802.11 May 2013 Closing Reports
Date: 2013-05-17
Name Company Address Phone email Adrian Stephens Intel
Corporation +44 792 008
4900 (mobile)
Authors:
doc.: IEEE 802.11-13/0409r0
Report
May 2013
Adrian Stephe
ns, Intel
Corporation
Slide 2
Abstract
• This document is a digest of the closing reports of all 802.11 sub-groups for presentation at the May 2013 closing plenary meeting.
doc.: IEEE 802.11-13/0409r0
Report
AttendanceMay 2013
Adrian Stephe
ns, Intel
Corporation
Slide 3
Row Labels Slots Total Ave Max802.11 Newcomer Training 1 13 13 13ARC 1 16 16 16Editors Meeting 1 9 9 9JTC1 4 52 13 16Reg SC 4 130 33 47TGac 4 217 54 76
TGaf 4 123 31 53TGah 4 306 77 95TGai 9 345 38 78TGak 1 36 36 36TGaq 3 80 27 36TGmc 8 121 15 34WG CAC 2 27 14 16WG Mid-Session Plenary 1 188 188 188WNG 1 137 137 137802.11 OPENING PLENARY 1 187 187 187HEW SG 7 1082 155 192TGak - Joint Meeting with ARC 1 8 8 8TGac - cancelled 1 3 3 3Publicity sc 1 28 28 28Grand Total 59 3108 53 192
doc.: IEEE 802.11-13/0409r0
Report
Attendance TotalMay 2013
Adrian Stephe
ns, Intel
Corporation
Slide 4
HEW SG
TGai
TGah
TGac
WG Mid-Session Plenary
802.11 OPENING PLENARY
WNG
Reg SC
TGaf
TGmc
TGaqJTC1 TGak Publicity sc WG CAC ARC802.11 Newcomer Training Editors MeetingTGak - Joint Meeting with ARCTGac - cancelledTotal Attandances
doc.: IEEE 802.11-13/0409r0
Report
Attendance Histogram (Thu)May 2013
Adrian Stephe
ns, Intel
Corporation
Slide 5
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 320
10
20
30
40
50
60
Number of slots attended
Nu
mb
er o
f m
emb
ers
doc.: IEEE 802.11-13/0409r0
Report
Type of Groups
May 2013
Adrian Stephe
ns, Intel
Corporation
Slide 6
Type of Group DescriptionWG Working GroupTG Task GroupSG Study GroupSC Standing
Committee
doc.: IEEE 802.11-13/0409r0
Report
GroupsMay 2013
Adrian Stephe
ns, Intel
Corporation
Slide 7
Type Group Description Chair
WG WG11 The IEEE 802.11 Working Group Bruce Kraemer
TG MC Maintenance (Revision C) Dorothy StanleyTG AC Very High Throughput (<6 GHz bands) Osama Aboul-MagdTG AF Operation in TV Whitespace bands Richard KennedyTG AH Operation in 900 MHz bands Dave Halasz TG AI Fast Initial Link Setup Hiroshi ManoTG AJ China Millimeter Wave (CMMW) Xiaoming PengTG AK General Link Setup Donald Eastlake 3rd TG AQ Pre-association Discovery Stephen McCannSC WNG Wireless Next Generation Clint ChaplinSC ARC Architecture Dave BagbySC JTC1 ISO/IEC/JTC1/SC6 shadow committee Andrew MylesSC REG Regulatory Richard KennedySG HEW High Efficiency WLAN Osama Aboul-Magd
doc.: IEEE 802.11-13/0409r0
Report Slide 8
802.11 WG Editor’s Meeting (May ‘13)
Date: 2013-05-10
Name Affiliation Address Phone email Peter Ecclesine Cisco Systems 170 W. Tasman Dr.,
MS SJ-14-4, San Jose, CA 95134-1706
+1-408-527-0815 [email protected]
Authors:
Adrian Stephe
ns, Intel
Corporation
from slide 1/6 of 11-13/0477r2 by Peter Ecclesine (Cisco Systems)
May 2013
doc.: IEEE 802.11-13/0409r0
Report Slide 9
Volunteer Editor Contacts• TGmc – Adrian Stephens – [email protected]• TGac – Robert Stacey – [email protected] • TGaf – Peter Ecclesine – [email protected] • TGah – Minyoung Park – [email protected]• TGai – Lee Armstrong– [email protected], Ping FANG [email protected]• TGaq – Dan Gal – [email protected]
• Editors Emeritus:– TGaa – Alex Ashley – [email protected]– TGad – Carlos Cordeiro – [email protected] – TGae – Henry Ptasinski – [email protected]
Adrian Stephe
ns, Intel
Corporation
May 2013
from slide 2/6 of 11-13/0477r2 by Peter Ecclesine (Cisco Systems)
May 2013
doc.: IEEE 802.11-13/0409r0
Report
May 14th Round table status report
• REVmc – comment resolution, hoping to recirculate out of July. Because we removed PMD from 802.11-2012, incoming amendments create work.
• 11ac – Processing SB comments, expect to recirc in July• 11af – LB195 comments resolved, MDR is in progress, expect to
recirc in May• 11ah – have a proposed Draft, are reviewing it, hearing technical
presentations on spec framework document. Possible TG review out of May.
• 11ai – starting TG review comment resolutions, do not expect to finish comment resolution this week.
• 11aq – no draft activity to report
Slide 10 Adrian Stephe
ns, Intel
Corporation
from slide 3/6 of 11-13/0477r2 by Peter Ecclesine (Cisco Systems)
May 2013
doc.: IEEE 802.11-13/0409r0
Report
802.11 Style Guide• See 11-09-1034-07-0000-wg11-style-guide.doc
– We updated 802.11 WG Style Guide based on 2012 IEEE Standards Style Manual and consistency changes in final publication of the 802.11 standard
• Editor’s responsibility includes checking the 2012 IEEE Standards Style Manual when creating or updating drafts. https://development.standards.ieee.org/myproject/Public/mytools/draft/styleman.pdf
• Submissions with draft text should conform to both the WG11 Style Guide and IEEE Standards Style Manual
• Note that the Style Guide evolves with our practice
Slide 11 Adrian Stephe
ns, Intel
Corporation
from slide 4/6 of 11-13/0477r2 by Peter Ecclesine (Cisco Systems)
May 2013
doc.: IEEE 802.11-13/0409r0
Report
802.11 Editor’s Guide
• https://mentor.ieee.org/802.11/dcn/11/11-11-0875-01-0000-editor-s-guide.doc
• This document contains material relevant to the job of being an 802.11 editor.
• It is recommended that editors read this material before they start, as it may avoid them needlessly re-inventing the wheel.
• Creating a Redline, Graphics, Numbering and ANA, Source Control
• Comment Resolution and PublicationAdrian Stephe
ns, Intel
Corporation
Slide 12from slide 5/6 of 11-13/0477r2 by Peter Ecclesine (Cisco Systems)
May 2013
doc.: IEEE 802.11-13/0409r0
Report
Most current
doc shaded green.
