come to Rs.9,95,70,151/-against T.S estimate provision Rs.9,52,91,560/-excess/ has come to Rs.42,78,591/-or 4.49 % which is within permissible limit i/e 4.50% hence the tender of lowest bidder M/S Ghazali Construction Company Government Contractor recommended for approval please.
74
Executive Engineer Superteintending Engineer
(Construction of Drains , Sullage Carriers, Brick on edge pavement, P.C.C in streets and R.C.C Sewer, with allied work)
Time Limits :( 12.Months)
MRS B-I ANNUAL PERIOD 1st August 2014 to 31 January 2015RATES QUOTED BY THE CONTRACTORS
Rate Amount Rate Amount
3050.95 30353 3109.64 30937
8798.63 516436 8967.89 526370
16867.45 742527 17191.92 756810
5033.60 787859 5130.42 803014
COMPERATIVE OF SCHEME FOR TENDER RECEIVED ON 25-03-2015 FOR PROVISION OF SEWERAGE / DRAINAGE / PAVEMENT IN HAILAN AND GHANIAN, TEHSIL PHALIA AND PROVISION OF SEWERAGE / DRAINAGE / PAVEMENT IN SARLAY, LASOORI KALAN, DUGGAL, PHALIA BOOTA (INCL. THQ HOSPITAL), TEHSIL PHALIA.
M/S Ghazali Constt: Company Govt: Contractor (4.49% Above on MRS (1st
August 2014 to 31st January 2015)
M/S Mian Abdul Razzaq Govt: Contractor (6.50% Above on MRS (1st August 2014 to 31st
January 2015)
75
Executive Engineer Superteintending Engineer
7225.27 1272263 7364.26 1296737
76
Executive Engineer Superteintending Engineer
89.97 1760183 91.70 1794043
230.87 414424 235.31 422396
11914.00 655032 12143.18 667633
0.00 0 0.00 0
3050.95 30890 3109.64 31485
8798.63 222715 8967.89 226999
77
Executive Engineer Superteintending Engineer
16867.45 1024698 17191.92 1044409
78
Executive Engineer Superteintending Engineer
20100.06 294552 20486.71 300218
1348.81 54626 1374.76 55677
0.00 0 0.00 0
3050.95 37927 3109.64 38656
8798.63 240632 8967.89 245261
16867.45 1110089 17191.92 1131443
20100.06 294256 20486.71 299917
1348.81 65755 1374.76 670190.00 0 0.00 0
323.55 11648 329.78 11872
4380.17 77149 4464.43 78633
79
Executive Engineer Superteintending Engineer
14146.17 2418479 14418.29 2465001
80
Executive Engineer Superteintending Engineer
0.00 0 0.00 0
323.55 211216 329.78 215279
7514.61 1962966 7659.16 2000726
20100.06 5250538 20486.71 53515390.00 0 0.00 0
761.37 304350 776.01 310205
323.55 74241 329.78 75669
1142.02 21787 1163.99 22206
4187.44 79888 4267.99 81425
3487.72 1616630 3554.81 16477285838.95 936803 5951.27 954824
1287.11 265897 1311.87 271012
312.11 593012 318.12 604419
81
Executive Engineer Superteintending Engineer
0.00 #VALUE! 0.00 #VALUE!
