DNIT Mandi S, Gunj (1)
Approximate Cost
Earnest Money.
Time Limit.
Sr. No.Item Description Quantity Unit Contractor Rate
1 Boring for tubewell in all types of soil except shingle
and rock, from ground level to 100 ft. (30 m) depth,
including sinking and withdrawing of casing pipe,
complete:- 6" dia 200.0 Rft. P. Rft. 213.00
2 Boring for tubewell in all types of soil except shingle
and rock, from ground level to 100.1 ft. to 200 ft (30 to
60 m) depth, including sinking and withdrawing of
casing pipe, complete:- 6" dia 100.0 Rft. P. Rft. 331.90
3 Furnishing sample of water from bore hole 4.0 Set. P. Set 170.70
TUBE WELL 1-NO.
4. Direct rotary/ reverse rotary drilling of bore of tube well
in all kinds of soil except shingle and rock from ground
level to 250 feet below ground level. (20" to 26"
Dia.) 300.0 Rft. P. Rft. 636.35
5. Furnishing samples of water from bore hole. 4.0 Set. P. Set 170.70
Providing and installing M.S bail plug 12" dia 2.0 No. Each 5052.65
6. Providing and installing Brass Strainer in Tube Well
bore hole i/c socket studs, integral socket, 12" i/dia
6.00mm Thick. 100.0 Rft. P. Rft. 4181.80
7. Providing and installing M.S blind pipe socket/ welded
joint M.S reducer (where necessary in tube well bore
hole I/c jointing welding with strainer etc: complete 12"
I/dia 1/4" (6.0 mm) thick.
12" I/dia 1/4" thick. 200.0 Rft. P. Rft. 2275.05
8. Shrouding with graded pea gravel 3/8" to 1/8" around
the tube well in bore hole. 844.80 Cft. P. Cft. 90.20
9. Tesing and Development of tube well 6" dia and above
continusely. Upto 1 Cusec discharge 48.0 Hours. P-Hour 786.15
10. Providing, Fixing in position suspension clamp for 12"
dia pipe including cost of plain cement concrete 1:2:4
ratio block foundation. (N. S) 2.0 No. Each 1400.00
11. Providding and fixing M.S well cap on tube well for 12"
dia pipe. (N. S) 2.0 No. Each 600.00
12. Testing of strata and water samples from PHED
Laboratory complete will all charges. (N. S) 4.0 No. Each 800.00
PUMP HOUSE 12'X12'
13. Excavation in foundation for building, bridges & other
structures, including dagbelling, dressing, refilling
around structures with excavated earth, watering and
ramming lead upto one chain 100 ft. and lift upto 5 ft, in
ordinary soil. 1334.250 Cft. %o Cft 5564.60
14. Cement concrete brick or stone ballast 1.5" to 2" gauge
in foundation and plinth ratio 1:6:12 643.640 Cft. % Cft. 9946.05
15. Pacca brick work cement sand mortar 1:6 in foundation
and plinth. 1188.000 Cft. % Cft. 15785.00
D.N.I.T. FOR PROVISION OF WATER SUPPLY SCHEME AT MANDI
SADIQ GUNJ TEHSIL MINCHANABAD DISTRICT BAHAWALNAGAR. Trail Bore,Tube well,Const: of Pump House, P/I Pumping Machinery, P/L Risinge Main & D/System.
Rs. 8,385,000/-
Rs. 168,000/-
3 Months
TRAIL BORE 1-NO.
Page 1 of 57
DNIT Mandi S, Gunj (1)
Sr. No.Item Description Quantity Unit Contractor Rate
TRAIL BORE 1-NO.16. Providing and laying damp proof course of cement
concrete 1:2:4 (using cement, sand and shingle),
including bitumen coating:
(b) with two coats of bitumen: 2" thick 236.250 Sft. % Sft. 4794.15
17. Providing and laying vertical damp proof course of
cement concrete 1:4 (using cement, sand and shingle),
including bitumen coating and polythene sheet 500
gauge.
(b) with two coats of bitumen: 1/2" thick 96.00 Sft. % Sft. 2687.95
18. Pacca brick work in (1:5) cement sand mortar in ground
floor. 1627.4 Cft. % Cft. 17251.30
19. Filling, watering and ramming earth under floors with
surpulas earth from foundation etc: 743.274 Cft. %o Cft. 2660.60
20. Supplying and filling sand under floor or plugging in
well. 135.14 Cft. % Cft. 1600.00
21. Cement plaster 1:4 upto 20 ft, height.
(b) 1/2" thick. 1296.00 Sft. % Sft. 1628.90
22. Providing and laying Topping PCC 1:2:4 (3" thick)
deviding in penels complete. 702.00 Sft. % Sft. 6049.55
23. Providing and laying reinforced cement concrete
(including presstressed concrete), using course sand
and screened graded and washed aggregate in required
shape and design including forms, moulds, shuttering,
lifting, compacting, curing, rendering and firnishing
exposed surfaces, complete (but excluding the cost of
steel reinforcement, its fabrication and placing in
position etc:)
(a) (i) reinforced cement concrete in roof slab, beams,
columns, lintels, girders and other structural members
laid in position, or prestressed members cast in situ,
complete in all respect.
(3) (C) Type C (nominal mix 1:2:4) 186.18 Cft. P. Cft. 324.75
24. Febrication of mild steel reinforcement for cement concrete,
including cutting, bending, laying, in position, making joints
and fastening, including cost of binding wire and labour
charges for binding of steel reinforcement (also includes
removal of rust from bars).(b) deformed bars. 570.22 Kg. % Kg 9867.60
25. Febrication of heavy steel work with angle, tee, flat iron,
round iron, and sheet iron for making trusses, girders, tanks
etc: i/c drilling riveting, handling, assembling, and fixing but
excluding erection in position including erection and fitting in
postion iron trusses, staging of water tank etc:579.36 Kg. % Kg 11693.00
26. Providing and fixing M.S flat 1/2" x 1/16" x 1/8"
grill including 3/4" x 1/8" M.S flat frame in windows of
approved design, including painting three coats complete in
all respect. 64.00 Sft. P-Sft. 178.00
27. Cement pointing 1:2 strick joint on walls upto 20 Ft,
height, i/c cost of red oxide pigment. 1590.00 Sft. % Sft. 2030.10
28. Single layer of tiles 9" x 4-1/2" x 1-1/2" laid over 4" earth and
1" Mud plaster without bhossa grouted with cement sand 1:3
on top of RCC roof slab providing with 34 Lb. bitumen
coating sand blinded. 288.00 Sft. % Sft. 5750.35
29. white washr three coats on new surface wall and
ceiling. 1584.00 Sft. % Sft. 245.85
30. Preparing surface and painting of doors and windows
any type (including edges):- three coats. 176.00 Sft. % Sft. 1334.00
Page 2 of 57
DNIT Mandi S, Gunj (1)
Sr. No.Item Description Quantity Unit Contractor Rate
TRAIL BORE 1-NO.31. Khassi parnalas in cement sand mortar 1: 2 outside 12"
width finished smoth with a floating coat of neat
cement. 28.0 Rft. P. Rft. 575.10
32. Bottom Khurras of brick masonry in cement sand
mortar 1:6, 4ft x 2ft x 4-1/2 inch over 3 inch cement
concrete 1:4:8 2.0 No. Each. 89.10
33. Khurras on roof 2ft x 2ft x 6inch. 2.0 No. Each. 790.25
34. Febrication of heavy steel work with angle, tee, flat iron,
round iron, and sheet iron for making trusses, girders,
tanks etc: i/c drilling riveting, handling, assembling, and
fixing but excluding erection in position including
erection and fitting in postion iron trusses, staging of
water tank etc:R.S joist 8" x 4" 5.5 mm thick Best quality
chaina made, i/c three coats of paint duly painted
complete in all respect. 160.00 Kg. % Kg 11081.50
35. P/F Cilling fan swepest quality.(Royal or G.F.C.) 2.0 No. Each. 3500.00
RISING MAIN
36. Excavation of trenches for water supply pipe line in all
kinds of soil except cutting rock upto 5 Ft. depth from
ground level including trimming dressing the sides
leveling the bed of trenches to correct grade and cutting
pits for joint etc, complete in all respect. 48824 Cft. %oCft. 3966.85
37. Providing, laying, cutting, jointing, testing and
disinfecting PVC Pipe of BSS with B-Class working
pressure in trenches, complete in all respects.
8" Dia. 6670 Rft. P. Rft. 158.60
38. Providing, laying, cutting, jointing, testing and
disinfecting G.I Pipe line in trenches, with flanged
joints, using G.I pipe of BSS 1387-1967, complete in all
respects. Including specials and valves. ( Medum
quality)
8" Dia. 80 Rft. P. Rft. 637.65
3" Dia. 30 Rft. P. Rft. 448.50
39. Providing and fixing C.I Specials of BSS B-Class such as
tees, bends, cross, reducer, tailpieces etc: flanged spigot
cap flanged socket callor angle branch pluge etc: for C.I
pipe line complete C.I flanged special with flanged
joints.
3" TO 6" Dia 180.54 Kg. P. Kg. 107.30
8" TO 12" Dia 613.22 Kg. P. Kg. 108.30
40. Providing and fixing C.I flanges on pipe i/c Turing
threading facing, and fitting etc: complete in all respect.
3" TO 6" Dia 72.82 Kg. P. Kg. 109.50
8" TO 12" Dia 139.02 Kg. P. Kg. 110.50
41. Providing and fixing PVC taper core of BBS Class B
working pressure.
6" Dia. 11.0 Nos. Each. 157.25
8" Dia. 21.0 Nos. Each. 132.45
42. Providing and fixing C.I. sluice valves of BSS Quality
and weight class B. (i/c cost of Jointing material)
8" Dia. 2.0 Nos. Each. 7839.05
43. Providing and fixing air valve 2-1/2" dia (Double). 3.0 Nos. Each. 7622.55
Page 3 of 57
DNIT Mandi S, Gunj (1)
Sr. No.Item Description Quantity Unit Contractor Rate
TRAIL BORE 1-NO.44. Providing and fixing C.I. Non return valves of BSS
Quality and weight class B. (i/c cost of Jointing material)
8" Dia. 2.0 Nos. Each. 6385.00
45. Back filling of trenches by rehandling of earth work
lead upto a single throw of kassi phorah or shovel
including mining moising arht to optimum content in
layers complete. 39060.0 Cft. %o Cft. 1320.00
DISTRIBUTION SYSTEM
46. Excavation of trenches for water supply pipe line in all
kinds of soil except cutting rock upto 5 Ft. depth from
ground level including trimming dressing the sides
leveling the bed of trenches to correct grade and cutting
pits for joint etc, complete in all respect. 10298.00 Cft. %oCft. 3966.85
47. Providing, laying, cutting, jointing, testing and
disinfecting PVC Pipe of BSS with B-Class working
pressure in trenches, complete in all respects.
6" Dia. 1000 Rft. P. Rft. 111.15
4" Dia. 300 Rft. P. Rft. 158.60
3" Dia. 200 Rft. P. Rft. 105.70
48. Providing and fixing C.I Specials of BSS B-Class such as
tees, bends, cross, reducer, tailpieces etc: flanged spigot
cap flanged socket callor angle branch pluge etc: for C.I
pipe line complete C.I flanged special with flanged
joints.
3" TO 6" Dia 426.79 Kg. P. Kg. 107.30
49. Providing and fixing C.I flanges on pipe i/c Turing
threading facing, and fitting etc: complete in all respect.
3" TO 6" Dia 220.26 Kg. P. Kg. 109.50
50. Providing and fixing PVC taper core of BBS Class B
working pressure.
3" Dia. 17.0 Nos. Each. 132.47
4" Dia. 18.0 Nos. Each. 157.25
6" Dia. 11.0 Nos. Each. 158.25
54. Providing and fixing C.I. sluice valves of BSS Quality and
weight class B. (i/c cost of Jointing material)
6" Dia. 2.0 Nos. Each. 7780.90
4" Dia. 2.0 Nos. Each. 7781.90
3" Dia. 2.0 Nos. Each. 6656.65
55. Back filling of trenches by rehandling of earth work
lead upto a single throw of kassi phorah or shovel
including mining moising arht to optimum content in
layers complete. 8238.0 Cft. %o Cft. 1320.00
55. Dismantling and removing road metalling. 208.25 Cft. % Cft. 1136.25
57. Restoration of metalled road, on laid service, i/c
compaction, black topped road, with two coats of
surfacing and 10" depth of stone metal, with 2" sand
cushion for sub base and base. 250.0 Sft. % Sft. 3192.45
56. Dismantling and removing road pavement, etc.,
including screening and stacking (30 metre).of
byproducts upto one chain lead 364.00 Cft. % Cft. 1268.80
57. Restoration of brick pavement on edge, over laid service
line, with 2" (50 mm) sand cushion under soling.1000.0 Sft. % Sft. 2748.70
Page 4 of 57
DNIT Mandi S, Gunj (1)
Sr. No.Item Description Quantity Unit Contractor Rate
TRAIL BORE 1-NO.58. Making connection for new watersupply lines with the
running main, including excavation of trench and
refilling,complete, but excluding cost of pipe and
specials, etc upto 6" i/d (150 mm) 9.0 Nos. Each. 1620.95
SLUICE VALVE CHAMBER 8 - No.
59. Excavation in foundation for building, bridges & other
structures, including dagbelling, dressing, refilling
around structures with excavated earth, watering and
ramming lead upto one chain 100 ft. and lift upto 5 ft, in
ordinary soil. 1210.00 Cft. %o Cft 5564.60
60. Cement Concrete brick or stone ballast 1.5" to 2" gauge
in foundation and plinth ratio 1:6:12. 79.84 Cft. % Cft. 9946.05
61. Pacca brick work in cement sand mortar 1:5 other than
buinding. 405.0 Cft. % Cft. 16677.60
62. Cement plastar 1:4 upto 20 ft. height. 1/2" thick. 420.0 Sft. % Sft. 1628.90
63. PCC (1:2:4) i/c placing, laying, finishing, curing etc
complete. 12.0 Cft. % Cft. 20495.40
64. Febrication of heavy steel work with angle, tee, flat iron,
round iron, and sheet iron for making trusses, girders,
tanks etc: i/c drilling riveting, handling, assembling, and
fixing but excluding erection in position including
erection and fitting in postion iron trusses, staging of
water tank etc: 324.0 Kg. % Kg 11693.00
PUMPING MACHINERY
65.Providing, fixing in position and testing of vertical
turbine pumping unit capable to give a discharge of 0.50
cusec of clear water against a total head of 220 feet with
60 feet column pipe with assembly directly coupled
with Vertical turbine 3-phase electric motor 20 BHP
380/440 Volts with following Accessories complete in all
respect. (All approved manufacturer PHED).
a) Supplying of tool kit comprising of one china spanner
set, one china screw wrench of 12" size, one china
insulated pliers and one china screw driver set & Grease
Gun. 1 Set
b) Supplying and Fixing MCU ( Motor contrpol unit) star
delta starter 20-ASD i/c circuit breaker etc./MCU
Complete in all recpects. 1 No.
c) Supplying and fixing phase indicator moon light and its
wiring. 3 No.
d) Supplying and fixing iron clad 3-phase main switch
CHINA/ fiCO 0-100 ampare. 1 No.
e)Supplying and fixing metallec board 3,1/2' x 2' made of
1/16" thick M.S Sheet with its 1-1/2" x 1-1/2" x 3/16"
angle iron frame with its legs properly grouted in walls
of pump house and duly painted in smoke grey colour.1 No.
f) Supplying and fixing volt meter 0-100 amp. 3 No.
g) Supplying and fixing ampere meter 0-60 Amp: 3 No.
h) Supplying and fixing Kit Kat fuses 0 to 500 volts on
board China made 3 No.
i) Supplying and fixing power wiring of 7/0.064 PVC
sheathed insulated wire from energy meter to main
switch to starter inflexible PVC pipe in suitable dia with
brass end connectors 1 Job.
Page 5 of 57
DNIT Mandi S, Gunj (1)
Sr. No.Item Description Quantity Unit Contractor Rate
TRAIL BORE 1-NO.j) Supplying and fixing powers from starter to motor with
7/0.044 three core cable enclosed in suitable diameter
G.I pipe at motor and starter ends along with brass end
connectors. 1 Job.
k) Earthing of main switch, board starter electric motor
and other fitting as per standard specifications and to
the entire satisfaction of Engineer Incharge. 2 Sets
l) Supplying and fixing foundation nuts and bolts. 4 No.
m) Making plain cement concrete ratio 1: 2 : 4 foundation
of pump and motor 2 x 2 x 3/4. 1 No.
n)providing and fixing base plate 2'x2'x1/4" on foudation
o) Supplying and fixing suit able dia C.I non return valves
on delivery ends. 1 No.
p) Providing and fixing 2-1/2" dia Air Valve (double) of
BSS quality o/c ots fittings & specials. 1 No.
q) Providing and fixing C.I. sluice valves of BSS Quality
and weight class B. suit able Dia (i/c cost of Jointing
material) 1 No.
r) Internal electrification of pump house with 16 mm dia PVC
pipe 250/440 volts PVC insulated 3/ 0.029" wire, 3 No. round
block of shallow wood, one shallow wood board of 12" x 14"
size, one 9" long swan neck plain brass/ steel oxidation
braket,lamp holder, one wall reflector with brass end holder,
one two pin 10/ 15 Amp: wall single rod and one set of
earthing as per standard specification etc: complete.
1 Job.
s)Providing and fixing in position suit able dia BSS
quality C.I specials and fittings required in pump house
i/c cost of suit able dia G.I pipe of BSS medium quality
inside and out side connected with rising main.1 Job.
t) Supplying of test report from MEPCO (WAPDA) by the
approved contractors. 1 Job.
Complete Set: 2 Set. P-Set 925000
66. Supplying of chain Pully block 5 ton capacity having 5
meter long chain complete in all respects. 2 Set. P-Set 15000
Total:-
Note:-
1
2
Contractor Signature _________________________
with full postal address ____________________________________________________________________ Bahawalnagar
In the case of dose not mentioned the single brand of approved manufacturer Pumping
Machinery of HUD & PHED in his bid, his bid shall be considerd as non-responsive and may be
rejected accordingly. Allotted work will have to be started by the lowest bidder within 15-days after issuance of
this acceptance letter from this office. Falling which will make the allotment order rescinded
automatically involving no notice of further correspondence.
Executive Engineer,P.H.Engg: Division,
Page 6 of 57
DNIT B,Amin khan Chakuka (2)
Approximate Cost
Earnest Money.
Time Limit.
Sr. No.Item Description Quantity Unit Contractor Rate
DISTRIBUTION SYSTEM
1. Excavation of trenches for water supply pipe line in all
kinds of soil except cutting rock upto 5 Ft. depth from
ground level including trimming dressing the sides
leveling the bed of trenches to correct grade and cutting
pits for joint etc, complete in all respect. 89169.00 Cft. %oCft. #REF!
2. Providing, laying, cutting, jointing, testing and
disinfecting PVC Pipe of BSS with B-Class working
pressure in trenches, complete in all respects.