TG Published or Draft Baseline DocumentsSource MEC
Style Guide Editor
Snapshot Date
Publishe
d
ac af mc ah ai aj aq
ac Y 5.0 Frame 10.0
Yes 2012 Robert Stacey 14-May
af Y 5.0 4.0 Frame 10.0
No 2012 Peter Ecclesine 14-May
mc Y 1.4 Frame10.0
No 2012 Adrian Stephens 14-May
ah Y 5.0 3.0 0.0 0.0 Frame 10.0
No 2012 Minyoung Park 14-May
ai Y 4.0 2.2 0.0 0.0 0.5 Frame 9.0
No 2012 Lee ArmstrongPing FANG
14-May
aj Y
aq Y
Changes from last report shown in red.
Slide 13
May 2013 Draft Development Snapshot
Slide 13 Adrian Stephe
ns, Intel
Corporation
May 2013
from slide 6/6 of 11-13/0477r2 by Peter Ecclesine (Cisco Systems)
May 2013
doc.: IEEE 802.11-13/0409r0
Report Adrian Stephe
ns, Intel
Corporation
Slide 14
May 2013 PublicityDate: 2013-05-17
Name Company Address Phone email
Stephen McCann Research in Motion (RIM) UK Ltd
200 Bath Road, Slough, Berkshire, SL1 3XE, UK
+44 1753 667099 [email protected]
Authors:
from slide 1/3 of 11-13/0617r0 by Stephen McCann, RIM
May 2013
doc.: IEEE 802.11-13/0409r0
Report Adrian Stephe
ns, Intel
Corporation
Slide 15
Abstract
Closing report for Publicity Standing Committee for May 2013, Waikoloa, HI,
USA
from slide 2/3 of 11-13/0617r0 by Stephen McCann, RIM
May 2013
doc.: IEEE 802.11-13/0409r0
Report Adrian Stephe
ns, Intel
Corporation
Slide 16
• IEEE 802.11 Press Releases– Previously generated for published amendments– Additionally required by IEEE for creation of new
projects, as a “call for interest”.– Publicity SC met on Wednesday AM1
• Generated Press Releases– HEW SG [11-13-0418r2]– GLK SG (TGak) [11-13-0419r0]– PAD SG (TGaq) [11-13-0410r1]
• Teleconferences– 10 days notice
from slide 3/3 of 11-13/0617r0 by Stephen McCann, RIM
May 2013
doc.: IEEE 802.11-13/0409r0
Report Adrian Stephens, Intel Corporation
Slide 17
Closing ReportDate: 2013-05-17
Name Company Address Phone email
Clint Chaplin Samsung Electronics 75 W. Plumeria Drive San Jose, Ca 95134
+1 408 544 2740 firstname dot lastname at gmail dot com
Authors:
from slide 1/3 of 11-13/0623r0 by Clint Chaplin, Chair (Samsung)
May 2013
doc.: IEEE 802.11-13/0409r0
Report Adrian Stephens, Intel Corporation
Slide 18
Abstract
Closing report for WNG SC for May 2013, Waikoloa, Hawai’i, Hawaii, USA
from slide 2/3 of 11-13/0623r0 by Clint Chaplin, Chair (Samsung)
May 2013
doc.: IEEE 802.11-13/0409r0
Report Adrian Stephens, Intel Corporation
Slide 19
• Presentations at May 2013 meeting1. DSRC Supporting Information (11-13-0543-01-0wng-dsrc-support-
information.pptx) – Lee Armstrong2. Dedicated Short Range Communication (DSRC) Applications
Tutorial (11-13-0541-00-0wng-dsrc-applications-tutorial.pptx) – John Kenney
3. Coexistence issues between 802.11p and 802.11ac in the proposed UNII-4 band (11-13-0552-00-0wng-802-11p-dsrc-and-802-11ac-coexistence.ppt) – Jim Lansford
4. Backoff protocol for IEEE 802.11 devices (11-13-0494-00-0wng-ieee-presentation-backoff.ppt) – Andrey Lukyanenko
5. IEEE 802.11 Accounting Extensions (11-13-0504-00-0wng-802-11-accounting-extensions.pptx) – Max Riegel
• Minutes– 11-13-0568-00-0wng-may-2013-meeting-minutes-waikoloa.doc
• Plans for July 2013– 1 2 hour session
from slide 3/3 of 11-13/0623r0 by Clint Chaplin, Chair (Samsung)
May 2013
doc.: IEEE 802.11-13/0409r0
Report Adrian Stephens, Intel CorporationSlide 20
ARC Closing Report Date: 2013-05-15
Name Affiliations Address Phone email Mark Hamilton Spectralink 2560 55th St,
Boulder, CO, 80301 +1-303-441-7553
Authors:
from slide 1/5 of 11-13/0610r0 by Mark Hamilton, Spectralink, Corp.
May 2013
doc.: IEEE 802.11-13/0409r0
Report
Abstract
This document is the closing report for ARC SC,
May 2013, Kona meeting
Adrian Stephens, Intel CorporationSlide 21from slide 2/5 of 11-13/0610r0 by Mark Hamilton, Spectralink, Corp.
May 2013
doc.: IEEE 802.11-13/0409r0
Report Adrian Stephens, Intel CorporationSlide 22
Work Completed• IETF/802 coordination – Dorothy Stanley
– Update on joint activities between IETF and IEEE 802– Reviewed RFC 4441 update (rev4). – One comment proposed, Dorothy will carry to editing committee
• 802 Overview and Architecture Draft 1.6 sponsor ballot– Three 802.11 comments needed us to do homework and submit a
proposed resolution. That was done (an updated architectural picture drawn), and captured in https://mentor.ieee.org/802.11/dcn/13/11-13-0115-05-0arc-considerations-on-ap-architectural-models.doc page 15.
– Reviewed all 802.11 comments and their proposed resolutions. All are acceptable (with the above)
• Brief update on General Links (GLK SC) and 802.1 bridging discussions – Donald Eastlake– Making progress and having productive discussions– 802.1Qbz Draft 0.1 has been posted on the 802.1 document server– Biggest challenge is understanding the architecture of AP/DS/Portal
from slide 3/5 of 11-13/0610r0 by Mark Hamilton, Spectralink, Corp.
May 2013
doc.: IEEE 802.11-13/0409r0
Report Adrian Stephens, Intel CorporationSlide 23
Work Completed (cont)• Architecture of APs/DS/Portals, and 802.1 concepts
– Reviewed submission: https://mentor.ieee.org/802.11/dcn/13/11-13-0115-04-0arc-considerations-on-ap-architectural-models.doc
– General agreement with direction headed on Figure 5-1 replacement, updates suggested.
Minutes are in 11-13/0611r0
Teleconferences:– One will be needed to coordinate comments on 802 O&A Sponsor
recirc, will schedule with 10 days notice once ballot timing is known
from slide 4/5 of 11-13/0610r0 by Mark Hamilton, Spectralink, Corp.