385.93 2693818 393.36 2745637513.67 2052123 523.55 2091598
82
Executive Engineer Superteintending Engineer
789.63 1516091 804.82 15452551170.60 4799466 1193.12 4891790
951.69 475056 970.00 484195
4587.37 1833768 4675.62 1869043
2712.98 622508 2765.17 634482
7514.61 143364 7659.16 146122
20100.06 383471 20486.71 3908480.00 0 0.00 0
4005.42 2109 4082.46 2149
10724.64 9062 10930.95 9237
18106.92 79611 18455.23 81142
1444.94 3034 1472.74 3093
20100.06 2388 20486.71 2434
83
Executive Engineer Superteintending Engineer
230.87 18061 235.31 18409
11914.00 21144 12143.18 21550
2944.74 3988 3001.38 4065
0.00 0 0.00 0
3487.72 26968 3554.81 27487
2944.74 32528 3001.38 33153
84
Executive Engineer Superteintending Engineer
8798.63 48911 8967.89 49852
18510.72 238869 18866.79 243464
1312.92 16942 1338.17 17268
85
Executive Engineer Superteintending Engineer
20100.06 63284 20486.71 64502
1572.52 32152 1602.77 32770
1242.60 3904 1266.50 3979
4382.99 109574 4467.30 111682
245.97 18448 250.70 18803
0.00 0 0.00 0
3487.72 59776 3554.81 60925
2944.74 97583 3001.38 99460
8798.63 182547 8967.89 186059
18510.72 584968 18866.79 596221
1312.92 41490 1338.17 42288
86
Executive Engineer Superteintending Engineer
20100.06 243979 20486.71 248672
1572.52 79460 1602.77 80989
87
Executive Engineer Superteintending Engineer
1242.60 11712 1266.50 11938
4382.99 328724 4467.30 335048
245.97 55343 250.70 56408
0.00 0 0.00 0
3487.72 43149 3554.81 43979
2944.74 52039 3001.38 53040
8798.63 78272 8967.89 79778
18510.72 299874 18866.79 305642
1312.92 21269 1338.17 21678
20100.06 144721 20486.71 147505
1572.52 44621 1602.77 45480
1242.60 6247 1266.50 6368
88
Executive Engineer Superteintending Engineer
4382.99 175320 4467.30 178692
89
Executive Engineer Superteintending Engineer
245.97 29516 250.70 30084
0.00 0 0.00 0
3487.72 59071 3554.81 602085838.95 98894 5951.27 100796
2944.74 71250 3001.38 72620
8798.63 113460 8967.89 115643
19014.36 1130069 19380.12 1151807
1312.92 79750 1338.17 81284
20100.06 175401 20486.71 178775
1572.52 126480 1602.77 128913
1242.60 8786 1266.50 8955
4382.99 157787 4467.30 160822
90
Executive Engineer Superteintending Engineer
245.97 79695 250.70 81228
91
Executive Engineer Superteintending Engineer
0.00 0 0.00 0
3487.72 130471 3554.81 1329811287.11 80397 1311.87 81943
312.11 1188522 318.12 1211384
951.69 28482 970.00 29030
2597.41 618184 2647.38 630075
0.00 0 0.00 0
0.00 0 0.00 0
3050.95 14245 3109.64 14519
8798.63 242367 8967.89 247029
16867.45 348473 17191.92 355176
5033.60 369748 5130.42 376861
92
Executive Engineer Superteintending Engineer
7225.27 597082 7364.26 608568
89.97 826067 91.70 841957
230.87 241754 235.31 246405
11914.00 382082 12143.18 3894320.00 0 0.00 0
93
Executive Engineer Superteintending Engineer
3050.95 61495 3109.64 62678
8798.63 443369 8967.89 451898
16867.45 2039908 17191.92 2079148
94
Executive Engineer Superteintending Engineer
20100.06 586374 20486.71 597654
1348.81 108754 1374.76 1108460.00 0 0.00 0
3050.95 41264 3109.64 42058
8798.63 238003 8967.89 242581
16867.45 1283244 17191.92 1307929
20100.06 374205 20486.71 381403
1348.81 72971 1374.76 743740.00 0 0.00 0
3050.95 44929 3109.64 45793
8798.63 285056 8967.89 290539
16867.45 1315029 17191.92 1340325
95
Executive Engineer Superteintending Engineer
20100.06 348582 20486.71 355287
1348.81 77894 1374.76 793930.00 0 0.00 0
96
Executive Engineer Superteintending Engineer
3050.95 97387 3109.64 99260
8798.63 463407 8967.89 472321
16867.45 2550360 17191.92 2599419
20100.06 591448 20486.71 602825
1348.81 158620 1374.76 1616710.00 0 0.00 0
323.55 17472 329.78 17808
4380.17 113095 4464.43 115270
14146.17 6186256 14418.29 63052570.00 0 0.00 0
323.55 95134 329.78 96964
97
Executive Engineer Superteintending Engineer
7514.61 1142446 7659.16 1164422
98
Executive Engineer Superteintending Engineer
20100.06 3055812 20486.71 31145950.00 0 0.00 0
761.37 129619 776.01 132112