4" Dia. 5190 Rft. P. Rft. 158.60
3" Dia. 9100 Rft. P. Rft. 105.70
3. Providing and fixing C.I Specials of BSS B-Class such as
tees, bends, cross, reducer, tailpieces etc: flanged spigot
cap flanged socket callor angle branch pluge etc: for C.I
pipe line complete C.I flanged special with flanged
joints.
3" TO 6" Dia 264.12 Kg. P. Kg. 107.30
4. Providing and fixing C.I flanges on pipe i/c Turing
threading facing, and fitting etc: complete in all respect.
3" TO 6" Dia 208.16 Kg. P. Kg. 109.50
5. Providing and fixing PVC taper core of BBS Class B
working pressure.
3" Dia. 29.0 Nos. Each. 132.47
4" Dia. 22.0 Nos. Each. 157.25
D.N.I.T. FOR PROVISION OF LINK WATER SUPPLY MAIN PIPE LINE TO
BASTI AMIN KHAN CHAKOKA TEHSIL FORTABBAS DISTRICT
BAHAWALNAGAR. P/L D/System.
Rs. 2,403,000/-
Rs. 48,000/-3 Months
Page 7 of 57
DNIT B,Amin khan Chakuka (2)
Sr. No.Item Description Quantity Unit Contractor Rate
9. Providing and fixing C.I. sluice valves of BSS Quality and
weight class B. (i/c cost of Jointing material)
3" Dia. 2.0 Nos. Each. 9634.30
4" Dia. 2.0 Nos. Each. 7839.05
10. Back filling of trenches by rehandling of earth work
lead upto a single throw of kassi phorah or shovel
including mining moising arht to optimum content in
layers complete. 71332.0 Cft. %o Cft. 1320.00
SLUICE VALVE CHAMBER 4 - No.
11. Excavation in foundation for building, bridges & other
structures, including dagbelling, dressing, refilling
around structures with excavated earth, watering and
ramming lead upto one chain 100 ft. and lift upto 5 ft, in
ordinary soil. 453.75 Cft. %o Cft 5564.60
12. Cement Concrete brick or stone ballast 1.5" to 2" gauge
in foundation and plinth ratio 1:6:12. 29.94 Cft. % Cft. 9946.05
13. Pacca brick work in cement sand mortar 1:5 other than
buinding. 151.9 Cft. % Cft. 16677.60
14. Cement plastar 1:4 upto 20 ft. height. 1/2" thick.157.5 Sft. % Sft. 1628.90
15. PCC (1:2:4) i/c placing, laying, finishing, curing etc
complete. 4.5 Cft. % Cft. 20495.40
16. Febrication of heavy steel work with angle, tee, flat iron,
round iron, and sheet iron for making trusses, girders,
tanks etc: i/c drilling riveting, handling, assembling, and
fixing but excluding erection in position including
erection and fitting in postion iron trusses, staging of
water tank etc: 121.5 Kg. % Kg 11693.00
Total:-
Note:-
1
Contractor Signature _________________________
with full postal address _______________________
_____________________________________________
Allotted work will have to be started by the lowest bidder within 15-days after issuance of
this acceptance letter from this office. Falling which will make the allotment order rescinded
automatically involving no notice of further correspondence.
Page 8 of 57
Approximate Cost
Earnest Money.
Time Limit.
Sr. No. Quantity UnitContractor
Rates
1
755.00 Cft. %o Cft. 5564.60
2
373.00 Cft. % Cft. 9946.05
3
725.90 Cft. % Cft. 16164.15
4
150.00 Sft. % Sft. 5015.15
5
170.50 Sft. % Sft. 2996.50
6
506.00 Cft. %o Cft. 2660.60
7
786.60 Cft. %o Cft. 6476.70
8
807.70 Cft. % Cft. 17251.30
Item Description
PLANT ROOM
Excavation in foundation of building, bridges & other
structures, including dagbelling, dressing, refilling
around structures with excavated earth, watering and
ramming lead upto one chain 100 ft. and lift upto 5 ft.
in ordinary soil.
Cement concrete brick or stone ballast 1- 1/2" to 2"
gauge in foundation and plinth.(1:6:12)
Pacca brick work 1:5 cement sand mortar foundation
and plinth up to 10 Ft height
Providing and laying 1.5” damp proof course of
cement concrete 1:2:4 ( using cement, sand and
shingle) with 2 coats of bitumen.
Providing and laying Vertically damp proof course of
3/4" Thick cement concrete 1:3 ( using cement, sand
and shingle) with 1 coat of bitumen.
Filling, watering and ramming earth under floors with
surpulas earth from foundation etc:
Earth excavation underessed lead upto a single throw
of kassi, phaorah or shovel in ordinary soil.
Transportation of earth all types when the total
distance, i/c the lead covered in the item of work, is
more than 1000 ft. a) upto 1/4 mile (400 m) b) for
every 330 feet beyond 1/4 mile upto 1mile (c) for
every ¼ mile (400 m) additional lead or part thereof,
beyond one mile (1.6 Km.) upto 5 mile (8 Km). (Lead
upto 3 Mile)
Pacca brick work for ground floor upto 10’ height in
1:5 cement sand mortor above P.L.
Rs. 13,592,000/-
Rs. 272,000/-3 Months
D.N.I.T. FOR PROVISION OF OF 7-NO,S FILTRATION PLANTS AT QURASH
COLONY, NEAR GALA MANDI, HUSSAINABAD, ADDA CHAK ABDULLAH,
ADDA DONGA BONGA, ADDA GAJJANI, MOHAR WALI TEHSIL &
DISTRICT BAHAWALNAGAR. CONST; OF PLANT ROOM P/F FILTRATION PLANTS.
9
184.70 Cft. P-Cft. 324.75
10
565.20 Kg. %Kg 9867.60
111260.90 Sft. % Sft. 1628.90
12
133.50 Cft. % Cft. 1600.00
13
256.00 Sft. P-Rft. 6.60
14
492.00 Sft. % Sft. 4521.90
15
296.80 Sft. % Sft. 5750.35
16
28.00 Sft. P- Sft. 678.05
17
16.00 Sft. P- Sft. 380.45
Providing and laying reinforced cement concrete
(including presstressed concrete), using course sand
and screened graded and washed aggregate in required
shape and design including forms, moulds, shuttering,
lifting, compacting, curing, rendering and firnishing
exposed surfaces, complete (but excluding the cost of
steel reinforcement, its fabrication and placing in
position etc:)
(a) (i) reinforced cement concrete in roof slab, beams,
columns, lintels, girders and other structural members
laid in position, or prestressed members cast in situ,
complete in all respect.
(3) (C) Type C (nominal mix 1:2:4)
Fabrication of mild steel reinforcement for cement
concrete, i/c cutting, bending, laying in position,
making joints and fastenings, i/c cost of binding wire
and labour charges for bending of steel reinforcement (
also includes removal of rust from bars ) Deformed
bars
Cement plaster ½” thick 1: 4, upto 20’ height.
Supplying and filling sand under floor or plugging in
well
P/L marble strip of any shade dividing the mosoic
flooring into panels 1-1/2"x3/8" size
P/L tooping of cement conctate 1:2:4 i/c surface
finshing and dividing in pannel 2" thick complate in all
respect
Single layer of tiles 9”x4-1/2 “x1 ½ “ laid over 4” earth
and 1” mud plaster with out bhoosa grouted with
cement sand 1:3 on top of RCC roof slab RCC
provided with 34 LBS bitumen coating sand blineled.
Providing, fixing, steel grated door with 1/16" thick
sheeting i/c I Iron frame 2"x2"x3/8" and 3/4" square
bars 4"c/c complete with locking arrangement.
P/Fixing steel window with openable glazed panels
making beams section for frame 1 ½ “x1”x5/8” section
for leaves ¾”x1”x3/8” T-section 1”x1”
x1/8”embedded over a thin layer of putty duly screed
with leaves brass fittings holds fast, duly painted
complete in all respect i/c cost of approved design as
directedby the Engineer Incharge fixed with wire gauze
22 SWG. Glass panes 4 mm thick window.
18
14.00 Rft. P- Rft. 89.10
19
1.00 No. Each. 790.25
20 1.00 No. Each. 435.95
19
153.00 Sft. % Sft. 12615.50
20
100.00 Sft. % Sft. 11604.05
21
998.00 Sft. % Sft. 2030.10
22
396.00 Kg. %Kg 11081.50
23
1104.00 Sft. % Sft. 363.15
2417.10 Cft. % Cft. 16668.75
25
86.00 Cft. P-Cft. 324.75
139.13 Cft. P-Cft. 354.35
Kassi Parnalas in cement sand mortor 1:2 12” out side
width finished smooth with and floating coat of neat
cement.
Bottom khurras or brick masonry in cement mortor
1:6,4” x2”x4” over 3” cement concrete 1:4:8
Khurras on roof 2x2x6
Coloured glazed tile dado (6x6-1/4) 6mm thick in
pigment over 1:2 concrete sand mortor 3/4" thick
complete in all respect.
Laying floor of approved coloured glazed tiles 1/4"
thick laid in white cement and pigment on a bad.
Cement pointing struck joints, on walls, upto 20' hight
including Extra cost of labour and material for red
oxide pigment in cement pointing to match with the
colour of bricks.
Fabrication of heavy steel work, with angle, tees, flat
iro round iron and sheet iron for making trusses,
girders,tanks, etc., including cutting, drilling, revitting,
handling, assembling and fixing, but excluding erection
in position. For Grill
Distempering new surface three costs.
OHR
Pacca brick work other then building upto 10 ft hieght
in cement sand mortar 1:4 ratio.
Providing and laying reinforced cement concrete
(including presstressed concrete), using course sand
and screened graded and washed aggregate in required
shape and design including forms, moulds, shuttering,
lifting, compacting, curing, rendering and firnishing
exposed surfaces, complete (but excluding the cost of
steel reinforcement, its fabrication and placing in
position etc:)
(a) (i) reinforced cement concrete in roof slab, beams,
columns, lintels, girders and other structural members
laid in position, or prestressed members cast in situ,
complete in all respect.
(3) (C) Type C (nominal mix 1:2:4)
(3) (C) Type C (nominal mix 1:1-1/2:3)
26
689.00 Kg. % Kg 9867.60
27
261.25 Sft. % Sft. 9777.35
28
29.60 Sft. % Sft. 1723.30
29
70.00 Rft. P. Rft.402.50
40.00 Rft. P. Rft. 247.05
50.00 Rft. P. Rft. 85.15
30
1332.00 Cft. %oCft. 3966.85
31
200.00 Rft. P. Rft. 158.60
32
1.00 No. Each. 7839.05
33
1066.00 Cft. %oCft. 1320.00
SLUICE VALVE CHAMBER 1 - No.
34.
151.25 Cft. %o Cft 5564.60
Fabrication of mild steel reinforcement for cement
concrete, i/c cutting, bending, laying in position,
making joints and fastenings, i/c cost of binding wire
and labour charges for bending of steel reinforcement (
also includes removal of rust from bars ) Deformed
bars
Mosaic dado or skirting with one part of cement and
marbal powder in the ration of 3:1 and two part of
marbal chips laid over 1/2" ( 13mm) thick cement
plaster 1:3 including rubbing and polishing complate
with finshing ii) Using white cement 1/2" (13
mm) thick
Cement plaster 1:3 cement sand ratio up to 20 Ft hight
3/4" Thick
Providing, laying, cutting, jointing, testing &
disinfecting, G.I pipe line in trenches, with flanged
joints, using G.I pipe of B.S.S 1387-1967 complete in
all respect, i/c specials and valves. 3" i/d (mediam
quality)
3" i/d
2" i/d
3/4" i/d
PVC PIPEExcavation of trenches for water supply pipe line in all
kinds of soil except cutting rock upto 5 Ft. depth from
ground level including trimming dressing the sides
leveling the bed of trenches to correct grade and
cutting pits for joint etc, complete in all respect.
Providing, laying, cutting, jointing, testing and
disinfecting PVC Pipe of BSS with B-Class working
pressure in trenches, complete in all respects.
4" Dia.
Providing and fixing C.I. sluice valves of BSS Quality
and weight class B. (i/c cost of Jointing material)
4" Dia.
Back filling of trenches by rehandling of earth work
lead upto a single throw of kassi phorah or shovel
including mining moising arht to optimum content in
layers complete.
Excavation in foundation for building, bridges & other
structures, including dagbelling, dressing, refilling
around structures with excavated earth, watering and
ramming lead upto one chain 100 ft. and lift upto 5 ft,
in ordinary soil.
35.9.98 Cft. % Cft. 9946.05
36.50.63 Cft. % Cft. 16298.50
37. 52.50 Sft. % Sft. 1628.90
38.
1.50 Cft. % Cft. 20495.40
39.
40.50 Kg. % Kg. 11693.00
40
Duty
Raw Water
Feed Pump
1 Quantity 01 No.
Flow Rate
35-40 GPM
continuous
2 Make Italy
3 Power 1-HP SS-Material
4 ControlCondor Germany
(Pressure Switch)
5 Material P. E
Silent Features
i
ii
Supplying ,installing,testing and commissioning
Ultrafiltration Plant of 2000 Liters per hour
capacity including Carriage loading unloading
charges, inclusive of all Taxes and Transportation
charges to the site of work (as per Approved
specifications of HUD & PHED) along with
following equipment and accessories properly
mounted in the Frame/Skid. Detail as per given in
below Specifications.
01-CHLORINATION PUMP
Cement Concrete brick or stone ballast 1.5" to 2"
gauge in foundation and plinth ratio 1:6:12.
Pacca brick work in cement sand mortar 1:5 other than
buinding.
Cement plastar 1:4 upto 20 ft. height. 1/2" thick.
PCC (1:2:4) i/c placing, laying, finishing, curing etc
complete.
02-PRESSURE SAND FILTER
Febrication of heavy steel work with angle, tee, flat
iron, round iron, and sheet iron for making trusses,
girders, tanks etc: i/c drilling riveting, handling,
assembling, and fixing but excluding erection in
position including erection and fitting in postion iron
trusses, staging of water tank etc:
UF PLANT
Treated Water Capacity 2000 Gallons Per Hour/
8000 Ltr per Hour.
Type " I " Plant for Turbidity and Bacteriological
Removel.
FRP pressure vessels offer composite fiberglass
construction for outstanding performance and durability
in harsh chemical environments.
Operating parameters
Maximum operating pressure: 150 psi
Maximum operating temperature: 150° F
iii
iv
v
vi
vii
viii
viiii
1 Flow Rate 2000 GPH
2
Maximum
Pressure 150PSI
3
Operating
Pressure. > 90 Psi
4 Material Tank
5 Standard NSF (USA).
6 Size 20”X60”
7 Filtration Media
Glass Grain
USA.
8
Filter Media
Density > 2.50 gm/cm3
9 Specific Gravity > 2.50 gm/cm3
10 Bulk Density 80 to 85 lb/ft3
11 Effective size
12
Co-efficient of
Uniformity 1.45 to 1.60
13
Estimated
Sphericity 0.30 to 0.50
14 Porosity Typically 48 %
15
Physical
Specification
16 Media size 0.50 to 1.00mm
17
Suspended
Solid Removal
range. 1 to 5 um
18 Backwash
19 Mesh Steel mesh.
Stainless steel vessel 3.50 mm thick
(Argon welded) conforming to 316 ASTM
specification or vessel may be of FRP
(Fiber Reinforced Polyester) having food
Grade plastic coating on inner surface.
from 0.30 mm to 1.80 mm.
Amorphous soda lime of
glass
Automatic throug PLC
system.
Design parameters – NSF
Safety Factor: 4:1 (Minimum burst at 600 psi)
Cycle test: 100,000 cycles without leakage
Design parameters – ASME
Design parameters – Pentair
Safety factor 4:1 (Minimum burst at 600 psi)
Cycle test: 250,000 cycles without leakage
1
Maximum Flow
Rate 2000 GPH
2 MicroN Rating 5 Micron
3
Operating
Pressure. 90 PSI (6.2 bar)
4
Type of
Cartridge Used
5 Dia of Cartridge 4"
6 Size 20"
7 Inlet and Outlet 1½"
8 Housing Dia 7"
9 Housing Length 24"
10
Housing
Material Polypropylene
11 Quantity 2 No.
12 Made By
1 Flow Rate 2000 GPH
2
Maximum
Pressure 150 PSI
3
Operating
Pressure. 90 PSI (6.2 bar)
4 Material Tank
5 Standard NSF (USA).
6 Size 20”X60”
7 Filtration Media
(Raw material)
8 Bulk Density 5 gm/cm3
9 Ash content 5%
10 Surface Area 800 m2/gm
11 Backwash
12 Inlet & Outlet 1½"
13 Made By
03- DIRT CUTTER (5 Micron) CARTRIDGE
FILTERS (JUMBO SEDIMENT FILTER)
Polypropylene Yarn/PPF
Hydrosep, Taiwan
04- ACTIVATED CARBON FILTRATION
Stainless steel vessel 3.50 mm thick
(Argon welded) conforming to 316 ASTM
specification or vessel may be of FRP
(Fiber Reinforced Polyester) having food
Grade plastic coating on inner surface.
Granular Activated Carbon Coconut
Shell based Acid wash YAO14/40.
SRILANKA/ TAIWAN
Automatic throug PLC
system.
Made in Taiwan
05- DIRT CUTTER (1 MICRON) CARTRIDGE
1
Maximum Flow
Rate 2000 GPH
2 Micron Rating 1 Micron
3
Operating
Pressure.
> 90 PSI (6.2
bar)
4
Type of
Cartridge Used
5 Dia of Cartridge 4”
6 Size 20”
7 Inlet & Outlet 1½"
8 Housing Dia 7”
9 Housing Length 24”
10
Housing
Material Polypropylene
11 Quantity 2 No.
12 Made By
1Ultra filtration
Plant.
1.1 Filtration units
1.2 Filter Vessel
· Material
· Size
· Thickness
1.3Type of Membrane
(No of bores)
1.4Maximum Flow
Rate
1.4Membrane
Material
· Make
· Origin
1.5
Membrane
Working
Pressure
1.6 Membrane Life
1.7Pore Size of
Membrane
1.8
Bacterial
Removal
Efficiency of the
Ultra filtration
Polypropylene Yarn/PPF
Hydrosep, Taiwan
USA / ITALY/ TAIWAN
1 Unit
1 Unit
FRP
4" x 40" +
5-7 mm
Multiple bore 4 No.
2000 GPH/ 8000 Ltr Hour
PES
Applied Membranes/Equivalent/USA/ATS
USA / ITALY /TAIWAN
40-150 PSI Max
5 Years
0.01 micron
99.99%
1.9
Viruses
Removal
Efficiency of the
Ultra filtration
1.10
Cleaning
Process of Ultra
filtration Plant
Cleaning
frequency
Cleaning
duration
1.11Working
Temperature
Max 140 oF
1.12Working
Pressure
1.13
High Pressure
Pump Coupled
with Motor
1 Flow Rate 1000 GPH
2 Ultraviolet
Lamp3 Made Atlantic USA
4 Lamp Light
5
Nominal Lamp
Length 33 7/8" inches
6 Quartz Sleeve (Made in U.S.A)
7
Power
Consumption 39 Watts x 2
8
Ultraviolet
Output 14 Watts
9 Design Pressure 125 Psi
10
Operating
Pressure. 75 Psi
11
Operating
Temperature. 35-100 F
12
Ultraviolet
Dosage.