May 2013
doc.: IEEE 802.11-13/0409r0
Report Adrian Stephens, Intel CorporationSlide 24
July 2013 Goals
• One meeting slot planned:– Continue discussion on architectural model for AP
(and DS and Portal), Figure 5-1, and how this relates to the 802.1 concepts and TGak work.
– 802 O&A sponsor ballot, as appropriate.– IETF/802 RFC 4441, if needed.
from slide 5/5 of 11-13/0610r0 by Mark Hamilton, Spectralink, Corp.
May 2013
doc.: IEEE 802.11-13/0409r0
Report Adrian Stephe
ns, Intel
Corporation
Slide 25
IEEE 802 JTC1 SC closing report (May 13)Date: 2013-5-17
Name Company email
Andrew Myles Cisco [email protected]
Authors:
from slide 1/6 of 11-13/0633r0 by Andrew Myles, Cisco
May 2013
doc.: IEEE 802.11-13/0409r0
Report Adrian Stephe
ns, Intel
Corporation
Slide 26
Abstract
Closing report for IEEE 802 JTC1 SCfor May 2013 in Hawaii
from slide 2/6 of 11-13/0633r0 by Andrew Myles, Cisco
May 2013
doc.: IEEE 802.11-13/0409r0
Report Adrian Stephens, Intel Corporation
JTC1 SC focused on reporting on status updates & prep’ing for next SC6 meeting
• A variety of standards are in ISO/IEC ballot process– 802.11aa/ad/ae
• Passed 60 day pre-ballot with Japan & China NB comments– 802.1X/AE
• FDIS ballot starts this week – 802.1AS/AR/AB
• 60 day pre-ballot closes 25 May– 802.3
• 60 day pre-ballot closes 2 June
Slide 27from slide 3/6 of 11-13/0633r0 by Andrew Myles, Cisco
May 2013
doc.: IEEE 802.11-13/0409r0
Report Adrian Stephens, Intel Corporation
JTC1 SC focused on reporting on status updates & prep’ing for next SC6 meeting
• Reviewed status of likely proposals at SC6/WG1 – TLSec
• Preso from China NB showing it has been implemented– TEPA-AC
• Preso from China NB claiming 802.1X is broken• Preso from Swiss NB claiming TEPA-AC better than 802.1X
– TAAA• Preso from China NB showing it has been implemented
– Wireless management• Proposal from China NB for sniffing & centralised management
– Infrastructure sharing• Proposal to allow SP’s share AP infrastructure
Slide 28from slide 4/6 of 11-13/0633r0 by Andrew Myles, Cisco
May 2013
doc.: IEEE 802.11-13/0409r0
Report Adrian Stephens, Intel Corporation
JTC1 SC focused on reporting on status updates & prep’ing for next SC6 meeting
• Delegation is developing responses for SC6/WG1– SC6/IEEE 802 collaboration process presentation (DONE)– Response to China NB & Japan NB on 802.11aa/ad/ae comments– Tell Swiss NB comments on 802.11-2012 submitted to TGmc– Response to China NB claim 802.1X is open to attack– Response to Swiss NB comparison of 802.1X and TEPA-AC– Discussion points on TLSec, TAAA, wireless management &
wireless infrastructure presentations– General status report on IEEE 802.1/3/11
• Note: finalised material will be approved by HoD– Bruce Kraemer
Slide 29from slide 5/6 of 11-13/0633r0 by Andrew Myles, Cisco
May 2013
doc.: IEEE 802.11-13/0409r0
Report
JTC1 SC will hear about the Korean SC6 meeting in July in Geneva
• Plans for IEEE 802 JTC1 SC in Geneva in July– Hear about SC6 meeting in Korea in June 2013
Adrian Stephe
ns, Intel
Corporation
Slide 30from slide 6/6 of 11-13/0633r0 by Andrew Myles, Cisco
May 2013
doc.: IEEE 802.11-13/0409r0
Report Adrian Stephe
ns, Intel
Corporation
Slide 31
IEEE 802.11 Regulatory SCWaikoloa Closing Report
Date: 2013-05-17
Name Affiliations Address Phone email Rich Kennedy BlackBerry 7305 Napier Trail
Austin, TX 78729 +1-972-207-3554 rikennedy@blackberr
y.com
Authors:
from slide 1/6 of 11-13/0571r0 by Rich Kennedy, BlackBerry
May 2013
doc.: IEEE 802.11-13/0409r0
Report Adrian Stephe
ns, Intel
Corporation
Slide 32
Abstract
This presentation is the closing report for the May 2013 IEEE 802.11 Regulatory Standing Committee meeting in Waikoloa.
from slide 2/6 of 11-13/0571r0 by Rich Kennedy, BlackBerry
May 2013
doc.: IEEE 802.11-13/0409r0
Report
Agenda
• Approve meeting and teleconference minutes• The regulatory summaries• Action items and issues• The NPRM FCC 13-22 response• Coexistence with ITS / DSRC • Response to Ofcom consultation “Licence Exempt
spectrum use in the 2400 MHz band”
Adrian Stephe
ns, Intel
Corporation
Slide 33from slide 3/6 of 11-13/0571r0 by Rich Kennedy, BlackBerry
May 2013
doc.: IEEE 802.11-13/0409r0
Report
Accomplishments
• Approved Orlando meeting and teleconference minutes• Heard regulatory update summaries for North America, the EU and Asia• Developed and approved a final draft response for the Comments in
NPRM FCC 13-22 (proceeding 13-49) on the 5 GHz bands– Approved by the SC: 16 Y / 4 N / 2 A– Approved in 802.18: 7 Y / 0 N / 0 A
• Planned to form a “Tiger Team-like” sub-group to:– Develop a list of 802.11 questions to help develop a clear and definitive scheme for
sharing with ITS / DSRC in the 5850 to 5925 MHz band– Meet with ITS representatives to discuss the list and have questions answered– Make recommendations for 802.11ac / ITS agreement on sharing plan
• Decided that response to Ofcom consultation unnecessary• Planned for teleconferences
– Thursdays, at 12:30ET for 90 minutes (starting April 4 th)
Adrian Stephe
ns, Intel
Corporation
Slide 34from slide 4/6 of 11-13/0571r0 by Rich Kennedy, BlackBerry
May 2013
doc.: IEEE 802.11-13/0409r0
Report
Teleconferences
• Weekly on Thursdays, 12:30 to 14:00 ET– Starting May 24th (by email request)– Continue through July 26th
Adrian Stephe
ns, Intel
Corporation
Slide 35from slide 5/6 of 11-13/0571r0 by Rich Kennedy, BlackBerry
May 2013
doc.: IEEE 802.11-13/0409r0
Report
References
• Meeting Plan and Agenda: https://mentor.ieee.org/802.11/dcn/13/11-13-0464-01-0reg-may-9th-teleconference-plan-and-agenda.ppt
• NPRM FCC 13-22 Response Framework: https://mentor.ieee.org/802.11/dcn/13/11-13-0353-03-0reg-fcc-13-49-comment-framework.docx
• IEEE 802.11 NPRM FCC 13-22 Comments: https://mentor.ieee.org/802.11/dcn/13/11-13-0444-03-0reg-fcc-13-49-comment.docx
• IEEE 802 NPRM FCC 13-22 Comments (to ExCom for approval): https://mentor.ieee.org/802.18/dcn/13/18-13-0064-06-0000-draft-802-comments-to-fcc-u-nii-band-nprm-fcc-13-49.docx
• Ofcom Consultation “Licence Exempt spectrum use in the 2400 MHz band” https://mentor.ieee.org/802.18/dcn/13/18-13-0059-00-0000-ofcom-consultation-license-exempt-use-in-the-2400-mhz-band.pdf
Slide 36 Adrian Stephe
ns, Intel
Corporation
from slide 6/6 of 11-13/0571r0 by Rich Kennedy, BlackBerry
May 2013
doc.: IEEE 802.11-13/0409r0
Report Adrian Stephe
ns, Intel
Corporation
Slide 37
IEEE 802.11mc Closing Report forMay 2013
Date: 2013-05-16
Name Affiliations Address Phone email Dorothy Stanley
Aruba Networks 1322 Crossman Ave Sunnyvale, CA 94089
+1 630-363-1389
Authors:
from slide 1/6 of 11-13/0629r0 by Dorothy Stanley (Aruba Networks)
May 2013
doc.: IEEE 802.11-13/0409r0
Report Adrian Stephe
ns, Intel
Corporation
Slide 38
Abstract
This document contains the TGmc closing report for May 2013.
