DNV GL © 2014 26 September 2013 SAFER, SMARTER, GREENER DNV GL © 2014
26 September 2013
ENERGY
DNV GL’s Offshore wind cost reduction manifesto
1
Impuls-Vortrag beim
Workshop Kostensenkungspotenziale Offshore Windenergie
DNV GL © 2014 26 September 2013
Combined strength to support Energy customers
3000 energy experts help customers
throughout the electrical power industry
realise efficient, reliable and clean
energy for today and the future
DNV GL © 2014 26 September 2013
Our work in offshore wind: Experience matters
Key trends • Cost compression for
offshore wind
• Transformation towards a renewable based energy system
• Improved grid connection & grid integration
Our work - We are rising to the cost reduction challenge:
optimizing projects and collaborating across industry and markets.
- We help bring innovation to market: qualifying new technology and methods, e.g. RAVE Research & FINO Projects.
- We provide an unappalled understanding of offshore risks: there is no substitute for hands-on experience, e.g. Borkum West II Project Managemnt.
Experience Matters:
>97% of offshore wind projects world wide
Meet the Experts: Peter Frohboese, Head of Section Offshore
>10 yrs front line wind experience
Evaluating Performance Borkum West II Phase 1 (Trianel)
• Technical Project Management
• Package & Risk Management
Enhancing project development through improvement and optimization
• Educational Background: Structural & Environmental Engineer
• 4 years expert and leader with international certification body
• 6 years in advisory business predominantly in offshore wind
• Due Diligence Expert
3
DNV GL © 2014 26 September 2013
The clock is ticking… new German FiT-law calls for cost reduction
• Feed-in-tariffs for Offshore Wind in Germany will be reduced by approx. 30% in
the next 5 years
• Introduction of auctioning / tendering process in 2019 will even further increase
cost pressure
• The industry in Europe has issued a target to reduce offshore wind costs by
approx. 35 to 40% in 2020
5
DNV GL © 2014 26 September 2013
Three strategies: finding the magic 40%
6
Reducing risk and
preventing mistakes
Improving efficiency of
existing processes
Bringing innovation
to market
DNV GL © 2014 26 September 2013
“Do it right”: mitigating risk and increasing certainty
DNV GL shall...
Launch a joint industry project (JIP) to improve Marine
Operations in both the installation and operations phase
Complete a cable installation JIP, which follows on from our
recently published recommended practice guide to tackling
subsea cable risks
Help share operational data as a key technical advisor to
SPARTA3 initiative
Provide the industry with interface risk management
Implement a methodology for assessing crew transfer
technologies and techniques
Help to ensure the safe and effective application of HVDC
technology*
* Not relevant to German market
8
1
DNV GL © 2014 26 September 2013
Doing it better
9
Improving the efficiency of existing processes
7 8 9
10 11
DNV GL © 2014 26 September 2013
“Do it better”: improving the efficiency of existing processes
DNV GL shall...
Launch “Offshore UNITED” - a JIP to drive collaborative and
integrated approaches to project development, design and
engineering
Optimise monopile design standards
Deliver better site design through an enhanced range of
planning and optimisation tools
Help the industry optimise the sizing of export electrical
systems
Help move jacket fabrication towards serial production methods
10
2
DNV GL © 2014 26 September 2013
“Do it differently”: innovating for the future
DNV GL shall...
Use the FORCE – a collaborative R&D project to show how the
cost reduction potential identified in project FORCE can be
applied on a real world project.
Continue to push the technological limits of turbine
design – especially with regard to larger turbines
Continue to drive the commercialisation of floating wind
12
3
DNV GL © 2014 26 September 2013
Next steps: Is the Baltic Sea already cost competitive? Stay tuned!
DNV GL will launch “Baltic PEARL” in February 2015, focussing on cost reduction
potentials for offshore wind in the Baltic Sea.
13
Work in progress
Good wind
speed
Less extreme
winds
Close to
shore
Ability to use
Class 2 turbines
Ground
conditions Less severe
metocean
conditions
Ice
Policy threat &
political
willingness
PRO CONTRA
Which direction does the balance tip for you?
DNV GL © 2014 26 September 2013
SAFER, SMARTER, GREENER
www.dnvgl.com
14
Helmut Klug, Regional Manager CEMEA
+49 173 1500332