13 Quantity
14 Sump
15
99.99%
Continuous
Continuous
77 oF to 140 oF
60 PSI
06- ULTRAVIOLET STERILIZATION / DISINFECTION UNIT.
High intensity hardened glass,Slim Line.
10,000 running hours
50,000 MW sec/cm2
02Nos Multi bore (Made in
U.S,A)
Stainless steel 304 SS.
II- PIPING AND FITTINGS.
Size 1½" i/d or
as required
material and
size.
Priming and
relieving
pressure.
Chek valve
Back pressure
valve.
16
17
18
1 Set P-Set 924815.00
41 2
1 Job P-Job 50000.00
42 3
1 Job P-Job 60000.00
Note:-
1
2
In the case of dose not mentioned the single brand of approved manufacturer Pumping
Machinery of HUD & PHED in his bid, his bid shall be considerd as non-responsive and may be
rejected accordingly.
Allotted work will have to be started by the lowest bidder within 15-days after issuance of
this acceptance letter from this office. Falling which will make the allotment order rescinded
automatically involving no notice of further correspondence.
Approved manufacturers of HUD &
PHED.
Bleed valve assembly shall be capable for
aids in priming and relieving pressure
from theGuided 4- ball check valve shall be for
ensuring accurate and reliable for
metering performance.
Injection back pressure valve assembly
shall be capable for injection at an angle
in order to inhibit siphoning.
Providing and fixing brass stop 07 Nos
Providing and laying, cutting 3" i/d & 3"/4 i/d
Electric Control Panel
01 to 06 (19) Complete Plant :-
Goldamatic PumpSupply& Installation and testing of
Goldamatic Pump unit (of approved
make) capable to give a 15m suction of
clear water against a total head of 30
Metre,directly coupled with horizantal
single phase o.50 BHP A.C electric
motor 50 cycle 250/440 Volts,2800 RPM
including cost of S/F power wiring of
suitable PVC sheated,insulated wire
from energy meter to Motor in flexible
Pvc pipe in suitable diameter with brass
end, and jointing material
union,tee,elbo includes P.C.C (1:2:4)
foundation of Pump and Motor as per
required size and shape etc, etc
complete Job.
Providing & Fixing Sign board
16.5' to 4' size i.c lighting
arrangement complete in all
DNIT WSS 30,Gajjani (4)
Approximate Cost
Earnest Money.
Time Limit.
Sr. No.Item Description Quantity Unit Contractor Rate
1 Boring for tubewell in all types of soil except shingle
and rock, from ground level to 100 ft. (30 m) depth,
including sinking and withdrawing of casing pipe,
complete:- 6" dia 100.0 Rft. P. Rft. 213.00
2 Boring for tubewell in all types of soil except shingle
and rock, from ground level to 100.1 ft. to 200 ft (30 to 60
m) depth, including sinking and withdrawing of casing
pipe, complete:- 6" dia 10.0 Rft. P. Rft. 331.90
3 Furnishing sample of water from bore hole2.0 Set. P. Set 170.70
TUBE WELL 1-NO.
4. Direct rotary/ reverse rotary drilling of bore of tube well
in all kinds of soil except shingle and rock from ground
level to 250 feet below ground level. (20" to 26"
Dia.) 110.0 Rft. P. Rft. 636.35
5. Furnishing samples of water from bore hole. 2.0 Set. P. Set 170.70
6. Providing and installing M.S bail plug 12" dia 1.0 No. Each 5052.65
7. Providing and installing Brass Strainer in Tube Well
bore hole i/c socket studs, integral socket, 12" i/dia
6.00mm Thick. 30.0 Rft. P. Rft. 4181.80
8. Providing and installing M.S blind pipe socket/ welded
joint M.S reducer (where necessary in tube well bore
hole I/c jointing welding with strainer etc: complete 12"
I/dia 1/4" (6.0 mm) thick.
12" I/dia 1/4" thick. 80.0 Rft. P. Rft. 2275.05
9. Shrouding with graded pea gravel 3/8" to 1/8" around
the tube well in bore hole. 309.76 Cft. P. Cft. 90.20
10. Tesing and Development of tube well 6" dia and above
continusely. Upto 1 Cusec discharge 24.0 Hours. P-Hour 786.15
11. Providing, Fixing in position suspension clamp for 12"
dia pipe including cost of plain cement concrete 1:2:4
ratio block foundation. (N. S) 1.0 No. Each 1400.00
12. Providding and fixing M.S well cap on tube well for 12"
dia pipe. (N. S) 1.0 No. Each 600.00
13. Testing of strata and water samples from PHED
Laboratory complete will all charges. (N. S) 2.0 No. Each 800.00
PUMP HOUSE 12'X12'
14. Excavation in foundation for building, bridges & other
structures, including dagbelling, dressing, refilling
around structures with excavated earth, watering and
ramming lead upto one chain 100 ft. and lift upto 5 ft, in
ordinary soil. 667.125 Cft. %o Cft 5564.60
15. Cement concrete brick or stone ballast 1.5" to 2" gauge in
foundation and plinth ratio 1:6:12 321.820 Cft. % Cft. 9946.05
16. Pacca brick work cement sand mortar 1:6 in foundation
and plinth. 594.000 Cft. % Cft. 15785.00
D.N.I.T. FOR PROVISION OF WATER SUPPLY SCHEME CHAK NO.
30/GAJJANI TEHSIL CHISHTIAN DISTRICT BAHAWALNAGAR. Trail Bore,Tube well,Const: of Pump House, P/I Pumping Machinery, P/L Risinge Main & D/System.
Rs. 13,326,000/-
Rs. 267,000/-
3 Months
TRAIL BORE 1-NO.
Page 19 of 57
DNIT WSS 30,Gajjani (4)
Sr. No.Item Description Quantity Unit Contractor Rate
TRAIL BORE 1-NO.17. Providing and laying damp proof course of cement
concrete 1:2:4 (using cement, sand and shingle),
including bitumen coating:
(b) with two coats of bitumen: 2" thick 118.125 Sft. % Sft. 4794.15
18. Providing and laying vertical damp proof course of
cement concrete 1:4 (using cement, sand and shingle),
including bitumen coating and polythene sheet 500
gauge.
(b) with two coats of bitumen: 1/2" thick 48.00 Sft. % Sft. 2687.95
19. Pacca brick work in (1:5) cement sand mortar in ground
floor. 813.7 Cft. % Cft. 17251.30
20. Filling, watering and ramming earth under floors with
surpulas earth from foundation etc: 371.637 Cft. %o Cft. 2660.60
21. Supplying and filling sand under floor or plugging in
well. 67.57 Cft. % Cft. 1600.00
22. Cement plaster 1:4 upto 20 ft, height.
(b) 1/2" thick. 648.00 Sft. % Sft. 1628.90
23. Providing and laying Topping PCC 1:2:4 (3" thick)
deviding in penels complete. 351.00 Sft. % Sft. 6049.55
24. Providing and laying reinforced cement concrete
(including presstressed concrete), using course sand and
screened graded and washed aggregate in required
shape and design including forms, moulds, shuttering,
lifting, compacting, curing, rendering and firnishing
exposed surfaces, complete (but excluding the cost of
steel reinforcement, its fabrication and placing in
position etc:)
(a) (i) reinforced cement concrete in roof slab, beams,
columns, lintels, girders and other structural members
laid in position, or prestressed members cast in situ,
complete in all respect.
(3) (C) Type C (nominal mix 1:2:4) 93.09 Cft. P. Cft. 324.75
25. Febrication of mild steel reinforcement for cement concrete,
including cutting, bending, laying, in position, making joints
and fastening, including cost of binding wire and labour
charges for binding of steel reinforcement (also includes
removal of rust from bars).(b) deformed bars. 285.11 Kg. % Kg 9867.60
26. Febrication of heavy steel work with angle, tee, flat iron,
round iron, and sheet iron for making trusses, girders, tanks
etc: i/c drilling riveting, handling, assembling, and fixing but
excluding erection in position including erection and fitting in
postion iron trusses, staging of water tank etc:289.68 Kg. % Kg 11693.00
27. Providing and fixing M.S flat 1/2" x 1/16" x 1/8"
grill including 3/4" x 1/8" M.S flat frame in windows of
approved design, including painting three coats complete in
all respect. 32.00 Sft. P-Sft. 178.00
28. Cement pointing 1:2 strick joint on walls upto 20 Ft,
height, i/c cost of red oxide pigment. 795.00 Sft. % Sft. 2030.10
29. Single layer of tiles 9" x 4-1/2" x 1-1/2" laid over 4" earth and
1" Mud plaster without bhossa grouted with cement sand 1:3
on top of RCC roof slab providing with 34 Lb. bitumen
coating sand blinded. 144.00 Sft. % Sft. 5750.35
30. white washr three coats on new surface wall and ceiling.
792.00 Sft. % Sft. 245.85
31. Preparing surface and painting of doors and windows
any type (including edges):- three coats. 88.00 Sft. % Sft. 1334.00
32. Khassi parnalas in cement sand mortar 1: 2 outside 12"
width finished smoth with a floating coat of neat
cement. 14.0 Rft. P. Rft. 575.10
Page 20 of 57
DNIT WSS 30,Gajjani (4)
Sr. No.Item Description Quantity Unit Contractor Rate
TRAIL BORE 1-NO.33. Bottom Khurras of brick masonry in cement sand mortar
1:6, 4ft x 2ft x 4-1/2 inch over 3 inch cement concrete
1:4:8 1.0 No. Each. 89.10
34. Khurras on roof 2ft x 2ft x 6inch. 1.0 No. Each. 790.25
35. Febrication of heavy steel work with angle, tee, flat iron,
round iron, and sheet iron for making trusses, girders,
tanks etc: i/c drilling riveting, handling, assembling, and
fixing but excluding erection in position including
erection and fitting in postion iron trusses, staging of
water tank etc:R.S joist 8" x 4" 5.5 mm thick Best quality
chaina made, i/c three coats of paint duly painted
complete in all respect. 80.00 Kg. % Kg 11081.50
36. P/F Cilling fan swepest quality.(Royal or G.F.C.) 1.0 No. Each. 3500.00
RISING MAIN
37. Excavation of trenches for water supply pipe line in all
kinds of soil except cutting rock upto 5 Ft. depth from
ground level including trimming dressing the sides
leveling the bed of trenches to correct grade and cutting
pits for joint etc, complete in all respect. 52095 Cft. %oCft. 3966.85
38. Providing, laying, cutting, jointing, testing and
disinfecting PVC Pipe of BSS with B-Class working
pressure in trenches, complete in all respects.
4" Dia. 7822 Rft. P. Rft. 158.60
39. Providing, laying, cutting, jointing, testing and
disinfecting G.I Pipe line in trenches, with flanged joints,
using G.I pipe of BSS 1387-1967, complete in all respects.
Including specials and valves. ( Medum quality)
3" Dia. 20 Rft. P. Rft. 448.50
40. Providing and fixing C.I Specials of BSS B-Class such as
tees, bends, cross, reducer, tailpieces etc: flanged spigot
cap flanged socket callor angle branch pluge etc: for C.I
pipe line complete C.I flanged special with flanged
joints.
3" TO 6" Dia 601.00 Kg. P. Kg. 107.30
41. Providing and fixing C.I flanges on pipe i/c Turing
threading facing, and fitting etc: complete in all respect.
183.40 Kg. P. Kg. 109.50
42. Providing and fixing PVC taper core of BBS Class B
working pressure.
4" Dia. 30.0 Nos. Each. 157.25
3" Dia. 10.0 Nos. Each. 132.45
43. Providing and fixing C.I. sluice valves of BSS Quality
and weight class B. (i/c cost of Jointing material)
4" Dia. 4.0 Nos. Each. 7839.05
44. Providing and fixing air valve 2-1/2" dia (Double). 2.0 Nos. Each. 7622.55
45. Back filling of trenches by rehandling of earth work
lead upto a single throw of kassi phorah or shovel
including mining moising arht to optimum content in
layers complete. 41676.0 Cft. %o Cft. 1320.00
DISTRIBUTION SYSTEM
46. Excavation of trenches for water supply pipe line in all
kinds of soil except cutting rock upto 5 Ft. depth from
ground level including trimming dressing the sides
leveling the bed of trenches to correct grade and cutting
pits for joint etc, complete in all respect. 165816.00 Cft. %oCft. 3966.85
Page 21 of 57
DNIT WSS 30,Gajjani (4)
Sr. No.Item Description Quantity Unit Contractor Rate
TRAIL BORE 1-NO.47. Providing, laying, cutting, jointing, testing and
disinfecting PVC Pipe of BSS with B-Class working
pressure in trenches, complete in all respects.
3" Dia. 27636 Rft. P. Rft. 105.70
48. Providing, laying, cutting, jointing, testing and
disinfecting G.I Pipe line in trenches, with flanged joints,
using G.I pipe of BSS 1387-1967, complete in all respects.
Including specials and valves. ( Medum quality)
3" Dia. 90 Rft. P. Rft. 448.50
49. Providing and installing P.V.C. tees, of B.S.S. i) Class `B'
working pressure:-
3" Dia. 72.0 Nos. Each. 615.65
4" Dia. 2.0 Nos. Each. 1092.75
50. Providing and installing P.V.C. bend, of B.S.S. i) Class
`B' working pressure:-
3" Dia. 15.0 Nos. Each. 216.45
4" Dia. 2.0 Nos. Each. 373.25
51. Providing and installing P.V.C. Socket, of B.S.S. i) Class
`B' working pressure:-
3" Dia. 55.0 Nos. Each. 147.50
4" Dia. 5.0 Nos. Each. 226.35
52. Providing and fixing C.I. sluice valves of BSS Quality and
weight class B. (i/c cost of Jointing material)
3" Dia. 6.0 Nos. Each. 6656.65
53. Back filling of trenches by rehandling of earth work
lead upto a single throw of kassi phorah or shovel
including mining moising arht to optimum content in
layers complete. 132653.0 Cft. %o Cft. 1320.00
SLUICE VALVE CHAMBER 7 - No.
54. Excavation in foundation for building, bridges & other
structures, including dagbelling, dressing, refilling
around structures with excavated earth, watering and
ramming lead upto one chain 100 ft. and lift upto 5 ft, in
ordinary soil. 1058.75 Cft. %o Cft 5564.60
55. Cement Concrete brick or stone ballast 1.5" to 2" gauge
in foundation and plinth ratio 1:6:12. 69.86 Cft. % Cft. 9946.05
56. Pacca brick work in cement sand mortar 1:5 other than
buinding. 354.4 Cft. % Cft. 16677.60
57. Cement plastar 1:4 upto 20 ft. height. 1/2" thick. 367.5 Sft. % Sft. 1628.90
58. PCC (1:2:4) i/c placing, laying, finishing, curing etc
complete. 10.5 Cft. % Cft. 20495.40
59. Febrication of heavy steel work with angle, tee, flat iron,
round iron, and sheet iron for making trusses, girders,
tanks etc: i/c drilling riveting, handling, assembling, and
fixing but excluding erection in position including
erection and fitting in postion iron trusses, staging of
water tank etc: 283.5 Kg. % Kg 11693.00
PUMPING MACHINERY
60.Providing, fixing in position and testing of vertical
turbine pumping unit capable to give a discharge of 0.25
cusec of clear water against a total head of 190 feet with
60 feet column pipe with assembly directly coupled with
Vertical turbine 3-phase electric motor 15 BHP 380/440
Volts with following Accessories complete in all respect.
(All approved manufacturer PHED).
Page 22 of 57
DNIT WSS 30,Gajjani (4)
Sr. No.Item Description Quantity Unit Contractor Rate
TRAIL BORE 1-NO.a) Supplying of tool kit comprising of one china spanner
set, one china screw wrench of 12" size, one china
insulated pliers and one china screw driver set & Grease
Gun. 1 Set
b) Supplying and Fixing MCU ( Motor contrpol unit) star
delta starter 15-ASD i/c circuit breaker etc./MCU
Complete in all recpects. 1 No.
c) Supplying and fixing phase indicator moon light and its
wiring. 3 No.
d) Supplying and fixing iron clad 3-phase main switch
CHINA/ fiCO 0-100 ampare. 1 No.
e)Supplying and fixing metallec board 3,1/2' x 2' made of
1/16" thick M.S Sheet with its 1-1/2" x 1-1/2" x 3/16" angle
iron frame with its legs properly grouted in walls of
pump house and duly painted in smoke grey colour.1 No.
f) Supplying and fixing volt meter 0-100 amp. 3 No.
g) Supplying and fixing ampere meter 0-60 Amp: 3 No.
h) Supplying and fixing Kit Kat fuses 0 to 500 volts on
board China made 3 No.
i) Supplying and fixing power wiring of 7/0.064 PVC
sheathed insulated wire from energy meter to main
switch to starter inflexible PVC pipe in suitable dia with
brass end connectors 1 Job.
j) Supplying and fixing powers from starter to motor with
7/0.044 three core cable enclosed in suitable diameter G.I
pipe at motor and starter ends along with brass end
connectors. 1 Job.
k)Earthing of main switch, board starter electric motor
and other fitting as per standard specifications and to
the entire satisfaction of Engineer Incharge.2 Sets
l) Supplying and fixing foundation nuts and bolts. 4 No.
m) Making plain cement concrete ratio 1: 2 : 4 foundation of
pump and motor 2 x 2 x 3/4. 1 No.
n)providing and fixing base plate 2'x2'x1/4" on foudation
o) Supplying and fixing suit able dia C.I non return valves
on delivery ends. 1 No.
p) Providing and fixing 2-1/2" dia Air Valve (double) of
BSS quality o/c ots fittings & specials. 1 No.
q) Providing and fixing C.I. sluice valves of BSS Quality
and weight class B. suit able Dia (i/c cost of Jointing
material) 1 No.
r) Internal electrification of pump house with 16 mm dia
PVC pipe 250/440 volts PVC insulated 3/ 0.029" wire, 3
No. round block of shallow wood, one shallow wood
board of 12" x 14" size, one 9" long swan neck plain
brass/ steel oxidation braket,lamp holder, one wall
reflector with brass end holder, one two pin 10/ 15 Amp:
wall single rod and one set of earthing as per standard
specification etc: complete. 1 Job.
s)Providing and fixing in position suit able dia BSS
quality C.I specials and fittings required in pump house
i/c cost of suit able dia G.I pipe of BSS medium quality
inside and out side connected with rising main.1 Job.
Page 23 of 57
DNIT WSS 30,Gajjani (4)
Sr. No.Item Description Quantity Unit Contractor Rate
TRAIL BORE 1-NO.t) Supplying of test report from MEPCO (WAPDA) by the
approved contractors. 1 Job.
Complete Set: 1 Set. P-Set 600000
61. Supplying of chain Pully block 5 ton capacity having 5
meter long chain complete in all respects. 1 Set. P-Set 15000
Total:-
Note:-
1
2
Contractor Signature _________________________with full postal address _______________________
_____________________________________________
In the case of dose not mentioned the single brand of approved manufacturer Pumping
Machinery of HUD & PHED in his bid, his bid shall be considerd as non-responsive and may be
rejected accordingly. Allotted work will have to be started by the lowest bidder within 15-days after issuance of
this acceptance letter from this office. Falling which will make the allotment order rescinded
automatically involving no notice of further correspondence.