from slide 2/6 of 11-13/0629r0 by Dorothy Stanley (Aruba Networks)
May 2013
doc.: IEEE 802.11-13/0409r0
Report
Status: comment resolution
• Continued processing comments received in the recent Initial Letter Ballot– 801 comments (713 LB, 88 remaining 2012 Call for comments)– Approved resolutions to 108 comments– 347 comments remain to be resolved
• ISO comments on IEEE Std 802.11-2012– March 2013: Approved 13 ISO comments (China NB)– May 2013: Received 11 ISO comments (Swiss NB), plan to
resolve in July 2013 meeting
Adrian Stephe
ns, Intel
Corporation
Slide 39from slide 3/6 of 11-13/0629r0 by Dorothy Stanley (Aruba Networks)
May 2013
doc.: IEEE 802.11-13/0409r0
Report Adrian Stephe
ns, Intel
Corporation
Slide 40Slide 40
TGmc Plan of Record• 20 July 2012 – 12 Sept 2012 – Call for Comment/Input• 29-30 Aug 2012 – NesCom, SASB PAR Approval• Sept 2012 – Begin to process input • Sept 2012 – 11aa, 11ae integration• Jan – First WG Letter ballot - without 11ad• Dec 2012 – March/May 2013 – 11ad integration – July/September
ballot on D2.0• Dec 2013 – March 2014 – 11ac integration• Feb 2014 – Mandatory Draft Review• Feb-March 2014 – Form Sponsor Pool (45 days) • April/May 2014 – Initial Sponsor Ballot • TBD – integration of additional completed amendments (e.g. 11af)• Nov 2014 – WG/EC Final Approval• March 2015 – RevCom/SASB Approval
from slide 4/6 of 11-13/0629r0 by Dorothy Stanley (Aruba Networks)
May 2013
doc.: IEEE 802.11-13/0409r0
Report
Teleconferences
• Conference Calls 10am Eastern (2 hours) – May 31, June 7, 21 (Friday)
Adrian Stephe
ns, Intel
Corporation
Slide 41from slide 5/6 of 11-13/0629r0 by Dorothy Stanley (Aruba Networks)
May 2013
doc.: IEEE 802.11-13/0409r0
Report
Next Steps
• Continued Comment Resolution• Recirculation Letter ballot (expect July/September)
Adrian Stephe
ns, Intel
Corporation
Slide 42from slide 6/6 of 11-13/0629r0 by Dorothy Stanley (Aruba Networks)
May 2013
doc.: IEEE 802.11-13/0409r0
Report Adrian Stephe
ns, Intel
Corporation
Slide 43
TGac May 2013 Closing ReportDate: 2013-05-16
Name Affiliations Address Phone email Osama Aboul-Magd Huawei Technologies 303 Terry Fox Drive,
Kanata, ONT, K2K-3J1 613-287-1405 Osama.aboulmagd@huaw
ei.com
Authors:
from slide 1/6 of 11-13/0612r0 by Osama Aboul-Magd (Huawei Technologies)
May 2013
doc.: IEEE 802.11-13/0409r0
Report Adrian Stephe
ns, Intel
Corporation
Slide 44
Abstract
This document is the closing report for the TGac for the May 2013 session.
from slide 2/6 of 11-13/0612r0 by Osama Aboul-Magd (Huawei Technologies)
May 2013
doc.: IEEE 802.11-13/0409r0
Report
Work Completed • Started the resolutions of the first sponsor ballot
comments– Comment spreadsheet is available at:
https://mentor.ieee.org/802.11/dcn/13/11-13-0485-04-00ac-sb0-comments-d5-0.xls
– Completed the resolution of 47 technical comments. About 110 CIDs are still open
– The Editor completed the resolution of about 120 editorial comments. • The plan is to continue the comment resolution during the TG
telecons and the July ad-hoc meeting.• The agenda is available in doc 11-13/0392r4.
– https://mentor.ieee.org/802.11/dcn/13/11-13-0392-04-00ac-may-2013-tgac-meeting-agenda.ppt
Adrian Stephe
ns, Intel
Corporation
Slide 45from slide 3/6 of 11-13/0612r0 by Osama Aboul-Magd (Huawei Technologies)
May 2013
doc.: IEEE 802.11-13/0409r0
Report
Next Ad Hoc Meeting
• July 10-12 in Munich, Germany.• Thanks to Lisa Ward and Rohde-Schwarz for hosting the
meeting.• Please approve the ePoll if you plan to attend
– https://mentor.ieee.org/802.11/poll-vote?p=9200008&t=9200008
Adrian Stephe
ns, Intel
Corporation
Slide 46from slide 4/6 of 11-13/0612r0 by Osama Aboul-Magd (Huawei Technologies)
May 2013
doc.: IEEE 802.11-13/0409r0
Report Adrian Stephe
ns, Intel
Corporation
Slide 47
July 2013 Goals
• Complete the comment resolution process and start a new ballot
from slide 5/6 of 11-13/0612r0 by Osama Aboul-Magd (Huawei Technologies)
May 2013
doc.: IEEE 802.11-13/0409r0
Report Adrian Stephe
ns, Intel
Corporation
Slide 48
Conference Call Times
• Previously Approved:– May 23 - 10:00 – 12:00 ET– May 30 - 20:00 – 22:00 ET
• June 6, 20, July 25 10:00 – 12:00 ET• June 13, 27, August 1 20:00 – 22:00 ET
from slide 6/6 of 11-13/0612r0 by Osama Aboul-Magd (Huawei Technologies)
May 2013
doc.: IEEE 802.11-13/0409r0
Report Adrian Stephe
ns, Intel
Corporation
Slide 49
TGaf Waikoloa Closing Report
Date: 2013-05-17
Name Affiliations Address Phone email Rich Kennedy BlackBerry 7305 Napier Trail
Austin, TX 78729 +1-972-207-3554 rikennedy@blackberr
y.com
Peter Ecclesine Cisco 170 W. Tasman Dr., San Jose, CA, 95134
+1-408-527-0815 [email protected]
Authors:
from slide 1/8 of 11-13/0570r0 by Rich Kennedy, BlackBerry
May 2013
doc.: IEEE 802.11-13/0409r0
Report Adrian Stephe
ns, Intel
Corporation
Slide 50
AbstractThis presentation is the closing report for the 21st face-to-
face meeting of IEEE 802.11 TGaf, taking place the week of May 13th, 2013 at the IEEE 802 Wireless Interim in Waikoloa.
