DNV GL © 2014 26 September 2013 SAFER, SMARTER, GREENER DNV GL © 2014

26 September 2013

ENERGY

DNV GL’s Offshore wind cost reduction manifesto

1

Impuls-Vortrag beim

Workshop Kostensenkungspotenziale Offshore Windenergie

DNV GL © 2014 26 September 2013

Combined strength to support Energy customers

3000 energy experts help customers

throughout the electrical power industry

realise efficient, reliable and clean

energy for today and the future

DNV GL © 2014 26 September 2013

Our work in offshore wind: Experience matters

Key trends • Cost compression for

offshore wind

• Transformation towards a renewable based energy system

• Improved grid connection & grid integration

Our work - We are rising to the cost reduction challenge:

optimizing projects and collaborating across industry and markets.

- We help bring innovation to market: qualifying new technology and methods, e.g. RAVE Research & FINO Projects.

- We provide an unappalled understanding of offshore risks: there is no substitute for hands-on experience, e.g. Borkum West II Project Managemnt.

Experience Matters:

>97% of offshore wind projects world wide

Meet the Experts: Peter Frohboese, Head of Section Offshore

>10 yrs front line wind experience

Evaluating Performance Borkum West II Phase 1 (Trianel)

• Technical Project Management

• Package & Risk Management

Enhancing project development through improvement and optimization

• Educational Background: Structural & Environmental Engineer

• 4 years expert and leader with international certification body

• 6 years in advisory business predominantly in offshore wind

• Due Diligence Expert

3

DNV GL © 2014 26 September 2013

The challenge: What are we up against?

4

DNV GL © 2014 26 September 2013

The clock is ticking… new German FiT-law calls for cost reduction

• Feed-in-tariffs for Offshore Wind in Germany will be reduced by approx. 30% in

the next 5 years

• Introduction of auctioning / tendering process in 2019 will even further increase

cost pressure

• The industry in Europe has issued a target to reduce offshore wind costs by

approx. 35 to 40% in 2020

5

DNV GL © 2014 26 September 2013

Three strategies: finding the magic 40%

6

Reducing risk and

preventing mistakes

Improving efficiency of

existing processes

Bringing innovation

to market

DNV GL © 2014 26 September 2013

Doing it right

7

Reducing risk and preventing mistakes

1 2 3

4 5 6

DNV GL © 2014 26 September 2013

“Do it right”: mitigating risk and increasing certainty

DNV GL shall...

Launch a joint industry project (JIP) to improve Marine

Operations in both the installation and operations phase

Complete a cable installation JIP, which follows on from our

recently published recommended practice guide to tackling

subsea cable risks

Help share operational data as a key technical advisor to

SPARTA3 initiative

Provide the industry with interface risk management

Implement a methodology for assessing crew transfer

technologies and techniques

Help to ensure the safe and effective application of HVDC

technology*

* Not relevant to German market

8

1

DNV GL © 2014 26 September 2013

Doing it better

9

Improving the efficiency of existing processes

7 8 9

10 11

DNV GL © 2014 26 September 2013

“Do it better”: improving the efficiency of existing processes

DNV GL shall...

Launch “Offshore UNITED” - a JIP to drive collaborative and

integrated approaches to project development, design and

engineering

Optimise monopile design standards

Deliver better site design through an enhanced range of

planning and optimisation tools

Help the industry optimise the sizing of export electrical

systems

Help move jacket fabrication towards serial production methods

10

2

DNV GL © 2014 26 September 2013

Doing it differently

11

Bringing innovation to market

12 13

14

DNV GL © 2014 26 September 2013

“Do it differently”: innovating for the future

DNV GL shall...

Use the FORCE – a collaborative R&D project to show how the

cost reduction potential identified in project FORCE can be

applied on a real world project.

Continue to push the technological limits of turbine

design – especially with regard to larger turbines

Continue to drive the commercialisation of floating wind

12

3

DNV GL © 2014 26 September 2013

Next steps: Is the Baltic Sea already cost competitive? Stay tuned!

DNV GL will launch “Baltic PEARL” in February 2015, focussing on cost reduction

potentials for offshore wind in the Baltic Sea.

13

Work in progress

Good wind

speed

Less extreme

winds

Close to

shore

Ability to use

Class 2 turbines

Ground

conditions Less severe

metocean

conditions

Ice

Policy threat &

political

willingness

PRO CONTRA

Which direction does the balance tip for you?

DNV GL © 2014 26 September 2013

SAFER, SMARTER, GREENER

www.dnvgl.com

14

Helmut Klug, Regional Manager CEMEA

[email protected]

+49 173 1500332