Executive Engineer,P.H.Engg: Division,
Bahawalnagar
Page 24 of 57
DNIT WSS 23Gajjani (5)
Approximate Cost
Earnest Money.
Time Limit.
Sr. No.Item Description Quantity Unit Contractor Rate
1 Boring for tubewell in all types of soil except shingle
and rock, from ground level to 100 ft. (30 m) depth,
including sinking and withdrawing of casing pipe,
complete:- 6" dia 100.0 Rft. P. Rft. 213.00
2 Boring for tubewell in all types of soil except shingle
and rock, from ground level to 100.1 ft. to 200 ft (30 to 60
m) depth, including sinking and withdrawing of casing
pipe, complete:- 6" dia 20.0 Rft. P. Rft. 331.90
3 Furnishing sample of water from bore hole2.0 Set. P. Set 170.70
TUBE WELL 1-NO.
4. Direct rotary/ reverse rotary drilling of bore of tube well
in all kinds of soil except shingle and rock from ground
level to 250 feet below ground level. (20" to 26"
Dia.) 120.0 Rft. P. Rft. 636.35
5. Furnishing samples of water from bore hole. 2.0 Set. P. Set 170.70
6. Providing and installing M.S bail plug 12" dia 1.0 No. Each 5052.65
7. Providing and installing Brass Strainer in Tube Well
bore hole i/c socket studs, integral socket, 12" i/dia
6.00mm Thick. 32.0 Rft. P. Rft. 4181.80
8. Providing and installing M.S blind pipe socket/ welded
joint M.S reducer (where necessary in tube well bore
hole I/c jointing welding with strainer etc: complete 12"
I/dia 1/4" (6.0 mm) thick.
12" I/dia 1/4" thick. 88.0 Rft. P. Rft. 2275.05
9. Shrouding with graded pea gravel 3/8" to 1/8" around
the tube well in bore hole. 337.92 Cft. P. Cft. 90.20
10. Tesing and Development of tube well 6" dia and above
continusely. Upto 1 Cusec discharge 24.0 Hours. P-Hour 786.15
11. Providing, Fixing in position suspension clamp for 12"
dia pipe including cost of plain cement concrete 1:2:4
ratio block foundation. (N. S) 1.0 No. Each 1400.00
12. Providding and fixing M.S well cap on tube well for 12"
dia pipe. (N. S) 1.0 No. Each 600.00
13. Testing of strata and water samples from PHED
Laboratory complete will all charges. (N. S) 2.0 No. Each 800.00
PUMP HOUSE 12'X12'
14. Excavation in foundation for building, bridges & other
structures, including dagbelling, dressing, refilling
around structures with excavated earth, watering and
ramming lead upto one chain 100 ft. and lift upto 5 ft, in
ordinary soil. 667.125 Cft. %o Cft 5564.60
15. Cement concrete brick or stone ballast 1.5" to 2" gauge in
foundation and plinth ratio 1:6:12 321.820 Cft. % Cft. 9946.05
16. Pacca brick work cement sand mortar 1:6 in foundation
and plinth. 594.000 Cft. % Cft. 15785.00
D.N.I.T. FOR PROVISION OF WATER SUPPLY SCHEME CHAK NO.
23/GAJJANI TEHSIL CHISHTIAN DISTRICT BAHAWALNAGAR.
Trail Bore,Tube well,Const: of Pump House, P/I Pumping Machinery, P/L Risinge Main & D/System.
Rs. 14,853,000/-
Rs. 297,000/-
3 Months
TRAIL BORE 1-NO.
Page 25 of 57
DNIT WSS 23Gajjani (5)
Sr. No.Item Description Quantity Unit Contractor Rate
TRAIL BORE 1-NO.17. Providing and laying damp proof course of cement
concrete 1:2:4 (using cement, sand and shingle),
including bitumen coating:
(b) with two coats of bitumen: 2" thick 118.125 Sft. % Sft. 4794.15
18. Providing and laying vertical damp proof course of
cement concrete 1:4 (using cement, sand and shingle),
including bitumen coating and polythene sheet 500
gauge.
(b) with two coats of bitumen: 1/2" thick 48.00 Sft. % Sft. 2687.95
19. Pacca brick work in (1:5) cement sand mortar in ground
floor. 813.7 Cft. % Cft. 17251.30
20. Filling, watering and ramming earth under floors with
surpulas earth from foundation etc: 371.637 Cft. %o Cft. 2660.60
21. Supplying and filling sand under floor or plugging in
well. 67.57 Cft. % Cft. 1600.00
22. Cement plaster 1:4 upto 20 ft, height.
(b) 1/2" thick. 648.00 Sft. % Sft. 1628.90
23. Providing and laying Topping PCC 1:2:4 (3" thick)
deviding in penels complete. 351.00 Sft. % Sft. 6049.55
24. Providing and laying reinforced cement concrete
(including presstressed concrete), using course sand and
screened graded and washed aggregate in required
shape and design including forms, moulds, shuttering,
lifting, compacting, curing, rendering and firnishing
exposed surfaces, complete (but excluding the cost of
steel reinforcement, its fabrication and placing in
position etc:)
(a) (i) reinforced cement concrete in roof slab, beams,
columns, lintels, girders and other structural members
laid in position, or prestressed members cast in situ,
complete in all respect.
(3) (C) Type C (nominal mix 1:2:4) 93.09 Cft. P. Cft. 324.75
25. Febrication of mild steel reinforcement for cement concrete,
including cutting, bending, laying, in position, making joints
and fastening, including cost of binding wire and labour
charges for binding of steel reinforcement (also includes
removal of rust from bars).(b) deformed bars. 285.11 Kg. % Kg 9867.60
26. Febrication of heavy steel work with angle, tee, flat iron,
round iron, and sheet iron for making trusses, girders, tanks
etc: i/c drilling riveting, handling, assembling, and fixing but
excluding erection in position including erection and fitting in
postion iron trusses, staging of water tank etc:289.68 Kg. % Kg 11693.00
27. Providing and fixing M.S flat 1/2" x 1/16" x 1/8"
grill including 3/4" x 1/8" M.S flat frame in windows of
approved design, including painting three coats complete in
all respect. 32.00 Sft. P-Sft. 178.00
28. Cement pointing 1:2 strick joint on walls upto 20 Ft,
height, i/c cost of red oxide pigment. 795.00 Sft. % Sft. 2030.10
29. Single layer of tiles 9" x 4-1/2" x 1-1/2" laid over 4" earth and
1" Mud plaster without bhossa grouted with cement sand 1:3
on top of RCC roof slab providing with 34 Lb. bitumen
coating sand blinded. 144.00 Sft. % Sft. 5750.35
30. white washr three coats on new surface wall and ceiling.
792.00 Sft. % Sft. 245.85
31. Preparing surface and painting of doors and windows
any type (including edges):- three coats. 88.00 Sft. % Sft. 1334.00
32. Khassi parnalas in cement sand mortar 1: 2 outside 12"
width finished smoth with a floating coat of neat
cement. 14.0 Rft. P. Rft. 575.10
Page 26 of 57
DNIT WSS 23Gajjani (5)
Sr. No.Item Description Quantity Unit Contractor Rate
TRAIL BORE 1-NO.33. Bottom Khurras of brick masonry in cement sand mortar
1:6, 4ft x 2ft x 4-1/2 inch over 3 inch cement concrete
1:4:8 1.0 No. Each. 89.10
34. Khurras on roof 2ft x 2ft x 6inch. 1.0 No. Each. 790.25
35. Febrication of heavy steel work with angle, tee, flat iron,
round iron, and sheet iron for making trusses, girders,
tanks etc: i/c drilling riveting, handling, assembling, and
fixing but excluding erection in position including
erection and fitting in postion iron trusses, staging of
water tank etc:R.S joist 8" x 4" 5.5 mm thick Best quality
chaina made, i/c three coats of paint duly painted
complete in all respect. 80.0 Kg. % Kg 11081.50
36. P/F Cilling fan swepest quality.(Royal or G.F.C.) 1.0 No. Each. 3500.00
RISING MAIN
37. Excavation of trenches for water supply pipe line in all
kinds of soil except cutting rock upto 5 Ft. depth from
ground level including trimming dressing the sides
leveling the bed of trenches to correct grade and cutting
pits for joint etc, complete in all respect. 130567 Cft. %oCft. 3966.85
38. Providing, laying, cutting, jointing, testing and
disinfecting PVC Pipe of BSS with B-Class working
pressure in trenches, complete in all respects.
4" Dia. 7229 Rft. P. Rft. 158.60
5" Dia. 2000 Rft. P. Rft. 219.80
6" Dia. 10050 Rft. P. Rft. 305.50
39. Providing, laying, cutting, jointing, testing and
disinfecting G.I Pipe line in trenches, with flanged joints,
using G.I pipe of BSS 1387-1967, complete in all respects.
Including specials and valves. ( Medum quality)
6" Dia. 38 Rft. P. Rft. 906.30
3" Dia. 35 Rft. P. Rft. 448.50
40. Providing and fixing C.I Specials of BSS B-Class such as
tees, bends, cross, reducer, tailpieces etc: flanged spigot
cap flanged socket callor angle branch pluge etc: for C.I
pipe line complete C.I flanged special with flanged
joints.
3" TO 6" Dia 626.08 Kg. P. Kg. 107.30
41. Providing and fixing C.I flanges on pipe i/c Turing
threading facing, and fitting etc: complete in all respect.
225.86 Kg. P. Kg. 109.50
42. Providing and fixing PVC taper core of BBS Class B
working pressure.
6" Dia. 27.0 Nos. Each. 197.45
4" Dia. 4.0 Nos. Each. 157.25
3" Dia. 8.0 Nos. Each. 132.45
43. Providing and fixing C.I. sluice valves of BSS Quality
and weight class B. (i/c cost of Jointing material)
5" Dia. 2.0 Nos. Each. 9634.30
4" Dia. 1.0 Nos. Each. 7837.05
44. Providing and fixing air valve 2-1/2" dia (Double). 8.0 Nos. Each. 7622.55
45. Back filling of trenches by rehandling of earth work
lead upto a single throw of kassi phorah or shovel
including mining moising arht to optimum content in
layers complete. 104454.0 Cft. %o Cft. 1320.00
Page 27 of 57
DNIT WSS 23Gajjani (5)
Sr. No.Item Description Quantity Unit Contractor Rate
TRAIL BORE 1-NO.DISTRIBUTION SYSTEM
46. Excavation of trenches for water supply pipe line in all
kinds of soil except cutting rock upto 5 Ft. depth from
ground level including trimming dressing the sides
leveling the bed of trenches to correct grade and cutting
pits for joint etc, complete in all respect. 148974.00 Cft. %oCft. 3966.85
47. Providing, laying, cutting, jointing, testing and
disinfecting PVC Pipe of BSS with B-Class working
pressure in trenches, complete in all respects.
3" Dia. 24829 Rft. P. Rft. 105.70
48. Providing and installing P.V.C. tees, of B.S.S. i) Class `B'
working pressure:-
3" Dia. 55.0 Nos. Each. 615.65
4" Dia. 9.0 Nos. Each. 1092.75
49. Providing and installing P.V.C. bend, of B.S.S. i) Class
`B' working pressure:-
3" Dia. 15.0 Nos. Each. 216.45
4" Dia. 2.0 Nos. Each. 373.25
50. Providing and installing P.V.C. Socket, of B.S.S. i) Class
`B' working pressure:-
3" Dia.30.0 Nos. Each. 147.50
4" Dia. 20.0 Nos. Each. 226.35
51. Providing and fixing C.I. sluice valves of BSS Quality and
weight class B. (i/c cost of Jointing material)
3" Dia. 3.0 Nos. Each. 6656.65
52. Back filling of trenches by rehandling of earth work
lead upto a single throw of kassi phorah or shovel
including mining moising arht to optimum content in
layers complete. 119179.0 Cft. %o Cft. 1320.00
SLUICE VALVE CHAMBER 4 - No.
53. Excavation in foundation for building, bridges & other
structures, including dagbelling, dressing, refilling
around structures with excavated earth, watering and
ramming lead upto one chain 100 ft. and lift upto 5 ft, in
ordinary soil. 605.00 Cft. %o Cft 5564.60
54. Cement Concrete brick or stone ballast 1.5" to 2" gauge
in foundation and plinth ratio 1:6:12. 39.92 Cft. % Cft. 9946.05
55. Pacca brick work in cement sand mortar 1:5 other than
buinding. 202.5 Cft. % Cft. 16677.60
56. Cement plastar 1:4 upto 20 ft. height. 1/2" thick. 210.0 Sft. % Sft. 1628.90
57. PCC (1:2:4) i/c placing, laying, finishing, curing etc
complete. 6.0 Cft. % Cft. 20495.40
58. Febrication of heavy steel work with angle, tee, flat iron,
round iron, and sheet iron for making trusses, girders,
tanks etc: i/c drilling riveting, handling, assembling, and
fixing but excluding erection in position including
erection and fitting in postion iron trusses, staging of
water tank etc: 162.0 Kg. % Kg 11693.00
PUMPING MACHINERY
59.Providing, fixing in position and testing of vertical
turbine pumping unit capable to give a discharge of 0.30
cusec of clear water against a total head of 180 feet with
60 feet column pipe with assembly directly coupled with
Vertical turbine 3-phase electric motor 15 BHP 380/440
Volts (SIEMENS) with following Accessories complete
in all respect. (All approved manufacturer PHED).
Page 28 of 57
DNIT WSS 23Gajjani (5)
Sr. No.Item Description Quantity Unit Contractor Rate
TRAIL BORE 1-NO.a) Supplying of tool kit comprising of one china spanner
set, one china screw wrench of 12" size, one china
insulated pliers and one china screw driver set & Grease
Gun. 1 Set
b) Supplying and Fixing MCU ( Motor contrpol unit) star
delta starter 15-ASD i/c circuit breaker etc./MCU
Complete in all recpects. 1 No.
c) Supplying and fixing phase indicator moon light and its
wiring. 3 No.
d) Supplying and fixing iron clad 3-phase main switch
CHINA/ fiCO 0-100 ampare. 1 No.
e)Supplying and fixing metallec board 3,1/2' x 2' made of
1/16" thick M.S Sheet with its 1-1/2" x 1-1/2" x 3/16" angle
iron frame with its legs properly grouted in walls of
pump house and duly painted in smoke grey colour.1 No.
f) Supplying and fixing volt meter 0-100 amp. 3 No.
g) Supplying and fixing ampere meter 0-60 Amp: 3 No.
h) Supplying and fixing Kit Kat fuses 0 to 500 volts on
board China made 3 No.
i) Supplying and fixing power wiring of 7/0.064 PVC
sheathed insulated wire from energy meter to main
switch to starter inflexible PVC pipe in suitable dia with
brass end connectors 1 Job.
j) Supplying and fixing powers from starter to motor with
7/0.044 three core cable enclosed in suitable diameter G.I
pipe at motor and starter ends along with brass end
connectors. 1 Job.
k)Earthing of main switch, board starter electric motor
and other fitting as per standard specifications and to
the entire satisfaction of Engineer Incharge.2 Sets
l) Supplying and fixing foundation nuts and bolts. 4 No.
m) Making plain cement concrete ratio 1: 2 : 4 foundation of
pump and motor 2 x 2 x 3/4. 1 No.
n)providing and fixing base plate 2'x2'x1/4" on foudation
o) Supplying and fixing suit able dia C.I non return valves
on delivery ends. 1 No.
p) Providing and fixing 2-1/2" dia Air Valve (double) of
BSS quality o/c ots fittings & specials. 1 No.
q) Providing and fixing C.I. sluice valves of BSS Quality
and weight class B. suit able Dia (i/c cost of Jointing
material) 1 No.
r) Internal electrification of pump house with 16 mm dia
PVC pipe 250/440 volts PVC insulated 3/ 0.029" wire, 3
No. round block of shallow wood, one shallow wood
board of 12" x 14" size, one 9" long swan neck plain
brass/ steel oxidation braket,lamp holder, one wall
reflector with brass end holder, one two pin 10/ 15 Amp:
wall single rod and one set of earthing as per standard
specification etc: complete.1 Job.
s)Providing and fixing in position suit able dia BSS
quality C.I specials and fittings required in pump house
i/c cost of suit able dia G.I pipe of BSS medium quality
inside and out side connected with rising main.1 Job.
Page 29 of 57
DNIT WSS 23Gajjani (5)
Sr. No.Item Description Quantity Unit Contractor Rate
TRAIL BORE 1-NO.t) Supplying of test report from MEPCO (WAPDA) by the
approved contractors. 1 Job.
Complete Set: 1 Set. P-Set 600000
60. Supplying of chain Pully block 5 ton capacity having 5
meter long chain complete in all respects. 1 Set. P-Set 15000
Total:-
Note:-
1
2
Contractor Signature _________________________with full postal address _______________________
_____________________________________________
In the case of dose not mentioned the single brand of approved manufacturer Pumping
Machinery of HUD & PHED in his bid, his bid shall be considerd as non-responsive and may be
rejected accordingly. Allotted work will have to be started by the lowest bidder within 15-days after issuance of
this acceptance letter from this office. Falling which will make the allotment order rescinded
automatically involving no notice of further correspondence.
Executive Engineer,P.H.Engg: Division,
Bahawalnagar
Page 30 of 57
DNIT WSS 07,FW (6)
Approximate Cost
Earnest Money.
Time Limit.
Sr. No.Item Description Quantity Unit Contractor Rate
1 Boring for tubewell in all types of soil except shingle
and rock, from ground level to 100 ft. (30 m) depth,
including sinking and withdrawing of casing pipe,
complete:- 6" dia 100.0 Rft. P. Rft. 213.00
2 Boring for tubewell in all types of soil except shingle
and rock, from ground level to 100.1 ft. to 200 ft (30 to 60
m) depth, including sinking and withdrawing of casing
pipe, complete:- 6" dia 15.0 Rft. P. Rft. 331.90
3 Furnishing sample of water from bore hole2.0 Set. P. Set 170.70
TUBE WELL 1-NO.
4. Direct rotary/ reverse rotary drilling of bore of tube well
in all kinds of soil except shingle and rock from ground
level to 250 feet below ground level. (20" to 26"
Dia.) 115.0 Rft. P. Rft. 636.35
5. Furnishing samples of water from bore hole. 2.0 Set. P. Set 170.70
6. Providing and installing M.S bail plug 12" dia 1.0 No. Each 5052.65
7. Providing and installing Brass Strainer in Tube Well
bore hole i/c socket studs, integral socket, 12" i/dia
6.00mm Thick. 32.0 Rft. P. Rft. 4181.80
8. Providing and installing M.S blind pipe socket/ welded
joint M.S reducer (where necessary in tube well bore
hole I/c jointing welding with strainer etc: complete 12"
I/dia 1/4" (6.0 mm) thick.