from slide 2/8 of 11-13/0570r0 by Rich Kennedy, BlackBerry
May 2013
doc.: IEEE 802.11-13/0409r0
Report
Plan for the Week
• Approve meeting and teleconference minutes• Regulatory update• Review the results of LB195• Review of the progress since March• Editorial review; spreadsheet 11-12/1017r42• Review and Approve all comment resolution submissions• Update the draft and comment resolution spreadsheet with
approved changes, and request a recirculation letter ballot• Prepare a PAR extension request• Plan for July meeting and teleconferences
Adrian Stephe
ns, Intel
Corporation
Slide 51from slide 3/8 of 11-13/0570r0 by Rich Kennedy, BlackBerry
May 2013
doc.: IEEE 802.11-13/0409r0
Report
TGaf Accomplishments • Reviewed the comment spreadsheet and resolved all of
the remaining comments from LB195• Requested the Editor to prepare D5.0 and then asked
WG to start a recirculation letter ballot• Prepared a PAR extension request• Planned for July meeting, and weekly teleconferences
– Tuesdays at 21:00 ET for 2 hours
Adrian Stephe
ns, Intel
Corporation
Slide 52from slide 4/8 of 11-13/0570r0 by Rich Kennedy, BlackBerry
May 2013
doc.: IEEE 802.11-13/0409r0
Report
Plan for July
• Approve Waikoloa and Teleconference minutes• Review and resolve comments from the recirculation
letter ballot on Draft 5.0• Ask the WG for a recirculation letter ballot and request
conditional approval to go to Sponsor Ballot• Request an extension of the PAR• Plan for September and Teleconferences
Adrian Stephe
ns, Intel
Corporation
Slide 53from slide 5/8 of 11-13/0570r0 by Rich Kennedy, BlackBerry
May 2013
doc.: IEEE 802.11-13/0409r0
Report Adrian Stephe
ns, Intel
Corporation
Slide 54
TGaf Timeline – Updated May 2013
• Initial Working Group Letter Ballot: January 2011• Second Working Group Letter Ballot: July 2012• Recirculation Letter Ballot: January 2013• Form Sponsor Ballot Pool: June 2013• Initial Sponsor Ballot: September 2013• Recirculate Sponsor Ballot: November 2013• Final WG/EC Approval: March 2014• RevCom/Standards Board Approval: June 2014
from slide 6/8 of 11-13/0570r0 by Rich Kennedy, BlackBerry
May 2013
doc.: IEEE 802.11-13/0409r0
Report
Teleconferences
• Weekly on Tuesdays through July 30th
– Until recirc is complete, calls will be used for regulatory updates as required
• Time: 21:00 ET for up to 2 hours
Adrian Stephe
ns, Intel
Corporation
Slide 55from slide 7/8 of 11-13/0570r0 by Rich Kennedy, BlackBerry
May 2013
doc.: IEEE 802.11-13/0409r0
Report
Motion
• Having approved comment resolutions for all of the comments received from LB195 on TGaf D4.0, as contained in document 11-12/1017r45
• Instruct the editor to prepare Draft 5.0 incorporating these resolutions and,
• Approve a 15 day Working Group Recirculation Ballot, asking the question “Should P802.11af D5.0 be forwarded to Sponsor Ballot?”
• Moved: Rich Kennedy on behalf of the task group.• Seconded: • Discussion?• Result:
• TG vote: • Moved by: Peter Ecclesine, Seconded by: Yongho Seok, Vote:7/0/0
Adrian Stephe
ns, Intel
Corporation
Slide 56from slide 8/8 of 11-13/0570r0 by Rich Kennedy, BlackBerry
May 2013
doc.: IEEE 802.11-13/0409r0
Report Adrian Stephe
ns, Intel
Corporation
Slide 57
IEEE 802.11ah Closing Report forMay 2013Date: 2013-5-16
Name Affiliations Address Phone email David Halasz Qualcomm 330-283-2715 [email protected]
Authors:
from slide 1/5 of 11-13/0613r0 by David Halasz (Qualcomm)
May 2013
doc.: IEEE 802.11-13/0409r0
Report
Activity in TGah
• Work continued on specification framework– Update to the spec framework adopted– 11-11-1137-15-00ah-specification-framework-for-tgah.docx
• Initial baseline draft text adopted– Draft text submission 13/500.
• Approved a 20 day Call for Comments on initial baseline draft text
Adrian Stephe
ns, Intel
Corporation
Slide 58from slide 2/5 of 11-13/0613r0 by David Halasz (Qualcomm)
May 2013
doc.: IEEE 802.11-13/0409r0
Report
Going forward
• Address comments received on initial draft text.• Wrap up on specification framework
Adrian Stephe
ns, Intel
Corporation
Slide 59from slide 3/5 of 11-13/0613r0 by David Halasz (Qualcomm)
May 2013
doc.: IEEE 802.11-13/0409r0
Report
Teleconference
• June 19 at 7 PM ET 1 hour– Review draft text comments categories– Request for volunteers to address comments
• July 10 at 10 AM ET 1 hour– Review unassigned comments– Comments review– Prepare for July meeting
Adrian Stephe
ns, Intel
Corporation
Slide 60from slide 4/5 of 11-13/0613r0 by David Halasz (Qualcomm)
May 2013
doc.: IEEE 802.11-13/0409r0
Report
Timeline – No change
• Current– Internal Task Group Ballot : May 2013– Initial Letter Ballot : September 2013– Initial Sponsor Ballot : March 2015– EC Approval : January 2016– Revcom Approval : March 2016
Adrian Stephe
ns, Intel
Corporation
Slide 61from slide 5/5 of 11-13/0613r0 by David Halasz (Qualcomm)
May 2013
doc.: IEEE 802.11-13/0409r0
Report
IEEE 802.11TGaiClosing Report
Date: 2013-5-17
Authors:
Name Company Address Phone email
Hiroshi MANO AlliedtelesisR&D center,K.K.