323.55 42349 329.78 43163
1142.02 9540 1163.99 9723
4187.44 34978 4267.99 35651
3487.72 1689890 3554.81 17223975838.95 122039 5951.27 124387
1287.11 212809 1311.87 216902
312.11 1190706 318.12 1213611
99
Executive Engineer Superteintending Engineer
0.00 #VALUE! 0.00 #VALUE!385.93 2749392 393.36 2802280473.18 2210711 482.29 2253236
100
Executive Engineer Superteintending Engineer
513.67 2542681 523.55 2591592659.28 1355479 671.96 1381553789.63 461935 804.82 470821
951.69 384810 970.00 392212
4587.37 780977 4675.62 796000
2712.98 355095 2765.17 361925
7514.61 62770 7659.16 63978
20100.06 167898 20486.71 1711270.00 0 0.00 0
4005.42 5273 4082.46 5374
10724.64 22656 10930.95 23091
18106.92 201898 18455.23 205781
1444.94 7586 1472.74 7732
20100.06 5970 20486.71 6084
101
Executive Engineer Superteintending Engineer
230.87 45151 235.31 46020
11914.00 52858 12143.18 53875
2944.74 9971 3001.38 10163
0.00 0 0.00 0
3487.72 97085 3554.81 989525838.95 9522 5951.27 9705
102
Executive Engineer Superteintending Engineer
2944.74 117100 3001.38 119352
8798.63 176078 8967.89 179465
103
Executive Engineer Superteintending Engineer
18510.72 906548 18866.79 923987
1312.92 64299 1338.17 65536
20100.06 227822 20486.71 232204
1572.52 121860 1602.77 124205
1242.60 14055 1266.50 14325
4382.99 394470 4467.30 402058
245.97 66412 250.70 67689
0.00 0 0.00 0
3487.72 90089 3554.81 91822
2944.74 96282 3001.38 98134
8798.63 180113 8967.89 183577
104
Executive Engineer Superteintending Engineer
18510.72 804092 18866.79 819560
105
Executive Engineer Superteintending Engineer
1312.92 57032 1338.17 58129
20100.06 240726 20486.71 245357
1572.52 80010 1602.77 81549
1242.60 11557 1266.50 11779
4382.99 324341 4467.30 330580
245.97 54605 250.70 55656
0.00 0 0.00 0
3487.72 55307 3554.81 56370
2944.74 74164 3001.38 75591
8798.63 111516 8967.89 113661
18510.72 427320 18866.79 435540
106
Executive Engineer Superteintending Engineer
1312.92 30308 1338.17 30891
20100.06 206227 20486.71 210194
1572.52 63585 1602.77 64808
1242.60 8902 1266.50 9073
4382.99 249830 4467.30 254636
245.97 42060 250.70 42869
0.00 0 0.00 0
3487.72 11866 3554.81 120945838.95 1164 5951.27 1186
2944.74 14311 3001.38 14586
8798.63 21525 8967.89 21939
18510.72 39563 18866.79 40324
107
Executive Engineer Superteintending Engineer
1312.92 2807 1338.17 2861
20100.06 36946 20486.71 37656
108
Executive Engineer Superteintending Engineer
1572.52 13797 1602.77 14062
1242.60 1718 1266.50 1751
4382.99 48213 4467.30 49140
245.97 10823 250.70 11031
0.00 0 0.00 0
3487.72 2969 3554.81 3026
2944.74 5013 3001.38 5110
8798.63 7813 8967.89 7963
18510.72 27746 18866.79 28280
1312.92 1968 1338.17 2005
20100.06 9449 20486.71 9631
109
Executive Engineer Superteintending Engineer
1572.52 3856 1602.77 3930
1242.60 732 1266.50 747
110
Executive Engineer Superteintending Engineer
4382.99 13149 4467.30 13402
245.97 1475 250.70 15040.00 0 0.00 0
3487.72 137050 3554.81 1396861287.11 84450 1311.87 86074
312.11 1248447 318.12 1272462
951.69 29918 970.00 30493
2597.41 649353 2647.38 6618440.00 0 0.00 0
0.00 0 0.00 0
0.00 0 0.00 0
111
Executive Engineer Superteintending Engineer
14607.70 1460770 14888.70 1488870
112
Executive Engineer Superteintending Engineer
0.00 94317346 0.00 96131662
65.83 3673367 67.10 37440290.00 97990713 0.00 99875691
3657.15 770221 3727.50 7850381880.82 188627 1917.00 192256
97031864 98898397
65.83 3022760 67.10 3080907100054625 101979304
3657.15 389172 3727.50 3966581880.82 95301 1917.00 97134
99570151 101485512
As per comparative statement the bid value of lowest bidder M/S Ghazali Construction Company Government Contractor come to Rs.9,95,70,151/-against T.S estimate provision Rs.9,52,91,560/-excess/ has come to Rs.42,78,591/-or 4.49 % which is within permissible limit i/e 4.50% hence the tender of lowest bidder M/S Ghazali Construction Company Government Contractor recommended for approval please.