12" I/dia 1/4" thick. 83.0 Rft. P. Rft. 2275.05
9. Shrouding with graded pea gravel 3/8" to 1/8" around
the tube well in bore hole. 323.84 Cft. P. Cft. 90.20
10. Tesing and Development of tube well 6" dia and above
continusely. Upto 1 Cusec discharge 24.0 Hours. P-Hour 786.15
11. Providing, Fixing in position suspension clamp for 12"
dia pipe including cost of plain cement concrete 1:2:4
ratio block foundation. (N. S) 1.0 No. Each 1400.00
12. Providding and fixing M.S well cap on tube well for 12"
dia pipe. (N. S) 1.0 No. Each 600.00
13. Testing of strata and water samples from PHED
Laboratory complete will all charges. (N. S) 2.0 No. Each 800.00
PUMP HOUSE 12'X12'
14. Excavation in foundation for building, bridges & other
structures, including dagbelling, dressing, refilling
around structures with excavated earth, watering and
ramming lead upto one chain 100 ft. and lift upto 5 ft, in
ordinary soil. 667.125 Cft. %o Cft 5564.60
15. Cement concrete brick or stone ballast 1.5" to 2" gauge in
foundation and plinth ratio 1:6:12 321.820 Cft. % Cft. 9946.05
16. Pacca brick work cement sand mortar 1:6 in foundation
and plinth. 594.000 Cft. % Cft. 15785.00
D.N.I.T. FOR PROVISION OF WATER SUPPLY SCHEME CHAK NO. 07/FW
ABADI DEH. TEHSIL CHISHTIAN DISTRICT BAHAWALNAGAR.
Trail Bore,Tube well,Const: of Pump House, P/I Pumping Machinery, P/L Risinge Main & D/System.
Rs. 8,853,000/-
Rs. 177,000/-
3 Months
TRAIL BORE 1-NO.
Page 31 of 57
DNIT WSS 07,FW (6)
Sr. No.Item Description Quantity Unit Contractor Rate
TRAIL BORE 1-NO.17. Providing and laying damp proof course of cement
concrete 1:2:4 (using cement, sand and shingle),
including bitumen coating:
(b) with two coats of bitumen: 2" thick 118.125 Sft. % Sft. 4794.15
18. Providing and laying vertical damp proof course of
cement concrete 1:4 (using cement, sand and shingle),
including bitumen coating and polythene sheet 500
gauge.
(b) with two coats of bitumen: 1/2" thick 48.00 Sft. % Sft. 2687.95
19. Pacca brick work in (1:5) cement sand mortar in ground
floor. 813.7 Cft. % Cft. 17251.30
20. Filling, watering and ramming earth under floors with
surpulas earth from foundation etc: 371.637 Cft. %o Cft. 2660.60
21. Supplying and filling sand under floor or plugging in
well. 67.57 Cft. % Cft. 1600.00
22. Cement plaster 1:4 upto 20 ft, height.
(b) 1/2" thick. 648.00 Sft. % Sft. 1628.90
23. Providing and laying Topping PCC 1:2:4 (3" thick)
deviding in penels complete. 351.00 Sft. % Sft. 6049.55
24. Providing and laying reinforced cement concrete
(including presstressed concrete), using course sand and
screened graded and washed aggregate in required
shape and design including forms, moulds, shuttering,
lifting, compacting, curing, rendering and firnishing
exposed surfaces, complete (but excluding the cost of
steel reinforcement, its fabrication and placing in
position etc:)
(a) (i) reinforced cement concrete in roof slab, beams,
columns, lintels, girders and other structural members
laid in position, or prestressed members cast in situ,
complete in all respect.
(3) (C) Type C (nominal mix 1:2:4) 93.09 Cft. P. Cft. 324.75
25. Febrication of mild steel reinforcement for cement concrete,
including cutting, bending, laying, in position, making joints
and fastening, including cost of binding wire and labour
charges for binding of steel reinforcement (also includes
removal of rust from bars).(b) deformed bars. 285.11 Kg. % Kg 9867.60
26. Febrication of heavy steel work with angle, tee, flat iron,
round iron, and sheet iron for making trusses, girders, tanks
etc: i/c drilling riveting, handling, assembling, and fixing but
excluding erection in position including erection and fitting in
postion iron trusses, staging of water tank etc:289.68 Kg. % Kg 11693.00
27. Providing and fixing M.S flat 1/2" x 1/16" x 1/8"
grill including 3/4" x 1/8" M.S flat frame in windows of
approved design, including painting three coats complete in
all respect. 32.00 Sft. P-Sft. 178.00
28. Cement pointing 1:2 strick joint on walls upto 20 Ft,
height, i/c cost of red oxide pigment. 795.00 Sft. % Sft. 2030.10
29. Single layer of tiles 9" x 4-1/2" x 1-1/2" laid over 4" earth and
1" Mud plaster without bhossa grouted with cement sand 1:3
on top of RCC roof slab providing with 34 Lb. bitumen
coating sand blinded. 144.00 Sft. % Sft. 5750.35
30. white washr three coats on new surface wall and ceiling.
792.00 Sft. % Sft. 245.85
31. Preparing surface and painting of doors and windows
any type (including edges):- three coats. 88.00 Sft. % Sft. 1334.00
32. Khassi parnalas in cement sand mortar 1: 2 outside 12"
width finished smoth with a floating coat of neat
cement. 14.0 Rft. P. Rft. 575.10
Page 32 of 57
DNIT WSS 07,FW (6)
Sr. No.Item Description Quantity Unit Contractor Rate
TRAIL BORE 1-NO.33. Bottom Khurras of brick masonry in cement sand mortar
1:6, 4ft x 2ft x 4-1/2 inch over 3 inch cement concrete
1:4:8 1.0 No. Each. 89.10
34. Khurras on roof 2ft x 2ft x 6inch. 1.0 No. Each. 790.25
35. Febrication of heavy steel work with angle, tee, flat iron,
round iron, and sheet iron for making trusses, girders,
tanks etc: i/c drilling riveting, handling, assembling, and
fixing but excluding erection in position including
erection and fitting in postion iron trusses, staging of
water tank etc:R.S joist 8" x 4" 5.5 mm thick Best quality
chaina made, i/c three coats of paint duly painted
complete in all respect. 80.00 Kg. % Kg 11081.50
36. P/F Cilling fan swepest quality.(Royal or G.F.C.) 1.0 No. Each. 3500.00
RISING MAIN
37. Excavation of trenches for water supply pipe line in all
kinds of soil except cutting rock upto 5 Ft. depth from
ground level including trimming dressing the sides
leveling the bed of trenches to correct grade and cutting
pits for joint etc, complete in all respect. 135524 Cft. %oCft. 3966.85
38. Providing, laying, cutting, jointing, testing and
disinfecting PVC Pipe of BSS with D-Class working
pressure in trenches, complete in all respects.
4" Dia. 5000 Rft. P. Rft. 267.35
39. Providing, laying, cutting, jointing, testing and
disinfecting PVC Pipe of BSS with B-Class working
pressure in trenches, complete in all respects.
4" Dia. 15349 Rft. P. Rft. 158.60
40. Providing, laying, cutting, jointing, testing and
disinfecting G.I Pipe line in trenches, with flanged joints,
using G.I pipe of BSS 1387-1967, complete in all respects.
Including specials and valves. ( Medum quality)
6" Dia. 102 Rft. P. Rft. 906.30
3" Dia. 50 Rft. P. Rft. 448.50
41. Providing and fixing C.I Specials of BSS B-Class such as
tees, bends, cross, reducer, tailpieces etc: flanged spigot
cap flanged socket callor angle branch pluge etc: for C.I
pipe line complete C.I flanged special with flanged
joints.
3" TO 6" Dia 1001.08 Kg. P. Kg. 107.30
42. Providing and fixing C.I flanges on pipe i/c Turing
threading facing, and fitting etc: complete in all respect.
310.20 Kg. P. Kg. 109.50
43. Providing and fixing PVC taper core of BBS Class B
working pressure.
4" Dia. 50.0 Nos. Each. 157.25
3" Dia. 18.0 Nos. Each. 132.45
44. Providing and fixing air valve 2-1/2" dia (Double). 10.0 Nos. Each. 7622.55
45. Providing and fixing C.I. Non return valves of BSS
Quality and weight class B. (i/c cost of Jointing material)
4" Dia. 2.0 Nos. Each. 6385.00
Page 33 of 57
DNIT WSS 07,FW (6)
Sr. No.Item Description Quantity Unit Contractor Rate
TRAIL BORE 1-NO.45. Back filling of trenches by rehandling of earth work
lead upto a single throw of kassi phorah or shovel
including mining moising arht to optimum content in
layers complete. 69078.0 Cft. %o Cft. 1320.00
DISTRIBUTION SYSTEM
46. Excavation of trenches for water supply pipe line in all
kinds of soil except cutting rock upto 5 Ft. depth from
ground level including trimming dressing the sides
leveling the bed of trenches to correct grade and cutting
pits for joint etc, complete in all respect. 291098.00 Cft. %oCft. 3966.85
47. Providing, laying, cutting, jointing, testing and
disinfecting PVC Pipe of BSS with B-Class working
pressure in trenches, complete in all respects.
4" Dia. 1875 Rft. P. Rft. 158.60
3" Dia. 46435 Rft. P. Rft. 105.70
48. Providing and installing P.V.C. tees, of B.S.S. i) Class `B'
working pressure:-
3" Dia. 80.0 Nos. Each. 615.65
4" Dia. 2.0 Nos. Each. 1092.75
49. Providing and installing P.V.C. bend, of B.S.S. i) Class
`B' working pressure:-
3" Dia. 25.0 Nos. Each. 216.45
4" Dia. 3.0 Nos. Each. 373.25
50. Providing and installing P.V.C. Socket, of B.S.S. i) Class
`B' working pressure:-
3" Dia. 55.0 Nos. Each. 147.50
4" Dia. 4.0 Nos. Each. 226.35
51. Providing and fixing C.I. sluice valves of BSS Quality and
weight class B. (i/c cost of Jointing material)
3" Dia. 5.0 Nos. Each. 6656.65
4" Dia. 5.0 Nos. Each. 7781.90
52. Back filling of trenches by rehandling of earth work
lead upto a single throw of kassi phorah or shovel
including mining moising arht to optimum content in
layers complete. 232878.0 Cft. %o Cft. 1320.00
SLUICE VALVE CHAMBER 5 - No.
53. Excavation in foundation for building, bridges & other
structures, including dagbelling, dressing, refilling
around structures with excavated earth, watering and
ramming lead upto one chain 100 ft. and lift upto 5 ft, in
ordinary soil. 756.25 Cft. %o Cft 5564.60
54. Cement Concrete brick or stone ballast 1.5" to 2" gauge
in foundation and plinth ratio 1:6:12. 49.90 Cft. % Cft. 9946.05
55. Pacca brick work in cement sand mortar 1:5 other than
buinding. 253.2 Cft. % Cft. 16677.60
56. Cement plastar 1:4 upto 20 ft. height. 1/2" thick. 262.5 Sft. % Sft. 1628.90
57. PCC (1:2:4) i/c placing, laying, finishing, curing etc
complete. 7.5 Cft. % Cft. 20495.40
58. Febrication of heavy steel work with angle, tee, flat iron,
round iron, and sheet iron for making trusses, girders,
tanks etc: i/c drilling riveting, handling, assembling, and
fixing but excluding erection in position including
erection and fitting in postion iron trusses, staging of
water tank etc: 202.5 Kg. % Kg 11693.00
PUMPING MACHINERY
Page 34 of 57
DNIT WSS 07,FW (6)
Sr. No.Item Description Quantity Unit Contractor Rate
TRAIL BORE 1-NO.59.Providing, fixing in position and testing of vertical
turbine pumping unit capable to give a discharge of 0.25
cusec of clear water against a total head of 260 feet with
60 feet column pipe with assembly directly coupled with
Vertical turbine 3-phase electric motor 15 BHP 380/440
Volts with following Accessories complete in all respect.
(All approved manufacturer PHED).
a) Supplying of tool kit comprising of one china spanner
set, one china screw wrench of 12" size, one china
insulated pliers and one china screw driver set & Grease
Gun. 1 Set
b) Supplying and Fixing MCU ( Motor contrpol unit) star
delta starter 15-ASD i/c circuit breaker etc./MCU
Complete in all recpects. 1 No.
c) Supplying and fixing phase indicator moon light and its
wiring. 3 No.
d) Supplying and fixing iron clad 3-phase main switch
CHINA/ fiCO 0-100 ampare. 1 No.
e)Supplying and fixing metallec board 3,1/2' x 2' made of
1/16" thick M.S Sheet with its 1-1/2" x 1-1/2" x 3/16" angle
iron frame with its legs properly grouted in walls of
pump house and duly painted in smoke grey colour.1 No.
f) Supplying and fixing volt meter 0-100 amp. 3 No.
g) Supplying and fixing ampere meter 0-60 Amp: 3 No.
h) Supplying and fixing Kit Kat fuses 0 to 500 volts on
board China made 3 No.
i) Supplying and fixing power wiring of 7/0.064 PVC
sheathed insulated wire from energy meter to main
switch to starter inflexible PVC pipe in suitable dia with
brass end connectors 1 Job.
j) Supplying and fixing powers from starter to motor with
7/0.044 three core cable enclosed in suitable diameter G.I
pipe at motor and starter ends along with brass end
connectors. 1 Job.
k)Earthing of main switch, board starter electric motor
and other fitting as per standard specifications and to
the entire satisfaction of Engineer Incharge.2 Sets
l) Supplying and fixing foundation nuts and bolts. 4 No.
m) Making plain cement concrete ratio 1: 2 : 4 foundation of
pump and motor 2 x 2 x 3/4. 1 No.
n)providing and fixing base plate 2'x2'x1/4" on foudation
o) Supplying and fixing suit able dia C.I non return valves
on delivery ends. 1 No.
p) Providing and fixing 2-1/2" dia Air Valve (double) of
BSS quality o/c ots fittings & specials. 1 No.
q) Providing and fixing C.I. sluice valves of BSS Quality
and weight class B. suit able Dia (i/c cost of Jointing
material) 1 No.
Page 35 of 57
DNIT WSS 07,FW (6)
Sr. No.Item Description Quantity Unit Contractor Rate
TRAIL BORE 1-NO.r) Internal electrification of pump house with 16 mm dia
PVC pipe 250/440 volts PVC insulated 3/ 0.029" wire, 3
No. round block of shallow wood, one shallow wood
board of 12" x 14" size, one 9" long swan neck plain
brass/ steel oxidation braket,lamp holder, one wall
reflector with brass end holder, one two pin 10/ 15 Amp:
wall single rod and one set of earthing as per standard
specification etc: complete. 1 Job.
s)Providing and fixing in position suit able dia BSS
quality C.I specials and fittings required in pump house
i/c cost of suit able dia G.I pipe of BSS medium quality
inside and out side connected with rising main.1 Job.
t) Supplying of test report from MEPCO (WAPDA) by the
approved contractors. 1 Job.
Complete Set: 1 Set. P-Set 650000
60. Supplying of chain Pully block 5 ton capacity having 5
meter long chain complete in all respects. 1 Set. P-Set 15000
Total:-
Note:-
1
2
Contractor Signature _________________________with full postal address _______________________
_____________________________________________
In the case of dose not mentioned the single brand of approved manufacturer Pumping
Machinery of HUD & PHED in his bid, his bid shall be considerd as non-responsive and may be
rejected accordingly. Allotted work will have to be started by the lowest bidder within 15-days after issuance of
this acceptance letter from this office. Falling which will make the allotment order rescinded
automatically involving no notice of further correspondence.
Executive Engineer,P.H.Engg: Division,
Bahawalnagar
Page 36 of 57
DNIT WSS 40,F (7)
Approximate Cost
Earnest Money.
Time Limit.
Sr. No.Item Description Quantity Unit Contractor Rate
1 Boring for tubewell in all types of soil except shingle
and rock, from ground level to 100 ft. (30 m) depth,
including sinking and withdrawing of casing pipe,
complete:- 6" dia 200.0 Rft. P. Rft. 213.00
2 Boring for tubewell in all types of soil except shingle
and rock, from ground level to 100.1 ft. to 200 ft (30 to 60
m) depth, including sinking and withdrawing of casing
pipe, complete:- 6" dia 40.0 Rft. P. Rft. 331.90
3 Furnishing sample of water from bore hole4.0 Set. P. Set 170.70
TUBE WELL 1-NO.
4. Direct rotary/ reverse rotary drilling of bore of tube well
in all kinds of soil except shingle and rock from ground
level to 250 feet below ground level. (20" to 26"
Dia.) 210.0 Rft. P. Rft. 636.35
5. Furnishing samples of water from bore hole. 4.0 Set. P. Set 170.70
6. Providing and installing M.S bail plug 12" dia 2.0 No. Each 5052.65
7. Providing and installing Brass Strainer in Tube Well
bore hole i/c socket studs, integral socket, 12" i/dia
6.00mm Thick. 60.0 Rft. P. Rft. 4181.80
8. Providing and installing M.S blind pipe socket/ welded
joint M.S reducer (where necessary in tube well bore
hole I/c jointing welding with strainer etc: complete 12"
I/dia 1/4" (6.0 mm) thick.
12" I/dia 1/4" thick. 150.0 Rft. P. Rft. 2275.05
9. Shrouding with graded pea gravel 3/8" to 1/8" around
the tube well in bore hole. 591.36 Cft. P. Cft. 90.20
10. Tesing and Development of tube well 6" dia and above
continusely. Upto 1 Cusec discharge 48.0 Hours. P-Hour 786.15
11. Providing, Fixing in position suspension clamp for 12"
dia pipe including cost of plain cement concrete 1:2:4
ratio block foundation. (N. S) 2.0 No. Each 1400.00
12. Providding and fixing M.S well cap on tube well for 12"
dia pipe. (N. S) 2.0 No. Each 600.00
13. Testing of strata and water samples from PHED
Laboratory complete will all charges. (N. S) 4.0 No. Each 800.00
PUMP HOUSE 12'X12'
14. Excavation in foundation for building, bridges & other
structures, including dagbelling, dressing, refilling
around structures with excavated earth, watering and
ramming lead upto one chain 100 ft. and lift upto 5 ft, in
ordinary soil. 1334.250 Cft. %o Cft 5564.60
15. Cement concrete brick or stone ballast 1.5" to 2" gauge in
foundation and plinth ratio 1:6:12 643.640 Cft. % Cft. 9946.05
16. Pacca brick work cement sand mortar 1:6 in foundation
and plinth. 1188.000 Cft. % Cft. 15785.00
D.N.I.T. FOR PROVISION OF WATER SUPPLY SCHEME CHAK NO. 40/F
AZAFI ABADI TEHSIL CHISHTIAN DISTRICT BAHAWALNAGAR. Trail Bore,Tube well,Const: of Pump House, P/I Pumping Machinery, P/L Risinge Main & D/System.
Rs. 3,438,000/-
Rs. 69,000/-
3 Months
TRAIL BORE 1-NO.
Page 37 of 57
DNIT WSS 40,F (7)
Sr. No.Item Description Quantity Unit Contractor Rate
TRAIL BORE 1-NO.17. Providing and laying damp proof course of cement
concrete 1:2:4 (using cement, sand and shingle),
including bitumen coating:
(b) with two coats of bitumen: 2" thick 236.250 Sft. % Sft. 4794.15
18. Providing and laying vertical damp proof course of
cement concrete 1:4 (using cement, sand and shingle),
including bitumen coating and polythene sheet 500
gauge.