8F TOC2 Bldg. 7-21-11 Nishi-Gotanda, Shinagawa-ku, Tokyo 141-0031 JAPAN
+81-3-5719-7630 [email protected]
May 2013
Slide 62 Adrian Stephe
ns, Intel
Corporation
from slide 1/11 of 11-13/0627r0 by Hiroshi Mano (ATRD Root Lab)
May 2013
doc.: IEEE 802.11-13/0409r0
Report
AbstractThis presentation is the closing report for the Waikoloa
meeting of the IEEE 802.11 TGai.
May 2013
Slide 63 Adrian Stephe
ns, Intel
Corporation
from slide 2/11 of 11-13/0627r0 by Hiroshi Mano (ATRD Root Lab)
May 2013
doc.: IEEE 802.11-13/0409r0
Report
IEEE 802.11 FILS TGai – Waikoloa May 2013
• Goals for the Meeting:
– Approve minutes of past meeting and teleconference– Comment resolution of Task Group review of TGai
draft.– Approve Timeline– Approve Teleconference schedule– Approve Plan for July
Adrian Stephe
ns, Intel
Corporation
Slide 64from slide 3/11 of 11-13/0627r0 by Hiroshi Mano (ATRD Root Lab)
May 2013
doc.: IEEE 802.11-13/0409r0
Report
Accomplishments TGai 1/3
• Review and approve March 2013 Orland Session Minutes– March 2013 Orlando Session Minutes
• https://mentor.ieee.org/802.11/dcn/13/11-13-0388-01-00ai-march-2013-orlando-session-minutes.doc
• Review and approve March-May Teleconference Minutes – March -May Teleconference Minutes 13-0412/05
• https://mentor.ieee.org/802.11/dcn/13/11-13-0412-05-00ai-march-may-teleconference-minutes.doc
May 2013
Slide 65 Adrian Stephe
ns, Intel
Corporation
from slide 4/11 of 11-13/0627r0 by Hiroshi Mano (ATRD Root Lab)
May 2013
doc.: IEEE 802.11-13/0409r0
Report Adrian Stephens, Intel Corporation
Accomplishments TGai 2/3
• 8 regular slots were held.• 462 received comment at the beginning by CC008
– 189 + α solved– 273 – α open
• Instructed editor to prepare draft 0.6 incorporating these resolutions.
• Approved Timeline• Approved Teleconference schedule• Approved Adhoc meeting schedule• Approved Plan for July
May 2013
Slide 66from slide 5/11 of 11-13/0627r0 by Hiroshi Mano (ATRD Root Lab)
May 2013
doc.: IEEE 802.11-13/0409r0
Report
Plan for July
• Goals for the Meeting:
– Approve minutes of past meeting and teleconference– Comment resolution of Task Group review of TGai
draft.– Approve to forward the draft to WG LB.– Approve Timeline– Approve Teleconference schedule– Approve Plan for Sep
Adrian Stephe
ns, Intel
Corporation
Slide 67from slide 6/11 of 11-13/0627r0 by Hiroshi Mano (ATRD Root Lab)
May 2013
doc.: IEEE 802.11-13/0409r0
Report
Time line of TGai (No Change)
PAR Approved, Modified, or Extended 2010-12-08– WG Letter Ballots Initial / Recirc Jul 13/ Nov13– Form Sponsor Ballot Pool / Reform Mar14– MEC Done Mar 14– IEEE-SA Sponsor Ballots Initial / Recirc Jul14/ Sep14
– Final 802.11 WG Approval Nov14– Final or Conditional 802 EC Approval Nov14– RevCom & Standards Board Final or
Continuous Process Approval Feb15– ANSI Approved N/A
Adrian Stephe
ns, Intel
Corporation
Slide 68from slide 7/11 of 11-13/0627r0 by Hiroshi Mano (ATRD Root Lab)
May 2013
doc.: IEEE 802.11-13/0409r0
Report
Motion: Adhoc meeting
• Motion:• Authorize TGai to hold an ad-hoc meeting on 10th to
12th July in Berlin with the preferred venue being Fraunhofer FOKUS, for the purpose of comment resolution.
• Moved: Rob Sun• Seconded: Hitoshi Morioka• Result: 10-0-8
May 2013
Adrian Stephe
ns, Intel
Corporation
Slide 69from slide 8/11 of 11-13/0627r0 by Hiroshi Mano (ATRD Root Lab)
May 2013
doc.: IEEE 802.11-13/0409r0
Report
Teleconference Schedule • Motion:
– Approve the following schedule of weekly teleconferences. – Tuesdays 00:00ET ( 23:59.59…. on Monday) on 4th June, 18th June and 2nd July
2013 Tuesday– Duration 1Hour– Using WEB-EX that will be provided by Task Group Chair
– Moved: Lei– Sconded: Jarkko Kneckt
– 18-1-2
• Approved by unanimous consent
May 2013
Adrian Stephe
ns, Intel
Corporation
Slide 70from slide 9/11 of 11-13/0627r0 by Hiroshi Mano (ATRD Root Lab)
May 2013
doc.: IEEE 802.11-13/0409r0
Report
Reference
• March 2013 Orlando Session Minutes– https://mentor.ieee.org/802.11/dcn/13/11-13-0388-01-00ai-march-
2013-orlando-session-minutes.doc
• March -May Teleconference Minutes 13-0412/05– https://mentor.ieee.org/802.11/dcn/13/11-13-0412-05-00ai-march-
may-teleconference-minutes.doc
• Closing report (include motion slides)
May 2013
Adrian Stephe
ns, Intel
Corporation
Slide 71from slide 10/11 of 11-13/0627r0 by Hiroshi Mano (ATRD Root Lab)
May 2013
doc.: IEEE 802.11-13/0409r0
Report
Thanks to all who participated!
May 2013
Slide 72 Adrian Stephe
ns, Intel
Corporation
from slide 11/11 of 11-13/0627r0 by Hiroshi Mano (ATRD Root Lab)
May 2013
doc.: IEEE 802.11-13/0409r0
Report Adrian Stephens, Intel CorporationSlide 73
Date: 2013-04-25Authors:
IEEE 802.11aj Task Group April 2013 Closing Report
from slide 1/7 of 11-13/0441r0 by Xiaoming Peng
May 2013
doc.: IEEE 802.11-13/0409r0
Report
Abstract
This document is the closing report for IEEE 802.11aj Task Group for the April 2013 session in Beijing China.
Slide 74 Adrian Stephe
ns, Intel
Corporation
from slide 2/7 of 11-13/0441r0 by Xiaoming Peng
May 2013
doc.: IEEE 802.11-13/0409r0
Report
Work Completed (1/2)
• Reviewed TG documents1) Usage Model – 11-12/1245r4
2) Functional Requirement – 11-12/1301r3
3) Evaluation Methodology – 11-12/1382r2
4) Selection Procedure, 11-12/1359r0
5) Process Overview, 11-13/0437r0
Adrian Stephe
ns, Intel
Corporation
Slide 75from slide 3/7 of 11-13/0441r0 by Xiaoming Peng
May 2013
doc.: IEEE 802.11-13/0409r0
Report
Work Completed (2/2)
Adrian Stephe
ns, Intel
Corporation
Slide 76
• New Contributions1) 11-13/0175r1 – backward compatibility feature for 802.11aj
2) 11-12/1361r3 – channel measurement for 45GHz,
3) 11-13/0435r0 – Consideration of PHY design for 1.08GHz channel
4) 11-13-0177r2 - backhaul-usage-model-proposal
5) 11-13-0433r0 – MAC protocol to support dynamic bandwidth for IEEE 802.11aj (60GHz)
6) 11-13/440r0 - Proposed Dynamic Channel Transfer (DCT) procedure for IEEE 802.11aj (60GHz)
from slide 4/7 of 11-13/0441r0 by Xiaoming Peng
May 2013
doc.: IEEE 802.11-13/0409r0
Report
Motion
• Motion: To approve the following TGaj documents as baseline– Usage Model – 11-12/1245r4– Functional Requirement – 11-12/1301r3– Evaluation Methodology – 11-12/1382r2– Selection Procedure, 11-12/1359r0– Process Overview, 11-13/0437r0
• Moved by: Bo Sun• Seconded by: Haiming WANG• Results: Yes-17, No-0, Abstain-0
Adrian Stephe
ns, Intel
Corporation
Slide 77from slide 5/7 of 11-13/0441r0 by Xiaoming Peng
May 2013
doc.: IEEE 802.11-13/0409r0
Report
Goals for July
• Issue CFP for 60GHz frequency band– Start to plan CFP for 60GHz frequency band during Conference
call
• Plan to Call for Nomination of TG Technical Editors
• New Submissions
Adrian Stephe
ns, Intel
Corporation
Slide 78from slide 6/7 of 11-13/0441r0 by Xiaoming Peng
May 2013
doc.: IEEE 802.11-13/0409r0
Report
Conference call times
• May 23, 8pm (Eastern Time) – 1 hour– Plan for CFP for 60GHz frequency band
• June 20, 8pm (Eastern Time) – 1 hour– Plan for CFP for 60GHz frequency band
Adrian Stephe
ns, Intel
Corporation
Slide 79from slide 7/7 of 11-13/0441r0 by Xiaoming Peng
May 2013
doc.: IEEE 802.11-13/0409r0
Report Adrian Stephens, Intel CorporationSlide 80
TGak May Closing Report• Date: 2013-05-16
Authors:
Name Address Affiliations Phone Email
Donald Eastlake, 3rd Huawei
Technologies
155 Beaver Street, Milford, MA 01757 USA
+1-508-333-2270 [email protected]
from slide 1/6 of 11-13/0614r2 by Donald Eastlake, Huawei
May 2013
doc.: IEEE 802.11-13/0409r0
Report Adrian Stephens, Intel CorporationSlide 81
Abstract
• Closing Report of IEEE 802.11 Task Group AK at the
802.11 Working Group Meeting, May 2013, held at
Hilton Waikoloa, Big Island, Hawai‘i.
from slide 2/6 of 11-13/0614r2 by Donald Eastlake, Huawei
May 2013
doc.: IEEE 802.11-13/0409r0
Report Adrian Stephens, Intel CorporationSlide 82
TGak Closing Report
• Thanks to Mark Hamilton and Stephen P. Pope who served as Secretary Pro-Tem for the two TGak sessions.
• Accomplishments• Received and discussed 4 submissions (see next page)• Met jointly with ARC SC Tuesday morning.• The minutes of this TGak meeting will be in 11-13/425
and an annotated agenda is in 11-13/0404r5.
from slide 3/6 of 11-13/0614r2 by Donald Eastlake, Huawei
May 2013
doc.: IEEE 802.11-13/0409r0
Report Adrian Stephens, Intel CorporationSlide 83
TGak Closing Report
• Teleconferences• TGak voted to hold 1 hour teleconferences on
Mondays, June 3rd, June 17th, and July 1st, at 5pm Eastern US time to be joint with 802.1Qbz if mutually convenient.
from slide 4/6 of 11-13/0614r2 by Donald Eastlake, Huawei
May 2013
doc.: IEEE 802.11-13/0409r0
Report Adrian Stephens, Intel CorporationSlide 84
TGak Closing Report
• Presentations• 13/406r4, “P802.1Qbz + P802.11ak Proposed Division
of Work”, Norman Finn / Brian Hart (Cisco)• 13/526r0, “Sub-Setting”, Donald Eastlake (Huawei
Technologies)• 13/479r0, “Portal diagram with DS using bridged
network”, Mark Hamilton (Spectralink)• 13/115r4, “Considerations on AP Architectural
models”, Mark Hamilton (Spectralink)
from slide 5/6 of 11-13/0614r2 by Donald Eastlake, Huawei
May 2013
doc.: IEEE 802.11-13/0409r0
Report Adrian Stephens, Intel CorporationSlide 85
TGak Closing Report
• July Plans• Develop an architectural model for 802.11ak.• Receive and discuss technical presentations.• Consider selection of an Editor.• Joint meeting with 802.1Qbz.• Develop process and timeline for TGak.
from slide 6/6 of 11-13/0614r2 by Donald Eastlake, Huawei
May 2013
doc.: IEEE 802.11-13/0409r0
Report Adrian Stephe
ns, Intel
Corporation
Slide 86
TGaq Closing ReportDate: 2013-05-17
Name Company Address Phone email
Stephen McCann Research in Motion (RIM) UK Ltd
200 Bath Road, Slough, Berkshire, SL1 3XE, UK
+44 1753 667099 [email protected]
Authors:
from slide 1/3 of 11-13/0618r0 by Stephen McCann, RIM
May 2013
doc.: IEEE 802.11-13/0409r0
Report Adrian Stephe
ns, Intel
Corporation
Slide 87
Abstract
Closing report for TGaq (Pre-Association Discovery) for May 2013, Waikoloa, HI,
USA
from slide 2/3 of 11-13/0618r0 by Stephen McCann, RIM
May 2013
doc.: IEEE 802.11-13/0409r0
Report Adrian Stephe
ns, Intel
Corporation
Slide 88
• Initial protocol design discussion• 11-13-0426-02-00aq-tgaq-design-option-for-one-way-service-
discovery-protocol.ppt• 11-13-0429-01-00aq-design-options-for-ibss.ppt• 11-13-0501-00-00aq-service-registration-of-sta-to-an-ap.ppt
• Use case update• 11-13-0591-00-00aq-use-cases-for-tgaq.ppt
• Requirements and terminology documents• 11-13-0299-00-00aq-draft-tgaq-terminology.docx
• Press release update– 11-13-0410-01-0000-pre-association-discovery-press-release.doc
• Teleconference: 1st July 2013 10:00 ET• Plans for July 2013
– Call for technical presentations
from slide 3/3 of 11-13/0618r0 by Stephen McCann, RIM
May 2013
doc.: IEEE 802.11-13/0409r0
Report Adrian Stephe
ns, Intel
Corporation
Slide 89
HEW SG May 2013 Closing ReportDate: 2013-05-16
Name Affiliations Address Phone email Osama Aboul-Magd Huawei Technologies 303 Terry Fox Drive,
Kanata, ONT, K2K-3J1 613-287-1405 Osama.aboulmagd@huaw
ei.com
Laurent Cariou Orange
Authors:
from slide 1/6 of 11-13/0624r0 by Osama Aboul-Magd (Huawei Technologies)
May 2013
doc.: IEEE 802.11-13/0409r0
Report Adrian Stephe
ns, Intel
Corporation
Slide 90
Abstract
This document is the closing report for the HEW SG for the May 2013 session.
from slide 2/6 of 11-13/0624r0 by Osama Aboul-Magd (Huawei Technologies)
May 2013
doc.: IEEE 802.11-13/0409r0
Report
Acknowledgement
• Many Thanks to Laurnet Cariou for conduction the SG meetings during this week – WELL DONE.