(b) with two coats of bitumen: 1/2" thick 96.00 Sft. % Sft. 2687.95
19. Pacca brick work in (1:5) cement sand mortar in ground
floor. 1627.4 Cft. % Cft. 17251.30
20. Filling, watering and ramming earth under floors with
surpulas earth from foundation etc: 743.274 Cft. %o Cft. 2660.60
21. Supplying and filling sand under floor or plugging in
well. 135.14 Cft. % Cft. 1600.00
22. Cement plaster 1:4 upto 20 ft, height.
(b) 1/2" thick. 1296.00 Sft. % Sft. 1628.90
23. Providing and laying Topping PCC 1:2:4 (3" thick)
deviding in penels complete. 702.00 Sft. % Sft. 6049.55
24. Providing and laying reinforced cement concrete
(including presstressed concrete), using course sand and
screened graded and washed aggregate in required
shape and design including forms, moulds, shuttering,
lifting, compacting, curing, rendering and firnishing
exposed surfaces, complete (but excluding the cost of
steel reinforcement, its fabrication and placing in
position etc:)
(a) (i) reinforced cement concrete in roof slab, beams,
columns, lintels, girders and other structural members
laid in position, or prestressed members cast in situ,
complete in all respect.
(3) (C) Type C (nominal mix 1:2:4) 186.18 Cft. P. Cft. 324.75
25. Febrication of mild steel reinforcement for cement concrete,
including cutting, bending, laying, in position, making joints
and fastening, including cost of binding wire and labour
charges for binding of steel reinforcement (also includes
removal of rust from bars).(b) deformed bars. 570.22 Kg. % Kg 9867.60
26. Febrication of heavy steel work with angle, tee, flat iron,
round iron, and sheet iron for making trusses, girders, tanks
etc: i/c drilling riveting, handling, assembling, and fixing but
excluding erection in position including erection and fitting in
postion iron trusses, staging of water tank etc:579.36 Kg. % Kg 11693.00
27. Providing and fixing M.S flat 1/2" x 1/16" x 1/8"
grill including 3/4" x 1/8" M.S flat frame in windows of
approved design, including painting three coats complete in
all respect. 64.00 Sft. P-Sft. 178.00
28. Cement pointing 1:2 strick joint on walls upto 20 Ft,
height, i/c cost of red oxide pigment. 1590.00 Sft. % Sft. 2030.10
29. Single layer of tiles 9" x 4-1/2" x 1-1/2" laid over 4" earth and
1" Mud plaster without bhossa grouted with cement sand 1:3
on top of RCC roof slab providing with 34 Lb. bitumen
coating sand blinded. 288.00 Sft. % Sft. 5750.35
30. white washr three coats on new surface wall and ceiling.
1584.00 Sft. % Sft. 245.85
31. Preparing surface and painting of doors and windows
any type (including edges):- three coats. 176.00 Sft. % Sft. 1334.00
32. Khassi parnalas in cement sand mortar 1: 2 outside 12"
width finished smoth with a floating coat of neat
cement. 28.0 Rft. P. Rft. 575.10
Page 38 of 57
DNIT WSS 40,F (7)
Sr. No.Item Description Quantity Unit Contractor Rate
TRAIL BORE 1-NO.33. Bottom Khurras of brick masonry in cement sand mortar
1:6, 4ft x 2ft x 4-1/2 inch over 3 inch cement concrete
1:4:8 2.0 No. Each. 89.10
34. Khurras on roof 2ft x 2ft x 6inch. 2.0 No. Each. 790.25
35. Febrication of heavy steel work with angle, tee, flat iron,
round iron, and sheet iron for making trusses, girders,
tanks etc: i/c drilling riveting, handling, assembling, and
fixing but excluding erection in position including
erection and fitting in postion iron trusses, staging of
water tank etc:R.S joist 8" x 4" 5.5 mm thick Best quality
chaina made, i/c three coats of paint duly painted
complete in all respect. 160.00 Kg. % Kg 11081.50
36. P/F Cilling fan swepest quality.(Royal or G.F.C.) 2.0 No. Each. 3500.00
RISING MAIN
37. Excavation of trenches for water supply pipe line in all
kinds of soil except cutting rock upto 5 Ft. depth from
ground level including trimming dressing the sides
leveling the bed of trenches to correct grade and cutting
pits for joint etc, complete in all respect. 86348 Cft. %oCft. 3966.85
38. Providing, laying, cutting, jointing, testing and
disinfecting PVC Pipe of BSS with B-Class working
pressure in trenches, complete in all respects.
4" Dia. 1000 Rft. P. Rft. 158.60
6" Dia. 9884 Rft. P. Rft. 305.50
39. Providing, laying, cutting, jointing, testing and
disinfecting PVC Pipe of BSS with D-Class working
pressure in trenches, complete in all respects.
6" Dia. 1500 Rft. P. Rft. 573.50
40. Providing, laying, cutting, jointing, testing and
disinfecting G.I Pipe line in trenches, with flanged joints,
using G.I pipe of BSS 1387-1967, complete in all respects.
Including specials and valves. ( Medum quality)
6" Dia. 200 Rft. P. Rft. 906.30
3" Dia. 60 Rft. P. Rft. 448.50
41. Providing and fixing C.I Specials of BSS B-Class such as
tees, bends, cross, reducer, tailpieces etc: flanged spigot
cap flanged socket callor angle branch pluge etc: for C.I
pipe line complete C.I flanged special with flanged
joints.
3" TO 6" Dia 1184.60 Kg. P. Kg. 107.30
42. Providing and fixing C.I flanges on pipe i/c Turing
threading facing, and fitting etc: complete in all respect.
394.64 Kg. P. Kg. 109.50
43. Providing and fixing PVC taper core of BBS Class B
working pressure.
6" Dia. 54.0 Nos. Each. 197.45
4" Dia. 8.0 Nos. Each. 157.25
3" Dia. 8.0 Nos. Each. 132.45
44. Providing and fixing C.I. sluice valves of BSS Quality
and weight class B. (i/c cost of Jointing material)
6" Dia. 1.0 Nos. Each. 12971.70
45. Providing and fixing air valve 2-1/2" dia (Double). 4.0 Nos. Each. 7622.55
Page 39 of 57
DNIT WSS 40,F (7)
Sr. No.Item Description Quantity Unit Contractor Rate
TRAIL BORE 1-NO.46. Back filling of trenches by rehandling of earth work
lead upto a single throw of kassi phorah or shovel
including mining moising arht to optimum content in
layers complete. 69078.0 Cft. %o Cft. 1320.00
DISTRIBUTION SYSTEM
47. Excavation of trenches for water supply pipe line in all
kinds of soil except cutting rock upto 5 Ft. depth from
ground level including trimming dressing the sides
leveling the bed of trenches to correct grade and cutting
pits for joint etc, complete in all respect. 196505.00 Cft. %oCft. 3966.85
48. Providing, laying, cutting, jointing, testing and
disinfecting PVC Pipe of BSS with B-Class working
pressure in trenches, complete in all respects.
4" Dia. 5018 Rft. P. Rft. 158.60
3" Dia. 25090 Rft. P. Rft. 105.70
49. Providing and installing P.V.C. tees, of B.S.S. i) Class `B'
working pressure:-
3" Dia. 65.0 Nos. Each. 615.65
4" Dia. 11.0 Nos. Each. 1092.75
50. Providing and installing P.V.C. bend, of B.S.S. i) Class
`B' working pressure:-
3" Dia. 32.0 Nos. Each. 216.45
4" Dia. 3.0 Nos. Each. 373.25
51. Providing and installing P.V.C. Socket, of B.S.S. i) Class
`B' working pressure:-
3" Dia. 44.0 Nos. Each. 147.50
4" Dia. 28.0 Nos. Each. 226.35
52. Providing and fixing C.I. sluice valves of BSS Quality and
weight class B. (i/c cost of Jointing material)
3" Dia. 8.0 Nos. Each. 6656.65
4" Dia. 5.0 Nos. Each. 7781.90
53. Back filling of trenches by rehandling of earth work
lead upto a single throw of kassi phorah or shovel
including mining moising arht to optimum content in
layers complete. 157204.0 Cft. %o Cft. 1320.00
SLUICE VALVE CHAMBER 7 - No.
54. Excavation in foundation for building, bridges & other
structures, including dagbelling, dressing, refilling
around structures with excavated earth, watering and
ramming lead upto one chain 100 ft. and lift upto 5 ft, in
ordinary soil. 1058.75 Cft. %o Cft 5564.60
55. Cement Concrete brick or stone ballast 1.5" to 2" gauge
in foundation and plinth ratio 1:6:12. 69.86 Cft. % Cft. 9946.05
56. Pacca brick work in cement sand mortar 1:5 other than
buinding. 354.4 Cft. % Cft. 16677.60
57. Cement plastar 1:4 upto 20 ft. height. 1/2" thick. 367.5 Sft. % Sft. 1628.90
58. PCC (1:2:4) i/c placing, laying, finishing, curing etc
complete. 10.5 Cft. % Cft. 20495.40
59. Febrication of heavy steel work with angle, tee, flat iron,
round iron, and sheet iron for making trusses, girders,
tanks etc: i/c drilling riveting, handling, assembling, and
fixing but excluding erection in position including
erection and fitting in postion iron trusses, staging of
water tank etc: 283.5 Kg. % Kg 11693.00
PUMPING MACHINERY
Page 40 of 57
DNIT WSS 40,F (7)
Sr. No.Item Description Quantity Unit Contractor Rate
TRAIL BORE 1-NO.60.Providing, fixing in position and testing of vertical
turbine pumping unit capable to give a discharge of 0.25
cusec of clear water against a total head of 190 feet with
60 feet column pipe with assembly directly coupled with
Vertical turbine 3-phase electric motor 15 BHP 380/440
Volts with following Accessories complete in all respect.
(All approved manufacturer PHED).
a) Supplying of tool kit comprising of one china spanner
set, one china screw wrench of 12" size, one china
insulated pliers and one china screw driver set & Grease
Gun. 1 Set
b) Supplying and Fixing MCU ( Motor contrpol unit) star
delta starter 15-ASD i/c circuit breaker etc./MCU
Complete in all recpects. 1 No.
c) Supplying and fixing phase indicator moon light and its
wiring. 3 No.
d) Supplying and fixing iron clad 3-phase main switch
CHINA/ fiCO 0-100 ampare. 1 No.
e)Supplying and fixing metallec board 3,1/2' x 2' made of
1/16" thick M.S Sheet with its 1-1/2" x 1-1/2" x 3/16" angle
iron frame with its legs properly grouted in walls of
pump house and duly painted in smoke grey colour.1 No.
f) Supplying and fixing volt meter 0-100 amp. 3 No.
g) Supplying and fixing ampere meter 0-60 Amp: 3 No.
h) Supplying and fixing Kit Kat fuses 0 to 500 volts on
board China made 3 No.
i) Supplying and fixing power wiring of 7/0.064 PVC
sheathed insulated wire from energy meter to main
switch to starter inflexible PVC pipe in suitable dia with
brass end connectors 1 Job.
j) Supplying and fixing powers from starter to motor with
7/0.044 three core cable enclosed in suitable diameter G.I
pipe at motor and starter ends along with brass end
connectors. 1 Job.
k)Earthing of main switch, board starter electric motor
and other fitting as per standard specifications and to
the entire satisfaction of Engineer Incharge.2 Sets
l) Supplying and fixing foundation nuts and bolts. 4 No.
m) Making plain cement concrete ratio 1: 2 : 4 foundation of
pump and motor 2 x 2 x 3/4. 1 No.
n)providing and fixing base plate 2'x2'x1/4" on foudation
o) Supplying and fixing suit able dia C.I non return valves
on delivery ends. 1 No.
p) Providing and fixing 2-1/2" dia Air Valve (double) of
BSS quality o/c ots fittings & specials. 1 No.
q) Providing and fixing C.I. sluice valves of BSS Quality
and weight class B. suit able Dia (i/c cost of Jointing
material) 1 No.
Page 41 of 57
DNIT WSS 40,F (7)
Sr. No.Item Description Quantity Unit Contractor Rate
TRAIL BORE 1-NO.r) Internal electrification of pump house with 16 mm dia
PVC pipe 250/440 volts PVC insulated 3/ 0.029" wire, 3
No. round block of shallow wood, one shallow wood
board of 12" x 14" size, one 9" long swan neck plain
brass/ steel oxidation braket,lamp holder, one wall
reflector with brass end holder, one two pin 10/ 15 Amp:
wall single rod and one set of earthing as per standard
specification etc: complete. 1 Job.
s)Providing and fixing in position suit able dia BSS
quality C.I specials and fittings required in pump house
i/c cost of suit able dia G.I pipe of BSS medium quality
inside and out side connected with rising main.1 Job.
t) Supplying of test report from MEPCO (WAPDA) by the
approved contractors. 1 Job.
Complete Set: 2 Set. P-Set 600000
61. Supplying of chain Pully block 5 ton capacity having 5
meter long chain complete in all respects. 2 Set. P-Set 15000
Total:-
Note:-
1
2
Contractor Signature _________________________with full postal address _______________________
_____________________________________________
Executive Engineer,
In the case of dose not mentioned the single brand of approved manufacturer Pumping
Machinery of HUD & PHED in his bid, his bid shall be considerd as non-responsive and may be
rejected accordingly. Allotted work will have to be started by the lowest bidder within 15-days after issuance of
this acceptance letter from this office. Falling which will make the allotment order rescinded
automatically involving no notice of further correspondence.
P.H.Engg: Division,Bahawalnagar
Page 42 of 57
DNIT B,Wall S, Carrier 48,F(8)
Approximate Cost
Earnest Money.
Time Limit.
Sr. No.Item Description Quantity Unit Contractor Rate
BOUNDARY WALL
1. Excavation in foundation for building, bridges & other
structures, including dagbelling, dressing, refilling
around structures with excavated earth, watering and
ramming lead upto one chain 100 ft. and lift upto 5 ft, in
ordinary soil. 1334.250 Cft. %o Cft 5564.60
2. Cement concrete brick or stone ballast 1.5" to 2" gauge in
foundation and plinth ratio 1:6:12 643.640 Cft. % Cft. 9946.05
3. Pacca brick work cement sand mortar 1:6 in foundation
and plinth. 1188.000 Cft. % Cft. 15785.00
4. Providing and laying damp proof course of cement
concrete 1:2:4 (using cement, sand and shingle),
including bitumen coating:
(b) with two coats of bitumen: 2" thick 236.250 Sft. % Sft. 4794.15
5. Providing and laying vertical damp proof course of
cement concrete 1:4 (using cement, sand and shingle),
including bitumen coating and polythene sheet 500
gauge.
(b) with two coats of bitumen: 1/2" thick 96.00 Sft. % Sft. 2687.95
6. Pacca brick work in (1:5) cement sand mortar in ground
floor. 1627.4 Cft. % Cft. 17251.30
7. Filling, watering and ramming earth under floors with
surpulas earth from foundation etc: 743.274 Cft. %o Cft. 2660.60
8. Supplying and filling sand under floor or plugging in
well. 135.14 Cft. % Cft. 1600.00
9. Cement plaster 1:4 upto 20 ft, height.
(b) 1/2" thick. 1296.00 Sft. % Sft. 1628.90
10. Providing and laying Topping PCC 1:2:4 (3" thick)
deviding in penels complete. 702.00 Sft. % Sft. 6049.55
11. Providing and laying reinforced cement concrete
(including presstressed concrete), using course sand and
screened graded and washed aggregate in required
shape and design including forms, moulds, shuttering,
lifting, compacting, curing, rendering and firnishing
exposed surfaces, complete (but excluding the cost of
steel reinforcement, its fabrication and placing in
position etc:)
(a) (i) reinforced cement concrete in roof slab, beams,
columns, lintels, girders and other structural members
laid in position, or prestressed members cast in situ,
complete in all respect.
(3) (C) Type C (nominal mix 1:2:4) 186.18 Cft. P. Cft. 324.75
12. Febrication of mild steel reinforcement for cement concrete,
including cutting, bending, laying, in position, making joints
and fastening, including cost of binding wire and labour
charges for binding of steel reinforcement (also includes
removal of rust from bars).(b) deformed bars. 570.22 Kg. % Kg 9867.60
D.N.I.T. FOR CONSTRUCTION OF BOUNDARY WALL GRAVEYARD+
SULLAGE CARRIER+ WATER COURSE 48/FATEH
TEHSIL CHISHTIAN DISTRICT BAHAWALNAGAR.
Rs. 1,163,000/-
Rs. 23,000/-
3 Months
Page 43 of 57
DNIT B,Wall S, Carrier 48,F(8)
Sr. No.Item Description Quantity Unit Contractor Rate
13. Febrication of heavy steel work with angle, tee, flat iron,
round iron, and sheet iron for making trusses, girders, tanks
etc: i/c drilling riveting, handling, assembling, and fixing but
excluding erection in position including erection and fitting in
postion iron trusses, staging of water tank etc:579.36 Kg. % Kg 11693.00
14. Providing and fixing M.S flat 1/2" x 1/16" x 1/8"
grill including 3/4" x 1/8" M.S flat frame in windows of
approved design, including painting three coats complete in
all respect. 64.00 Sft. P-Sft. 178.00
15. Cement pointing 1:2 strick joint on walls upto 20 Ft,
height, i/c cost of red oxide pigment. 1590.00 Sft. % Sft. 2030.10
16. Single layer of tiles 9" x 4-1/2" x 1-1/2" laid over 4" earth and
1" Mud plaster without bhossa grouted with cement sand 1:3
on top of RCC roof slab providing with 34 Lb. bitumen
coating sand blinded. 288.00 Sft. % Sft. 5750.35
17. white washr three coats on new surface wall and ceiling.
1584.00 Sft. % Sft. 245.85
18. Preparing surface and painting of doors and windows
any type (including edges):- three coats. 176.00 Sft. % Sft. 1334.00
19. Khassi parnalas in cement sand mortar 1: 2 outside 12"
width finished smoth with a floating coat of neat
cement. 28.0 Rft. P. Rft. 575.10
20. Bottom Khurras of brick masonry in cement sand mortar
1:6, 4ft x 2ft x 4-1/2 inch over 3 inch cement concrete
1:4:8 2.0 No. Each. 89.10
21. Khurras on roof 2ft x 2ft x 6inch. 2.0 No. Each. 790.25
23. Febrication of heavy steel work with angle, tee, flat iron,
round iron, and sheet iron for making trusses, girders,
tanks etc: i/c drilling riveting, handling, assembling, and
fixing but excluding erection in position including
erection and fitting in postion iron trusses, staging of
water tank etc:R.S joist 8" x 4" 5.5 mm thick Best quality
chaina made, i/c three coats of paint duly painted
complete in all respect. 160.00 Kg. % Kg 11081.50
Total:-
Note:-
1
Contractor Signature _________________________with full postal address _______________________
_____________________________________________
Allotted work will have to be started by the lowest bidder within 15-days after issuance of
this acceptance letter from this office. Falling which will make the allotment order rescinded
automatically involving no notice of further correspondence.
Executive Engineer,P.H.Engg: Division,
Bahawalnagar
Page 44 of 57
DNIT S, NALI Mouza Ashiq (9)
Approximate Cost
Earnest Money.
Time Limit.
Sr. No.Item Description Quantity Unit Contractor Rate
SURFACE DRAIN1. Earth work excavation in open cutting upto 5' depth for storm
water channals drains, sullage drains in open areas etc:5724.00 Cft. %o Cft. 4697.05
2. Cement Concrete brick or stone ballast 1.5" to 2" gauge in
foundation and plinth ratio 1:6:12. 1842.38 Cft. % Cft. 9946.05
3. Pacca brick work in plinth and foundation in cement sand
mortar. (1:5 Ratio.) 2763.00 Cft. % Cft. 16164.15
4. Pacca brick on edge laid in reimbursement in 1:5 cement sand
mortar on sides and of drains other works where required all
joints to be completely filled and struck flush 1:5 Ratio.7369.5 Sft. % Sft. 7158.40
5. Construction of punjab standard drains of cement concrete 1":
2-1/2":5 cement concrete bedding ratio 1:6:12 complete laid to
kines grade slopes and shapes rendering exposed surface of
concrete with 1:1 content sand mortar 1/4" thick as per
engineering drawing 4913.00 Rft. P.Rft. 95.75
6. Providing and laying reinforced cement concrete (including
presstressed concrete), using course sand and screened
graded and washed aggregate in required shape and design
including forms, moulds, shuttering, lifting, compacting,
curing, rendering and firnishing exposed surfaces, complete
(but excluding the cost of steel reinforcement, its fabrication
and placing in position etc:)
7. (a) (i) reinforced cement concrete in roof slab, beams, columns,
lintels, girders and other structural members laid in position,
or prestressed members cast in situ, complete in all respect.
(3) (C) Type C (nominal mix 1:2:4) 253.39 Cft. P. Cft. 324.75
8. Febrication of mild steel reinforcement for cement concrete,
including cutting, bending, laying, in position, making joints
and fastening, including cost of binding wire and labour
charges for binding of steel reinforcement (also includes
removal of rust from bars). (b) deformed bars. 776.00 Kg. % Kg. 9867.60
BRICK PAVEMENT.9. Earthwork excavation undressed lead upto a single throw of
Kassi, phaorah or shovel:- b) In ordinary soil. Transportation
of earth all types when the total distance, including the lead
covered in the item of work, is more than 1000 ft. (300 m) a)
upto ¼ mile (400 m). b) for every 330 ft. (100 m) additional
lead or part thereof, beyond ¼ mile (400 m) upto one mile. (1.6
Km.)18332.00 Cft. %o Cft. 5204.70
10. Providing and laying dry brick pavement soling in street or
road etc sand grouted laid in peoper camber i/c preparetion
watereing compaction of bed to proper camber.11520.00 Cft. % Cft. 13364.45
Total:-
Note:-
1
Contractor Signature _________________________with full postal address ____________________________________________________________________
Executive Engineer,P.H.Engg: Division,
Bahawalnagar
D.N.I.T. FOR CONSTRUCTION OF SOLING NALI OF BASTI ASHIQ
MUHAMMAD TEHSIL CHISHTIAN DISTRICT BAHAWALNAGAR. Trail Bore,Tube well,Const: of Pump House, P/I Pumping Machinery, P/L Risinge Main & D/System.
Rs. 9,614,000/-
Rs. 288,420/-
8 Months
Allotted work will have to be started by the lowest bidder within 15-days after issuance of
this acceptance letter from this office. Falling which will make the allotment order rescinded
automatically involving no notice of further correspondence.
Page 45 of 57
DNIT Reh; Najam colony (10)
Approximate Cost
Earnest Money.
Time Limit.
Sr. No.Item Description Quantity Unit Contractor Rate
1 Boring for tubewell in all types of soil except shingle
and rock, from ground level to 100 ft. (30 m) depth,
including sinking and withdrawing of casing pipe,
complete:- 6" dia 200.0 Rft. P. Rft. 213.00
2 Boring for tubewell in all types of soil except shingle
and rock, from ground level to 100.1 ft. to 200 ft (30 to 60
m) depth, including sinking and withdrawing of casing
pipe, complete:- 6" dia 40.0 Rft. P. Rft. 331.90
3 Furnishing sample of water from bore hole6.0 Set. P. Set 170.70
TUBE WELL 1-NO.
4. Direct rotary/ reverse rotary drilling of bore of tube well
in all kinds of soil except shingle and rock from ground
level to 250 feet below ground level. (20" to 26"
Dia.) 220.0 Rft. P. Rft. 636.35
5. Furnishing samples of water from bore hole. 4.0 Set. P. Set 170.70
6. Providing and installing Brass Strainer in Tube Well
bore hole i/c socket studs, integral socket, 12" i/dia
6.00mm Thick. 64.0 Rft. P. Rft. 4181.80
7. Providing and installing M.S blind pipe socket/ welded
joint M.S reducer (where necessary in tube well bore
hole I/c jointing welding with strainer etc: complete 12"
I/dia 1/4" (6.0 mm) thick.
12" I/dia 1/4" thick. 156.0 Rft. P. Rft. 2275.05
8. Shrouding with graded pea gravel 3/8" to 1/8" around
the tube well in bore hole. 619.52 Cft. P. Cft. 90.20
9. Tesing and Development of tube well 6" dia and above
continusely. Upto 1 Cusec discharge 48.0 Hours. P-Hour 786.15
10. Providing, Fixing in position suspension clamp for 12"
dia pipe including cost of plain cement concrete 1:2:4
ratio block foundation. (N. S) 2.0 No. Each 1400.00
11. Providding and fixing M.S well cap on tube well for 12"
dia pipe. (N. S) 2.0 No. Each 600.00
12. Testing of strata and water samples from PHED
Laboratory complete will all charges. (N. S) 4.0 No. Each 800.00
PUMP HOUSE 12'X12'
13. Excavation in foundation for building, bridges & other
structures, including dagbelling, dressing, refilling
around structures with excavated earth, watering and
ramming lead upto one chain 100 ft. and lift upto 5 ft, in
ordinary soil. 1334.250 Cft. %o Cft 5564.60
14. Cement concrete brick or stone ballast 1.5" to 2" gauge in
foundation and plinth ratio 1:6:12 643.640 Cft. % Cft. 9946.05
15. Pacca brick work cement sand mortar 1:6 in foundation
and plinth. 1136.250 Cft. % Cft. 15785.00
TRAIL BORE 1-NO.
D.N.I.T. FOR REHABILITATION OF RURAL WATER SUPPLY SCHEME
CHAK NO. 53/4-R NAJAM COLONY, RIAZ COLONY, BISMILLAH
COLONY, QIDI QAMAR PURA, MASEEM TOWN & AL-HASHIM
COLONY TEHSIL HAROONABAD DISTRICT BAHAWALNAGAR. Trail Bore,Tube well,Const: of Pump House, P/I Pumping Machinery, P/L Risinge Main & D/System.
Rs. 100/-
Rs. 201,000/-
3 Months
Page 46 of 57
DNIT Reh; Najam colony (10)
Sr. No.Item Description Quantity Unit Contractor Rate
TRAIL BORE 1-NO.16. Providing and laying damp proof course of cement
concrete 1:2:4 (using cement, sand and shingle),
including bitumen coating:
(b) with two coats of bitumen: 2" thick 236.250 Sft. % Sft. 4794.15
17. Providing and laying vertical damp proof course of
cement concrete 1:4 (using cement, sand and shingle),
including bitumen coating and polythene sheet 500
gauge.
(b) with two coats of bitumen: 1/2" thick 96.00 Sft. % Sft. 2687.95
18. Pacca brick work in (1:5) cement sand mortar in ground
floor. 1627.4 Cft. % Cft. 17251.30
19. Filling, watering and ramming earth under floors with
surpulas earth from foundation etc: 743.274 Cft. %o Cft. 2660.60
20. Supplying and filling sand under floor or plugging in
well. 135.14 Cft. % Cft. 1600.00
21. Cement plaster 1:4 upto 20 ft, height.
(b) 1/2" thick. 1248.00 Sft. % Sft. 1628.90
22. Providing and laying Topping PCC 1:2:4 (3" thick)
deviding in penels complete. 702.00 Sft. % Sft. 6049.55
23. Providing and laying reinforced cement concrete
(including presstressed concrete), using course sand and
screened graded and washed aggregate in required
shape and design including forms, moulds, shuttering,
lifting, compacting, curing, rendering and firnishing
exposed surfaces, complete (but excluding the cost of
steel reinforcement, its fabrication and placing in
position etc:)
(a) (i) reinforced cement concrete in roof slab, beams,
columns, lintels, girders and other structural members
laid in position, or prestressed members cast in situ,
complete in all respect.
(3) (C) Type C (nominal mix 1:2:4) 186.18 Cft. P. Cft. 324.75
24. Febrication of mild steel reinforcement for cement concrete,
including cutting, bending, laying, in position, making joints
and fastening, including cost of binding wire and labour
charges for binding of steel reinforcement (also includes
removal of rust from bars).(b) deformed bars. 570.22 Kg. % Kg 9867.60
25. Febrication of heavy steel work with angle, tee, flat iron,
round iron, and sheet iron for making trusses, girders, tanks
etc: i/c drilling riveting, handling, assembling, and fixing but
excluding erection in position including erection and fitting in
postion iron trusses, staging of water tank etc:579.36 Kg. % Kg 11693.00
26. Providing and fixing M.S flat 1/2" x 1/16" x 1/8"
grill including 3/4" x 1/8" M.S flat frame in windows of
approved design, including painting three coats complete in
all respect. 64.00 Sft. P-Sft. 178.00
27. Cement pointing 1:2 strick joint on walls upto 20 Ft,
height, i/c cost of red oxide pigment. 1476.00 Sft. % Sft. 2030.10
28. Single layer of tiles 9" x 4-1/2" x 1-1/2" laid over 4" earth and
1" Mud plaster without bhossa grouted with cement sand 1:3
on top of RCC roof slab providing with 34 Lb. bitumen
coating sand blinded. 288.00 Sft. % Sft. 5750.35
29. white washr three coats on new surface wall and ceiling.
1440.00 Sft. % Sft. 245.85
30. Preparing surface and painting of doors and windows
any type (including edges):- three coats. 176.00 Sft. % Sft. 1334.00
31. Khassi parnalas in cement sand mortar 1: 2 outside 12"
width finished smoth with a floating coat of neat
cement. 28.0 Rft. P. Rft. 575.10
Page 47 of 57
DNIT Reh; Najam colony (10)
Sr. No.Item Description Quantity Unit Contractor Rate
TRAIL BORE 1-NO.32. Bottom Khurras of brick masonry in cement sand mortar
1:6, 4ft x 2ft x 4-1/2 inch over 3 inch cement concrete
1:4:8 2.0 No. Each. 89.10
33. Khurras on roof 2ft x 2ft x 6inch. 2.0 No. Each. 790.25
34. Febrication of heavy steel work with angle, tee, flat iron,
round iron, and sheet iron for making trusses, girders,
tanks etc: i/c drilling riveting, handling, assembling, and
fixing but excluding erection in position including
erection and fitting in postion iron trusses, staging of
water tank etc:R.S joist 8" x 4" 5.5 mm thick Best quality
chaina made, i/c three coats of paint duly painted
complete in all respect. 140.00 Kg. % Kg 11081.50
35. P/F Cilling fan swepest quality.(Royal or G.F.C.) 2.0 No. Each. 3500.00
RISING MAIN
36. Excavation of trenches for water supply pipe line in all
kinds of soil except cutting rock upto 5 Ft. depth from
ground level including trimming dressing the sides
leveling the bed of trenches to correct grade and cutting
pits for joint etc, complete in all respect. 37253 Cft. %oCft. 3966.85
37. Providing, laying, cutting, jointing, testing and
disinfecting PVC Pipe of BSS with B-Class working
pressure in trenches, complete in all respects.
4" Dia. 800 Rft. P. Rft. 158.60
6" Dia. 4560 Rft. P. Rft. 305.50
38. Providing, laying, cutting, jointing, testing and
disinfecting G.I Pipe line in trenches, with flanged joints,
using G.I pipe of BSS 1387-1967, complete in all respects.
Including specials and valves. ( Medum quality)
6" Dia. 88 Rft. P. Rft. 906.30
3" Dia. 10 Rft. P. Rft. 448.50
39. Providing and fixing C.I Specials of BSS B-Class such as
tees, bends, cross, reducer, tailpieces etc: flanged spigot
cap flanged socket callor angle branch pluge etc: for C.I
pipe line complete C.I flanged special with flanged
joints.
3" TO 6" Dia 364.65 Kg. P. Kg. 107.30
40. Providing and fixing C.I flanges on pipe i/c Turing
threading facing, and fitting etc: complete in all respect.
189.16 Kg. P. Kg. 109.50
41. Providing and fixing PVC taper core of BBS Class B
working pressure.
6" Dia. 20.0 Nos. Each. 197.45
4" Dia. 2.0 Nos. Each. 157.25
3" Dia. 2.0 Nos. Each. 132.45
42. Providing and fixing C.I. sluice valves of BSS Quality
and weight class B. (i/c cost of Jointing material)
6" Dia. 1.0 Nos. Each. 12971.70
43. Providing and fixing air valve 2-1/2" dia (Double). 2.0 Nos. Each. 7622.55
44. Providing and fixing C.I. Non return valves of BSS
Quality and weight class B. (i/c cost of Jointing material)
6" Dia. 2.0 Nos. Each. 11400.00
Page 48 of 57
DNIT Reh; Najam colony (10)
Sr. No.Item Description Quantity Unit Contractor Rate
TRAIL BORE 1-NO.45. Back filling of trenches by rehandling of earth work
lead upto a single throw of kassi phorah or shovel
including mining moising arht to optimum content in
layers complete. 29802.0 Cft. %o Cft. 1320.00
DISTRIBUTION SYSTEM
46. Excavation of trenches for water supply pipe line in all
kinds of soil except cutting rock upto 5 Ft. depth from
ground level including trimming dressing the sides
leveling the bed of trenches to correct grade and cutting
pits for joint etc, complete in all respect. 69001.00 Cft. %oCft. 3966.85
47. Providing, laying, cutting, jointing, testing and
disinfecting PVC Pipe of BSS with B-Class working
pressure in trenches, complete in all respects.
4" Dia. 955 Rft. P. Rft. 158.60
3" Dia. 9637 Rft. P. Rft. 105.70
48. Providing and fixing C.I Specials of BSS B-Class such as
tees, bends, cross, reducer, tailpieces etc: flanged spigot
cap flanged socket callor angle branch pluge etc: for C.I
pipe line complete C.I flanged special with flanged
joints.
3" TO 6" Dia 30.38 Kg. P. Kg. 107.30
49. Providing and fixing C.I flanges on pipe i/c Turing
threading facing, and fitting etc: complete in all respect.
3" TO 6" Dia 21.74 Kg. P. Kg. 109.50
50. Providing and fixing PVC taper core of BBS Class B
working pressure.
3" Dia. 2.0 Nos. Each. 132.47
4" Dia. 3.0 Nos. Each. 157.25
51. Providing and installing P.V.C. tees, of B.S.S. i) Class `B'
working pressure:-
3" Dia. 19.0 Nos. Each. 615.65
52. Providing and installing P.V.C. bend, of B.S.S. i) Class
`B' working pressure:-
3" Dia. 5.0 Nos. Each. 216.45
53. Providing and fixing C.I. sluice valves of BSS Quality and
weight class B. (i/c cost of Jointing material)
3" Dia. 1.0 Nos. Each. 6656.65
4" Dia. 1.0 Nos. Each. 7781.90
54. Back filling of trenches by rehandling of earth work
lead upto a single throw of kassi phorah or shovel
including mining moising arht to optimum content in
layers complete. 55201.0 Cft. %o Cft. 1320.00
SLUICE VALVE CHAMBER 3 - No.
55. Excavation in foundation for building, bridges & other
structures, including dagbelling, dressing, refilling
around structures with excavated earth, watering and
ramming lead upto one chain 100 ft. and lift upto 5 ft, in
ordinary soil. 453.75 Cft. %o Cft 5564.60
56. Cement Concrete brick or stone ballast 1.5" to 2" gauge
in foundation and plinth ratio 1:6:12. 29.94 Cft. % Cft. 9946.05
57. Pacca brick work in cement sand mortar 1:5 other than
buinding. 151.9 Cft. % Cft. 16677.60
58. Cement plastar 1:4 upto 20 ft. height. 1/2" thick. 157.5 Sft. % Sft. 1628.90
59. PCC (1:2:4) i/c placing, laying, finishing, curing etc
complete. 4.5 Cft. % Cft. 20495.40
Page 49 of 57
DNIT Reh; Najam colony (10)
Sr. No.Item Description Quantity Unit Contractor Rate
TRAIL BORE 1-NO.60. Febrication of heavy steel work with angle, tee, flat iron,
round iron, and sheet iron for making trusses, girders,
tanks etc: i/c drilling riveting, handling, assembling, and
fixing but excluding erection in position including
erection and fitting in postion iron trusses, staging of
water tank etc: 121.5 Kg. % Kg 11693.00
PUMPING MACHINERY
61.Providing, fixing in position and testing of vertical
turbine pumping unit capable to give a discharge of 0.25
cusec of clear water against a total head of 150 feet with
60 feet column pipe with assembly directly coupled with
Vertical turbine 3-phase electric motor 10 BHP 380/440
Volts with following Accessories complete in all respect.
(All approved manufacturer PHED).
a) Supplying of tool kit comprising of one china spanner
set, one china screw wrench of 12" size, one china
insulated pliers and one china screw driver set & Grease
Gun. 1 Set
b) Supplying and Fixing MCU ( Motor contrpol unit) star
delta starter 10-ASD i/c circuit breaker etc./MCU
Complete in all recpects. 1 No.
c) Supplying and fixing phase indicator moon light and its
wiring. 3 No.
d) Supplying and fixing iron clad 3-phase main switch
CHINA/ fiCO 0-100 ampare. 1 No.
e)Supplying and fixing metallec board 3,1/2' x 2' made of
1/16" thick M.S Sheet with its 1-1/2" x 1-1/2" x 3/16" angle
iron frame with its legs properly grouted in walls of
pump house and duly painted in smoke grey colour.1 No.
f) Supplying and fixing volt meter 0-100 amp. 3 No.
g) Supplying and fixing ampere meter 0-60 Amp: 3 No.
h) Supplying and fixing Kit Kat fuses 0 to 500 volts on
board China made 3 No.
i) Supplying and fixing power wiring of 7/0.064 PVC
sheathed insulated wire from energy meter to main
switch to starter inflexible PVC pipe in suitable dia with
brass end connectors 1 Job.
j) Supplying and fixing powers from starter to motor with
7/0.044 three core cable enclosed in suitable diameter G.I
pipe at motor and starter ends along with brass end
connectors. 1 Job.
k)Earthing of main switch, board starter electric motor
and other fitting as per standard specifications and to
the entire satisfaction of Engineer Incharge.2 Sets
l) Supplying and fixing foundation nuts and bolts. 4 No.
m) Making plain cement concrete ratio 1: 2 : 4 foundation of
pump and motor 2 x 2 x 3/4. 1 No.
n)providing and fixing base plate 2'x2'x1/4" on foudation
o) Supplying and fixing suit able dia C.I non return valves
on delivery ends. 1 No.
p) Providing and fixing 2-1/2" dia Air Valve (double) of
BSS quality o/c ots fittings & specials. 1 No.