Adrian Stephe
ns, Intel
Corporation
Slide 91from slide 3/6 of 11-13/0624r0 by Osama Aboul-Magd (Huawei Technologies)
May 2013
doc.: IEEE 802.11-13/0409r0
Report
Work Completed • The SG has agreed to a leadership structure and completed
the elections of a SG chair and a secretary• 24 submissions were covered during the meeting covering
areas related to:– Scenarios/use cases– Problem statement/identification– Functional requirements– Evaluation methodology (Scenarios and metrics)– Technical feasibility
• Approved a liaison letter to the WFA expressing interest in WFA input on prioritization of usage cases and requirements.
• Preliminary discussion on timeline and roadmap.• The SG agenda is available at:
– https://mentor.ieee.org/802.11/dcn/13/11-13-0400-05-0hew-hew-sg-may-2013-agenda.ppt Adrian
Stephens,
Intel Corpor
ation
Slide 92from slide 4/6 of 11-13/0624r0 by Osama Aboul-Magd (Huawei Technologies)
May 2013
doc.: IEEE 802.11-13/0409r0
Report Adrian Stephe
ns, Intel
Corporation
Slide 93
July 2013 Goals
• Continue the discussion on issues related to:– Usage Cases– Functional Requirements– Feasibility – Scope and Process
from slide 5/6 of 11-13/0624r0 by Osama Aboul-Magd (Huawei Technologies)
May 2013
doc.: IEEE 802.11-13/0409r0
Report Adrian Stephe
ns, Intel
Corporation
Slide 94
Conference Call Times
• June 5 10:00 – 12:00 ET• June 19 20:00 – 22:00 ET
from slide 6/6 of 11-13/0624r0 by Osama Aboul-Magd (Huawei Technologies)
May 2013
doc.: IEEE 802.11-13/0409r0
Report Adrian Stephe
ns, Intel
Corporation
Slide 95
Liaison Report for OmniRAN EC SGDate: 2013-05-16
Authors:
from slide 1/7 of omniRAN-13/0043r0 by Michael Montemurro, Research in Motion
May 2013
doc.: IEEE 802.11-13/0409r0
Report Adrian Stephe
ns, Intel
Corporation
Slide 96
Key Activities• Currently focused on responding to EC request for:
– Gap analysis of use cases point out relevant areas to be covered by IEEE 802 that are not covered by other SDO’s.
– Articulate scope of OmniRAN based on gap analysis.– Identify relevant IEEE 802 work items
• Approve scope document for OmniRAN• Dropped the WLAN Hotspot roaming use case for gap
analysis• Representative use cases for gap analysis include:
– SDN use case– 3GPP trusted WLAN use case– Smart Grid use case
from slide 2/7 of omniRAN-13/0043r0 by Michael Montemurro, Research in Motion
May 2013
doc.: IEEE 802.11-13/0409r0
Report
Access Network Abstraction by OmniRAN
OmniRAN provides a generic model of an access network based on IEEE 802 technologies
Access Network Terminal Core Service
Medium Medium
Data LinkPhysical
Network
Transport
Application
Data LinkPhysical
Data LinkPhysical
Data LinkPhysical
Network
Transport
Application
NetworkNetwork
Medium Medium
Data LinkPhysical
Data LinkPhysical
Data LinkPhysical
Data LinkPhysical
Core
R2
R1 R3
OmniRAN Architecture
Access NetworkTerminal
from slide 3/7 of omniRAN-13/0043r0
May 2013
doc.: IEEE 802.11-13/0409r0
Report
OmniRAN Reference Points capture the functions of an access network
• Reference Points denote the interconnections between functional entities of an access network, i.e.:– R1 between terminal and base station:
• Access link, technology specific– R2 between terminal and core network:
• User & terminal authentication, subscription & terminal management– R3 between access network and core network:
• Authorization, service management, user data connection, mobility support, accounting, location– R4 between access networks:
• Inter-access network coordination and cooperation, fast inter-technology handover– R5 between core networks to enable co-use of access networks:
• Inter-operator roaming control interface
• Reference Points build the foundation for realizing interoperability for real world access networks.
• The Reference Points capture the control information necessary to allow dynamic control of network functions by a central entity (core).
from slide 4/7 of omniRAN-13/0043r0
May 2013
doc.: IEEE 802.11-13/0409r0
Report
OmniRAN Scope
• OmniRAN provides an abstraction of access networks based on IEEE 802 technologies.
• Reference Points reflect IEEE 802 specific control information– R1 is completely covered by IEEE 802 specifications– R2 and R3 are mainly carrying control information for IEEE 802 functions– R4 enhances direct cooperation among multiple IEEE 802 access networks– R5 is present for conceptual purposes to forster the cooperation among cores.
• Attributes carried on R5 may mostly be identical to the attributes defined for R3
• OmniRAN Specification in the scope of IEEE 802 would consist of– a normative part defining control attributes and referencing the DL SAP– an informative part outlining the overall architecture– an informative part proposing the usage of particular IP protocols and the mapping
of the IEEE 802 attributes into the IP protocols.
from slide 5/7 of omniRAN-13/0043r0
May 2013
doc.: IEEE 802.11-13/0409r0
Report Adrian Stephe
ns, Intel
Corporation
Slide 100
Objectives for July• Teleconferences: June 20 at 09:00 ET– details on
OmniRAN SG website• Complete use case and gap analysis• Identify potential standardization topics for IEEE 802
from slide 6/7 of omniRAN-13/0043r0 by Michael Montemurro, Research in Motion
May 2013
doc.: IEEE 802.11-13/0409r0
Report Adrian Stephe
ns, Intel
Corporation
Slide 101
References
• OmniRAN website– http://www.ieee802.org/OmniRANsg/
• Document repository for OmniRAN:– https://mentor.ieee.org/omniran/documents
• Link to May 2013 OmniRAN Agenda:– https://mentor.ieee.org/omniran/dcn/13/omniran-13-0030-03-ecsg-may-20
13-waikoloa-agenda.pptx
• Scope Document– https://mentor.ieee.org/omniran/dcn/13/omniran-13-0032-05-0000-ieee-802-scope-
of-omniran.pptx
from slide 7/7 of omniRAN-13/0043r0 by Michael Montemurro, Research in Motion
May 2013