Page 50 of 57
DNIT Reh; Najam colony (10)
Sr. No.Item Description Quantity Unit Contractor Rate
TRAIL BORE 1-NO.q) Providing and fixing C.I. sluice valves of BSS Quality
and weight class B. suit able Dia (i/c cost of Jointing
material) 1 No.
r) Internal electrification of pump house with 16 mm dia
PVC pipe 250/440 volts PVC insulated 3/ 0.029" wire, 3
No. round block of shallow wood, one shallow wood
board of 12" x 14" size, one 9" long swan neck plain
brass/ steel oxidation braket,lamp holder, one wall
reflector with brass end holder, one two pin 10/ 15 Amp:
wall single rod and one set of earthing as per standard
specification etc: complete. 1 Job.
s)Providing and fixing in position suit able dia BSS
quality C.I specials and fittings required in pump house
i/c cost of suit able dia G.I pipe of BSS medium quality
inside and out side connected with rising main.1 Job.
t) Supplying of test report from MEPCO (WAPDA) by the
approved contractors. 1 Job.
Complete Set: 2 Set. P-Set 525000
62. Supplying of chain Pully block 5 ton capacity having 5
meter long chain complete in all respects. 1 Set. P-Set 15000
Total:-
Note:-
1
2
Contractor Signature _________________________with full postal address _______________________
_____________________________________________
In the case of dose not mentioned the single brand of approved manufacturer Pumping
Machinery of HUD & PHED in his bid, his bid shall be considerd as non-responsive and may be
rejected accordingly. Allotted work will have to be started by the lowest bidder within 15-days after issuance of
this acceptance letter from this office. Falling which will make the allotment order rescinded
automatically involving no notice of further correspondence.
Executive Engineer,P.H.Engg: Division,
Bahawalnagar
Page 51 of 57
DNIT RWSS 95,6-R (11)
Approximate Cost
Earnest Money.
Time Limit.
Sr. No.Item Description Quantity Unit Contractor Rate
1 Boring for tubewell in all types of soil except shingle
and rock, from ground level to 100 ft. (30 m) depth,
including sinking and withdrawing of casing pipe,
complete:- 6" dia 200.0 Rft. P. Rft. 213.00
2 Boring for tubewell in all types of soil except shingle
and rock, from ground level to 100.1 ft. to 200 ft (30 to 60
m) depth, including sinking and withdrawing of casing
pipe, complete:- 6" dia 60.0 Rft. P. Rft. 331.90
3 Furnishing sample of water from bore hole6.0 Set. P. Set 170.70
TUBE WELL
4. Direct rotary/ reverse rotary drilling of bore of tube well
in all kinds of soil except shingle and rock from ground
level to 250 feet below ground level. (20" to 26"
Dia.) 240.0 Rft. P. Rft. 636.35
5. Furnishing samples of water from bore hole. 4.0 Set. P. Set 170.70
6. Providing and installing Brass Strainer in Tube Well
bore hole i/c socket studs, integral socket, 12" i/dia
6.00mm Thick. 64.0 Rft. P. Rft. 4181.80
7. Providing and installing M.S blind pipe socket/ welded
joint M.S reducer (where necessary in tube well bore
hole I/c jointing welding with strainer etc: complete 12"
I/dia 1/4" (6.0 mm) thick.
12" I/dia 1/4" thick. 176.0 Rft. P. Rft. 2275.05
8. Shrouding with graded pea gravel 3/8" to 1/8" around
the tube well in bore hole. 675.84 Cft. P. Cft. 90.20
9. Tesing and Development of tube well 6" dia and above
continusely. Upto 1 Cusec discharge 48.0 Hours. P-Hour 786.15
10. Providing, Fixing in position suspension clamp for 12"
dia pipe including cost of plain cement concrete 1:2:4
ratio block foundation. (N. S) 2.0 No. Each 1400.00
11. Providding and fixing M.S well cap on tube well for 12"
dia pipe. (N. S) 2.0 No. Each 600.00
12. Testing of strata and water samples from PHED
Laboratory complete will all charges. (N. S) 4.0 No. Each 800.00
PUMP HOUSE 12'X12'
13. Excavation in foundation for building, bridges & other
structures, including dagbelling, dressing, refilling
around structures with excavated earth, watering and
ramming lead upto one chain 100 ft. and lift upto 5 ft, in
ordinary soil. 1334.250 Cft. %o Cft 5564.60
14. Cement concrete brick or stone ballast 1.5" to 2" gauge in
foundation and plinth ratio 1:6:12 643.640 Cft. % Cft. 9946.05
TRAIL BORE
D.N.I.T. FOR REHABILITATION OF RURAL WATER SUPPLY SCHEME
CHAK NO. 95/6-R TEHSIL HAROONABAD DISTRICT BAHAWALNAGAR.
Trail Bore,Tube well,Const: of Pump House, P/I Pumping Machinery, P/L Risinge Main & D/System.
Rs. 18,679,000/-
Rs. 374,000/-
3 Months
Page 52 of 57
DNIT RWSS 95,6-R (11)
Sr. No.Item Description Quantity Unit Contractor Rate
TRAIL BORE 15. Pacca brick work cement sand mortar 1:6 in foundation
and plinth. 1136.250 Cft. % Cft. 15785.00
16. Providing and laying damp proof course of cement
concrete 1:2:4 (using cement, sand and shingle),
including bitumen coating:
(b) with two coats of bitumen: 2" thick 236.250 Sft. % Sft. 4794.15
17. Providing and laying vertical damp proof course of
cement concrete 1:4 (using cement, sand and shingle),
including bitumen coating and polythene sheet 500
gauge.
(b) with two coats of bitumen: 1/2" thick 96.00 Sft. % Sft. 2687.95
18. Pacca brick work in (1:5) cement sand mortar in ground
floor. 1627.4 Cft. % Cft. 17251.30
19. Filling, watering and ramming earth under floors with
surpulas earth from foundation etc: 743.274 Cft. %o Cft. 2660.60
20. Supplying and filling sand under floor or plugging in
well. 135.14 Cft. % Cft. 1600.00
21. Cement plaster 1:4 upto 20 ft, height.
(b) 1/2" thick. 1248.00 Sft. % Sft. 1628.90
22. Providing and laying Topping PCC 1:2:4 (3" thick)
deviding in penels complete. 702.00 Sft. % Sft. 6049.55
23. Providing and laying reinforced cement concrete
(including presstressed concrete), using course sand and
screened graded and washed aggregate in required
shape and design including forms, moulds, shuttering,
lifting, compacting, curing, rendering and firnishing
exposed surfaces, complete (but excluding the cost of
steel reinforcement, its fabrication and placing in
position etc:)
(a) (i) reinforced cement concrete in roof slab, beams,
columns, lintels, girders and other structural members
laid in position, or prestressed members cast in situ,
complete in all respect.
(3) (C) Type C (nominal mix 1:2:4) 186.18 Cft. P. Cft. 324.75
24. Febrication of mild steel reinforcement for cement concrete,
including cutting, bending, laying, in position, making joints
and fastening, including cost of binding wire and labour
charges for binding of steel reinforcement (also includes
removal of rust from bars).(b) deformed bars. 570.22 Kg. % Kg 9867.60
25. Febrication of heavy steel work with angle, tee, flat iron,
round iron, and sheet iron for making trusses, girders, tanks
etc: i/c drilling riveting, handling, assembling, and fixing but
excluding erection in position including erection and fitting in
postion iron trusses, staging of water tank etc:579.36 Kg. % Kg 11693.00
26. Providing and fixing M.S flat 1/2" x 1/16" x 1/8"
grill including 3/4" x 1/8" M.S flat frame in windows of
approved design, including painting three coats complete in
all respect. 64.00 Sft. P-Sft. 178.00
27. Cement pointing 1:2 strick joint on walls upto 20 Ft,
height, i/c cost of red oxide pigment. 1476.00 Sft. % Sft. 2030.10
28. Single layer of tiles 9" x 4-1/2" x 1-1/2" laid over 4" earth and
1" Mud plaster without bhossa grouted with cement sand 1:3
on top of RCC roof slab providing with 34 Lb. bitumen
coating sand blinded. 288.00 Sft. % Sft. 5750.35
29. white washr three coats on new surface wall and ceiling.
1440.00 Sft. % Sft. 245.85
30. Preparing surface and painting of doors and windows
any type (including edges):- three coats. 176.00 Sft. % Sft. 1334.00
Page 53 of 57
DNIT RWSS 95,6-R (11)
Sr. No.Item Description Quantity Unit Contractor Rate
TRAIL BORE 31. Khassi parnalas in cement sand mortar 1: 2 outside 12"
width finished smoth with a floating coat of neat
cement. 28.0 Rft. P. Rft. 575.10
32. Bottom Khurras of brick masonry in cement sand mortar
1:6, 4ft x 2ft x 4-1/2 inch over 3 inch cement concrete
1:4:8 2.0 No. Each. 89.10
33. Khurras on roof 2ft x 2ft x 6inch. 2.0 No. Each. 790.25
34. Febrication of heavy steel work with angle, tee, flat iron,
round iron, and sheet iron for making trusses, girders,
tanks etc: i/c drilling riveting, handling, assembling, and
fixing but excluding erection in position including
erection and fitting in postion iron trusses, staging of
water tank etc:R.S joist 8" x 4" 5.5 mm thick Best quality
chaina made, i/c three coats of paint duly painted
complete in all respect. 140.00 Kg. % Kg 11081.50
35. P/F Cilling fan swepest quality.(Royal or G.F.C.) 2.0 No. Each. 3500.00
RISING MAIN
36. Excavation of trenches for water supply pipe line in all
kinds of soil except cutting rock upto 5 Ft. depth from
ground level including trimming dressing the sides
leveling the bed of trenches to correct grade and cutting
pits for joint etc, complete in all respect. 110573 Cft. %oCft. 3966.85
37. Providing, laying, cutting, jointing, testing and
disinfecting PVC Pipe of BSS with B-Class working
pressure in trenches, complete in all respects.
4" Dia. 14735 Rft. P. Rft. 158.60
6" Dia. 950 Rft. P. Rft. 305.50
38. Providing, laying, cutting, jointing, testing and
disinfecting G.I Pipe line in trenches, with flanged joints,
using G.I pipe of BSS 1387-1967, complete in all respects.
Including specials and valves. ( Medum quality)
3" Dia. 30 Rft. P. Rft. 448.50
39. Providing and fixing C.I Specials of BSS B-Class such as
tees, bends, cross, reducer, tailpieces etc: flanged spigot
cap flanged socket callor angle branch pluge etc: for C.I
pipe line complete C.I flanged special with flanged
joints.
3" TO 6" Dia 170.53 Kg. P. Kg. 107.30
40. Providing and fixing C.I flanges on pipe i/c Turing
threading facing, and fitting etc: complete in all respect.
89.26 Kg. P. Kg. 109.50
41. Providing and fixing PVC taper core of BBS Class B
working pressure.
6" Dia. 4.0 Nos. Each. 197.45
4" Dia. 11.0 Nos. Each. 157.25
42. Providing and fixing C.I. sluice valves of BSS Quality
and weight class B. (i/c cost of Jointing material)
4" Dia. 2.0 Nos. Each. 7839.05
43. Providing and fixing air valve 2-1/2" dia (Double). 6.0 Nos. Each. 7622.55
44. Providing and fixing C.I. Non return valves of BSS
Quality and weight class B. (i/c cost of Jointing material)
4" Dia. 2.0 Nos. Each. 6385.00
Page 54 of 57
DNIT RWSS 95,6-R (11)
Sr. No.Item Description Quantity Unit Contractor Rate
TRAIL BORE 45. Back filling of trenches by rehandling of earth work
lead upto a single throw of kassi phorah or shovel
including mining moising arht to optimum content in
layers complete. 88458.0 Cft. %o Cft. 1320.00
DISTRIBUTION SYSTEM
46. Excavation of trenches for water supply pipe line in all
kinds of soil except cutting rock upto 5 Ft. depth from
ground level including trimming dressing the sides
leveling the bed of trenches to correct grade and cutting
pits for joint etc, complete in all respect. 50236.00 Cft. %oCft. 3966.85
47. Providing, laying, cutting, jointing, testing and
disinfecting PVC Pipe of BSS with B-Class working
pressure in trenches, complete in all respects.
4" Dia. 920 Rft. P. Rft. 158.60
3" Dia. 6785 Rft. P. Rft. 105.70
48. Providing and fixing C.I Specials of BSS B-Class such as
tees, bends, cross, reducer, tailpieces etc: flanged spigot
cap flanged socket callor angle branch pluge etc: for C.I
pipe line complete C.I flanged special with flanged
joints.
3" TO 6" Dia 30.38 Kg. P. Kg. 107.30
49. Providing and fixing C.I flanges on pipe i/c Turing
threading facing, and fitting etc: complete in all respect.
3" TO 6" Dia 21.74 Kg. P. Kg. 109.50
50. Providing and fixing PVC taper core of BBS Class B
working pressure.
3" Dia. 2.0 Nos. Each. 132.47
4" Dia. 3.0 Nos. Each. 157.25
51. Providing and installing P.V.C. tees, of B.S.S. i) Class `B'
working pressure:-
3" Dia. 9.0 Nos. Each. 615.65
52. Providing and installing P.V.C. bend, of B.S.S. i) Class
`B' working pressure:-
3" Dia. 2.0 Nos. Each. 216.45
53. Providing and fixing C.I. sluice valves of BSS Quality and
weight class B. (i/c cost of Jointing material)
3" Dia. 4.0 Nos. Each. 6656.65
4" Dia. 3.0 Nos. Each. 7781.90
54. Back filling of trenches by rehandling of earth work
lead upto a single throw of kassi phorah or shovel
including mining moising arht to optimum content in
layers complete. 40188.0 Cft. %o Cft. 1320.00
SLUICE VALVE CHAMBER 5 - No.
55. Excavation in foundation for building, bridges & other
structures, including dagbelling, dressing, refilling
around structures with excavated earth, watering and
ramming lead upto one chain 100 ft. and lift upto 5 ft, in
ordinary soil. 756.25 Cft. %o Cft 5564.60
56. Cement Concrete brick or stone ballast 1.5" to 2" gauge
in foundation and plinth ratio 1:6:12. 49.90 Cft. % Cft. 9946.05
57. Pacca brick work in cement sand mortar 1:5 other than
buinding. 253.2 Cft. % Cft. 16677.60
58. Cement plastar 1:4 upto 20 ft. height. 1/2" thick. 262.5 Sft. % Sft. 1628.90
59. PCC (1:2:4) i/c placing, laying, finishing, curing etc
complete. 7.5 Cft. % Cft. 20495.40
Page 55 of 57
DNIT RWSS 95,6-R (11)
Sr. No.Item Description Quantity Unit Contractor Rate
TRAIL BORE 60. Febrication of heavy steel work with angle, tee, flat iron,
round iron, and sheet iron for making trusses, girders,
tanks etc: i/c drilling riveting, handling, assembling, and
fixing but excluding erection in position including
erection and fitting in postion iron trusses, staging of
water tank etc: 202.5 Kg. % Kg 11693.00
PUMPING MACHINERY
61.Providing, fixing in position and testing of vertical
turbine pumping unit capable to give a discharge of 0.25
cusec of clear water against a total head of 220 feet with
60 feet column pipe with assembly directly coupled with
Vertical turbine 3-phase electric motor 15 BHP 380/440
Volts with following Accessories complete in all respect.
(All approved manufacturer PHED).
a) Supplying of tool kit comprising of one china spanner
set, one china screw wrench of 12" size, one china
insulated pliers and one china screw driver set & Grease
Gun. 1 Set
b) Supplying and Fixing MCU ( Motor contrpol unit) star
delta starter 15-ASD i/c circuit breaker etc./MCU
Complete in all recpects. 1 No.
c) Supplying and fixing phase indicator moon light and its
wiring. 3 No.
d) Supplying and fixing iron clad 3-phase main switch
CHINA/ fiCO 0-100 ampare. 1 No.
e)Supplying and fixing metallec board 3,1/2' x 2' made of
1/16" thick M.S Sheet with its 1-1/2" x 1-1/2" x 3/16" angle
iron frame with its legs properly grouted in walls of
pump house and duly painted in smoke grey colour.1 No.
f) Supplying and fixing volt meter 0-100 amp. 3 No.
g) Supplying and fixing ampere meter 0-60 Amp: 3 No.
h) Supplying and fixing Kit Kat fuses 0 to 500 volts on
board China made 3 No.
i) Supplying and fixing power wiring of 7/0.064 PVC
sheathed insulated wire from energy meter to main
switch to starter inflexible PVC pipe in suitable dia with
brass end connectors 1 Job.
j) Supplying and fixing powers from starter to motor with
7/0.044 three core cable enclosed in suitable diameter G.I
pipe at motor and starter ends along with brass end
connectors. 1 Job.
k)Earthing of main switch, board starter electric motor
and other fitting as per standard specifications and to
the entire satisfaction of Engineer Incharge.2 Sets
l) Supplying and fixing foundation nuts and bolts. 4 No.
m) Making plain cement concrete ratio 1: 2 : 4 foundation of
pump and motor 2 x 2 x 3/4. 1 No.
n)providing and fixing base plate 2'x2'x1/4" on foudation
o) Supplying and fixing suit able dia C.I non return valves
on delivery ends. 1 No.
p) Providing and fixing 2-1/2" dia Air Valve (double) of
BSS quality o/c ots fittings & specials. 1 No.
Page 56 of 57
DNIT RWSS 95,6-R (11)
Sr. No.Item Description Quantity Unit Contractor Rate
TRAIL BORE q) Providing and fixing C.I. sluice valves of BSS Quality
and weight class B. suit able Dia (i/c cost of Jointing
material) 1 No.
r) Internal electrification of pump house with 16 mm dia
PVC pipe 250/440 volts PVC insulated 3/ 0.029" wire, 3
No. round block of shallow wood, one shallow wood
board of 12" x 14" size, one 9" long swan neck plain
brass/ steel oxidation braket,lamp holder, one wall
reflector with brass end holder, one two pin 10/ 15 Amp:
wall single rod and one set of earthing as per standard
specification etc: complete. 1 Job.
s)Providing and fixing in position suit able dia BSS
quality C.I specials and fittings required in pump house
i/c cost of suit able dia G.I pipe of BSS medium quality
inside and out side connected with rising main.1 Job.
t) Supplying of test report from MEPCO (WAPDA) by the
approved contractors. 1 Job.
Complete Set: 2 Set. P-Set 650000
62. Supplying of chain Pully block 5 ton capacity having 5
meter long chain complete in all respects. 2 Set. P-Set 15000
Total:-
Note:-
1
2
Contractor Signature _________________________with full postal address _______________________
_____________________________________________P.H.Engg: Division,
Bahawalnagar
In the case of dose not mentioned the single brand of approved manufacturer Pumping
Machinery of HUD & PHED in his bid, his bid shall be considerd as non-responsive and may be
rejected accordingly. Allotted work will have to be started by the lowest bidder within 15-days after issuance of
this acceptance letter from this office. Falling which will make the allotment order rescinded
automatically involving no notice of further correspondence.
Executive Engineer,
Page 57 of 57